36C26319B0002-0001003.pdf
PDF 16 MB Posted
- Solicitation number
- 36C26319B0002
About this file
36C26319B0002 0001 Scale 636-803 Expand Specialty Care Addition Part 3 (35 pages).pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26319C0132-000.docx | DOCX document | |
| 36C26319B0002-0005001.pdf | ||
| 36C26319B0002-0005000.docx | DOCX document | |
| 36C26319B0002-0004001.pdf | ||
| 36C26319B0002-0004002.pdf | ||
| 36C26319B0002-0004000.docx | DOCX document | |
| 36C26319B0002-0003005.pdf | ||
| 36C26319B0002-0003004.pdf | ||
| 36C26319B0002-0003001.pdf | ||
| 36C26319B0002-0003006.pdf | ||
| 36C26319B0002-0003000.docx | DOCX document | |
| 36C26319B0002-0003007.pdf | ||
| 36C26319B0002-0003003.pdf | ||
| 36C26319B0002-0003002.pdf | ||
| 36C26319B0002-0003008.pdf | ||
| 36C26319B0002-0002001.pdf | ||
| 36C26319B0002-0002000.docx | DOCX document | |
| 36C26319B0002-0001001.pdf | ||
| 36C26319B0002-0001002.pdf | ||
| 36C26319B0002-0001004.pdf | ||
| 36C26319B0002-0001000.docx | DOCX document | |
| 36C26319B0002-007.docx | DOCX document | |
| 36C26319B0002-008.pdf | ||
| 36C26319B0002-009.pdf | ||
| 36C26319B0002-010.pdf | ||
| 36C26319B0002-013.pdf | ||
| 36C26319B0002-014.pdf | ||
| 36C26319B0002-011.pdf | ||
| 36C26319B0002-012.pdf | ||
| 36C26319B0002-000.docx | DOCX document |
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P-528
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V DOWN
81 1.1 2 2.8 3 4 4.5 5 6 6.2
A
B
C
D
D.7
E
E.9
F
P-528
P-528
P-528P-528
2" V
2" V
2" V
2" V
P-501
2" V DOWN
2" V
DOWN
2" V DOWN
2" V DOWN
2" V DOWN
2" V DOWN
2" V DOWN
2" V DOWN
2" V DOWN
2" V DOWN
2" V DOWN
2" V DOWN
2" V DOWN 2" V DOWN
2" V DOWN
2" V DOWN
2" V DOWN
2" V
3" V DOWN
4" SAN
DOWN
FD-C
P-101
P-101
FD-C
FD-C
FD-C
P-101
P-101
2" VENT DOWN
2" VENT DOWN
P-505
2" V DOWN
2" V
2" V
P-604
2" V
FD-CFD-C
P-528P-528
P-101P-101
3" VTR
V
4" VTR
S
4" VTR
S
3" VTR
V
3" VTR
V
4" VTR
S
4" VTR
S
3" VTR
V
3" VTR
V
4" VTR
S
4" VTR
S
3" VTR
V
4" VTR
S
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
STAFF LOUNGE
STAFF TOILET
PATIENT TOILET
BARIATRIC EXAM
EXAM
EXAM
227EXAM
EXAM
EXAM
EXAM
COPY / FORMS
STORAGE
200A
HT/WT
CORRIDOR
2C05
HSKP
IT
ELEC
COMM
STAIR
2ST01
WHEELCHAIR
STORAGE
CORRIDOR
2C04
VENDING
CONFERENCE
PUBLIC TOILET
PUBLIC TOILET
WAITING
2C02
MY HEALTHY VET
CORRIDOR
2C03
CORRIDOR
2C07
CORRIDOR
2C06
TEAM WORK
AREA
WORK ALCOVE
217A
SOILED UTILITY
217B
CLEAN SUPPLY
217C
LINEN / STORAGE
217D
MEDS ROOM
217E
WORK ALCOVE
217F
RECEPTION /
CONTROL
STAIR
2ST02
STORAGE
STAFF TOILET
ELEVATOR S-1
EL S-1
ELEVATOR S-2
EL S-2
MECHANICAL
SHAFT
PATIENT TOILET
3" VTR
V
2" V
2" SAN
1 1/2" SAN
3" V UP
1" V
1" V
2" V3" V
BASE BIDE + ALTERNATE NOTES .
A. BID ITEM 1 - CONTRACTOR SHALL PROVIDE TOOLS, MATERIALS AND LABOR NECESSARY
FOR COMPLETION OF CONSTRUCTION PROJECT #636-803 “CONSTRUCT SPECIALTY
CLINICS ADDITION” AT THE IOWA CITY VA HEALTHCARE SYSTEM, IN IOWA CITY, IOWA
AND IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS.
B. ALTERNATE 1 – ALL WORK OF BID ITEM NO. 1, LESS THE WORK TO PROVIDE AND
INSTALL CERTAIN ITEMS OR SYSTEMS, AS FOLLOWS.
1. ELIMINATE ALL THE MECHANICAL WORK SHOWN IN THE LOWER LEVEL:
DOMESTIC WATER HEATER WH-2, HYDRONIC HEATING PUMP 50-HWP-B2,
HYDRONIC HEAT EXCHANGER 50-HX-B2, DEMOLITION OF STEAM PIPING AND
ASSOCIATED NEW PIPING.
C. ALTERNATE 2 - ALL WORK OF BID ITEM 1, LESS THE WORK DELETED IN ALTERNATE 1,
AND LESS THE WORK TO PROVIDE AND INSTALL CERTAIN ITEMS OR SYSTEMS, AS
FOLLOWS.
1. ELIMINATE MEN’S TOILETS 120 AND 220, AND WOMEN’S TOILETS 121 AND 122B: AT
ROOMS 122 AND 122 LEAVE SINGLE SPACE IN EXISTING FINISHED CONDITION. AT
ROOMS 222 AND 222 PROVIDE SINGLE ROOM WITH MECHANICAL, PLUMBING, FIRE
PROTECTION AS SHOWN FOR THIS BID ITEM 1 ON THE DRAWINGS.
2. ELIMINATE FINISHES FOR EXAM 116, 118, 132, 134, & 136. LEAVE SPACES IN
EXISTING FINISHED CONDITION.
3. ELIMINATE FINISHES FOR EXAM 216, 218, 232, 234, & 236. PROVIDE SINGLE ROOM
FOR EACH GROUP OF ROOMS. INSTALL MECHANICAL, FIRE PROTECTION AS
SHOWN FOR THE BASE BID. STUB PLUMBING INTO ROOM.
000 2' 4' 8'
SCALE:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BLDG. 1
BLDG. 7
BLDG. 50
NEW
ADDITION
KEY PLAN
CBRE Heery International, Inc.
125 South Dubuque Street, Suite 500, Iowa City, IA 52240-4003
319.354.4700 AE PROJECT NO. : 14980
CONSTRUCTION DOCUMENTS
- 100% CD ISSUE
FULLY SPRINKLERED
EXPAND SPECIALTY CARE
ADDITION
VA# 636-803
BLDG 50
10/05/2018
IOWA CITY, IA
1/4" = 1'-0"
PROJECT NO.: HII-1810200
Dwg. of 118
C
H
II
P
R J \P
-H
II
-1
-V A
-S p e c C lin ic
-P h a s e
P e te r.
M c d e rm o tt c b re
.c o m
.r v t
/2 /2
:4
:4
A
M
50-P06
PLUMBING SANITARY PLAN LEVEL
DH HRO 68
1. EXISTING VTRS ON LEVEL 2 ROOF ARE TO BE DEMOLISHED.
GENERAL DEMOLITION NOTE
Revisions: Date: 11/28/2018
81 1.1 2 2.8 3 4 4.5 5 6 6.2
A
B
C
D
D.7
E
E.9
F
P-812
P-528
P-528
P-516
P-528
P-528
P-516
P-516
P-516
P-516
P-528
P-528
P-516
P-516
P-516
P-516
P-516 P-516 P-516 P-516
P-516
P-516
P-516
P-516
P-516
1/2" H & CW DOWN
1/2" H & CW DOWN
1/2" H & CW DOWN
1/2" H & CW DOWN 1/2" CW DOWN
1/2" H & CW DOWN
1/2" H & CW DOWN
1/2" H & CW DOWN
1/2" H & CW DOWN
1/2" H & CW DOWN1/2" H & CW DOWN 1/2" H & CW DOWN1/2" H & CW DOWN
1/2" H & CW DOWN
1/2" H & CW DOWN
1/2" H & CW DOWN
1/2" H & CW DOWN
1/2" H & CW DOWN
1/2" H & CW DOWN
1/2" H & CW DOWN
1/2" H & CW DOWN
P-528
P-812
W
P-101
P-101
P-101 P-101
P-505
1/2" HW & 1 1/4" CW DOWN
P-604
P-501
1/2" HW & 1 1/4" CW DOWN
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
STAFF LOUNGE
STAFF TOILET
PATIENT TOILET
BARIATRIC EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
COPY / FORMS
STORAGE
200A
HT/WT
CORRIDOR
2C05
HSKP
IT
ELEC
COMM
STAIR
2ST01
WHEELCHAIR
STORAGE
CORRIDOR
2C04
VENDING
CONFERENCE
PUBLIC TOILET
PUBLIC TOILET
WAITING
2C02
MY HEALTHY VET
CORRIDOR
2C03
CORRIDOR
2C07
CORRIDOR
2C06
TEAM WORK
AREA
WORK ALCOVE
217A
SOILED UTILITY
217B
CLEAN SUPPLY
217C
LINEN / STORAGE
217D
MEDS ROOM
217E
WORK ALCOVE
217F
ELEVATOR S-1
EL S-1
RECEPTION /
CONTROL
STAIR
2ST02
STORAGE
STAFF TOILET
ELEVATOR S-2
EL S-2
MECHANICAL
SHAFT
PATIENT TOILET
FD-C FD-C
P-528
P-101
P-101
P-528
1/2" HW & 1 1/4" CW DOWN
2" CW
1 1/2" HW
1 1/2" HW
2" CW
1 1/2" HW
2" CW
1 1/2" HW
2" CW
1 1/2" HW
2" CW
1 1/2" HW
2" CW
1 1/2" HW
2" CW
1 1/2" HW2" CW
1 1/2" HW
2" CW
1 1/4" HW 2" CW
2" CW
1 1/4" HW
2" CW1 1/4" HW
2" CW
1 1/4" HW
1 1/4" HW2" CW
1 1/4" HW
2" CW
1 1/4" HW
2" CW
2" CW
1 1/4" HW
1 1/4" HW2" CW
1 1/2" CW
1" HW2" CW
1" HW
1 1/2" CW
1" HW
1 1/2" CW
1" HW
1 1/2" CW1" HW
1 1/2" CW
1" HW
1" CW
1" HW
1" HW 1" CW
3/4" CW3/4" HW
1/2" CWR
1/2" HWR
1/2" HWR
1/2" CWR
50-P07
BASE BIDE + ALTERNATE NOTES .
A. BID ITEM 1 - CONTRACTOR SHALL PROVIDE TOOLS, MATERIALS AND LABOR NECESSARY
FOR COMPLETION OF CONSTRUCTION PROJECT #636-803 “CONSTRUCT SPECIALTY
CLINICS ADDITION” AT THE IOWA CITY VA HEALTHCARE SYSTEM, IN IOWA CITY, IOWA
AND IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS.
B. ALTERNATE 1 – ALL WORK OF BID ITEM NO. 1, LESS THE WORK TO PROVIDE AND
INSTALL CERTAIN ITEMS OR SYSTEMS, AS FOLLOWS.
1. ELIMINATE ALL THE MECHANICAL WORK SHOWN IN THE LOWER LEVEL:
DOMESTIC WATER HEATER WH-2, HYDRONIC HEATING PUMP 50-HWP-B2,
HYDRONIC HEAT EXCHANGER 50-HX-B2, DEMOLITION OF STEAM PIPING AND
ASSOCIATED NEW PIPING.
C. ALTERNATE 2 - ALL WORK OF BID ITEM 1, LESS THE WORK DELETED IN ALTERNATE 1,
AND LESS THE WORK TO PROVIDE AND INSTALL CERTAIN ITEMS OR SYSTEMS, AS
FOLLOWS.
1. ELIMINATE MEN’S TOILETS 120 AND 220, AND WOMEN’S TOILETS 121 AND 122B: AT
ROOMS 122 AND 122 LEAVE SINGLE SPACE IN EXISTING FINISHED CONDITION. AT
ROOMS 222 AND 222 PROVIDE SINGLE ROOM WITH MECHANICAL, PLUMBING, FIRE
PROTECTION AS SHOWN FOR THIS BID ITEM 1 ON THE DRAWINGS.
2. ELIMINATE FINISHES FOR EXAM 116, 118, 132, 134, & 136. LEAVE SPACES IN
EXISTING FINISHED CONDITION.
3. ELIMINATE FINISHES FOR EXAM 216, 218, 232, 234, & 236. PROVIDE SINGLE ROOM
FOR EACH GROUP OF ROOMS. INSTALL MECHANICAL, FIRE PROTECTION AS
SHOWN FOR THE BASE BID. STUB PLUMBING INTO ROOM.
1 1.1 2
2" CW
1 1/2" HW
1/2" CW
1/2" HW
DEDICATED 1" COLD
WATER LINE WITH SHUT-
OFF VALVE FOR
CHEMICAL DISPENSERS
1/2" HWR1/2" CWR
P-501
A
50-P07
1" CWR
1" HWR2" HW
2 1/2" CW
1/2" CWR
1/2" HWR
1 1/2" HW
2" CW
1/2" CWR
1/2" HWR
1 1/2" HW
2" CW
1" CWR
1" HWR
2 1/2" HW
3" CW
SHUT OFF VALVE
CAP FOR FUTURE
000 2' 4' 8'
SCALE:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BLDG. 1
BLDG. 7
BLDG. 50
NEW
ADDITION
KEY PLAN
CBRE Heery International, Inc.
125 South Dubuque Street, Suite 500, Iowa City, IA 52240-4003
319.354.4700 AE PROJECT NO. : 14980
CONSTRUCTION DOCUMENTS
- 100% CD ISSUE
FULLY SPRINKLERED
EXPAND SPECIALTY CARE
ADDITION
VA# 636-803
BLDG 50
10/05/2018
IOWA CITY, IA
1/4" = 1'-0"
PROJECT NO.: HII-1810200
Dwg. of 118
C
H
II
P
R J \P
-H
II
-1
-V A
-S p e c C lin ic
-P h a s e
P e te r.
M c d e rm o tt c b re
.c o m
.r v t
/2 /2
:4
:4
A
M
50-P07
PLUMBING DOMESTIC WATER
PLAN LEVEL 2
DH HRO 69
1/2" = 1'-0"1
PLUMBING DOMESTIC WATER LEVEL 2 HOUSEKEEPING
NOT TO SCALE
A
PLUMBING DOMESTIC WATER LEVEL 2 STACK ISOMETRIC
81 1.1 2 2.8 3 4 4.5 5 6 6.2
A
B
C
D
D.7
E
E.9
F
4" VTR
S
3" VTR
V
3" VTR
V
4" VTR
S
4" VTR
S
3" VTR
V
4" VTR
S
4" VTR
S
3" VTR
V
4" VTR
S
3" VTR
V
3" VTR
V
4" VTR
S
3" VTR
V
3" SAN CAPPED FOR FUTURE
2" V CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
4" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
4" SAN CAPPED FOR FUTURE
3" SAN CAPPED FOR FUTURE3" SAN CAPPED FOR FUTURE
4" SAN CAPPED FOR FUTURE
3" SAN CAPPED FOR FUTURE
3" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
3" SAN CAPPED FOR FUTURE
3" SAN CAPPED FOR FUTURE
2" SAN CAPPED FOR FUTURE
2" V CAPPED FOR FUTURE
2" V CAPPED FOR FUTURE
4" SAN CAPPED
FOR FUTURE
2" V CAPPED FOR FUTURE
2" V CAPPED
FOR FUTURE
2" SAN CAPPED
FOR FUTURE
2" SAN CAPPED FOR FUTURE
2" SAN BELOW SLAB
3" SAN BELOW SLAB
3" SAN BELOW SLAB
4" SAN BELOW SLAB
2" SAN BELOW SLAB
3" SAN BELOW SLAB
4" SAN BELOW SLAB
4" SAN CAPPED FOR FUTURE
3" SAN BELOW SLAB
2" SAN BELOW SLAB
2" SAN BELOW SLAB
3" SAN BELOW SLAB
3" SAN BELOW SLAB
3" SAN BELOW SLAB
3" SAN BELOW SLAB
4" SAN BELOW SLAB
2" SAN BELOW SLAB
3" SAN BELOW SLAB
3" SAN BELOW SLAB
3" SAN BELOW SLAB
3" SAN BELOW SLAB
3" SAN BELOW SLAB
3" SAN BELOW SLAB
3" SAN BELOW SLAB
3" SAN BELOW SLAB
2" SAN BELOW SLAB
2" SAN BELOW SLAB
3" SAN BELOW SLAB
3" SAN BELOW SLAB
2" SAN BELOW SLAB
BASE BIDE + ALTERNATE NOTES .
A. BID ITEM 1 - CONTRACTOR SHALL PROVIDE TOOLS, MATERIALS AND LABOR NECESSARY
FOR COMPLETION OF CONSTRUCTION PROJECT #636-803 “CONSTRUCT SPECIALTY
CLINICS ADDITION” AT THE IOWA CITY VA HEALTHCARE SYSTEM, IN IOWA CITY, IOWA
AND IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS.
B. ALTERNATE 1 – ALL WORK OF BID ITEM NO. 1, LESS THE WORK TO PROVIDE AND
INSTALL CERTAIN ITEMS OR SYSTEMS, AS FOLLOWS.
1. ELIMINATE ALL THE MECHANICAL WORK SHOWN IN THE LOWER LEVEL:
DOMESTIC WATER HEATER WH-2, HYDRONIC HEATING PUMP 50-HWP-B2,
HYDRONIC HEAT EXCHANGER 50-HX-B2, DEMOLITION OF STEAM PIPING AND
ASSOCIATED NEW PIPING.
C. ALTERNATE 2 - ALL WORK OF BID ITEM 1, LESS THE WORK DELETED IN ALTERNATE 1,
AND LESS THE WORK TO PROVIDE AND INSTALL CERTAIN ITEMS OR SYSTEMS, AS
FOLLOWS.
1. ELIMINATE MEN’S TOILETS 120 AND 220, AND WOMEN’S TOILETS 121 AND 122B: AT
ROOMS 122 AND 122 LEAVE SINGLE SPACE IN EXISTING FINISHED CONDITION. AT
ROOMS 222 AND 222 PROVIDE SINGLE ROOM WITH MECHANICAL, PLUMBING, FIRE
PROTECTION AS SHOWN FOR THIS BID ITEM 1 ON THE DRAWINGS.
2. ELIMINATE FINISHES FOR EXAM 116, 118, 132, 134, & 136. LEAVE SPACES IN
EXISTING FINISHED CONDITION.
3. ELIMINATE FINISHES FOR EXAM 216, 218, 232, 234, & 236. PROVIDE SINGLE ROOM
FOR EACH GROUP OF ROOMS. INSTALL MECHANICAL, FIRE PROTECTION AS
SHOWN FOR THE BASE BID. STUB PLUMBING INTO ROOM.
000 4' 8' 16'
SCALE:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BLDG. 1
BLDG. 7
BLDG. 50
NEW
ADDITION
KEY PLAN
CBRE Heery International, Inc.
125 South Dubuque Street, Suite 500, Iowa City, IA 52240-4003
319.354.4700 AE PROJECT NO. : 14980
CONSTRUCTION DOCUMENTS
- 100% CD ISSUE
FULLY SPRINKLERED
EXPAND SPECIALTY CARE
ADDITION
VA# 636-803
BLDG 50
10/05/2018
IOWA CITY, IA
1/8" = 1'-0"
PROJECT NO.: HII-1810200
Dwg. of 118
C
H
II
P
R J \P
-H
II
-1
-V A
-S p e c C lin ic
-P h a s e
P e te r.
M c d e rm o tt c b re
.c o m
.r v t
/2 /2
:4
:5
A
M
50-P08
PLUMBING PLAN LEVEL 3 ROOF
DH HRO 70
1. PIPING SHOWN ON THIS PLAN IS TO BE INSTALLED ABOVE
LEVEL 2 CEILING AND BELOW LEVEL 3 SLAB FOR FUTURE
LEVEL 3 CONSTRUCTION.
2. STUB OUT SANITARY AND VENT PLUMBING AS NOTED
THROUGH ROOF SLAB 6" AND FOR FUTURE CONNECTION.
INSTALL ROOFING MATERIAL OVER CAPPED FOR FUTURE
CONNECTIONS.
3. INSTALL ALL CAPPED FOR FUTURE CONNECTION
BRANCHES DISCONNECTED FROM MAIN SAINTARY AND
VENT STACKS. PROVIDE AND INSTALL ALL FITTINGS FOR
BRANCH LINES. CAP ALL OPEN FITTINGS AND PIPES.
GENERAL NOTES
P-516
P-516
P-516
P-516
P-516
P-516
P-516
P-528
P-516
P-516
P-516
P-516
P-516
P-516
P-516
P-516
4" VTR
S
3" VTR
V
4" VTR
S
P-516
2" SAN
2" V
2" V
2" V
2" V
2" SAN
2" SAN
3" SAN
2" V
3" V
4" SAN
3" V
2" V
2" V
2" SAN
2" V
2" V
3" SAN
3" V
2" SAN
2" V
2" V
3" SAN
2" V
2" V
2" V
2" SAN
2" V
2" SAN
2" V
2" V
3" V
2" V
2" V
3" V
2" V
2" V
2" V
2" V
4" SAN
3" V
2" V
2" V
2" V
2" SAN
2" V
2" V
4" VTR
S
P-528
P-528
2" V
3" SAN
2" V
2" V
2" SAN
2" V
2" V
2" V
2" V
2" V
3" SAN
2" V
2" SAN
2" V
2" V
2" V
3" SAN
2" V
3" V 2" SAN
2" V
4" SAN 2" SAN
4" SAN
3" V
2" SAN
P-528
P-528
3" SAN
P-516
FCO
2" SAN
2" V
3" SAN
3" SAN
2" SAN
2" V
2" V
P-501
2" SAN
2" V
P-528
2" V
2" V
WCO
WCO
4" SAN
3" VTR
V
4" VTR
S
3" VTR
V
3" VTR
V
4" VTR
S
4" VTR
S
3" VTR
V
4" SAN
6" SAN
3" SAN
3" SAN
3" SAN
3" SAN
3" SAN
3" SAN
2" SAN
3" SAN
3" SAN
GCO
6" SAN
6" SAN
2" SAN
6" SAN
WCO
WCO
WCO
4" SAN
4" SAN
3" SAN
2" SAN
3" V
3" SAN
3" SAN
FD-E
4" SAN
FCO
P-101 P-101
P-101
P-101
2" V
4" SAN
4" SAN
FD-E
FCO
4" SAN
3" SAN
2" V
2" V
FD-E
4" SAN
2" V
FD-E
2" V
2" V
3" SAN
2" V
2" V
2" SAN
2" V
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
FD-E
FD-C
FD-C
FD-C
FD-C
FD-C
FD-C
2" V
2" V
3" SAN
2" V
2" V
FD-C
FD-C
FCO
3" SAN
3" SAN
2" V
WCO
3" VTR
V
GCO
4" SAN
4" SAN
2" V 2" V
P-528
3" V
4" SAN
2" SAN
2" V
3" SAN
3" SAN
4" SAN
P-505
4" SAN
2" V
4" SAN
2" V
2" V
2" V
2" SAN
2" V
4" SAN
4" SAN
CO
CO
4" SAN4" SAN
3" SAN
3" SAN
2" V
2" V
2" SAN
4" SAN
3" SAN
2" SAN
P-604
2" V
3" SAN
2" SAN
FD-E
FCO
FCO
FCO
CO
CO
CO
CO
CO
CO
WCO
2" V
2" V
AT BOTTOM OF
ELEVATOR
SUMP PIT
FCO
2" V
4" SAN
2" V
FD-E
SEE CIVIL DRAWINGS
FOR CONTINUATION
2" FM
BALL VALVE (TYP)
CHECK VALVE (TYP)
FD-E
4" SAN
4" SAN
FD-E
4" SAN
2" V
4" VTR
S
3" VTR
V
1" V
3" V 2" V
1" V
1" V
2" V 3" V
3" V
2" V 1" V
P-528
4" SAN
P-101
P-101
P-528
P-528
P-101
P-101
P-528
P-516
P-516
2" V
2" V
2" V
4" SAN
2" V
2" SAN
3" V
3" V
3" V
3" V
BASE BIDE + ALTERNATE NOTES .
A. BID ITEM 1 - CONTRACTOR SHALL PROVIDE TOOLS, MATERIALS AND LABOR NECESSARY
FOR COMPLETION OF CONSTRUCTION PROJECT #636-803 “CONSTRUCT SPECIALTY
CLINICS ADDITION” AT THE IOWA CITY VA HEALTHCARE SYSTEM, IN IOWA CITY, IOWA
AND IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS.
B. ALTERNATE 1 – ALL WORK OF BID ITEM NO. 1, LESS THE WORK TO PROVIDE AND
INSTALL CERTAIN ITEMS OR SYSTEMS, AS FOLLOWS.
1. ELIMINATE ALL THE MECHANICAL WORK SHOWN IN THE LOWER LEVEL:
DOMESTIC WATER HEATER WH-2, HYDRONIC HEATING PUMP 50-HWP-B2,
HYDRONIC HEAT EXCHANGER 50-HX-B2, DEMOLITION OF STEAM PIPING AND
ASSOCIATED NEW PIPING.
C. ALTERNATE 2 - ALL WORK OF BID ITEM 1, LESS THE WORK DELETED IN ALTERNATE 1,
AND LESS THE WORK TO PROVIDE AND INSTALL CERTAIN ITEMS OR SYSTEMS, AS
FOLLOWS.
1. ELIMINATE MEN’S TOILETS 120 AND 220, AND WOMEN’S TOILETS 121 AND 122B: AT
ROOMS 122 AND 122 LEAVE SINGLE SPACE IN EXISTING FINISHED CONDITION. AT
ROOMS 222 AND 222 PROVIDE SINGLE ROOM WITH MECHANICAL, PLUMBING, FIRE
PROTECTION AS SHOWN FOR THIS BID ITEM 1 ON THE DRAWINGS.
2. ELIMINATE FINISHES FOR EXAM 116, 118, 132, 134, & 136. LEAVE SPACES IN
EXISTING FINISHED CONDITION.
3. ELIMINATE FINISHES FOR EXAM 216, 218, 232, 234, & 236. PROVIDE SINGLE ROOM
FOR EACH GROUP OF ROOMS. INSTALL MECHANICAL, FIRE PROTECTION AS
SHOWN FOR THE BASE BID. STUB PLUMBING INTO ROOM.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BLDG. 1
BLDG. 7
BLDG. 50
NEW
ADDITION
KEY PLAN
CBRE Heery International, Inc.
125 South Dubuque Street, Suite 500, Iowa City, IA 52240-4003
319.354.4700 AE PROJECT NO. : 14980
CONSTRUCTION DOCUMENTS
- 100% CD ISSUE
FULLY SPRINKLERED
EXPAND SPECIALTY CARE
ADDITION
VA# 636-803
BLDG 50
10/05/2018
IOWA CITY, IA
PROJECT NO.: HII-1810200
Dwg. of 118
C
H
II
P
R J \P
-H
II
-1
-V A
-S p e c C lin ic
-P h a s e
P e te r.
M c d e rm o tt c b re
.c o m
.r v t
/2 /2
:4
:5
A
M
50-P09
PLUMBING SANITARY SEWER
RISER DIAGRAM
DH HRO 71Revisions: Date: 11/28/2018
4" VTR
S
3" VTR
V
4" VTR
S
4" VTR
S
3" VTR
V
4" VTR
S
3" VTR
V
3" VTR
V
4" VTR
S
4" VTR
S
3" VTR
V
WCO
3" VTR
V
4" VTR
S
3" VTR
V
3" SAN
3" SAN
2" SAN
2" SAN
2" SAN
4" SAN
4" SAN
2" SAN
2" SAN
3" SAN
3" SAN
2" SAN
2" SAN
3" SAN
2" SAN
2" SAN
3" SAN
3" SAN
3" SAN
2" SAN
2" SAN
3" SAN
2" SAN
3" SAN
3" SAN
3" SAN
2" V
3" SAN
2" SAN
3" SAN
3" SAN
3" SAN
2" V
2" V
3" SAN
3" SAN
2" SAN
2" SAN
3" SAN
3" SAN
2" SAN
3" SAN
3" SAN
2" SAN
4" SAN
3" SAN
2" SAN
2" SAN
2" V
2" SAN
3" SAN
2" SAN
2" SAN
4" SAN
2" V
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BLDG. 1
BLDG. 7
BLDG. 50
NEW
ADDITION
KEY PLAN
CBRE Heery International, Inc.
125 South Dubuque Street, Suite 500, Iowa City, IA 52240-4003
319.354.4700 AE PROJECT NO. : 14980
CONSTRUCTION DOCUMENTS
- 100% CD ISSUE
FULLY SPRINKLERED
EXPAND SPECIALTY CARE
ADDITION
VA# 636-803
BLDG 50
10/05/2018
IOWA CITY, IA
PROJECT NO.: HII-1810200
Dwg. of 118
C
H
II
P
R J \P
-H
II
-1
-V A
-S p e c C lin ic
-P h a s e
P e te r.
M c d e rm o tt c b re
.c o m
.r v t
/2 /2
:5
:0
A
M
50-P10
PLUMBING SANITARY SEWER
RISER DIAGRAM FUTURE LEVEL 3
DH HRO 72Revisions: Date: 11/28/2018
P-516
P-812
P-516
P-516
P-516
P-516
P-516
P-516
P-528
P-516
P-516
P-516
P-528
P-516
P-516
P-516
P-516
2 1/2" CW
2" HW
P-516
P-528
P-528
P-528 P-528
1/2" HW
1/2" CW
P-5012" HW
P-516
1" HWR
1/2" HW
1/2" CW
P-812
P-528
1/2" HW
1/2" CW
P-101
P-101
P-101
P-101
1/2" CW
1/2" CW
1/2" CW
DU-1
1/2" CW
1/2" CW
1" CWR
1 1/4" CW
3/4" HW
P-505
P-604
SA
SA
1/2" TRAP PRIMER LINE
RPZ-2
2" CW
1 1/2" HW
1/2" CW
1/2" HW
P-528P-101
P-101
P-528
P-528
P-101
P-101 P-528
50-WH-2
50-WH-1
ET-1
P-516
P-516
P-516
P-516
P-516
1/2" CW1/2" HW
1/2" CW
1/2" HW
1/2" CW
1/2" HW
1" CW
1" HW
1" CW
1" HW
2" CW
1 1/2" HW
2" CW
1 1/2" HW
1/2" CW
1/2" HW
1/2" CWR
1/2" HWR
1/2" CWR
1/2" HWR
1 1/2" CW
1" HW
1" CW
1" HW
1/2" CW
1/2" HW
1" CW
1" CW
1/2" HW
1/2" CW
1 1/4" CW
1" CW
1/2" CW
1/2" HW
1/2" CW
1/2" HW
1/2" CW
1/2" HW
1/2" CW
1/2" CW
1/2" CW
1/2" CW
1/2" HW
2" CW
1 1/2" HW
2" CW
1 1/4" HW
2" CW
1 1/4" HW
1 1/4" HW
2" CW
2" CW
1 1/4" HW
2" CW
1 1/4" HW
2" CW
1 1/4" HW
1/2" CW
1/2" HW
2" CW
1 1/4" HW
2" CW
1 1/4" HW
1 1/2" CW
1" HW
1/2" CW
1/2" HW
1/2" CW
1/2" HW
1/2" H & CW1 1/4" CW
1" CW
1/2" H & CW
1/2" CW
1/2" HW
1 1/2" CW
1" HW
1/2" CW
1/2" HW
1" HW
2" CW
1/2" CW
1/2" HW
1 1/2" CW
1" HW
1/2" CW
1/2" HW
1" CW
1" HW
P-812
P-812
P-528
1/2" CW
1/2" CW
1/2" CW
1/2" HW
P-101
P-101
P-528
P-528
FD-E
P-604
P-101
P-101
P-528
P-528
P-516
P-528
P-505
P-528
P-516P-501
TP-1
P-801
TP-1
P-516
P-516
P-516
P-516
P-516
TP-1
P-516
P-516
P-516
P-516
1/2" HW
1/2" CW
1/2" HW
1/2" CW
1/2" HW
1/2" CW
1 1/2" HW
2" CW
1/2" CW
1/2" HW
1/2" HW
1/2" CW
1/2" HW
1/2" CW
1/2" HW
1/2" CW
1/2" HW
1/2" CW
1" CW
1" CW
1/2" HW
1/2" CW
1/2" CW
1/2" HW
1/2" CW
1/2" HW
1/2" CW
1/2" HW
1/2" CW
1/2" HW
3/4" HW
1 1/2" CW
1" CW
3/4" HW
1" CW
3/4" HW
2" CW
1 1/2" HW
2" CW
1 1/2" HW
1 1/2" HW
2" CW
2" CW
1 1/2" HW
1 1/4" HW
2" CW
1/2" CW
1/2" HW
SA
1 1/4"
1/2" CW
1/2" HW
BASE BIDE + ALTERNATE NOTES .
A. BID ITEM 1 - CONTRACTOR SHALL PROVIDE TOOLS, MATERIALS AND LABOR NECESSARY
FOR COMPLETION OF CONSTRUCTION PROJECT #636-803 “CONSTRUCT SPECIALTY
CLINICS ADDITION” AT THE IOWA CITY VA HEALTHCARE SYSTEM, IN IOWA CITY, IOWA
AND IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS.
B. ALTERNATE 1 – ALL WORK OF BID ITEM NO. 1, LESS THE WORK TO PROVIDE AND
INSTALL CERTAIN ITEMS OR SYSTEMS, AS FOLLOWS.
1. ELIMINATE ALL THE MECHANICAL WORK SHOWN IN THE LOWER LEVEL:
DOMESTIC WATER HEATER WH-2, HYDRONIC HEATING PUMP 50-HWP-B2,
HYDRONIC HEAT EXCHANGER 50-HX-B2, DEMOLITION OF STEAM PIPING AND
ASSOCIATED NEW PIPING.
C. ALTERNATE 2 - ALL WORK OF BID ITEM 1, LESS THE WORK DELETED IN ALTERNATE 1,
AND LESS THE WORK TO PROVIDE AND INSTALL CERTAIN ITEMS OR SYSTEMS, AS
FOLLOWS.
1. ELIMINATE MEN’S TOILETS 120 AND 220, AND WOMEN’S TOILETS 121 AND 122B: AT
ROOMS 122 AND 122 LEAVE SINGLE SPACE IN EXISTING FINISHED CONDITION. AT
ROOMS 222 AND 222 PROVIDE SINGLE ROOM WITH MECHANICAL, PLUMBING, FIRE
PROTECTION AS SHOWN FOR THIS BID ITEM 1 ON THE DRAWINGS.
2. ELIMINATE FINISHES FOR EXAM 116, 118, 132, 134, & 136. LEAVE SPACES IN
EXISTING FINISHED CONDITION.
3. ELIMINATE FINISHES FOR EXAM 216, 218, 232, 234, & 236. PROVIDE SINGLE ROOM
FOR EACH GROUP OF ROOMS. INSTALL MECHANICAL, FIRE PROTECTION AS
SHOWN FOR THE BASE BID. STUB PLUMBING INTO ROOM.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BLDG. 1
BLDG. 7
BLDG. 50
NEW
ADDITION
KEY PLAN
CBRE Heery International, Inc.
125 South Dubuque Street, Suite 500, Iowa City, IA 52240-4003
319.354.4700 AE PROJECT NO. : 14980
CONSTRUCTION DOCUMENTS
- 100% CD ISSUE
FULLY SPRINKLERED
EXPAND SPECIALTY CARE
ADDITION
VA# 636-803
BLDG 50
10/05/2018
IOWA CITY, IA
PROJECT NO.: HII-1810200
Dwg. of 118
C
H
II
P
R J \P
-H
II
-1
-V A
-S p e c C lin ic
-P h a s e
P e te r.
M c d e rm o tt c b re
.c o m
.r v t
/2 /2
:5
:0
A
M
50-P11
PLUMBING DOMESTIC WATER
RISER DIAGRAM
DH HRO 73
NOT TO SCALE
DOMESTIC WATER RISER DIAGRAM
W
SEE SHEET 50-P14 FOR CIRCULATION SYSTEM SCHEMATIC DETAILS
1/2" H & CW
1" CW
3/4" HW
1 1/2" CW
3/4" HW
1/2" HW
1/2" CW
1" CW
1" CW
1/2" HW
1/2" CW
1 1/2" CW
3/4" HW
1 1/2" CW
1" HW
1 1/2" CW
1" HW
2" CW
1" HW
1 1/4" CW
1/2" CW
1/2" HW
1/2" HW
1/2" CW
1 1/4" CW
2" CW
1 1/4" HW
2" CW
1 1/4" HW
2" CW
1 1/4" HW
2" CW
1 1/2" HW
1/2" CW
1/2" HW
1/2" CW
1/2" HW
1/2" CW
1/2" HW
2" CW
1 1/2" HW
2" CW
1 1/2" HW
2" CW
1 1/2" HW
2" CW
1 1/2" HW
2" CW
1 1/2" HW
2" CW
1 1/2" HW
2" CW
1 1/2" HW
3/4" CWR
3/4" HWR
1/2" HW
1/2" CW
1/2" HW
1/2" CW
1/2" CW
1/2" CW
1/2" HW
1/2" CW
1/2" HW
1/2" CW
1/2" HW
1/2" CW
1/2" HW
1/2" CW
1/2" HW
1/2" CW
1/2" CW
1/2" HW
1/2" CW
1/2" HW
1/2" CW
1/2" HW1/2" CW
1/2" HW
1/2" CW
1/2" HW
P-528
P-101
P-101 P-528
P-516
P-516
P-516
P-501
P-516
P-516
P-516
P-516
P-528
P-505
P-528
P-516
P-516
P-516
P-516
P-812
P-812
P-528
P-101
P-101
P-528
P-528 P-604
P-101
P-101
P-528
P-528
P-516
P-516
P-516
P-516
P-516
P-516
P-516
1/2" HW
1/2" CW
1/2" CW
1/2" HW
1 1/2" HW
2" CW
1/2" CW
1/2" CW
SEE NOTE
ON SHEET 50-P05
P-516
P-516
P-516
P-812
P-516
P-516
P-516
P-516
P-516
P-516
P-528
P-516
P-516
P-516
P-528
P-516
P-516
P-516
P-516
P-516
P-528
P-528
P-528 P-528
1/2" HW1/2" CW
P-501
P-516
1/2" HW
1/2" CW
P-812
P-528
1/2" HW
1/2" CW
P-101
P-101
P-101
P-101
1/2" CW
1 1/4" CW
3/4" HW
P-505
P-604
SA
SA
2" CW
1 1/2" HW
1/2" HW
P-528
P-101
P-101 P-528
1" CW
1" HW
1" CW
1" HW
2" CW
1 1/2" HW
2" CW
1 1/2" HW
1/2" CW
1/2" HW
1/2" CWR
1/2" HWR
1/2" CWR
1/2" HWR
1 1/2" CW
1" HW
1" CW
1" HW
1/2" CW
1/2" HW
1" CW
1" CW
1/2" HW
1/2" CW
1 1/4" CW
1" CW
1/2" CW
1/2" HW
1/2" CW
1/2" HW
1/2" CW
1/2" HW
1/2" CW
1/2" CW
1/2" CW
1/2" CW
1/2" HW
2" CW
1 1/2" HW
2" CW
1 1/4" HW2" CW
1 1/4" HW
1 1/4" HW
2" CW
2" CW
1 1/4" HW
2" CW
1 1/4" HW
2" CW
1 1/4" HW
1/2" CW
1/2" HW
2" CW
1 1/4" HW
2" CW
1 1/4" HW
1 1/2" CW
1" HW
1/2" CW
1/2" HW
1/2" CW
1/2" HW
1/2" H & CW1 1/4" CW
1" CW
1/2" H & CW
1/2" CW
1/2" HW
1 1/2" CW
1" HW
1/2" CW
1/2" HW
1" HW
2" CW
1/2" CW
1/2" HW
1 1/2" CW
1" HW
1/2" CW
1/2" HW
1" CW
1" HW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BLDG. 1
BLDG. 7
BLDG. 50
NEW
ADDITION
KEY PLAN
CBRE Heery International, Inc.
125 South Dubuque Street, Suite 500, Iowa City, IA 52240-4003
319.354.4700 AE PROJECT NO. : 14980
CONSTRUCTION DOCUMENTS
- 100% CD ISSUE
FULLY SPRINKLERED
EXPAND SPECIALTY CARE
ADDITION
VA# 636-803
BLDG 50
10/05/2018
IOWA CITY, IA
PROJECT NO.: HII-1810200
Dwg. of 118
C
H
II
P
R J \P
-H
II
-1
-V A
-S p e c C lin ic
-P h a s e
P e te r.
M c d e rm o tt c b re
.c o m
.r v t
/2 /2
:5
:1
A
M
50-P12
PLUMBING DOMESTIC WATER
RISER DIAGRAM LEVELS 1 AND 2
DH HRO 74
NOT TO SCALE
DOMESTIC WATER RISER DIAGRAM LEVEL 1
NOT TO SCALE
DOMESTIC WATER RISER DIAGRAM LEVEL 2
BALL VALVE
1" DRAIN VALVE
CHECK VALVE
BALANCING VALVE
CWR = 1.25 GPM
HWR = 1.87 GPM
BALL VALVE
THERMOMETER
TEMPERTURE SENSOR
T
THERMOMETER
PRESSURE GAUGE
BALL VALVE
TEMPERTURE SENSOR
1" DRAIN VALVE
T
ROOF
LOWER LEVEL
LEVEL 1
LEVEL 2
LOWER LEVEL
ROOF
LEVEL 2
LEVEL 1
C W
C W
C W
R C
W R
C W
R
H W
H W
H W
R
H W
R
H W
R s
3" CW
1" HWR
1" CWR
2 1/2" HW
WH-1WH-2
RPZ-1
3" INCOMING
WATER SERVICE
3" CW
1" HWR
COLD WATER RECIRCULATION PUMP
HOT WATER RECIRCULATION PUMP
HOT & COLD WATER BRANCH LINE
1" CWR
3" CW
2 1/2" HW
FUTURE BOOSTER
PUMP CONNECTION
HOT & COLD WATER RECIRCULATION LINE
3" CW
1" HWR
1" CWR
2 1/2" HW
C W
1" CWR, 1" HWR, 2" HW, 2 1/2" CW
CAP FOR FUTURE
HWR
CW
HW
CW
C W
CW
HW
CWR
HWR
C W
HW
HWR
CWR
CW
HW
HOT & COLD WATER BRANCH LINE
SEE DETAIL 3 FOR ADDITIONAL INFORMATION
HOT & COLD WATER RECIRCULATION LINE
SEE DETAIL 2 FOR ADDITIONAL INFORMATION
HWR
CWR
CW
HW
CW
H W
R
H W
MPRESSURE GAUGE
THERMOMETER
TEMPERATURE SENSOR
CHECK VALVE
BALANCING VALVE
STRAINER
SOLENOID VALVE
S
RECIRCULATION PUMP
WATER METER
DIRECTION OF FLOW
BACKFLOW PREVENTER
CW COLD WATER
HW HOT WATER
CWR COLD WATER RETURN
HWR HOT WATER RETURN
LEGEND
DOMESTIC WATER TEMPERATURE MONITORING
CONTROLS DEVICES AND PROGRAMMING BY CONTROLS CONTRACTOR
THE HOT WATER TEMPERATURE SHALL BE SET TO 140 F
DOMESTIC WATER TEMPERATURE MONITORING:
INSTALL TEMPERATURE SENSORS AT EACH FLOOR.
INSTALL TEMPERATURE SENSORS AT EACH DOMESTIC WATER HEATER
ALARMS, INTERLOCKS AND SAFETIES:
SEND AN ALARM TO FMCS UPON THE OCCURRENCE OF ANY OF THE FOLLOWING CONDITIONS
IF ANY DOMESTIC HOT WATER DEVIATES 5 F (ADJUSTABLE) ABOVE OR BELOW SETPOINT FOR MORE THAN 10 MINUTES (ADJUSTABLE)
IF ANY DOMESTIC HOT WATER RECIRCULATION IS BELOW 130 F (ADJUSTABLE) FOR MORE THAN 10 MINUTES (ADJUSTABLE)
IF ANY DOMESTIC COLD WATER RECIRCULATION IS ABOVE 65 F (ADJUSTABLE) FOR MORE THAN 10 MINUTES (ADJUSTABLE) SOLENIOD VALVE #1 WILL CLOSE AND SOLENIOD #2 WILL OPEN. WHEN DOMESTIC COLD WATER TEMPERATURE DROPS BELOW 65 F (ADJUSTABLE) SOLENIOD VALVE #1 WILL OPEN AND SOLENIOD #2 WILL CLOSE WITH ALARM TO BE RESET RETURNING RECIRCULATION SYSTEM TO NORMAL
OPERATION
IF ANY DOMESTIC COLD WATER IS ABOVE 65 F (ADJUSTABLE) FOR MORE THAN 10 MINUTES (ADJUSTABLE)
REPORT GENERATION:
FMCS SHALL MONITOR THE FOLLOWING POINTS ON 5 MINUTE (ADJUSTABLE) INTERVALS WITH A SINGLE TREND. THE TREND SHALL RUN FOR 14 DAY (ADJUSTABLE DURATION AT WHICH POINT THE NEWEST VALUES SHALL OVERWRITE THE OLDEST VALUES
DATE
TIME
STATUS OF CIRCULATION PUMP (OFF/ON)
DOMESTIC HOT WATER TEMPERATURE (F)
DOMESTIC HOT WATER CIRCULATION TEMPERATURE (F)
DOMESTIC COLD WATER TEMPERATURE (F)
DOMESTIC COLD WATER CIRCULATION TEMPERATURE (F)
THIS INFORMATION SHALL BE ACCESSIBLE TO VIEW IN EITHER TABULAR OR GRAPHICAL FORM ON THE FMCS OPERATOR INTERFACE
CONTROL SYMBOLS LEGEND
CS CURRENT SWITCH
AI ANALOG INPUT
DI DIGITAL INPUT
T TEMPERATURE SENSOR
GENERAL NOTES:GENERAL:
1. TIE ALL POINTS INTO THE EXISTING FACILITY MANAGEMENT
SYSTEM (FMCS)
2. EACH POINT SHOWN FOR ALL CONTROLS DIAGRAMS SHALL BE
DISCRETE FROM ALL OTHER POINTS EXCEPT AS SPECIFICALLY
NOTED
3. ALL WIRING, CONTROL COMPONENTS DEVICES AND PROGRAMING
ON THESE CONTROL DRAWINGS SHALL BE PROVIDED BY THE
TEMPERATURE CONTROL CONTRACTOR UNLESS SPECIFICALLY
NOTED OTHERWISE.
4. ALL ACTUATORS SHALL BE ELECTRICAL TYPE FOR THIS PROJECT
(NO PNEUMATIC ACTUATORS ALLOWED)
5. ALL CONTROL COMPONENTS SUCH AS RELAYS, SWITCHES, DDC
CONTROLLERS, ETC. SHALL BE MOUNTED IN STEEL ENCLOSURES
WITH STEEL MOUNTING BACKPLATES PER SPECIFICATION 23 09 23
6. EACH CONTROL PANEL SHALL HAVE A LAMINATED COPY OF
APPLICABLE SEQUENCE OF OPERATION AND CONTROL INDICATING
THE POINTS, COMPONENTS AND OPERATION OF EQUIPMENT
ASSOCIATED WITH PANEL. REFER TO SPECIFICATION 23 09 23 FOR
ADDITIONAL REQUIREMENTS
7. CONTROL DIAGRAMS ARE SCHEMATIC IN NATURE AND DO NOT
SHOW ALL REQUIRED CONTROL DEVICES AND COMPONENTS.
REFER TO FLOOR PLANS, PIPING DIAGRAMS, DETAILS AND
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
1/2 in. 15 ft 107 ft 42 ft 107 ft 7 ft 7 ft 15 ft
3/4 in. 7 ft 53 ft 20 ft 53 ft 3 ft 3 ft 7 ft
1 in. 4 ft 30 ft 11 ft 30 ft 2 ft 2 ft 4 ft
1 1/4 in. 2 ft 19 ft 7 ft 19 ft 1 ft 1 ft 2 ft
1 1/2 in. 1 ft 13 ft 5 ft 13 ft 0 ft 0 ft 1 ft
2 in. 1 ft 7 ft 3 ft 7 ft 0 ft 0 ft 1 ft
24 oz 164 oz 64 oz 164 oz 12 oz 12 oz 24 oz
PIPE DAIMETER MAXIMUM FIXTURE RUN-OUT LENGTH
2 1/2 in. 0 ft 5 ft 1 ft 5 ft 0 ft 0 ft 0 ft
3 in. 0 ft 3 ft 1 ft 3 ft 0 ft 0 ft 0 ft
VA PLUMBING DESIGN CRITERIA FOR LEGIONELLA
COLD WATER HOT WATER
SINKS,
LAVATORIES, AND
SHOWERS
WATER CLOSETS
(1.28 gpf)
URINALS
(0.5 gpf)
BATHROOM
GROUP*
ICE MACHINES
PUBLIC
LAVATORIES
OTHER LAVATORY
FAUCETS
NOTES:
1. FOR FIXTURE RUN-OUTS, PIPE LENGTH SHALL BE AS SHORT
AS POSSIBLE TO SUPPLY THE FIXTURE OR EQUIPMENT.
2. THE MAXIMUM ALLOWABLE FIXTURE RUN-OUT LENGTH OF
THE PIPE SHALL BE DETERMINED BASED ON THE MAXIMUM
VOLUME OF WATER LISTED IN THE TABLE.
3. IF THE MAXIMUM FIXTURE RUN-OUT LENGTH IS EXCEEDED,
WATER MUST BE RECIRCULATED AS CLOSE TO THE
FIXTURE OR DEVICE AS POSSIBLE USING THE CHASE OR
WALL CAVITY. A WATER RETURN LINE WITH BALANCING
VALVE SHALL BE USED TO PROVIDE CONTINUAL WATER
FLOW NEAR FIXTURE.
4. * A BATHROOM GROUP IS DEFINED AS A GROUP OF
FIXTURES LOCATED IN A PRIVATE BATH CONSISTING OF A
WATER CLOSET, LAVATORY, BATHTUB OR SHOWER,
INCLUDING OR EXCLUDING A BIDET. IN THIS
CONFIGURATION, THE COLD-WATER SUPPLY TO ALL THE
FIXTURES OF THE BATHROOM GROUP SHALL BE IN SERIES
WITH THE WATER CLOSET CONNECTED AS THE FINAL
FIXTURE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CBRE Heery International, Inc.
125 South Dubuque Street, Suite 500, Iowa City, IA 52240-4003
319.354.4700 AE PROJECT NO. : 14980
CONSTRUCTION DOCUMENTS
- 100% CD ISSUE
FULLY SPRINKLERED
EXPAND SPECIALTY CARE
ADDITION
VA# 636-803
BLDG 50
10/05/2018
IOWA CITY, IA
PROJECT NO.: HII-1810200
Dwg. of 118
C
H
II
P
R J \P
-H
II
-1
-V A
-S p e c C lin ic
-P h a s e
P e te r.
M c d e rm o tt c b re
.c o m
.r v t
/2 /2
:5
:1
A
M
50-P13
DOMESTIC WATER LEGIONELLA
PREVENTION DIAGRAMS
DH HRO 75
NOT TO SCALE
TYPICAL BRANCH HOT & COLD WATER RECIRCULATION
NOT TO SCALE
TYPICAL BRANCH HOT & COLD WATER PIPING
AI
AI
NOT TO SCALE
DOMESTIC WATER SCHEMATIC FLOW DIAGRAM
CFM
RANGE
0-100
105-200
205-300
305-450
8X4
10X6
12X6
14X8
16X10
BRANCH
SIZE *
BRANCH DIAMETER *
6" ø
8"ø
10" ø
12" ø
14" ø
* UNLESS NOTED OTHERWISE
** ADD REDUCER AT DIFFUSER NECK FOR BRANCHES
LONGER THAN 72" IF SELECTED DIFFUSER HAS
SMALLER NECK THAN BRANCH.
STANDARD BRANCH DUCT SIZES *
ELBOW TURNED UP OR TOWARDS
ELBOW TURNED DOWN OR AWAY
TEE TURNED UP OR TOWARDS
TEE TURNED DOWN OR AWAY
ARROW IN LINE INDICATES DIRECTION
OF
FLOW
PITCH DOWN IN DIRECTION OF ARROW
REGULATING VALVE
GATE VALVE
GLOBE VALVE
ANGLE GATE VALVE
ANGLE GLOBE VALVE
BALL VALVE
BUTTERFLY VALVE
TWO WAY AUTOMATIC CONTROL VALVE
THREE WAY AUTOMATIC MIXING
OR
DIVERTING VALVE
RELIEF OR SAFETY VALVE
PRESSURE REDUCING VALVE
CHECK VALVE
VALVE IN RISER
STRAINER
PIPE GUIDE
PIPE ANCHOR
STEAM DRIP ASSEMBLY. F & T=FLOAT &
THERMOSTAT TRAP, BT=BUCKET TRAP
EXPANSION COMPENSATOR
FLEXIBLE PIPE CONNECTION
FLOW METER FITTING FOR ALL
PIPING
LARGER THAN 4". PART OF
COMBINATION
BALANCING VALVE AND FLOW
METER
FITTING FOR ALL PIPING 4" AND
SMALLER.
AIR VENT
VACUUM BREAKER
PETE'S PLUG
PRESSURE GAUGE
THERMOMETER
UNION - SCREWED, FLANGED
EXHAUST OR RETURN AIR REGISTER OR
GRILLE AS INDICATED IN BOTTOM OF DUCT
AIR EXTRACTOR - FULL DEPTH OF BRANCH
DUCT, GRILLE OR REGISTER
SUPPLY OR DISCHARGE AIR DUCT. SOLID
CROSS-UP OR TOWARDS, DASHED CROSS-
DOWN OR AWAY.
EXHAUST OR RELIEF AIR DUCT. SOLID
CROSS-UP OR TOWARDS, DASHED CROSS-
DOWN OR AWAY.
RETURN OR OUTDOOR AIR DUCT. SOLID
CROSS-UP OR TOWARDS, DASHED CROSS-
DOWN OR AWAY.
DUCT PRESSURE CLASS. DESIGNATION
IN INCHES OF W.G.
"N" SUPERSCRIPT INDICATES NEGATIVE
PRESSURE DUCT
POINT OF CHANGE IN DUCT CONSTRUCTION
(BY STATIC PRESSURE CLASS OR
OPERATING PRESSURE IN ACCORDANCE WITH
SMACNA)
MOTOR OPERATED DAMPER - SUPPLY,
RETURN, EXHAUST, OR OUTDOOR AIR AS
INDICATED.
DIFFUSER IN BOTTOM OF DUCT - SQUARE
OR ROUND AS INDICATED
BRANCH DUCT TAKE-OFF
PRESSURE CLASS SYMBOLS USED ON
COMPUTER GENERATED DRAWINGS
LOCATION OF DUCT MOUNTED SMOKE DETECTOR
MANUAL VOLUME DAMPER
SPLITTER DAMPER
TRANSITION PIECE
FLEXIBLE CONNECTION
FLEXIBLE DUCT
ELBOW WITH AIR VANES
GRILLE OR REGISTER IN SIDE OF DUCT.
SUPPLY, RETURN, OR EXHAUST AS
INDICATED.
DIRECTION OF FLOW
DUCT SIZE, FIRST FIGURE IS SIDE SHOWN
CHANGE OF ELEVATION, RISE(R), DROP(D)
RADIUS ELBOW - WITH AIR VANES FOR
DUCT WITH 'R' 30" OR MORE
FIRE DAMPER
SMOKE DAMPER
COMBINATION
FIRE/SMOKE
DAMPER
THREE WAY THROW DIFFUSER
SHADED AREA IN THE BLOCKED
OFF QUADRANT.
CHILLED WATER SUPPLY
CHILLED WATER RETURN
HEAT RECOVERY SUPPLY
HEAT RECOVERY RETURN
REFRIGERANT SUCTION GAS
REFRIGERANT LIQUID
REFRIGERANT HOT GAS
SNOW MELTING SYSTEM SUPPLY
SNOW MELTING SYSTEM RETURN
REMOTE RADIATOR SUPPLY
REMOTE RADIATOR RETURN
HUMIDISTAT
RECESSED ASPIRATING THERMOSTAT
TEMPERATURE SENSOR
HEATING HOT WATER SUPPLY
HEATING HOT WATER RETURN
HIGH PRESSURE STEAM. GAUGE
PRESSURE IN PSI AS INDICATED.
LOW PRESSURE STEAM
CONDENSATE PUMP DISCHARGE
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
SAFETY RELIEF VALVE DISCHARGE
HOT AND CHILLED WATER SUPPLY
HOT AND CHILLED WATER RETURN
MEDIUM PRESSURE STEAM.
GAUGE
PRESSURE IN PSI AS INDICATED.
CONDENSATE RETURN - LPR, MPR, AND
HPR - LOW, MEDIUM, AND HIGH PRESSURE
RETURN
LOW PRESSURE STEAM (CLEAN)
SA - SUPPLY AIR
RA - RETURN AIR
EA - EXHAUST AIR
SR - SUPPLY REGISTER
RR - RETURN REGISTER
ER - EXHAUST REGISTER
SG - SUPPLY GRILLE
RG - RETURN GRILLE
EG - EXHAUST GRILLE
SD - SUPPLY DIFFUSER
LD - LINEAR DIFFUSER
FR - FLOOR REGISTER
FG - FLOOR GRILLE
LR - LINEAR RETURN
BDD - BACK DRAFT DAMPER
SUPPLY DIFFUSER
RETURN DIFFUSER
EXHAUST DIFFUSER
HUMIDISTAT SENSOR
ROOM PRESSURE SENSOR
STATIC PRESSURE SENSOR
SHUTOFF VALVE
THERMOSTAT
BACKFLOW PREVENTOR (PRZ)
BACK DRAFT DAMPER
DIFFERENTIAL PRESSURE SENSOR
TX
Hz
Ms
Hz S
RRR
RRS
SMR
SMS
RHG
RL
RS
HRR
HRS
CHR
CHS
HWS
HWR
HPS
MPS-50
LPS
LPS-1
LPR
CP
SR
HCS
HCR
C
CR
AV
S P
TS
B
CRT
DP
A
1-1/2XR
1/2XR
18 X 6
R
3A
NY
NY
Ms Ms
E
PIPING SYMBOLS SHEET METAL- DOUBLE LINE HEATING AND AIR CONDITIONING
SHEET METAL ABBREVIATIONS
S S
F
455-600
CONNECT NEW DUCT TO EXISTING DUCT
LIMIT OF DEMOLITION
GYLCOL WATER SUPPLY
GYLCOL WATER RETURNGR
GS
MECHANICAL SYMBOLS AND ABBREVIATIONS
STEAM VENTSV
DETAIL NUMBER
DRAWING NUMBER WHERE DRAWN
SECTION LETTER
DRAWING NUMBER WHERE SHOWN
BUILDING NO. WHERE EQUIPMENT IS LOCATED
EQUIPMENT ABBREVIATION (SUPPLY FAN)
SUPPLY FAN NO. 3 IN BUILDING NO. 1
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED
ITEM (TERMINAL UNIT SHOWN)
ITEM NUMBER (TERMINAL UNIT NO. 1)
SERVED BY AIR HANDLER UNIT NO. 1
DEVICE TYPE (SEE SCHEDULE)
DEVICE AIR FLOW
50 - SF - 3
50 - TU - 1 - 1
SD - B
200 CFM
50-M4
A
50-M6
DRAWING SYMBOLS
A E J R
A/E ARCHITECT / ENGINEER EA EXHAUST AIR J INTENTIALLY LEFT BLANK R/E RETURN OR EXHAUST
AAHX AIR TO AIR HEAT EXCHANGER EAT ENTERING AIR TEMPERATURE RA RETURN AIR
AB AIR BLENDER EC EVAPORATIVE COOLER K RAD REFRIGERANT AIR DRYER
AAV AUTOMATIC AIR VENT ECC ENGINEERING CONTROL CENTER kG KILOGRAM RAF RADIO FREQUENCY ACC AIR COOLED CONDENSER ECU EVAPORATE CONDESER UNIT kG/HR KILOGRAM PER HOUR RAHX ROTARY AIR HEAT EXCHANGER ACCH AIR COOLED CHILLER EDH ELECTRIC DUCT HEATER kPa KILOPASCAL RAT RETURN AIR TEMPERATURE ACCU AIR—COOLED CONDENSING UNIT EER ENERGY EFFICIENCY RATIO kW KILOWATT RCCH REMOTE CONDENSER CHILLER ACU AIR CONDITIONING UNIT EF EXHAUST FAN kWh KILOWATT HOUR RCU RECIPROCATING CHILLER UNIT ACD AUTOMATIC CONTROL DAMPER, MODULATING EG EXHAUST GRILLE RD REFRIGERANT DISCHARGE ACD-TP AUTOMATIC CONTROL DAMPER, EGS EMERGENCY GAS SHUT OFF L RDS ROOM DATA SHEETS
TWO POSITION EGT ENTERING GLYCOL TEMPERATURE L LITER REA RELIEF AIR
AD ACCESS DOOR EH EXHAUST HOOD L/h LITERS PER HOUR (OR LITERS/HOUR) RF RETURN FAN AF AFTER FILTER EJ EXPANSION JOINT L/m LITERS PER MINUTE (OR LITERS/MINUTE) RG RETURN GRILLE AFCV AIR FLOW CONTROL VALVE EMD END OF MAIN DRIP (STEAM) L/s LITERS PER SECOND (OR LITERS/SECOND) RH RELATIVE HUMIDITY AFF ABOVE FINISHED FLOOR ENT ENTERING LAT LEAVING AIR TEMPERATURE RHC REHEAT COIL AFMD AIR FLOW MEASURING DEVICE ER EXHAUST REGISTER LBS/HR POINDS PER HOUR RHG REFRIGERANT HOT GAS AHU AIR—HANDLING UNIT ERC ELECTRIC REHEAT COIL LF LINEAR FOOT (FEET) RL REFRIGERANT LIQUID LINE AMP AMPERGE ERP ELECTRIC RADIANT PANEL LGT LEAVING GLYCOL TEMPERATURE RLA RUN LOAD AMPERE
AP ACCESS PANEL ESP EXTERNAL STATIC PRESSURE LH LATENT HEAT RO REVERSE OSMOSIS
APD AIR PRESSURE DROP ET EXPANSION TANK LPG LIQUID PROPANE GAS RPM REVOLUTIONS PER MINUTE
ARI AIR CONDITIONING AND REFRIGERATION
INSTITUTE
ETO ETHYLENE OXIDE LPR LOW PRESSURE RETURN RR RETURN REGISTER
EUH ELECTRIC UNIT HEATER (STEAM CONDENSATE) RS REFRIGERANT SUCTION
AS AIR SEPARATOR EWC EVAPORATIVE WATER COOLER LPRC LOW PRESSURE STEAM RETURN (CLEAN) RTU ROOF TOP UNIT ASME AMERICAN SOCIETY OF MECHANICAL EWT ENTERING WATER TEMPERATURE LPRP LOW PRESSURE STEAM RETURN (PUMPED) RV RELIEF VALVE
ENGINEERS EX. EXISTING LLHX LIQUID TO LIQUID HEAT EXCHANGER
ATCP AUTOMATIC TEMPERATURE CONTROL PANEL LPS LOW PRESSURE STEAM S
AW AIR WASHER F LPSC LOW PRESSURE STEAM (CLEAN) SA SUPPLY AIR
AXF AXIAL FLOW F FAHRENHEIT LSD LINEAR SLOT DIFFUSER SAD SOUND ATTENUATING DEVICE
F&T FLOAT AND THERMOSTATIC LTCP LOCAL TEMPERATURE CONTROL PANEL SAT SUPPLY AIR TEMPERATURE PCF
B F/S COMBINATION FIRE SMOKE DAMPER LVG LEAVING SC SHADING COEFFICIENT
B BOILER FA FREE AREA LVR LOUVER SCFM STANDARD CUBIC FEET PER MINUTE
BD BUTTERFLY DAMPER FC FLEXIBLE CONNECTION LWT LEAVING WATER TEMPERATURE SCI SPINAL CORD INJURY
BDD BACKDRAFT DAMPER FCU FAN COIL UNIT (4 PIPE) SCR SILICON CONTROLLED RECTIFIER
BDR BASE BOARD RADIATOR FCUC FAN COIL UNIT COOLING ONLY M SD SMOKE DETECTOR
BFP BACKFLOW PRESENTER FCUH FAN COIL UNIT HEATING ONLY M METER, SI UNIT SD SUPPLY AIR DIFFUSER BFT BOILER PLANT FIRE TUBE FCW FORWARD CURVED WHEEL (FAN) M/s METERS PER SECOND SDPR SMOKE DAMPER
BG BOTTOM GRILLE FD FLOOR DRAIN (OR METERS / SECOND) SDR SMOKE DAMPER (RETURN)
BHP BRAKE HORSEPOWER FD FIRE DAMPER MA MIXED AIR SDS SMOKE DAMPER (SUPPLY)
BHW HOT WATER HEATING BOILER FF FINAL FILTER MAT MIXED AIR TEMPERATURE SEN SENSIBLE HEAT BHX BOILER BLOWDOWN HEAT EXCHANGER FHX FLUE GAS / FEEDWATER HEAT EXCHANGER MAU MAKE-UP AIR UNIT SG SUPPLY AIR GRILLE BIW BACKWARD INCLINED WHELL (FAN) FM FLOW METER MAV MANUAL AIR VALVE SH STEAM HUMIDIFIER
BMT BONE MARROW TRANSPLANT FOP FUEL OIL PUMP MAX MAXIMUM SHC STEAM HEAT COIL
BR BOTTOM REGISTER FOT FUEL OIL TANK MB MIXING BOX SI SQUARE INCHES
BSC BIOLOGICAL SAFETY CABINETS FOHX FUEL OIL HEAT EXCHANGER MBH 1000 BTUH SP STATIC PRESSURE BT BLOWOFF TANK FPM FEET PER MINUTE MCA MINIMUM BRANCH CIRCUIT AMPACITY SP GR SPECIFIC GRAVITY
BTC BLOWOFF TANK CONTROL VALVE FPS FEET PER SECOND MER MECHANICAL EQUIPMENT ROOM SPD SUPPLY PROCESS AND DISTRIBUTION BTU BRITISH THERMAL UNIT FPTU FAN POWERED TERMINAL UNIT MERV MINIMUM EFFICIENCY REPORTING VALUE SPRV STEAM PRESSURE REDUCING VALVE BTUH BRITISH THERMAL UNIT PER HOUR FR FLOOR REGISTER MH MANHOLE SPS STATIC PRESSURE SENSOR BWT BOILER PLANT WATER TUBE FRP FIBER REINFORCED POLYESTER MHP MOTOR HORSEPOWER SQ FT SQUARE FOOT (FEET)
FS FLOW SWITCH MIN MINIMUM SR SUPPLY AIR REGISTER
C FSTAT FREEZESTAT MM MILLIMETER SS STAINLESS STEEL
C CENTIGRADE (CELCIUS) FT FEET MOV MOTOR OPERATED VALVE SSHX STEAM TO STEAM HEAT EXCHANGER CA COMPRESSED AIR FT—LB FOOT—POUND MPR MEDIUM PRESSURE RETURN SSR SOLID SEPARATOR
CC COOLING COIL FTR FIN TUBE RADIATION (STEAM CONDENSATE) ST STEAM TRAP
CCD COOLING COIL CONDENSATE DRAIN FV FACE VELOCITY MPS MEDIUM PRESSURE STEAM SUH STEAM UNIT HEATER
CD CEILING DIFFUSER MRI MAGNETIC RESONANCE IMAGING SV STEAM VENT
CENT CENTRIFICAL G MTD MEAN TEMPERATURE DIFFERENCE SVS STEAM VENT SILENCER
CFH CUBIC FEET PER HOUR ACC GA GAUGE MVD MANUAL VOLUME DAMPER SWHX STEAM TO WATER HEAT EXCHANGER
CFM CUBIC FEET PER MINUTE GAL GALLONS PER DAY MZ MULTI-ZONE
CFT CUBIC FEET GH GRAVITY HOOD T
CFP CHEMICAL FEED PUMP GPD GALLONS PER DAY N T&PCV TEMPERATURE AND PRESSURE CONTROL
VALVECG CEILING GRILLE GPH GALLONS PER HOUR NA NOT APPLICABLE
CH CHILLER GPM GALLONS PER MINUTE NC NOISE CRITERIA TAB TESTING, ADJUSTING, BALANCE CHP CHILLED WATER PUMP GPR GAS PRESSURE REGULATOR NC NORMALLY CLOSED TD TEMPERATURE DIFFERENCE CHR CHILLED WATER RETURN GS GALVANIZED STEEL NG NATURAL GAS TDH TOTAL DYNAMIC HEAD
CHS CHILLED WATER SUPPLY NGFM NATURAL GAS FLOWMETER TDS TOTAL DISSOLVED SOLIDS
CHW CHILLER WATER H NO NORMALLY OPEN TG TRANSFER GRILLE
CI CAST IRON H HUMIDIFER NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
TP TRAP
CM CARBON MONOXIDE AFF H&CW HOT & COLD WATER TR TOP REGISTER
CM CUBIC METER HAC HOUSEKEEPING AID CLOSET NOM NOMINAL TSP TOTAL STATIC PRESSURE
CM/S CUBIC METER PER SECOND HB HOSE BIBB NPLV NON—STANDARD PART LOAD VALUE TSTAT THERMOSTAT
CO CLEAN OUT HC HEATING COIL NPSH NET POSITIVE SECTION HEAD TU TERMINAL UNIT
CO2 CARBON DIOXODE HD HEAD NTS NOT TO SCALE THU THRU—WALL UNIT
COMP COMPRESSOR UNIT HD HOOD
CONV CONVECTOR (STEAM OR HOT WATER) HOA HAND/OFF/AUTOMATIC O U
COP COEFFICIENT OF PERFORMANCE HP HEAT PUMP OA OUTSIDE AIR UC UNDERCUT
CP CONDENSATE PUMP HP HORSEPOWER OAF OUTSIDE AIR FAN UC UNIT COOLER
CR CEILING REGISTER HPDT HIGH PRESSURE DRIP TRAP OAG OUTSIDE AIR GRILLE UH UNIT HEATER CS CONDENSATE STORAGE TANK HPR HIGH PRESSURE RETURN OAI OUTSIDE AIR INTAKE UL UNDERWRITERS LABORATORY CT COOLING TOWER (STEAM CONDENSATE) OD OUTSIDE DIAMETER URV UPBLAST UNIT VENTILATOR
CU CONDENSING UNIT HPS HIGH PRESSURE STEAM OFM OIL FLOWMETER
CUH CABINET UNIT HEATER HRC HEAT RECOVERY COIL OR OPERATING ROOM V
CV CONSTANT VOLUME HRD HEAT RECOVERY DEVICE V VALVE
CWCC CHILLED WATER COOLING COIL HRP HYDRONIC RADIANT (CEILING) PANEL P VAF VANE-AXIAL FAN
CWP CONDENSER WATER PUMP HRW HEAT RECOVERY WHEEL P PUMP VAV VARIABLE AIR VOLUME
CWR CONDENSER WATER RETURN HSTAT HUMIDISTAT PA PASCAL VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
(TO COOLING TOWER) HTM HUMIDIFIER TERMINAL PC PUMPED CONDENSATE VFD VARIABLE FREQUENCY DRIVE
CWS CONDENSER WATER SUPPLY HUM HUMIDIFIER UNIT MOUNTED PCF POUNDS PER CUBIC FOOT (FEET) VHA VETERANS HEALTH ADMINISTRATION
(FROM COOLING TOWER) HVU HEATING AND VENTILATING UNIT PD PRESSURE DROP VI VIBRATION ISOLATOR
HW HOT WATER PEF PROPELLER (TYPE) EXHAUST FAN VIV VARIABLE INLET VANES
D HWC HOT WATER COIL PF PRE—FILTER VP VACUUM PUMP
D DAMPER — AUTOMATIC HWHC HOT WATER HEATING COIL PG PRESSURE PAGE VPS VARIABLE PRIMARY SYSTEM
D—OA OUTDOOR AIR DAMPER HWP HEATING HOT WATER PUMP PGW PROPYLENE GLYCOL—WATER (SOLUTION) VR VACUUM (STEAM CONDENSATE) RETURN
D—RA RETURN AIR DAMPER HWR HEATING HOT WATER RETURN PHC PREHEAT COIL VSD VARIABLE SPEED DRIVE
D—ReA RELIEF AIR DAMPER HWS HEATING HOT WATER SUPPLY PPM PARTS PER MILLION VUH VERTICAL UNIT HEATER
DB DECIBELS HWUH HOT WATER UNIT HEATER PRS PRESSURE REGULATING (VALVE) STATION
Db DRY— BULB TEMPERATURE HVD HOISTWYAY VENT DAMPER PRV PRESSURE REGULATING VALVE W
DDC DIRECT DIGITAL CONTROLS HX HEAT EXCHANGER PSI POUNDS PER SQUARE INCH W WATTS
DEG DEGREE HZ HERTZ PSIA POUNDS PER SQUARE INCH — ABSOLUTE WAG WASTE ANETHESIA GAS DF DIFFUSER PSIG POUNDS PER SQUARE INCH — GAUGE Wb WET— BULB (TEMPERATURE) WC
DIA DIAMETER I PSS PRIMARY SECONDARY SYSTEM WCCH WATER COOLED CHILLER
DIW DEIONIZED WATER I/O INPUT/OUTPUT PSV PRESSURE SAFETY VALVE WCCU WATER COOLED CONDENSING UNIT DP DEW POINT TEMPERATURE IAQ INDOOR AIR QUALITY PTAC PACKAGED TERMINAL AIR CONDITIONER WCHP WATER COOLED HEAT PUMPS
DP DIFFUSER PLATE IBT INVERTED BUCKET TRAP WCPU WATER COOLED PACKAGED UNIT
DPA DIFFERENTIAL PRESSURE ASSEMBLY ICF IN-LINE CENTRIFUGAL FAN Q WEF WALL EXHAUST FAN
DPS DIFFERENTIAL PRESSURE SENSOR ICU INTENSIVE CARE UNIT Q INTENTIALLY LEFT BLANK WF WATER FILTER DCW DOMESTIC COLD WATER (POTABLE) ID INSIDE DIAMETER WFCV WATER FLOW CONTROL VALVE
DCWR DOMESTIC COLD WATER RETURN (POTABLE) IFB INTEGRAL FACE AND BYPASS WFM WATER FLOWMETER
DHW DOMESTIC HOT WATER (POTABLE) IN INCHES WFMD WATER FLOW MEASURING DEVICE
DHWR DOMESTIC HOT WATER RETURN (POTABLE) IN HG INCHES OF MERCURY WG WATER GAGE
DX DIRECT EXPANSION IN WC INCH WATER COLUMN WPD WATER SIDE PRESSURE DROP
DXCC DIRECT EXPANSION COOLING COIL IN WG INCH WATER GAUGE
IN—LB INCH-POUND X
IPLV INTEGRATED PART LOAD VALUE X INTENTIALLY LEFT BLANK
IRH INTRARED HEATER
IS INSECT SCREEN YR
IU INDUCTION UNIT YR YEAR
IV INLET VANES
Z
Z INTENTIALLY LEFT BLANK
DRAWING SUBMISSIONS
SD-1 SCHEMATIC DESIGN (SUBMISSION I) DD-1 DESIGN DEVELOPMENT (SUBMISSION I) CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION I)
SD-2 SCHEMATIC DESIGN (SUBMISSION 2) DD-2 DESIGN DEVELOPMENT (SUBMISSION2) CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)
0S SMOKE RATED WALL
0SB SMOKE BARRIER
1F ONE HOUR FIRE RATED
1FS ONE HOUR FIRE AND SMOKE RATED
2F TWO HOUR FIRE RATED
2FS TWO HOUR FIRE AND SMOKE RATED
3F THREE HOUR FIRE RATED
3FS THREE HOUR FIRE AND SMOKE RATED
4F FOUR HOUR FIRE RATED
4FS FOUR HOUR FIRE AND SMOKE RATED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CBRE Heery International, Inc.
125 South Dubuque Street, Suite 500, Iowa City, IA 52240-4003
319.354.4700 AE PROJECT NO. : 14980
CONSTRUCTION DOCUMENTS
- 100% CD ISSUE
FULLY SPRINKLERED
EXPAND SPECIALTY CARE
ADDITION
VA# 636-803
BLDG 50
10/05/2018
IOWA CITY, IA
PROJECT NO.: HII-1810200
Dwg. of 118
C
H
II
P
R J \M
-H
II
-1
-V A
-S p e c C lin ic
-P h a s e
P e te r.
M c d e rm o tt c b re
.c o m
.r v t
/2 /2
:1
:3
A
M
50-M01
MECHANICAL DRAWING LIST,
SYMBOLS AND ABBREVIATIONS
PAB HRO 76
MECHANICAL ABBREVIATIONS
WALL LEGEND - RATING SYMBOLOGY
MECHANICAL SHEET INDEX
SHEET
NUMBER SHEET NAME
50-M01 MECHANICAL DRAWING LIST, SYMBOLS AND ABBREVIATIONS
50-M02 MECHANICAL NOTES AND DESIGN CRITERIA
50-M03 MECHANICAL HVAC PLAN LOWER LEVEL
50-M04 MECHANICAL PIPING PLAN LOWER LEVEL
50-M05 MECHANICAL HVAC PLAN LEVEL 1
50-M06 MECHANICAL PIPING PLANS LEVEL 1
50-M07 MECHANICAL HVAC PLAN LEVEL 2
50-M08 MECHANICAL PIPING PLANS LEVEL 2
50-M09 MECHANICAL HVAC PLAN LEVEL 3 ENLARGED PLANS
50-M10 MECHANICAL SECTIONS
50-M11 FLOW DIAGRAM - AIRFLOW
50-M12 STEAM FLOW DIAGRAM PART A
50-M13 STEAM FLOW DIAGRAM PART B
50-M14 MECHANICAL EQUIPMENT SCHEDULES
50-M15 MECHANICAL EQUIPMENT SCHEDULES
50-M16 MECHANICAL EQUIPMENT SCHEDULES
50-M17 MECHANICAL AIRFLOW SCHEDULE
50-M18 MECHANICAL DETAILS
50-M19 MECHANICAL DETAILS
50-M20 MECHANICAL DETAILS
50-M21 MECHANICAL CONTROLS NOTES, SYMBOLS AND ABBREVIATIONS
50-M22 SEQUENCE OF OPERATIONS MECHANICAL SYSTEMS
50-M23 MECHANICAL ISOMETRIC VIEWS
50-M24 MECHANICAL ALTERNATES 1 & 2
Grand total: 24
ALL DUCTWORK IS SHOWN IN SCHEMATIC FORM. NOT ALL DUCT
RISES AND DROPS ARE SHOWN. PROVIDE OFFSETS AS REQUIRED
FOR CLEARANCE WITH STRUCTURAL CONDITIONS AND OTHER
BUILDING SYSTEMS. COORDINATE WITH OTHER TRADES AS
REQUIRED. DO NOT SCALE DRAWINGS. DRAWINGS ARE NOT
INTENDED TO BE USED AS CONTRACTOR SHOP DRAWINGS.
PROVIDE RIGID METAL DUCT, WITH NO EXCEPTION, WHERE FIRE
WALLS AND/OR SMOKE WALLS ARE PENETRATED. BOTH SIDES OF
WALL SHALL BE PROPERLY SEALED.
MANUAL VOLUME DAMPERS SHALL BE PROVIDED ON ALL
SUPPLY, RETURN, AND EXHAUST BRANCH DUCTS.
VERIFY EXACT SIZE AND LOCATION OF EXISTING UTILITIES
BEFORE START OF CONSTRUCTION.
SMOKE DAMPERS SHALL BE INSTALLED AS REQUIRED IN ALL
DUCTS PENETRATING SMOKE RATED WALLS AS INDICATED
ON ARCHITECTURAL PLANS. INSTALL WITH EXTENDED SLEEVES
AND SPECIAL RATED WALL BOXES TO MAKE WALL PERPENDICULAR
TO DUCT PENETRATION WHERE REQUIRED FOR IRREGULAR WALL
BENDS AND ANGLES.
COORDINATE ANY SERVICE OR EQUIPMENT SHUTDOWNS WITH
OWNER TO MINIMIZE INTERFERENCE WITH OWNER'S OPERATION
AND DOWNTIME OF NEW AND EXISTING SERVICES. CONTRACTOR
SHALL SUBMIT TO OWNER FOR REVIEW AND APPROVAL
THE PROPOSED PHASING PLAN FOR CONNECTING NEW SERVICES TO
EXISTING SERVICES.
ROUGH-IN AND CONNECT ALL PLUMBING REQUIRED TO EQUIPMENT
FURNISHED AND INSTALLED BY OTHER DIVISIONS. WATER SUPPLY
DROPS AND MEDICAL GAS DROPS IN WALLS TO FIXTURE GROUPS
SHALL BE EXTENDED HORIZONTALLY TO SERVE EACH FIXTURE
AS NEEDED.
PIPING THROUGH ALL FIRE OR SMOKE RATED FLOORS, ROOFS,
WALLS, AND PARTITIONS SHALL BE PROVIDED WITH FIRE STOPPING.
SPACE BETWEEN WALLS/FLOORS AND PIPING SHALL BE SEALED
WITH FIRE BARRIER MATERIAL EQUIVALENT TO RATING OF
WALL/FLOOR.
DIFFUSERS WITH NO THROW INDICATION SHALL BE 4-WAY.
ALL BRANCH DUCTWORK WITH MORE THAN ONE DIFFUSER SHALL
REQUIRE MANUAL VOLUME DAMPER. THIS APPLIES TO ALL SUPPLY,
RETURN, AND EXHAUST SYSTEMS.
EXACT LOCATION OF DIFFUSERS, GRILLES, AND REGISTERS, SHALL
BE COORDINATED WITH REFLECTED CEILING PLANS BEFORE
INSTALLATION. PROVIDE SYMMETRY WITH THE ROOM LIGHT SYSTEMS.
FIRE DAMPERS SHALL BE INSTALLED IN ALL DUCTS PENETRATING 2HR
FIRE WALLS. DUCTS THRU 1HR FIRE WALLS SHALL NOT BE REQUIRED
TO HAVE FIRE DAMPERS INSTALLED. FIRE DAMPERS SHALL BE
INSTALLED IN A 1HR RATED WALLS WHEN TRANSFER AIR IS USED.
INSTALL WITH EXTENDED SLEEVES AND SPECIAL RATED WALL
BOXES TO MAKE WALL PERPENDICULAR TO DUCT PENETRATION
WHERE REQUIRED FOR IRREGULAR WALL BENDS AND ANGLES.
REFER TO SMACNA FIRE DAMPER GUIDE FIFTH EDITION.
VERIFY DIFFUSER, GRILLE, AN REGISTER MOUNTING FRAME TYPE
WITH THE CEILING AND/OR WALL TYPES. MATCH FRAME STYLE
WITH CEILING AND/OR WALL CONFIGURATION.
PROVIDE ACCESS DOORS OF PANELS FOR DUCT MOUNTED FIRE,
SMOKE, AND FIRE/SMOKE DAMPERS. PROVIDE FIRE RATED ACCESS
DOOR THROUGH CEILINGS WHERE DAMPERS ARE LOCATED ABOVE
UNACCESSIBLE CEILINGS.
COORDINATE ALL DOOR UNDER-CUTS INDICATED AND REQUIRED
FOR PROPER AIR MOVEMENT.
INSTALL ALL EQUIPMENT PLUMB AND LEVEL. PROVIDE BLOCKING
AND HARDWARE AS REQUIRED
PROVIDE CONICAL TRANSITIONS ROUND TO ELLIPSE AT BRANCH
DUCT TAKE-OFFS WHERE REQUIRED
ALL DUCTWORK IN MECHANICAL ROOM AND SUPPLY MAINS SHALL
BE CONSTRUCTED TO PRESSURE CLASS OF 4 INCHES
INDICATES CONNECT NEW TO EXISTING
DIFFUSER AND REGISTER NOMENCLATURE SHALL BE AS
FOLLOWS:
SUPPLY - TYPE
200 - CFM
TYPICAL VAV PRESSURE CLASSIFICATION. SEE TERMINAL AIR
BOX SCHEDULE FOR INLET SIZE
CONTRACTOR SHALL PATCH AND SEAL ALL HOLES IN DUCT AND
INSULATION CREATED FOR INSTALLATION INSPECTIONS
MADE BY OWNER OR ENGINEER.
NO DUCT OR PIPE SHALL BE FABRICATED OR INSTALLED UNTIL SHOP
DRAWINGS ARE COORDINATED WITH ALL OTHER TRADES AND
APPROVED BY OWNER AND ENGINEER. THE QUALITY OF WORKMANSHIP
REQUIRED FOR ALL WORK SHALL BE OF THE HIGHEST OBTAINABLE,
WORKING WITH THE MATERIALS SPECIFIED. WORKMANSHIP SHALL BE
SATISFACTORY TO THE OWNER AND ENGINEER, AND THEIR DECISION AS
TO ACCEPTABLE QUALITY IS FINAL. IF WORKMANSHIP IS DETERMINED TO
BE UNSATISFACTORY FOR ANY REASON, OR INSTALLED PRODUCTS DO
NOT MEET DESIGN INTENT, THEN CONTRACTOR SHALL REPLACE
UNSATISFACTORY MATERIALS WITH NO ADDITIONAL CHARGE TO OWNER
WALL THERMOSTATS SHALL BE 4'-0" ABOVE FLOOR IN ROOMS AND
CORRIDORS UNLESS NOTED OTHERWISE.
ALL PIPING, DUCTWORK AND EQUIPMENT SHALL BE PAINTED, INSULATED
AND SUPPORTED AS SPECIFIED IN THE TECHNICAL PROVISIONS OF THE
SPECIFICATIONS.
ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR
ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS
PANELS SHALL BE FINISHED AND INSTALLED UNDER THE
ARCHITECTURAL SPECIFICATIONS.
ALL PIPING AND DUCTS IN FURNISHED ROOMS OR SPACES SHALL BE
CONCEALED IN A FURRED CHASE OR ABOVE THE CEILING.
SEISMIC PROVISIONS ARE NOT REQUIRED. ALL PRESSURES LISTED
ARE GAUGE PRESSURE UNLESS NOTED OTHERWISE.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
HVAC GENERAL NOTES
REFER TO THE SECTION 01 00 00 FOR LIST OF DEDUCT ALTERNATES.
ALL DUCTWORK GAUGES AND CONSTRUCTION…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.