This file is a Vendor Questions and Answers document for federal contract solicitation 36C26227Q0084 addressing Anti-Ligature Door Alarm Installation Services at a VA facility's Mental Health Floor 2 A Pod.

The project requires installation of Securitech brand anti-ligature door alarm systems in four rooms (three patient rooms and one patient toilet) containing four door assemblies with specific dimensions provided. The contractor must supply and install equipment including controllers, sensors, hinges, key switches, strobe lights, sirens, and nurse station consoles. Required Securitech part numbers are DAISY-CPS-1A52-24, DAISY-DCRS-24, DAISY-P2, DAISY-ECHFS-MH-AL-4X4, DAISY-KS101, and DAISY-SL2. Technically equivalent systems are not acceptable. The scope includes preliminary and final acceptance testing with VA Engineering and HTM personnel, one training session for 5-10 employees, and one-year warranty covering weekends and federal holidays with replacement of defective components within five business days. The offering date is November 24, 2026, by 12:00 PM Pacific Standard Time. This is a new requirement reserved for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The contract contains two line items: Installation Labor (CLIN 0001) and Installation Materials (CLIN 0002), both requiring firm fixed pricing with all project management, inspection, mobilization, testing, training, reporting, shipping, disposal, and warranty support incorporated into these prices. Work is limited to 7:00 AM to 5:00 PM, Monday through Friday. The contractor must possess California C-7 and C-10 licenses and asbestos certification. Payments occur upon work completion and invoice receipt via the Tungsten system. A coordinated site walkthrough is scheduled for the week of November 23, 2026. If performance extends beyond twelve months, clause 52.217-8 allows contract extension up to six additional months.

View the file

Other files

File Type Posted
Corrected - 36C26227Q0084 0004.pdf PDF
36C26227Q0084 0004.pdf PDF
RFQ Amendment 0004.docx DOCX document
36C26227Q0084 0003.pdf PDF
Site Visit Questions and Answers.docx DOCX document
36C26227Q0084 0002.pdf PDF
Site Visit - 2South Apod Anti-Ligature System.pdf PDF
36C26227Q0084 0001.pdf PDF
36C26227Q0084_2.docx DOCX document
P09 - FINAL SOW - Door Alarm.doc DOC document
W-9 Form.pdf PDF
FMS Vendor File Update Request Form.pdf PDF
VA10091.pdf PDF
S02 - 36C26227Q0084_1 - Door Alarm.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vendor Questions 36C26227Q0084

ANTI-LIGATURE DOOR ALARM INSTALLATION SERVICE

All questions asked at the site will be posted shortly after the visit. See Site Visit Memo

Attachment.

1. Site Visit: Will the Government schedule a site visit to the Mental Health Floor 2 A Pod before quotes is due? If not, can photos be provided? Yes there will be a scheduled walkthrough.

2. Drawings/Specifications: Are floor plans, door schedules, or specifications available showing the 4 rooms, the nurse station location, and existing door/hinge hardware? There will be a scheduled walkthrough.

3. Existing Conditions: Is there existing conduit or pathway between the rooms and the nurse station? What is the ceiling type in the work area (accessible drop ceiling or hard lid)? Unknown if there is conduit pathway, ceiling is combination hard lid and drop tile between locations

4. Manufacturer: Does the VA have a preferred or standardized anti-ligature door alarm manufacturer/system, or must the system integrate with any existing nurse call or security system? Yes, must be Securitech anti-ligature hardware, does not integrate with nurse call

Manufacturer Part Number

Securitech DAISY-CPS-1A52-24

Securitech DAISY-DCRS-24

Securitech DAISY-P2

Securitech DAISY-ECHFS-MH-AL-4X4

Securitech DAISY-KS101

Securitech DAISY-SL2

5. Scope Clarification: The SAM.gov description references "Sewer Line Hydro Jetting and

Cabling Services." Please confirm this was included in error and that the SOW (P09) governs.

Yes, this was done in error, the correct title is: H263--ANTI-LIGATURE DOOR ALARM

INSTALLATION SERVICES. A corrected Combined Synopsis will be attached the Amendment

0001, along with these questions. See attached corrected Combine Synopsis.

6. Due Date: The SAM.gov notice lists November 24 at 12:00 PM PST, the description states

November 25, and the RFQ states November 24 at 12:00 PM MST. Please confirm the correct date, time, and time zone. The offer due date is November 24,2026 NLT 12:00PM.

7. Limitations on Subcontracting: For purposes of VAAR 852.219-75, will the anti-ligature door alarm equipment (Line Item 1 – Materials) be considered the supply portion and excluded from the 50% services limitation? Yes. For purposes of VAAR 852.219-75, SBA Subcontracting

Commitments and Limitations, the anti-ligature door alarm equipment identified under Line Item

1 (Materials) will be treated as the material/supply portion of the requirement and is excluded from the calculation of the 50% limitation on subcontracting applicable to services.

The limitation on subcontracting for a services contract is calculated based on the cost of contract performance incurred for personnel, and the cost of materials is not included in that calculation. Accordingly, the cost of the anti-ligature door alarm equipment itself would not count toward the 50% services limitation. Offerors remain responsible for ensuring compliance with all applicable subcontracting limitations and SBA regulations.

8. We are performing independent research on the Combined Synopsis/Solicitation

(36C26227Q0084). We would like to know if this is a brand-new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number and what the total contract value was? Yes, this is new requirement.

9. The solicitation lists several different offer due dates: SF1449 Block 8 (11/06/2026, 12:00 PM

PST), the SF1449 continuation (11/24/2026, 12:00 PM PST), Section E.1 (11/24/2026, 12:00

PM MST), and the Combined Synopsis Notice (11/25/2026, 12:00 PM PST). Please confirm the correct due date, time, and time zone. The offer due date is November 24,2026 NLT 12:00PM.

10.The SF1449/B.3 lists the period of performance as 11/20/2026 – 11/19/2027, but the SOW lists 12/01/2026 – 11/30/2027. Also, the attached SOW (P09 FINAL SOW) includes a "Badges and Parking" section that is not in Section D.1. Please confirm which period of performance and which SOW version apply. The period of performance (POP) will be based of the award date.

This is difficult to predict; if SDVOSB offers are determined to not be fair and reasonable the solicitation will have to be reposted and opened to all socioeconomic groups, therefore, pushing the POP date forward.

ANTI-LIGATURE DOOR ALARM INSTALLATION SERVICE

11.Please provide the following: (1) the number and type of doors/frames to be alarmed in each room; (2) the quantity of sensors/hinges, key switches, strobe lights, and sirens needed per door; and (3) whether the new system must connect to an existing head-end, nurse call, or alarm system (please include manufacturer/model) or match a preferred manufacturer. See #2

& #4

12.What warranty period is required for the installed system? How many training sessions and attendees should be included in the base price? A year warranty, one training session, 5-10 attendees

13.The "SCHEDULE" section of the Combined Synopsis Notice describes Sewer Line Hydro

Jetting and Cabling Services with 24/7 on-call support at the VA San Diego Medical Center and

CBOCs. Please confirm this section does not apply and that the scope is limited to installing anti-ligature door alarms in four (4) rooms. Yes, this was done in error, the correct title is: H263--

ANTI-LIGATURE DOOR ALARM INSTALLATION SERVICES. A corrected Combined Synopsis will be attached the Amendment 0001, along with these questions. See attached corrected

Combine Synopsis.

14.Will the VA provide: (1) electrical power (dedicated circuits) for the head-end and nurse station equipment; (2) a staging/storage area for materials; and (3) an on-site location to dispose of removed materials? If not, is there a recommended disposal facility? Unsure about power, will not provide staging/storage area for materials, there is disposal on site

15. Please confirm the offer due date, time and time zone. The SF1449 block 8 shows 11-06-

2026 at 12:00 PM PST, the continuation page shows 11/24/2026 at 12:00 PM PST, the combined synopsis shows November 25, 2026, at 12 PM PST, and Section E shows November

24, 2026, at 12:00 PM MST. The offer due date is November 24,2026 NLT 12:00PM.

16. Please confirm the question deadline, date, time and time zone. The continuation page shows 11/18/2026 at 12:00 PM PST, the combined synopsis shows November 20, 2026, at

12AM PST, and Section E shows 12:00 PM MST on March 18, 2026. Question are due NLT

November 20, 2026, at 12AM PST

17. Please confirm the period of performance. The continuation page and B.3 show 11/20/2026 to 11/19/2027, while D.1 and the attached SOW show 12/01/2026 to 11/30/2027. The period of performance (POP) will be based of the award date. This is difficult to predict; if SDVOSB offers are determined to not be fair and reasonable the solicitation will have to be reposted and opened to all socioeconomic groups, therefore, pushing the POP date forward.

18. Please confirm which Statement of Work governs: Section D.1 or the attached P09 FINAL

SOW. D.1 contains only the scope, schedule of services, holidays and invoice paragraphs. P09 adds the description and specifications, parts, test equipment, reporting hours, and badges and parking. Both D.1 and the attached SOW are the same with the exception of the location and word SCOPE. And the removal of BADGES and PARKING. These are typographical errors only.

ANTI-LIGATURE DOOR ALARM INSTALLATION SERVICE

19. Please confirm whether the SCHEDULE paragraph in the combined synopsis (sewer line hydro jetting and 24-7 on call at the medical center and CBOCs) applies to this requirement, or whether on-site work is limited to 8:00 AM to 5:00 PM, Monday to Friday, as stated in P09.

Please also confirm the “storage containers” wording in the invoice paragraph does not apply.

Yes, this was done in error, the correct title is: H263--ANTI-LIGATURE DOOR ALARM

INSTALLATION SERVICES. A corrected Combined Synopsis will be attached the Amendment

0001, along with these questions. See attached corrected Combine Synopsis. The “storage container” reference should have been updated to “Contractor shall submit monthly invoices in the arrears electronically via the Tungsten-Network System at the end of each month, for expected payments for that billing period”.

20. The Statement of Work lists nurse station equipment among the head-end components.

Please define the expected scope and specifications for the nurse station equipment (for example, a flashing light panel, an annunciator panel, or a full nurse call system), including any required integration with existing facility systems. This was in error, it has to integrate with the prior anti-ligature system but not nurse call. Below is a list of equipment part numbers that integrate with the rest of the anti-ligature system.

Manufacturer Part Number

Securitech DAISY-CPS-1A52-24

Securitech DAISY-DCRS-24

Securitech DAISY-P2

Securitech DAISY-ECHFS-MH-AL-4X4

21. Please provide a marked-up plan with all four room numbers and every opening requiring alarms. Does four rooms mean four door assemblies, or are bathroom or other openings included?

There are 3 patient room door assemblies and 1 patient bathroom assembly.

Room Number

Blueprint Number

Room name

Anti- Ligature Door System

Qty of Doors

Door Height (in)

Door Width (in)

2144 10 Patient Room

1 1 6'11" 11/32 3'10" 2/32

2146 11 Patient Room

1 1 6'11" 1/4 3'10" 19/32

2148 12 Patient toilet

1 1 6'11" 3/16 3'10" 5/8

2150 13 Patient Room

1 1 6'11" 7/32 3'10" 21/32

22. Are existing door leaves and frames to remain? Identify required replacements, dimensions, thickness, material, rating and existing manufacturer/model for each opening. Door frames and leaves are to remain. I do not have the information regarding the thickness, material, rating and existing manufacturer/model of each opening. I have listed the door heights and width below.

Number

Blueprint Number

Room name

Anti- Ligature Door System

Qty of Doors

Door Height (in)

Door Width (in)

2144 10 Patient Room

1 1 6'11" 11/32 3'10" 2/32

2146 11 Patient Room

1 1 6'11" 1/4 3'10" 19/32

2148 12 Patient toilet

1 1 6'11" 3/16 3'10" 5/8

2150 13 Patient

1 1 6'11" 7/32 3'10" 21/32

23. The schedule lists quantity of four controllers. Must four separate controllers be furnished, or is a central controller with door nodes acceptable? Confirm nurse-station display counts and locations. Integration to nurse call will not be needed in this procurement. One controller per door (4 controllers total) with separate door sensors is acceptable, see below list of equipment:

Manufacturer Part Number

Securitech DAISY-CPS-1A52-24

Securitech DAISY-DCRS-24

ANTI-LIGATURE DOOR ALARM INSTALLATION SERVICE

Securitech DAISY-P2

Securitech DAISY-ECHFS-MH-AL-4X4

24. With no pre-bid site visit planned, please provide current drawings and patient-free photographs of both faces of each affected door, ceilings, proposed controller locations and the nurse station. There will be a pre-bid visit planned for the week of 11/23.

25. Please identify required hinge type, anti-barricade function and acceptable protected wire-transfer method. Are existing pivots/closers removed? Hinges can be looked at on walkthrough.

Below is a list of equipment that is required and integrates with the VA San Diego current system:

Manufacturer Part Number

Securitech DAISY-CPS-1A52-24

Securitech DAISY-DCRS-24

Securitech DAISY-P2

Securitech DAISY-ECHFS-MH-AL-4X4

26. Please identify locksets, cylinders, backsets, strikes, stops and closers to retain or replace, who provides keying, and acceptance criteria for emergency door release without lock/stop interference. Doors don’t have any lock functionality.

27. If hinges or floor pivots are removed, what repair is required for frame pockets and floor voids? Are engineered cover plates acceptable, and who performs flooring, wall patching and finish matching? Can discuss on walkthrough

28. Are kickplates, edge guards, privacy glazing, vision panels or door modifications included?

Provide quantities/specifications and identify owner-furnished hardware. Can discuss on walkthrough

29. Please provide required detection coverage (top, bottom or other), alarm timing, fault supervision, silence/reset logic, room identification and objective acceptance test criteria. There is a dome light attached to ceiling for anti-ligature alarm. There is a key/lock reset to reset the alarm. We can discuss the rest on the walkthrough.

30. Identify available branch circuit, panel, breaker and receptacle locations. Is a new circuit or panel modification required? Specify UPS/emergency-power needs, backup runtime and outage approval process. They will be on emergency power, will have to discuss circuit breaker route with electrician. We can discuss on the walkthrough

31. Provide allowable routes, ceiling types, rated barriers and access restrictions. Is interstitial access permitted, and may existing supports or raceways be reused? The ceiling type is a

ANTI-LIGATURE DOOR ALARM INSTALLATION SERVICE

mixture between hard lid and drop ceiling tiles. Access is permitted in the interstitial with asbestos certification and ceiling tiles can be popped with use of ceiling access cart. Vendor will need to create own pathway using conduit and/or cable trays.

32. Is the system standalone or connected to VA IT, nurse call, security or other systems?

Specify interfaces, network responsibilities, remote-access restrictions and credential turnover requirements. The system is standalone.

33. Please provide the locations of the electrical room and Office of Information and Technology

(OIT) room serving the project area. Identify the building, floor and room number for each, and show both rooms and the project area on a marked-up floor plan so that distances and potential cable routes can be evaluated. We can discuss on walkthrough.

34. How many rooms may be unavailable at once, for how long, and who relocates patients?

Please specify temporary barriers, tool control, escorts and daily restoration requirements. This will be up to the clinical staff in the area but the assumption is that patients will not need to be relocated. Its preferred that the vendor remove the door and do the modification outside and then bring it back in to avoid disturbing patients.

35. Please provide project-specific infection-control, dust containment, negative-air, noise, hot-work and hazardous-material requirements, including who supplies barriers and testing. Vendor should do the work for the door outside. The ceiling access cart will be the barrier and infection control for any ceiling work.

36. What existing alarm, nurse-call wiring or equipment must be removed or retained? Identify disposal and sensitive-data procedures and whether temporary coverage is required. No existing equipment. If anything comes from the interstitial or ceiling then the waste has to be disposed of by asbestos disposal rules. Anything other waste can be disposed of in our dumpsters.

37. Where may materials be delivered and securely stored? San Diego VA

38. Confirm required as-builts, architecture diagrams, software backups/licenses, O&M manuals, training records and spare-parts handover quantities/formats. PDF format is preferred.

39. Is any spare controller I/O, enclosure space, network capacity or additional-door expansion required in the base scope? No spare parts are required in base scope.

40. Submission addresses. PDF page 1 lists your address and DCVAMCACCOUNTINGTEAM@va.gov.

Pages 34 and 36 list your address and NCO22SERVICES4SOLICITATIONINBOX@va.gov. Please confirm the required recipients for the quote and questions.

NCO22SERVICES4SOLICITATIONINBOX@va.gov and charity.cazee@va.gov are the correct emails to send offers.

41. The submission instructions reference both Pacific and Mountain time.

All times for this requirement is Pacific Standard Time.

mailto:NCO22SERVICES4SOLICITATIONINBOX@va.gov mailto:charity.cazee@va.gov

ANTI-LIGATURE DOOR ALARM INSTALLATION SERVICE

42. The RFQ requires quotations in PDF format, while also referring to compatibility with Microsoft Office software. Please confirm whether separate PDF files should be submitted for the technical response, experience documentation, pricing schedule, signed certifications, and administrative supporting documents.

Yes, a PDF (Adobe) for each factor is required. I will submit a request for corrections the author of the

Instructions to Offeror.

43. Please confirm that eligibility is determined through the SBA Veteran Small Business Certification

Program and whether any additional VA specific verification or documentation must accompany the quotation beyond the required representations and certifications.

SDVOSBs will confirm through SAM.gov and SDB DSBS (https://search.certifications.sba.gov/) by contracting. Both are searchable by utilizing the Vendor UEI.

44. VAAR 852.219-73 addresses qualifying SDVOSB joint ventures. Please confirm whether eligible joint ventures may submit quotations under this procurement and identify any solicitation specific documentation required to establish joint venture eligibility at quotation submission.

Refer to section D of VAAR 852.219-73.

45. Please confirm which certification or certifications must be completed and signed for this services acquisition, and whether the completed VAAR 852.219-75 certification in the solicitation is sufficient.

Completing the information on page 30 of the RFQ is sufficient.

46. For a proposed team consisting of an eligible certified SDVOSB prime contractor and a specialized security system installation subcontractor, please confirm whether the Government requires a detailed work allocation or limitations on subcontracting calculation with the quotation. If such documentation is required, please identify its expected format and level of detail.

If a subcontractor is going to be used, their information should be included in the technical and experience factors.

47. Identify any required manufacturer, model, approved system, applicable technical standard, or existing facility equipment standard. Are technically equivalent systems acceptable, and if so, what documentation must accompany the quotation to demonstrate equivalency? Equipment needs to be

Securitech manufactured equipment. The equipment should have the part numbers below. Technically equivalent systems are not acceptable, it has to be Securitech equipment.

Manufacturer Part Number

Securitech DAISY-CPS-1A52-24

Securitech DAISY-DCRS-24

Securitech DAISY-P2

Securitech DAISY-ECHFS-MH-AL-4X4

48. Confirm the required number of monitored doors, controller configuration, nurse station interfaces, alarm annunciation points, power supplies, key switches, strobes, sirens, and other necessary components. Please also confirm whether the contractor must provide four independent systems or one integrated system serving four rooms. The contractor must provide four independent systems for the four rooms. Will need one console for the nurses station.

Manufacturer Part Number

Securitech DAISY-CPS-1A52-24

Securitech DAISY-DCRS-24

Securitech DAISY-P2

Securitech DAISY-ECHFS-MH-AL-4X4

49. Please confirm whether the new door alarm equipment must interface with existing nurse call, security, access control, fire alarm, building management, or other VA systems. If integration is required, please identify the existing system manufacturers, models, communication interfaces, and applicable connection requirements. No integration is necessary.

50. Advise whether the Government can provide floor plans, door schedules, door dimensions, door construction details, existing wiring diagrams, or photographs sufficient to determine installation conditions. Will a pre-quotation site visit or coordinated site walkthrough be available to interested offerors? A coordinated site walkthrough will be required.

51. The SOW requires preliminary system testing, formal final acceptance testing with VA personnel, a system architecture overview, and staff training. Please identify the required functional tests, acceptance criteria, documentation, training duration, training materials, and personnel responsible for Government acceptance. Please also clarify whether any manufacturer certification or independent third party testing is required. The functional tests would involve whatever tests required by the manufacturer. San Diego

VA Engineering and HTM will be responsible for the acceptance criteria and documentation for the system. Training will be for 5-10 employees for whatever is determined to be the best duration for staff.

52. The SOW requires replacement of defective components within five business days and identifies parts replacement obligations. Please confirm the required warranty period for equipment and installation workmanship and whether the contractor is responsible for ongoing maintenance, service calls, inspections, or emergency repairs following final acceptance. Please distinguish any post-acceptance obligations from the original installation scope so that costs can be accurately included.

There should be at least a year warranty on the equipment. Contractor will need to respond during warranty period which includes coverage on weekend and all Federal holidays. The only post-acceptance obligation will be the warranty period which would include replacement of broken parts, maintenance, service calls, inspections and emergency repairs.

ANTI-LIGATURE DOOR ALARM INSTALLATION SERVICE

53. Please identify any specific California contractor license classification, local permits, manufacturer certifications, installer qualifications, or other technical credentials required for performing this work.

Asbestos certification

54. Please also confirm whether such documentation must be submitted with the quotation or provided before contract performance.

Any required certification must be submitted at the time of offer, as it is part of the comparative analysis.

55. Clarify whether installation personnel must complete background investigations, fingerprinting, security screening, medical clearance, infection prevention training, patient privacy training, or other facility specific requirements.

These are not required for non-VA employees.

56. Identify anticipated processing times and whether escorts are required in addition to the patient escorts described in the SOW. HTM staff will be available to escort staff to the area and any additional areas (interstitial, etc.).

57. confirm whether the proposed alarm system will connect to any VA information technology network, store or transmit sensitive information, or require remote access. If applicable, identify required cybersecurity, equipment approval, network authorization, data protection, and Information Security

Officer review requirements. Identify whether the Government requires any additional security documentation beyond the incorporated FAR representations. The system will not be connected to any

VA system.

58. The installation will occur in an operational mental health environment. Please confirm permitted work hours, room availability, patient safety restrictions, infection control precautions, noise and dust limitations, temporary security measures, and any restrictions on service interruptions. Identify whether the VA will provide designated work areas or whether installation must be scheduled around ongoing patient occupancy. The permitted work hours will be 7am to 5pm Monday through Friday. We can discuss more details on the walkthrough.

59. The pricing schedule contains two contract line items:

CLIN 0001: Installation Labor, CLIN 0002: Installation Materials

Confirm that offerors must provide one firm fixed price for each CLIN and a consolidated total. Yes

Clarify whether project management, inspection, mobilization, testing, training, reporting, shipping, disposal, warranty support, and other incidental expenses must be incorporated into these two CLIN prices rather than identified separately. Yes

60. Confirm that this is the controlling wage determination for the solicitation and provide the complete applicable wage determination, including occupational classifications, fringe benefits, and any applicable labor requirements.

Wage determination information can be found at https://sam.gov/wage-determination/2015-5635/32 https://sam.gov/wage-determination/2015-5635/32

ANTI-LIGATURE DOOR ALARM INSTALLATION SERVICE

61. Will payment occur upon completion and Government acceptance of the entire system, upon acceptance of individual CLIN deliverables, or through authorized progress payments?

All invoices will need to be uploaded to Tungsten, the vendor is responsible for registering with

Tungsten. Payments will be made once the work is completed and invoices have been received.

62. Please clarify whether the Government anticipates exercising this clause for any continuing service obligation associated with this installation and, if so, how the applicable services and extension rates should be priced or otherwise addressed in the quotation.

In the event that it take more than the 12-month allotted for the requirement 52.217-8 will be utilized, extending the contract up to six months.

63. Clarify whether the Government will consider relevant subcontractor experience in satisfying the experience factor when the prime contractor does not independently possess three years of directly comparable anti ligature door alarm installation experience.

Yes

64. Clarify the relative importance of the technical approach, experience, and price factors, including whether technical and experience considerations are collectively more important than price. Please also confirm whether Factor 3, Required Documents, is evaluated solely for administrative compliance or receives a separate qualitative assessment.

Price has to be determined to be fair & reasonable, but not necessarily the lowest price. A vendor may have the lowest price but lacks demonstrating the technical approach to fulfilling the requirements outlined in the SOW. Factor 3 is evaluated only for administrative compliance.

65. Clarify whether all attached forms must be completed separately or whether submission through the

VA Customer Engagement Portal satisfies some of these requirements.

Both are required.

66. Advise whether amendments have been issued, modify the quotation requirements and identify how all applicable amendments must be acknowledged.

Acknowledgment of any amendments is recorded on page 4 of the RFQ.

67. Confirm whether the solicitation requires any additional signed representations, certifications, product compliance statements, or security disclosures beyond those expressly identified in Section E and the incorporated FAR and VAAR provisions.

There is nothing beyond what is outlined in Section E. All California requirements for the specific trade must be followed. It is the responsibility of the vendor to be in compliance with California requirements.

68. The solicitation says (4) rooms. So, I would assume each room would get two alarms. Any clarification would help, if not available I will bid it this way. Two alarms per room. It should be one alarm per room but two switches per door. One anti-ligature system per room.

69. Does this project require a California C-7 Low Voltage Systems Contractor license, C-10 Electrical

Contractor license, or another specific classification? Contractor should be licensed in order to install anti-ligature systems from circuit breaker to door to control panel. Yes they should have C-10 and C-7 licenses.

70. If a license is required, must the prime contractor hold that license, or may VGS serve as the

SDVOSB prime contractor while utilizing an appropriately licensed and qualified subcontractor to perform the installation? This work can be done by a subcontractor with the appropriate licenses.

Whoever is performing the work needs to have the licenses.

71. Will the Government allow prospective offerors a site visit before offers are due? If so, please provide the date, time, meeting location, and how to request or RSVP. If no site visit is planned, please confirm that offers should be based on the solicitation documents.

72. Door Measurements