This is a Price/Cost Schedule for a landscape and decomposed granite project at the Loma Linda VA Health Care System. The contract covers a one-year base period of performance from June 20, 2026, through June 19, 2027, and is classified under NAICS code 561730 (Landscaping Services) with Product/Service Code S208 (Housekeeping - Landscaping/Groundskeeping).

The project comprises six primary line items: (1) installation of 50,000 square feet of stabilized decomposed granite material with restoration and color matching to VA specifications; (2) installation of 2,400 square feet of river rock walkway with 200 linear yards of bender board edging; (3) removal and installation of 100 square feet of Elite Plus sodded turf with soil preparation and irrigation adjustment; (4) irrigation system modifications including removal, adjustment, and installation of components across the new generator yard, parking structure, and CLC building, with campus-wide irrigation adjustments; (5) furnishing and installation of eighty 5-gallon shrubs including Mexican Bird of Paradise, Crape Myrtle, Lantana, Bottlebrush, Indian Hawthorn, Rosemary, Rock Rose, and Red Yucca plants at designated locations throughout the facility; and (6) tree staking for twenty trees using 8-foot stakes and VA-standard tree ties. All line items are bid as lump sum (JB) with unit pricing to be completed by the contractor. The solicitation is a 100 percent Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with a small business size standard of $10 million.

View the file

Other files

File Type Posted
36C26226Q0597_4.docx DOCX document
36C26226Q0597_3.docx DOCX document
36C26226Q0597_2.docx DOCX document
36C26226Q0597_1.docx DOCX document
36C26226Q0597.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B.2 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
JB
__________________
__________________

Installing 50,000 sq ft of Decomposed Granite Material:

1. Perform comprehensive DG restoration across existing areas to reestablish proper color consistency, compaction, and surface condition.

2. Remove old DG and replace with stabilized decomposed granite (DG).

3. Install new stabilized decomposed granite (DG) in additional areas identified on the plans, matching VA-designated color and type.

4. Apply stabilized decomposed granite DG to a uniform depth, compact thoroughly, and water to specification.

Contract Period: Base POP Begin: 06-20-2026 POP End: 06-19-2027 PRINCIPAL NAICS CODE: 561730 - Landscaping Services PRODUCT/SERVICE CODE: S208 - Housekeeping - Landscaping/Groundskeeping

1.00
JB
__________________
__________________

River Rock:

1. Install 2,400 sq ft of river rock walkway, shaping and grading as required.

2. Install 200 linear yards of bender board to create defined edgings around DG, rock, and planting zones.

Contract Period: Base POP Begin: 06-20-2026 POP End: 06-19-2027

1.00
JB
__________________
__________________

Elite Plus Sodded Turf:

1. Removal of 100 sq ft. of existing sod.

2. Prepare soil for SOD installation.

3. Install 100 sq. ft. of new SOD.

4. Adjust irrigation to ensure proper coverage.

Contract Period: Base POP Begin: 06-20-2026 POP End: 06-19-2027

1.00
JB
__________________
__________________

Irrigation System Modifications:

1. Remove, adjust or install irrigation components to support the updated layout.

2. Install new irrigation lines, valves, or heads in areas receiving new plant material. The location for new irrigation installation are new generator yard on Loma Linda drive, Parking structure, and CLC building.

3. Ensure irrigation does not overlap DG surfaces to preserve stability and longevity. Adjust all irrigation for the whole campus.

Contract Period: Base POP Begin: 06-20-2026 POP End: 06-19-2027

1.00
JB
__________________
__________________

Planting of Eighty (80) 5-gallon shrubs:

Contractor shall furnish and install eighty (80) new 5-gallon shrubs, selected to match existing plantings and meet VA facility standards.

1. Main Entrance Benton Street Five (5) Mexican Bird of Paradise

2. Pond 3 Two (2) Purple Crape Myrtle shrubs , two (2) Red Crape Myrtle shrubs, and two Pink Crape Myrtle shrubs (total of 6 Crape Myrtle shrubs), two (2) Muhlenbergia Rigens, and two (2) Loropetalum Chinese Flower.

3. Parking Lot Green Ten (10) Yellow Lantana, ten (10) white Lantana, ten (10) purple Lantana, and ten (10) orange Lantana.

4. Pond 5 Five (5) Little John Bottlebrush, and five (5) Indian Hawthorn shrub.

5. Op Pharmacy Entrance and around the building Five (5) Rosemary bush, Five (5) Rock Rose Shrub, and five (5) Red Yucca Plant.

Contract Period: Base POP Begin: 06-20-2026 POP End: 06-19-2027

1.00
JB
__________________
__________________

Tree Staking for twenty (20) Trees:

1. Install 8' stakes per tree (total of 80 stakes) and secure each tree with VA-standard tree ties Contract Period: Base POP Begin: 06-20-2026 POP End: 06-19-2027