Attachment 5 - Section 11 53 23 Lab Refrige.pdf

PDF 70 KB Posted

Attached to
1SE Remodel- Pharmacy Expansion & Waiting - Project: 664-15-412
Solicitation number
36C26223B0014_1
Issued by

About this file

This document is a technical specification for laboratory refrigerators to be installed at a VA healthcare center as part of a pharmacy expansion and waiting area remodel project. The specification covers condensing units, unit coolers, temperature controls and alarms, piping, and installation requirements. Laboratory refrigerators must meet ASHRAE safety standards and be able to operate down to 10 degrees Fahrenheit. Condensing units should be air cooled, water cooled, or a combination, with sufficient refrigerant capacity. Unit coolers must comply with ARI standards and be UL listed with integral defrost, drainage, and insulation. Controls will integrate with the Direct Digital Control system specified in section 23 09 23. The refrigeration equipment will be furnished and installed by the VA as part of project number 664-15-412, solicited under solicitation number 36C26223B0014_1 for the pharmacy and waiting area remodel at the VA San Diego Healthcare Center.

View the file

Other files

File Type Posted
Award Notice (Contract 36C26223C0285).pdf PDF
Attachment 37 - I-S16_1st Floor Struct Interstitial.pdf PDF
Attachment 24 - Section 23 08 00 Commissioning HVAC.pdf PDF
Attachment 23 - Section 02 82 13.19 Asbestos Floor.pdf PDF
Attachment 19 - Structural Bldg 1 - As Built (3 of 4).pdf PDF
Attachment 10 - Section 28 31 00 Fire Detection Alarm.pdf PDF
Attachment 22 - Section 02 82 13.13 Glovebag Asbestos.pdf PDF
Attachment 3 - 1st Floor Interstitial Plan (As Built).pdf PDF
Attachment 4 - Basement Interstitial Plan (As Built).pdf PDF
Attachment 33 - D1CEXA (Photo 5 of 6).JPG JPG image
Attachment 36 - I-S71 thru I-S77 Bldg 1 (As Built).pdf PDF
Attachment 19 - Structural Bldg 1 - As Built (1 of 4).pdf PDF
Attachment 20 - Section 01 35 26 Safety Requirements.pdf PDF
Attachment 21 - Section 02 82 11 Asbestos Abatement.pdf PDF
Attachment 9 - Section 21 13 13 Wet-Pipe Sprinkler Sys.pdf PDF
Attachment 14 - Bldg 1 - 1st Floor FATC-I1_Inter Cat.pdf PDF
Attachment 39 - PP205 - Partial 5th Floor Plumbing.pdf PDF
Amendment 0002 (SF30) - Solicitation 36C26223B0014.pdf PDF
Attachment 7 - Section 01 45 00 Quality Control.pdf PDF
Attachment 18 - 1st Floor Plan Fully Sprinkler.pdf PDF
Attachment 30 - D1CEXA (Photo 2 of 6).JPG JPG image
Attachment 35 - I-S129_Bldg 1 Seismic (As Built).pdf PDF
Attachment 34 - D1CEXA (Photo 6 of 6).JPG JPG image
Attachment 26 - VA SD Master Finishes Legend.pdf PDF
Attachment 40 - P301 Details_Pantry-Hanger Rod.pdf PDF
Attachment 25 - Section 23 09 23 Direct-Digital Cntrl.pdf PDF
RFI Notice - Solicitation No. 36C26223B0014.pdf PDF
Attachment 8 - Section 01 91 00 General Commissioning.pdf PDF
Attachment 17 - Facility Fire Protection Study.pdf PDF
Attachment 29 - D1CEXA (Photo 1 of 6).JPG JPG image
Attachment 16 - Partial 1st Flor Power Remodel Plan.pdf PDF
Attachment 2 - VHA Master Specs-Table of Contents.pdf PDF
Attachment 1 - General Requirements-Table of Contents.pdf PDF
Attachment 11 - Physical Security Design Manual.pdf PDF
Attachment 15 - Fire Sprinkler Valves_Basement Level.pdf PDF
Attachment 32 - D1CEXA (Photo 4 of 6).JPG JPG image
Attachment 31 - D1CEXA (Photo 3 of 6).JPG JPG image
Attachment 28 - Wireframe Drawing.pdf PDF
Attachment 6 - 5th Floor Demo Plan_FV Photos.pdf PDF
Attachment 19 - Structural Bldg 1 - As Built (2 of 4).pdf PDF
Attachment 27- 5th Floor Plan Fully Sprinkler.pdf PDF
Attachment 19 - Structural Bldg 1 - As Built (4 of 4).pdf PDF
Attachment 13 - Equipment and Accessories Schedule.pdf PDF
Attachment 38 - I-S19_1st Floor Struct Interstitial.pdf PDF
Attachment 12 - Haz Mat Inspection Report.pdf PDF
Amendment 0001 (SF30) - Solicitation 36C26223B0014.pdf PDF
Pre-Bid Site Visit_Sign-In Sheet.pdf PDF
Attachment D (File 3 of 10) - 02-ARCH.pdf PDF
Attachment B - Wage Determination.pdf PDF
Attachment F - Limited Lead (XRF) Survey Report.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA San Diego Healthcare Center San Diego, California

VA Project # 664-15-412 1SE Pharmacy Expansion & Waiting

LABORATORY REFRIGERATORS

11 53 23 - 1

SECTION 11 53 23

LABORATORY REFRIGERATORS

PART 1 - GENERAL

1.1 DESCRIPTION

A. Refrigerators for Laboratories. Refer to architectural drawings for dimensions and arrangement of units.

B. Refer to the architectural drawings for refrigeration equipment schedules and installation details.

C. Refer to Section 23 23 00, REFRIGERANT PIPING, for piping and insulation.

D. Refer to electrical drawings for lighting.

E. Furnished and installed by VA.

1.2 RELATED WORK

A. Section 23 05 11, COMMON WORK RESULTS FOR HVAC AND STEAM GENERATION

B. Section 23 23 00, REFRIGERANT PIPING

C. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC

1.3 QUALITY ASSURANCE

Safety Standard: ASHRAE 15, describes requirements for refrigerant containing parts.

1.4 SUBMITTALS

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND

SAMPLES.

B. Manufacturer's Literature and Data:

1. Condensing units, with mounting rack where required

2. Unit coolers

3. Temperature controls and alarms

4. Diagrams and details of piping, wiring and controls

C. Operating Test Data

D. Maintenance and operating manuals in accordance with Section 01 00 00, GENERAL

REQUIREMENTS

1.5 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. Air-Conditioning and Refrigeration Institute (ARI):

420-00 ........................................ Unit Coolers for Refrigeration

520-04 ........................................ Performance Rating of Positive Displacement Condensing Units

C. American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE):

15-10 .......................................... Safety Standards for Refrigeration Systems

PART 2 - PRODUCTS

2.1 CONDENSING UNITS

A. Comply with ARI Standard 520. Air cooled, water cooled, or combination air/water cooled type as

11 53 23 - 2 shown, motor driven integral compressor, motor starter, condenser, receiver, common base, and safety/operational controls. Receiver capacity shall be not less than 125 percent of system refrigerant charge. For units racked one above the other and for units installed in a closet, provide a factory fabricated steel rack extending approximately 1150 mm (45 inches) above the floor. For larger freezers provide two condensing units and unit coolers with independent refrigeration systems as shown. Do not locate compressors on top of refrigerator or freezers.

B. Provide positive oil lubrication and oil level indicating device for each compressor. Provide water regulating valve for water cooled unit.

C. Compressor Motor: Squirrel cage induction type of ample size for continuous operating at maximum compressor performance indicated. Provide inherent (Klixon) protection, in compressor terminal box, for each phase of motor.

D. Pressure Switches: Automatic reset low pressure switch, and automatic or manual reset high pressure cutout.

E. Air Cooled Condensing Units:

1. High efficiency type piped and automatically controlled to operate at lower head pressures during low ambient temperature conditions, designed and weather-proofed for outdoor installation, to operate satisfactorily at winter ambient temperatures down to 6 degrees C (10 degrees F), and be provided with crankcase and receiver heaters.

2. The condenser fans shall be driven by permanent split capacitor motors.

2.2 UNIT COOLERS

A. Comply with ARI Standard 420. Units shall be UL listed, forced-ventilation type integral defrosting, internal or external refrigerant distributor, single or multiple fans and motors, drip-pan, deflectors, aluminum or baked-enamel steel housing, hangers, and all accessories.

B. Motors: Permanent split capacitor type in accordance with Section 11 05 12, General Motor

Requirements for Equipment. Provide motors with thermal overload protection. Provide manual starting switch.

C. Drain Pans: Galvanized sheet steel. Provide additional drain pans under uncovered refrigerant connections, and interconnect them with main drain pan. For freezer units provide electrically heated drain pan.

D. Defrost Provision:

1. Refrigerators: Defrost shall occur during compressor off cycle with evaporator fan running continuously.

2.3 PIPING, PIPE INSULATION, AND REFRIGERANT AND OIL CHARGES

Refer to Section 23 23 00, REFRIGERANT PIPING

2.4 EQUIPMENT IDENTIFICATION REQUIREMENTS

A. Refer to Section 23 05 11, COMMON WORK RESULTS FOR HVAC AND STEAM

GENERATION.

11 53 23 - 3

B. Identify all refrigeration equipment and alarm devices.

PART 3 – EXECUTION

3.1 INSTALLATION

A. Install refrigeration equipment as described in the respective manufacturer's instructions. Make panel joints tight and seal all panel penetrations to prevent condensation or frosting.

1. Unit cooler: NSF approval requires that the unit be suspended at 90 mm (3-1/2 inches) minimum distance below the ceiling to allow cleaning the top of the unit cooler.

2. To the extent feasible, mount pipe, conduit, and instrumentation on the exterior and pass thru neatly drilled penetrations to the lights or other devices.

B. Piping, Pipe Insulation and Refrigerant: Provide in accordance with Section 23 23 00, REFRIGERANT PIPING.

C. Controls Installation: As specified in Section 23 09 23, Direct-Digital Controls Systems for HVAC.

3.2 REFRIGERATOR START-UP, AND PERFORMANCE TESTS AND INSTRUCTIONS

A. Start-up Temperature Reduction: On start-up, reset the room thermostats daily for a maximum temperature drop of 8 degrees, on C scale (15 degrees on F scale per day down to 2 degrees C

(36 degrees F), and a maximum of 6 degrees on C scale, (10 degrees on F scale) per day between 2 degrees C (36 degrees F) and final operating temperature.

B. Perform test in accordance with Section 01 00 00, GENERAL REQUIREMENTS. Operate each system and record conditions hourly for eight hours. Submit the following information:

1. Station, Building and System Identification, Contractor, Date and Time.

2. Compressor nameplate data: Make, model, horsepower, RPM, refrigerant and charge in pounds.

3. Compressor operation: Approximate percentage running time, pressure gage readings, actual amps (starting and running), condenser water temperature in and out, or condenser entering air temperature.

4. Room temperatures.

5. Defrost and drain functions of unit coolers. Demonstrate alarm functions.

C. By arrangement with the Resident Engineer, 24 hours in advance, use the start-up and test period for required operation and maintenance instructions to VA personnel in accordance with

Section 01 00 00, GENERAL REQUIREMENTS.

- - - E N D - - -