Attachment 2 - VHA Master Specs-Table of Contents.pdf

PDF 92 KB Posted

Attached to
1SE Remodel- Pharmacy Expansion & Waiting - Project: 664-15-412
Solicitation number
36C26223B0014_1
Issued by

About this file

This document provides a table of contents for master specifications for the VA San Diego Healthcare Center Pharmacy Expansion & Waiting project. The specifications cover requirements for demolition, hazardous materials abatement, concrete, metals, wood, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, fire suppression, plumbing, HVAC, electrical, communications, fire detection and alarm. The related federal contract opportunity is a solicitation from the Department of Veterans Affairs Veterans Health Administration VISN 22 for the 1SE Remodel Pharmacy Expansion & Waiting project with number 664-15-412. Responses are due under solicitation number 36C26223B0014_1.

View the file

Other files

File Type Posted
Award Notice (Contract 36C26223C0285).pdf PDF
Attachment 37 - I-S16_1st Floor Struct Interstitial.pdf PDF
Attachment 24 - Section 23 08 00 Commissioning HVAC.pdf PDF
Attachment 23 - Section 02 82 13.19 Asbestos Floor.pdf PDF
Attachment 19 - Structural Bldg 1 - As Built (3 of 4).pdf PDF
Attachment 10 - Section 28 31 00 Fire Detection Alarm.pdf PDF
Attachment 22 - Section 02 82 13.13 Glovebag Asbestos.pdf PDF
Attachment 3 - 1st Floor Interstitial Plan (As Built).pdf PDF
Attachment 4 - Basement Interstitial Plan (As Built).pdf PDF
Attachment 33 - D1CEXA (Photo 5 of 6).JPG JPG image
Attachment 36 - I-S71 thru I-S77 Bldg 1 (As Built).pdf PDF
Attachment 19 - Structural Bldg 1 - As Built (1 of 4).pdf PDF
Attachment 20 - Section 01 35 26 Safety Requirements.pdf PDF
Attachment 21 - Section 02 82 11 Asbestos Abatement.pdf PDF
Attachment 9 - Section 21 13 13 Wet-Pipe Sprinkler Sys.pdf PDF
Attachment 14 - Bldg 1 - 1st Floor FATC-I1_Inter Cat.pdf PDF
Attachment 39 - PP205 - Partial 5th Floor Plumbing.pdf PDF
Amendment 0002 (SF30) - Solicitation 36C26223B0014.pdf PDF
Attachment 7 - Section 01 45 00 Quality Control.pdf PDF
Attachment 18 - 1st Floor Plan Fully Sprinkler.pdf PDF
Attachment 30 - D1CEXA (Photo 2 of 6).JPG JPG image
Attachment 35 - I-S129_Bldg 1 Seismic (As Built).pdf PDF
Attachment 34 - D1CEXA (Photo 6 of 6).JPG JPG image
Attachment 26 - VA SD Master Finishes Legend.pdf PDF
Attachment 40 - P301 Details_Pantry-Hanger Rod.pdf PDF
Attachment 25 - Section 23 09 23 Direct-Digital Cntrl.pdf PDF
RFI Notice - Solicitation No. 36C26223B0014.pdf PDF
Attachment 8 - Section 01 91 00 General Commissioning.pdf PDF
Attachment 17 - Facility Fire Protection Study.pdf PDF
Attachment 29 - D1CEXA (Photo 1 of 6).JPG JPG image
Attachment 16 - Partial 1st Flor Power Remodel Plan.pdf PDF
Attachment 5 - Section 11 53 23 Lab Refrige.pdf PDF
Attachment 1 - General Requirements-Table of Contents.pdf PDF
Attachment 11 - Physical Security Design Manual.pdf PDF
Attachment 15 - Fire Sprinkler Valves_Basement Level.pdf PDF
Attachment 32 - D1CEXA (Photo 4 of 6).JPG JPG image
Attachment 31 - D1CEXA (Photo 3 of 6).JPG JPG image
Attachment 28 - Wireframe Drawing.pdf PDF
Attachment 6 - 5th Floor Demo Plan_FV Photos.pdf PDF
Attachment 19 - Structural Bldg 1 - As Built (2 of 4).pdf PDF
Attachment 27- 5th Floor Plan Fully Sprinkler.pdf PDF
Attachment 19 - Structural Bldg 1 - As Built (4 of 4).pdf PDF
Attachment 13 - Equipment and Accessories Schedule.pdf PDF
Attachment 38 - I-S19_1st Floor Struct Interstitial.pdf PDF
Attachment 12 - Haz Mat Inspection Report.pdf PDF
Amendment 0001 (SF30) - Solicitation 36C26223B0014.pdf PDF
Pre-Bid Site Visit_Sign-In Sheet.pdf PDF
Attachment D (File 3 of 10) - 02-ARCH.pdf PDF
Attachment B - Wage Determination.pdf PDF
Attachment F - Limited Lead (XRF) Survey Report.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA San Diego Healthcare Center San Diego, California

VA Project # 664-15-412 1SE Pharmacy Expansion & Waiting

TABLE OF CONTENTS

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 03-20

01 00 11 Special Requirements 06-20

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 03-20

01 33 23 Shop Drawings, Product Data, and Samples 05-17

01 35 26 Safety Requirements 05-20

01 42 19 Reference Standards 09-19

01 45 00 Quality Control 03-19

01 45 29 Testing Laboratory Services 11-18

01 45 35 Special Inspections 03-19

01 57 19 Temporary Environmental Controls 01-11

01 58 16 Temporary Interior Signage 07-15

01 74 19 Construction Waste Management 09-13

01 81 13 Sustainable Construction Requirements 10-17

01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

02 82 11 Traditional Asbestos Abatement 04-19

02 82 13.13 Glovebag Asbestos Abatement 09-15

02 82 13.19 Asbestos Floor Tile and Mastic Abatement 09-15

02 83 33.13 Lead-Based Paint Removal and Disposal 08-16

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 02-16

DIVISION 04 – MASONRY (Not Used)

DIVISION 05 – METALS

05 40 00 Cold-Formed Metal Framing 05-16

05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 06 60 Schedules for Plastic Fabrications 05-20

06 10 00 Rough Carpentry 10-17

00 01 10-2

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 Acoustical Insulation 10-17

07 81 00 Applied Fireproofing 10-17

07 84 00 Firestopping 02-16

07 92 00 Joint Sealants 10-17

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16

08 14 00 Interior Wood Doors 02-16

08 31 13 Access Doors and Frames 02-16

08 33 00 Coiling Doors and Grilles 02-16

08 34 53 Security Doors and Frames 05-15

08 34 59 Vault Doors and Day Gates 02-16

08 42 29.23 Sliding Automatic Entrances 05-20

08 56 59 Service and Teller Window Units 02-16

08 71 00 Door Hardware 04-20

08 80 00 Glazing 10-15

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 02-15

09 06 00 Schedule for Finishes 04-15

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 04-20

09 51 00 Acoustical Ceilings 12-18

09 65 13 Resilient Base and Accessories 02-16

09 65 16 Resilient Sheet Flooring 05-18

09 65 19 Resilient Tile Flooring 05-18

09 67 23.30 Resinous (Epoxy Resin Composition) Mortar Flooring (RES-3) 07-14

09 68 00 Carpeting 10-15

09 72 16 Vinyl-Coated Fabric Wall Coverings 10-15

09 91 00 Painting 01-16

DIVISION 10 – SPECIALTIES

10 11 13 Chalkboards and Markerboards 10-15

10 11 23 Tackboards 10-15

10 14 00 Signage 10-15

10 26 00 Wall and Door Protection 10-15

10 28 00 Toilet, Bath, and Laundry Accessories 02-16

10 28 14 Baby Changing Stations 06-20

10 44 13 Fire Extinguisher Cabinets 08-18

10 51 13 Standard Steel Lockers 05-20

DIVISION 11 – EQUIPMENT

11 17 36 Package Transfer Units 02-13

00 01 10-3

SECTION NO. DIVISION AND SECTION TITLES DATE

11 31 13 Residential Kitchen Appliances 05-20

11 52 13.52 Recessed Projection Screen 05-20

11 53 23 Laboratory Refrigerators 11-11

DIVISION 12 – FURNISHINGS

12 32 00 Manufactured Wood Casework 09-15

12 36 00 Countertops 12-18

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural Components 01-14

DIVISION 14– CONVEYING EQUIPEMENT (NOT USED)

DIVISION 21- FIRE SUPPRESSION (NOT USED)

21 13 13 Wet-Pipe Sprinkler Systems

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-16

22 05 23 General-Duty Valves for Plumbing Piping 09-15

22 07 11 Plumbing Insulation 09-15

22 08 11 Commissioning of Plumbing Systems 11-19

22 11 00 Facility Water Distribution 11-19

22 13 00 Facility Sanitary and Vent Piping 09-15

22 40 00 Plumbing Fixtures 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING

(HVAC)

23 05 11 Common Work Results for HVAC 02-20

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment 02-20

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20

23 07 11 HVAC and Boiler Plant Insulation 02-20

23 09 23 Testing, Adjusting, and Balancing for HVAC 09-11

23 21 13 Hydronic Piping 02-20

23 31 00 HVAC Ducts and Casings 02-20

23 36 00 Air Terminal Units 02-20

23 37 00 Air Outlets and Inlets 02-20

23 37 73 Indoor Central-Station Air-Handling Units 02-20

DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)

DIVISION 26 – ELECTRICAL

26 00 08 Testing Requirements 08-19

26 05 11 Requirements for Electrical Installations 01-16

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17

26 05 26 Grounding and Bonding for Electrical Systems 01-17

00 01 10-4

SECTION NO. DIVISION AND SECTION TITLES DATE

26 05 33 Raceway and Boxes for Electrical Systems 01-18

26 08 00 Commissioning of Electrical Systems 01-18

26 09 23 Lighting Controls 01-18

26 24 16 Panelboards 01-18

26 27 26 Wiring Devices 01-18

26 51 00 Interior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY (NOT USED)

28 31 00 Fire Detection and Alarm

DIVISION 31 – EARTHWORK (NOT USED)

DIVISION 32 – EXTERIOR IMPROVEMENTS (NOT USED)

DIVISION 33 – UTILITIES (NOT USED)

File details come from the government source that posted it. Updated .