Z2DZ--Emergency Generator Farm and Switchgear Upgrades - Project: 605-19-400
Solicitation number
36C26222B0005
Issued by

About this file

This solicitation seeks bids for Project 605-19-400: Emergency Generator Farm and Switchgear Upgrade for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22. The project involves general construction, electrical work including installation of a new 2500kW generator, and mechanical work including installation of new switchgear. Bids are due by 11:00am on June 30, 2022. The total project duration is 224 calendar days. The solicitation was amended to provide contractors' questions and answers, revise the price schedule to include deductive alternates, and attach fuel cell system drawings. Additive alternates were deleted in their entirety.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

ATTACHMENT 1 – CONTRACTORS’ RFIs AND VA RESPONSES

AMENDMENT 0004

ATTACHMENT D – RFI FORM

36C26222B0005

RFI Questions & Answers

Project Name: 605-19-400 – Emergency Generator Farm and Switchgear Upgrades Solicitation Number: 36C26222B0005 Company’s Name: Contractor 1

Question 1

Q: Who is going to drain and refill the sprinkler system?

A: Contractor will be responsible for draining and refilling the system. Contractor must coordinate this with facilities.

Question 2

Q: Does the sprinkler pipe have to be painted? If so, who is going to paint it?

A: Fire sprinkler will be painted by the contractor

Question 3

Q: What K factor is required to install on the new upright sprinkler?

A: K factor to match existing. This could not be verified during field investigations. Assume 5.6 until K factor can be verified.

Question 4

Q: Who is going to be responsible for fire watch after demo?

A: Fire watch is not required if work is completed within 10 hours. If system is not fully functional after 10 hours, then fire watch must be supplied by contractor.

Company’s Name: Contractor 2

Q: No HAZMAT survey was provided in the RFP. Please provide A: Specific information on HAZMAT is available upon specific request, but there is no broad all-encompassing survey available.

Q: Does all equipment on the roof that gets removed get returned to the Government? Or is it our responsibility to dispose of?

A: It is the contractor’s responsibility to dispose of all equipment.

Q: The Doosan Power cells in the generator yard are not very old. Does the Government want to keep this equipment?

A: The government does not want to keep the Doosan Power Cells.

Q: The equipment supports on the roof, are those to be demolished flat and the area re-roofed? If so, please provide as-builts on the roof system to see how extensive the demo will be to remove the concrete supports for the muffler & equipment.

A: The 8” concrete pads will remain to maintain the integrity of the roofing system. All other concrete and equipment will be removed.

Company’s Name: Contractor 3

Q: Will (2) permanent generators operate in closed transition with Utility? Either in momentary (less than 100msec) or in extended (soft load) mode.

A: The (2) permanent generators will not operate in closed transition with the Utility. Upon return to stable utility power the generators will continue to operate while VA facilities manually transfers the unit substations from the backup power source to the utility power source. After all unit substations have been transferred to utility source the permanent generator(s) will begin their shutdown sequence.

Q: Can the Tie circuit breaker be located after (2) generator paralleling circuit breakers? In this way the tie circuit breaker can remain normally open when utility power is available and maintenance can be done on the generators or emergency side of switchgear. ASCO is ok with current location of Tie as well.

A: The tie circuit breaker shall be normally open, and the position of the tie circuit is required in position shown on plans. The distribution system is designed with A & B feeders. The A feeders will carry utility power typically to the unit substations, and the B feeders will carry the generator power typically to the unit substations. The typical scenarios we can identify for when the tie will be closed are either when there is a fault or maintenance requirements on an A feeder while on Utility, in which case the tie can be closed to feed power to the substation thru the B feeder or when there is a fault or maintenance requirements on a B feeder while on Generator, in which case the tie can be closed to feed power to the substation thru the A feeder.

Q: Should the design utilize: Dedicated synchronized/hot to hot back up PLCs for Master/system with redundant I/Os.?

Integrated paralleling control systems we can provide failed PLC parts (like CPU, power supply, I/Os) as spare parts and services can replace them very easily. Adding this design after award may cause a change order to the VA.

A: The design of the switchgear controller shall incorporate redundant PLCs with redundant IO’s. We recommend furnishing spare PLC parts as part of the bid package.

Q: If paralleling gear manufacture provides: (1) 125VDC station battery system for operation of all MV circuit breakers a CPT will not be needed is this design acceptable?

A: Yes. It is acceptable to integrate the 125VDC station battery system into the paralleling switchgear to eliminate the need to relocate existing external DC battery system. The new switchgear space is very tight on space therefore the integrated DC battery system shall not add to the overall width of the switchgear as estimated on drawing E701.

Question 5

Q: ASCO can control remote LV ATSs for load control OR control circuit breakers in MV switchgear. Is there a specific load control that should be utilized for this project?

A: The LV ATS’s are served by a separate 2MW LV Emergency/Lifesafety Generator System. The existing utility switchgear has a N.O. contact within the main service disconnect that provides a transfer inhibit signal to the ATS control panel. The new switchgear main service disconnect requires a N.O. contact to perform the same function:

upon loss of utility power the N.O. contact will close signalling to the LV ATS control system that the main utility power is off and to remain on the LV emergency/lifesafety generator backup power source until the status of the contacts changes back to open. This will inhibit the emergency/lifesafety ATS to transfer back to the normal terminals when the new parallel MV backup generators come on line to supply the unit substations with power.

Question 6

Q: Would the site like the paralleling gear to have true hard wired manual paralleling of a generator is available as standard (no added cost) without use of system/master HMI? It takes less than 5 min.

On-board paralleling controls may have it as part of the HMI or may not and if HMI fails there is no way of doing manual paralleling of a generator. If this is determined to be needed to be added later there will likely be additional cost to the VA

A: The site shall be equipped with the capability of manual paralleling.

Question 7

Q: On failure of the generator PLC, synchronizer still operates, closes generator paralleling breaker allowing generator to connect to bus. No manual intervention is required by an operator. This is a standard design for internal controls paralleling gear rather than On-board paralleling. Should this be provided as a requirement? as there is no additional cost for internal paralleling design.

On-board paralleling controls may have a single controller at the engine and failure of it will require replacing complete controller. Adding the redundancy later may cause a change order to the VA.

A: The site shall be equipped with internal paralleling controls switchgear.

Question 8

Q: Should the paralleling controls be designed so that failure of master/system HMI doesn’t affect any automatic operation of the system.?

On-board paralleling controls have a single system HMI and failure of it will require replacing complete HMI for automatic operation, annunciation, metering, etc. Systems don’t rely on the screen for sequence of operation/controls or metering. The screen on onboard paralleling controls may represent a single point of failure.

To add this redundancy later may cause a change order to the VA.

A: The site shall be equipped with redundant paralleling controls.

Question 9

Q: Internal paralleling systems often utilize synchronizers like: DSLC2 (Woodward synchronizer) which provide redundant load share lines. On-board paralleling controls may not provide this redundancy. If the load share control fails with on-board paralleling controls could be considered a major system failure that will cause the engines to shut down. Should internal paralleling system design be utilized with redundant load share lines? Adding this redundancy later may cause a change order to the VA.

A: The site shall be equipped with internal paralleling system with redundant load share lines.

Question 10

Q: Internal paralleling systems are provided with E-Stop pushbuttons for each engine. On-board paralleling controls have this at the engines or on the screen. An operator would have to go to the engine (sometimes outside) or scroll through a screen to engage an E-stop. In an emergency situation or if the fire department needs to e-stop engine and therefore it should be as accessible and easy as possible. Should the E-Stop pushbuttons be provided at the paralleling gear? Changing this location later may cause a change order to the VA.

A: The site shall be equipped with E-Stop pushbuttons at paralleling switchgear for generator e-stop requirements. Each E-stop switch shall be circuited to both the permanent generator and associated temporary generator control box.

Question 11

Q: Internal paralleling systems provide status indication/alarms and shutdowns on separate status panels (24 LED lights) that do not rely on the Master HMI. On-board paralleling controls have on the HMI, if the screen fails this information is lost. Separate annunciation panels as well as including the information on the Master HMI screen.

Should the project design include separate status indicators so that if the HMI fails this information is still available?

Adding this later may cause a change order to the VA.

A: A remote status/control panel shall be provided and installed in shell space 1D-01A as indicated in detail 1 on drawing EP100.

Question 12

Q: Internal paralleling systems provide DC-DC convertors for each engine generator section as well as the Master controls to provide a steady 24VDC to the controls. DC power is critical to any Power Control system. Some paralleling designs may have only one DC-DC convertor representing a single point of failure. Should the overall project utilize DC-DC converters for each section?

A: The project shall utilize DC-DC converters for each section to avoid single point of failure.

Question 13

Q: Internal paralleling systems often utilize a dedicated PLC for each generator and is independent of master PLCs. In the event of master PLC failure, Generator PLC will allow automatic start of generator, connect to bus and add priority 1 loads.

On-board paralleling controls may have a single controller at the engine and failure of it will require replacing complete controller. Integrated systems can provide failed PLC parts (like CPU, power supply, I/Os) as spare parts and services can replace them very easily. Should the paralleling design utilize dedicated generator PLCs to avoid a single point of failure due to the control design? Adding this later may cause a change order to the VA.

A: The paralleling switchgear design shall utilize dedicated generator PLC’s to avoid single point of failure.

Question 14

Q: In order to operate (2) temporary generators in parallel with each or operate in parallel with permanent generators, paralleling controls will be needed similar to controls provided for permanent generators and temporary generators must be of same make, model, type, controller, pitch, etc. as permanent generators. Thus, system will become a (4) generator paralleling system. Is this the intent of the design? Or will there be a different sequence of operation that is necessary in utilizing the temporary generators?

A: There will be a different sequence of operations needed to operate temporary generators.

The design incorporates (reference detail 1 on drawing E510) a temporary generator quick connect switchgear, and three section metal enclosed switchgear to connect the temporary generator and permanent generator to a common bus, and single output to the indoor paralleling switchgear. The design specifies a kirk key interlock to prevent the simultaneous operation of the temporary generator and the permanent generator; the design intent was therefore to have the capability of paralleling either two permanent generators, one permanent and one temporary, or potentially two temporary generators together at the paralleling switchgear. The VA facilities will be required to confirm compliance regarding the temporary generator make, model, type, controller, pitch, etc.

Company’s Name: Contractor 4

Q: We understand that the Government intends to award a lump sum contract for this Task Order. The construction industry continues to experience significant cost volatility in nearly all commodities that cannot be anticipated. Subcontractors are receiving unforeseen increases in material costs from their suppliers, sometimes on a weekly basis, that can be as high as 10% or more.

How is the Government going to accommodate the current price escalation being experienced in the marketplace with regards to commodities such as wood, steel, plastics, etc? Can an Equitable Price Adjustment (EPA) clause be added to the RFP?

A: No escalation shall be provided for this solicitation for increase of material costs during the duration of the performance of this project since award shall be made with a Firm-Fixed-Price Contract. Ensure that probable escalation to all material cost is included in your bid.

Contractor to forecast pricing. The Contractor, through experience and market conditions, shall make a determination of pricing of materials required for this project.

Q: The construction industry continues to experience significant volatility, resulting in material lead time delays, in nearly all commodities that cannot be anticipated. Subcontractors are receiving unforeseen increases in material delivery durations from their suppliers.

How is the Government going to accommodate the current extended lead times and material manufacturing and delivery delays that are occurring in the construction industry?

A: Upon receipt of NTP, the contractor will evaluate lead times. At that point the VA will re-evaluate the period of performance and adjust as needed.

Q: Has a Limited Source Justification (FAR 6.302-1(c), 6.303) been prepared for any materials identified under this solicitation? If so, identify which systems to which they apply and provide all related documentation, including any required Approval (FAR 6.304) or Certification (FAR 6.303(b)(12)).

A: There are no limited source J&A prepared for this solicitation

Q: Confirm that the Government will allow proposers a minimum of seven (7) days to respond to the RFP starting from the date that the Government responds to 100% of the RFIs received.

A: The VA has provided to all Contractors 2 weeks after the posting of the Responses to RFI to submit all bids on 11:00 a.m., June 30, 2022.

Company’s Name: Contractor 5

Q: Please provide the phasing plans referenced in the drawings.

A: Contractor will work with COR to develop a phasing plan that balances productivity with a minimal effect to the hospital.

Q: The plans call out deductive alternates in several locations. The Price/Cost Schedule on page 3 of the solicitation does not list these alternates. Please provide/confirm correct pricing for bidding.

A: Attachment 2 – Revised Price/Cost Schedule will outline deductive alternate. Use Attachment 2 for pricing submission of all bids.

***PLEASE BE ADVISED THAT ALL ADDITIVE ALTERNATES ARE DELETED IN ITS ENTIRETY WHEN REFERENCED ANYWHERE IN ATTACHMENT A – DRAWINGS – 605-19-400 AND ATTACHMENT B - SPECIFICATIONS – 605-19-400

APPENDED TO SOLICITATION 36C26222B0005. ***

Q: The Price/Cost Schedule lists three (3) items to price with each one having 224 construction days but the total project duration is 224 days. Please clarify if pricing for each item should include 224 days of GCs.

A: Completion days for Project 605-19-400 shall remain 224 Calendar Days for the total project duration. Please see Attachment 2 - Revised Price/Cost Summary Sheet to this Amendment 0004. Use Attachment 2 for your bid.

***PLEASE BE ADVISED THAT ALL ADDITIVE ALTERNATES ARE DELETED IN ITS ENTIRETY WHEN REFERENCED

Q: The Price/Cost Schedule lists three (3) items to price with each one having 224 construction days but the total project duration is 224 days. If we are to include only the 224 days which line item should carry the GCs? We cannot spread them out in the event a line item is not awarded.

A: Completion days for Project 605-19-400 shall remain 224 Calendar Days for the total project duration. Please see Attachment 2 - Revised Price/Cost Summary Sheet to this Amendment 0004. Use Attachment 2 for your bid.

***PLEASE BE ADVISED THAT ALL ADDITIVE ALTERNATES ARE DELETED IN ITS ENTIRETY WHEN REFERENCED

Q: Please provide a soils report.

A: No soils report available.

Q: Drawing C-2 Construction Note 20 states “Construct joint utility trench. See plans by others . . .” Please provide the plans by others.

A: The construction note 20 points to an Electrical Trench. Coordinate utility and trench size with electrical drawings.

Company’s Name: Contractor 6

Q: PLEASE CONFIRM: WILL A ¾ INCH CONDUIT BE RUN FROM THE NEW CARD READER DOOR LOCATION TO THE REINSTALLED EXTERIOR HOFFMAN SECURITY ENCLOSURE WITHIN THE FUEL CELL? WILL A ¾ INCH CONDUIT BE

RUN FROM THE EXTERIOR HOFFMAN SECURITY ENCLOSURE TO SERVICE BAY 1-6?

A: ¾” conduit will be acceptable.

Q: PLEASE CONFIRM THE TYPE OF DOOR BEING INSTALLED IN THE REMODELED FUEL CELL? WILL THE DOOR BE METAL, PREPPED FOR A BEST MORTISE LOCK? WILL SECURITY SOLUTIONS PROVIDE THE LOCK HARDWARE? WILL CONDUIT PATHWAY BE PROVIDED FROM THE ELECTRIFIED HINGE, DOOR CONTACT TO THE REINSTALLED

HOFFMAN EXTERIOR SECURITY ENCLOSURE?

A: Refer to the door schedule on sheet AJ501 for the new exterior door at Switchgear 1D-19. The general contractor is responsible for the complete installation of the door and hardware.

Q: PLEASE CONFIRM A 4 INCH CONDUIT WILL BE RUN FROM THE FUEL CELL EXTERIOR HOFFMAN SECURITY

ENCLOSURE WITHIN THE FUEL CELL TO SERVICE BAY 1-6 FOR THE CCTV CAMERAS?

A: Data should come from the FIT shed. Conduit size TBD based upon the number of cameras.

Q: PLEASE CONFIRM A DEDICATED EMERGENCY CIRCUIT (120VAC POWER) WILL BE RUN FROM SERVICE BAY 1-6 TO THE EXTERIOR HOFFMAN SECURITY ENCLOSURE BEING REINSTALLED WITHIN HE FUEL CELL?

A: A dedicated emergency circuit is specified in detail 1 on EP110 for security system power requirements. The specified circuit goes to panel EG which will be installed in the renovated fuel cell yard.

Q: PLEASE CONFIRM THE VA SECURITY VENDOR IS SECURITY SOLUTIONS AND THE CONTACT IS PATTY MATHENY – 714-615-7354?

A: Confirmed.

Company’s Name: Contractor 7

Q: Will a temporary generator be required during construction?

A: The Contractor shall install and commission the new permanent generator prior to removal of existing generator. The Contractor shall provide a temporary power connection between the new permanent generator and the existing Generator switchgear via the existing temporary generator connection box located on the exterior of Central Plant as indicate in detail 1 on EDP100. Connection of the protection and control wiring for the permanent generator with the existing switchgear controls shall also be provided. This will allow the removal of the existing generator within the building, and build-out of that space with the new switchgear. The Contractor shall estimate that a temporary generator hookup to the existing switchgear will be required during the time period required to extend the permanent generator power, protection and control wiring to the new switchgear, extending utility power to the new switchgear, and commissioning of the new switchgear.

Q: What will the size of the temporary generator be?

A: The Contractor shall include the cost of a temporary 2.0MW, 12KV, 3PH, 3W diesel generator within their proposal.

Q: What is the duration that the temporary generator will need to be on site?

A: The Contractor shall include a budget for the cost of a temporary generator for 2 months to cover the time period required to cover the estimated time to hook up the permanent generators to the new switchgear, hook up utility power to the new switchgear, hook up protection and control requirements, and commission the new switchgear. The budget shall include the cost of 96 hours of fuel at full load.

Q: The contract seems it is only for a single new 2500kW generator, with one to be added later. How will we test the paralleling controls in the switchgear?

A: The Contractor shall include in their bid a 2.5MW, 12KV, 3PH, 3W second temporary diesel generator to be connected to the temporary generator connection cabinet (installed for the second permanent generator) to commission the paralleling controls. The temporary generator shall be of the same make, model, control, pitch of the permanent generator. Provide a budget for 96 hours of fuel at full load.

Q: The automatic transfer switch, shown on page E510, shows connections to 2EMG and EG devices, are these the existing remaining generators?

A: The new ATS is connected to the normal bus of switchboard MDBCP and emergency bus of switchboard MCS.

The emergency switchboard MCS is powered by (4) existing 500KW, 480/277V, 3 phase, 4 wire emergency/life safety generators. We are creating our own emergency distribution system for this project to cover emergency/lifesafety requirements. Refer to drawing E600 for Panel Schedules for panels 2EMG and EG.

Q: Shall the overcurrent device described in 26 32 13 2.12 be located inside the generator enclosure, or elsewhere?

A: Provide SEL Generator relay protection as indicated in SLD, detail 1 on drawing E510, within the generator enclosure. Furnish the metal enclosed switchgear exterior to the generator enclosure as indicated in the same detail and shown located on the floor plan in detail 1, drawing EP110.

Company’s Name: Contractor 8

Q: Please provide a Hazardous Material Report for the project scope areas (asbestos etc.)? If unavailable, please advise on hazardous material / asbestos protocol for the project?

A: Contractor is responsible for removing all hazardous materials contained in the scope of work. Asbestos, if discovered, will be abated and removed from site in coordination with VA Environmental specialist.

Q: Please provide the soils report for the project scope areas? If unavailable, please advise on the project’s soils sampling/testing protocol?

A: No soils report is available. Use EPA guidelines for soil sampling/testing.

Q: What environmental testing has been accomplished in the project scope areas? Please provide any environmental testing results available?

A: No environmental testing has been conducted.

Q: Can we request a second visit?

A: There is only one schedule pre-bid conference and job walk which was conducted on June 2, 2022. Another job walk will not be scheduled.

Q: Is the generator room floor slab on grade?

A: The floor in Switchgear 1D-19 is slab on grade per the original construction documents.

Q: How long can we block the loading dock during construction?

A: Steel plates must be provided to allow for loading dock delivery during the hours of 6am-5pm.

Q: Will a back-up generator be required on site throughout construction?

A: The Contractor shall install and commission the new permanent generator prior to removal of existing generator. The Contractor shall provide a temporary power connection between the new permanent generator and the existing Generator switchgear via the existing temporary generator connection box located on the exterior of Central Plant as indicate in detail 1 on EDP100. Connection of the protection and control wiring for the permanent generator with the existing switchgear controls shall also be provided. This will allow the removal of the existing generator within the building, and build-out of that space with the new switchgear. The Contractor shall estimate that a temporary generator hookup to the existing switchgear will be required during the time period required to extend the permanent generator power, protection and control wiring to the new switchgear, extending utility power to the new switchgear, and commissioning of the new switchgear.

Q: Will we be able to have a laydown area on-campus near the project site? If so where would the laydown area be located?

A: There will be a lay down site made available near the project site and will be coordinated between the contractor and VA before the start of work.

Q: Can we request an extension of the 240 calendar days period of performance given the current construction market conditions where electrical equipment/material delivery lead times from manufacturers / distributors is typically extended/delayed?

A: Upon receipt of NTP, the contractor will evaluate lead times. At that point the VA will re-evaluate the period of

Q: Will the VA require a specific brand to be procured for the generator and/or other electrical components? If so please provide the brand requirements?

A: Refer to E600 electrical schedules.

Company’s Name: Contractor 9

Q: SOW, 1.A.ii.- Are existing fire life safety and critical branch systems on a UPS, as indicated on 1.B.i.11.? Please provide existing circuit control diagrams and existing hospital's fire protection plan for cutover design, and for the req'd design "fire protection program" by 1.B.i.15.a.

A: Existing critical and life safety power for the facility is furnished by a separate emergency/life safety power distribution system powered by a parallel set of (4) 500 KW, 480/277V, 3PH, 4W diesel generators, and separate low voltage automatic transfer switches.

Q: SOW, 1.B.i.8. - Please indicate the remote monitoring protocol of the existing/preferred control system, i.e.

internet, SCADA radio, or local network, etc. Please indicate the POC of generator control panel to the existing bldg. system controller.

A: Coordinate exact monitoring protocol with VA Loma Linda Facilities Group. We estimate the generator control panel POC with the building system controller will be within the Graphic Control Room 1D-16A as indicated in detail 1 on drawing EP100.

Q: SOW, 1.D.i. - vi. - Contractor to perform this paragraph's requirements in accordance with the SOW and the C.D., please indicate these outstanding requirements in these paragraphs (1.D.i. - vi.) that are not included in the C.D. within Contractor's control.

A: SOW 1.D is sustainable design and energy reduction. It references submitting the project for LEED certification, which does not seem appropriate for this specific project.

Q: SOW, 1.E.3.b. - Please provide information (such as test reports and CIH site surveys, etc.) for bid estimate of existing hazardous material abatement/remediation including the existing fuel cell system.

A: No CIH site surveys have been conducted by VA. Drawings for fuel cell system will be provided. Contractor is responsible for removing all hazardous materials contained in the scope of work. Asbestos, if discovered, will be abated and removed from site in coordination with VA Environmental specialist. Attachment 3 – Fuel Cell System is attach herein.

Q: 605-19-400 A.1 – Items 0001, 0002 and 0003 indicate 3 x 224 calendar days respectively. The current lead time and pricing for the generator set and switch gears are difficult, if not impossible, to ascertain for the required contract duration; currently, its normally exceed a year from date of order. Please address.

A: The total calendar completion days for this project is 224 calendar days. However, upon receipt of NTP, the contractor will evaluate lead times. At that point the VA will re-evaluate the period of performance and adjust as needed.

Q:AE110 – Confirming that bid price will be net of (excluding) deductive alternates in regard to the phase 2 second generator set and related installations A: Attachment 2 – Revised Price/Cost Summary Sheet with Alternate Deducts is attach herein.

***PLEASE BE ADVISED THAT ALL ADDITIVE ALTERNATES ARE DELETED IN ITS ENTIRETY WHEN REFERENCED

Q: S014 and P001 – Please specify back-fill requirements including clearance between top of tank to bottom of the 6” aggregate base to achieve the 90% compaction. Shall excavated soil be disposed on the VA site?

A: All excavated soil will be removed from site by contractor.

Q: Drawings, EP110, E510, E600 – Please reconfirm temporary gen set size of 125 MVA. Please note the 12KV gen set is required.

A: Provide 2MW, 12KV, 3PH, 3W temporary generator as indicated on demolition SLD on drawing ED500.

Company’s Name: Contractor 10

Q: Can the VA please specify the BMS line on site?

A: Andover System

Q: Can the VA please provide the name of the Automation Contractor who services the BMS System, and contact name?

A: EMCOR Services- Tony Maduro.

Q: Please provide a hazardous materials report.

A: No job specific hazardous materials report is available. Contractor is responsible for removing all hazardous materials contained in the scope of work. Asbestos, if discovered, will be abated, and removed from site in coordination with VA Environmental specialist.

Q: Is there any fuel or oil in any of the existing equipment that needs to be removed? If so, indicate which equipment and approximately how much fuel/oil.

A: Yes, the existing generator may have approximately 400 ga of oil and 300 ga of diesel. Contractor is responsible for removing any and all residual fluids along with equipment during removal.

Q: The project duration is 224 calendar days. Generator, switchgear and underground fuel tanks have a current lead time of approximately 52 – 60 weeks. Will VA consider extending the project duration?

A: Upon receipt of NTP, the contractor will evaluate lead times. At that point the VA will re-evaluate the period of

Q: Material pricing is volatile and pricing for major items like generator, switchgear and fuel tanks may have significant increases from time of bid to procurement after submittal approval. Will VA cover the material increases by contractor providing bid quote and invoice when materials are ordered?

A: No escalation shall be provided for this solicitation for increase of material costs during the duration of the performance of this project since award shall be made with a Firm-Fixed-Price Contract. Ensure that probable escalation to all material cost is included in all bids. Contractor to forecast pricing. Contractor, through experience and market conditions, shall make a determination of the pricing of materials required for this project.

***PLEASE BE ADVISED THAT ALL ADDITIVE ALTERNATES ARE DELETED IN ITS ENTIRETY WHEN REFERENCED

Q: Drawing PP120 Key Note 16 “3” fuel oil fill above grade” is indicated at the remote fill station and for the fuel lines and vent between the fill station and the fuel tanks. Please clarify the piping between the remote fill station and fuel tanks should be underground.

A: Piping between fuel oil tanks (FOT-1 & 2) and transition sump (TS-2) are underground. Piping between transition sump (TS-2) and remote fueling station (RFS-1) are above grade.

Q: The plans show an “Alternate Route” for the conduit going from the Generator Farm to the Central Plant which is listed as a deductive alternate. Can this path be used for the fuel system conduit to reach the monitoring system on that corner of the building?

A: Yes, this path be used for the fuel system conduit to reach the monitoring system on that corner of the building.

Q: Attachment C Scope of Work, Specific Requirements B, Paragraph 4 states, “The new utility/normal power . . .

will be connected to the incoming service from the utility with new underground service entrance conductors . . .”

and shown on ES100 and ES110. Has this work been coordinated with the local utility? Has the local utility issued drawings? If so, please provide.

A: The new service has not been coordinated with the utility company. The Contractor shall include in their bid utility coordination requirements. A service upgrade request will need to be issued to the utility company to begin the design and coordination process.

Q: Please provide as-builts for the fuel cell yard and central plant.

A: Attachment 3 – Fuel Cell Drawings is attached herein.

Question 11

Q: Has the new service (HV-S1) been coordinated with the utility and are there any drawings from the utility available for this new service?

A: The new service has not been coordinated with the utility company. The Contractor shall include in their bid utility coordination requirements.

Question 12

Q: Will the contractor be required to pay any fees that the utility company may assess?

A: Yes, the contractor is required to pay any fees that the utility company may assess.

Question 13

Q: Single line sheet ED500 appears to show the point of connection for the existing circuits (HV-B3) and (HV-A3) in the switchgear room trench. Site plan ES100 shows a dark dashed line from the new switchgear to manhole No.

1 for these circuits. Does the dashed represent new underground conduit and/or cable?

A: Detail 1 on drawing EP100 indicates that the point of connection for HVA3 and HVB3 are in the existing switchgear trench located in shell space 1D-01A. The are no new cable and/or conduit requirements between the cable trench and MH No. 1.

Company’s Name: Contractor 11

Q: Can this be value-engineered? i.e. Regarding the switchgear, upgrading the internal components while keeping the frame

A: Regarding Value-Engineered (VE) by utilizing existing switchgear and replacing components, we believe it will be quite difficult, and any proposal for this VE shall including all costs associated with maintaining utility and generator power to the facility during construction. The existing switchgear is based on a single generator connection which will require additional equipment structure to be added. Some of the rear connection feeder structures are not full height switchgear which may limit the design of the new switchgear to just single height circuit breaker structures as currently manufactured, further potentially limiting the value added feature of double height circuit breaker to provide the Owner with spare circuit breaker space capacity. A/E of record need to evaluate the Value-Engineered item on a case-by-case basis.

ATTACHMENT 2 – REVISED PRICE/COST SCHEDULE

AMENDMENT 0004 TO SOLICITATION 36C26222B0005

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

LINE

ITEM

NO. DESCRIPTION OF SUPPLIES/SERVICES

DEDUCTED AMOUNT

FOR ITEMS NO. 0002 -

0006 TOTAL

0001 MAIN BASE BID:

General Construction: Work includes general construction, alterations, roads, walks, grading, drainage, necessary removal of existing structures and construction and certain other items.

Electrical Work: Work includes all labor, material, equipment, and supervision to perform the required electrical construction work.

Mechanical Work: Work includes all labor, material, equipment, and supervision to perform the required Mechanical construction work.

COMPLETION TIME IS: 224 CALENDAR DAYS

Total Main Base Bid:

0002 Bid Alternate Deduct #1 –

Do not build generator # 2 enclosure.

Refer to Sheets: AD110 & AE110.

0003 Bid Alternate Deduct #2 –

Do not install (1 ea) Fuel Tank Including Reduction of Site Improvements.

Refer to Sheets C-2, AE110 &PP120.

0004 Bid Alternate Deduct #3

Delete alternate utility pathway.

Refer to Sheets: C-2, C-3, ES110, & EP100

0005 Bid Alternate Deduct #4

Removal of Generator Enclosure Screen Wall Refer to Sheets: AI201, S012

0006 Bid Alternate Deduct #5

Removal of Temporary Generators Refer to Sheets: AI201, S012

ATTACHMENT 2 – REVISED PRICE/COST SCHEDULE

AMENDMENT 0004 TO SOLICITATION 36C26222B0005

BID PRICE EVALUATION

To determine the lowest price, bid price shall be evaluated based on the following bid price evaluation methods:

BID PRICE EVALUATION ITEM 1 - MAIN BASE BID ITEM:

Total bid price of the following:

General Construction: Work includes general construction, alterations, roads, walks, grading, drainage, necessary removal of existing structures and construction and certain other items.

Electrical Work: Work includes all labor, material, equipment, and supervision to perform the required electrical construction work.

Mechanical Work: Work includes all labor, material, equipment, and supervision to perform the required Mechanical construction work.

BID PRICE EVALUATION BID DEDUCTIVE ALTERNATE # 1, #2, #3, #4, & #5:

The Government shall select and award the Main Base Bid Item total or may select any combination of deducts subtracted from the Main Base Item total. The contractor that submits the lowest responsive responsible bid for the total main base item total, or combination of deducts selected by the government subtracted from the main base item total shall be awarded the contract to provide the requirements for project 605-19-400, and shall be in the best interest to the Government.

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

LOMA LINDA VA HOSPITAL

DB FUEL CELL COGEN SYSTEM

VA Loma Linda Healthcare System

(Jerry L. Pettis Memorial Hospital), Loma Linda, California

LLVA PROJECT NO:

TASK ORDER NO:

CONTRACT NO:

605-10-305NE

N/A

VA701-RA-0058

Office of

Construction and Facilities

Management

VA PROJECT NO: 101-09-067

AS-BUILT DRAWINGS 07-12

ATTACHMENT 3 - FUEL CELL DRAWINGS TO SOLICITATION 36C26222B0005

LOMA LINDA VA HOSPITAL

DB FUEL CELL COGEN SYSTEM

KEY PLAN SHEET INDEX

VA Loma Linda Healthcare System

(Jerry L. Pettis Memorial Hospital), Loma Linda, California

SITE PLANVICINITY PLAN G0.1

T I

L E

S

H

SHEET

IDENTIFICATION

SHEET OF

O f f i c e o

C n s t r u a d

F l i t

M g m i n d a i f o r n

V A i n d l t h c a r y t

J e r r y

L

P t i i a p i t a

D B

U

G

N

Y

R

W

GENERAL NOTES AND SPECIFICATIONS

M0.1 f i t i n d a i f o r n i n d l t h c a r t e r r y

L t i i a p i t a

SYMBOLS

M0.2

ABBREVIATIONS

f i t i n d a i f o r n i n d l t h c a r t e r r y

L t i i a p i t a

PUMP SCHEDULE

HEAT EXCHANGER SCHEDULE

AIR/DIRT SEPARATOR SCHEDULE

EXPANSION TANK SCHEDULE

CONTROL VALVE SCHEDULE

FUEL CELL SCHEDULE

COOLING MODULE SCHEDULE

M0.3

Q f i t i n d a i f o r n i n d l t h c a r t e r r y

L t i i a p i t a

PARTIAL MECHANICAL SITE PLAN

M1.1 f i t i n d a i f o r n i n d l t h c a r t e r r y

L t i i a p i t a

SHEET NOTES:

PARTIAL MECHANICAL SITE PLAN - FUEL CELL ENCLOSURE AREA

M2.1

KEY PLAN

f i t i n d a i f o r n i n d l t h c a r t e r r y

L t i i a p i t a

PARTIAL FIRST FLOOR CENTRAL PLANT MECHANICAL PLAN

M2.2 f i t i n d a i f o r n i n d l t h c a r t e r r y

L t i i a p i t a

PARTIAL SECOND FLOOR CENTRAL PLANT MECHANICAL PLAN

M2.3

DETAIL A - DOMESTIC HOT WATER SYSTEM

f i t i n d a i f o r n i n d l t h c a r t e r r y

L t i i a p i t a

M3.1

FUEL CELL WASTE HEAT FLOW DIAGRAM

SEQUENCE OF OPERATIONS:

f i t i n d a i f o r n i n d l t h c a r t e r r y

L t i i a p i t a

(TYPICAL) FUEL CELL PIPING AND INSTRUMENTATION DIAGRAM

PURECELL MODEL 400

POWER MODULE

FC-1

COOLING MODULE (TYP)

PRE-FABRICATED NITROGEN PURGE

MANIFOLD AND FRAME ASSEMBLY

M3.2

NATURAL GAS CALCULATION

f i t i n d a i f o r n i n d l t h c a r t e r r y

L t i i a p i t a

FUEL CELL AREA ELEVATION - LOOKING NORTH

FUEL CELL AREA ELEVATION - LOOKING WEST

FUEL CELL PIPING ELEVATION - LOOKING NORTH

M4.1

FUEL CELL ENCLOSURE EQUIPMENT LAYOUT PLAN

f i t i n d a i f o r n i n d l t h c a r t e r r y

L t i i a p i t a

GENERAL SHEET NOTES:

M5.1 f i t i n d a i f o r n i n d l t h c a r t e r r y

L t i i a p i t a

M5.2

PRESSURE GAUGE CONNECTION DETAIL

FUEL CELL 2 PIPING ENTRY DETAIL (PLAN & ELEVATION VIEWS) (TYPICAL FOR FUEL CELL 1)

TEMPERATURE SENSOR AND THERMOWELL DETAILWATER FLOW METER HOOK-UP DETAIL

f i t i n d a i f o r n i n d l t h c a r t e r r y

L t i i a p i t a

END SUCTION PUMP HOOK-UP DETAIL

CLOSED COUPLED PUMP HOOK-UP DETAILPIPE PENETRATION THROUGH WALL DETAIL

PIPING SUPPORT AND HANGING DETAIL

PIPE SUPPORT DETAIL PIPE STANCHION DETAILS

FLOOR STANCHION

SCHEDULE (SCH. 40 PIPE)

M5.3

INSTALLATION OF THERMOMETER WELLS DETAIL

TYPICAL HEAT EXCHANGER HOOK-UP DETAILWALL PENETRATION DETAIL

TYPICAL MANUAL AIR VENT

TYPICAL CHILLED AND HOT WATER

PIPING DRAIN VALVE CONNECTIONS

DRAIN VALVE AND AIR VENT CONNECTIONS DETAIL

f i t i n d a i f o r n i n d l t h c a r t e r r y

L t i i a p i t a

EXPANSION LOOP DETAIL

CROSSOVER DETAIL

PIPE TRENCH SECTION

EXPANSION LOOP SCHEDULE

EXPANSION BOLSTER DETAIL

PIPING RISER DETAIL

BUILDING RISER DETAIL

BUILDING RISER DETAIL

TRENCH PIPING SCHEDULE

M5.4

PIPING ANCHOR DETAIL SUPPORT/ANCHOR FOR PIPE RISERS DETAIL

f i t i n d a i f o r n i n d l t h c a r t e r r y

L t i i a p i t a

REDUCED PRESSURE DEVICE

M5.5

(E) HEATING HW & PUMPS CONNECTION DETAIL(E) DOMESTIC WATER HEATER CONNECTION DETAIL FLOOR MOUNTED EXPANSION TANK - PIPING CONNECTIONS DETAIL

GAS METER HOOK-UP DETAILCONCRETE EQUIPMENT BASES DETAIL

f i t i n d a i f o r n i n d l t h c a r t e r r y

L t i i a p i t a

10011_COVER-Cover Sheet

10011_G0.1-Layout1

10011_M0.1-Layout1

10011_M0.2-Layout1

10011_M0.3-Layout1

10011_M1.1-Layout1

10011_M2.1-Layout1

10011_M2.2-Layout1

10011_M2.3-Layout1

10011_M3.1-Layout1

10011_M3.2-Layout1

10011_M4.1-Layout1

10011_M5.1-Layout1

10011_M5.2-Layout

10011_M5.3-Layout1

10011_M5.4-Layout1

10011_M5.5-Layout1

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 1

06/16/2022

605-19-400

36C262

Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815

Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815

To all Offerors/Bidders

05-16-2022

X

X

NOT APPLICABLE

X 1

AMENDMENT 0004 IS ISSUED TO PROVIDE CONTRACTORS' RFIs AND VA RESPONSES REFERENCED IN ATTACHMENT 1 - CONTRACTORS RFIs AND VA RESPONSES; TO PROVIDE ATTACHMENT 2 - REVISED PRICE/COST SCHEDULE 605-19-400; AND TO PROVIDE ATTACHMENT 3 - FUEL CELL DRAWINGS IN RESPONSE TO CONTRACTORS RFIs ATTACHED HEREIN.

***PLEASE BE ADVISED THAT ALL ADDITIVE ALTERNATES ARE DELETED IN ITS ENTIRETY WHEN REFERENCED ANYWHERE IN ATTACHMENT A – DRAWINGS – 605-19-400 AND ATTACHMENT B - SPECIFICATIONS – 605-19-400 APPENDED TO

SOLICITATION 36C26222B0005. ***

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.

MARIA CRUZ-THOMPSON

CONTRACTING OFFICER

See attached document: ATTACHMENT 1 - CONTRACTORS RFIs AND VA RESPONSES.

See attached document: ATTACHMENT 2 - REVISED PRICE - COST SCHEDULE 605-19- 400.

See attached document: ATTACHMENT 3 - FUEL CELL DRAWINGS.

File details come from the government source that posted it. Updated .