320523 Cement Concrete for Exterior.pdf
PDF 143 KB Posted
- Solicitation number
- 36C26221Q0220
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26221Q0220 0006.docx | DOCX document | |
| As builts for Domestic Water.jpg | JPG image | |
| 36C26221Q0220 0005.docx | DOCX document | |
| LANDSCAPE PALM RD WATER MAIN REPAIR_REVISED.pdf | ||
| Pine and Palm Electrical.jpg | JPG image | |
| VA STREET LIGHT STAND r 1 13 21.pdf | ||
| VA Street Light Stand Revised_13JAN2021.pdf | ||
| Land Palm Road Water Main Repair_Revised_20JAN2021.pdf | ||
| SOW_Revised 20JAN2021.pdf | ||
| 36C26221Q0220 0004.docx | DOCX document | |
| 328400 Planting Irrigation.pdf | ||
| 36C26221Q0220 0003.docx | DOCX document | |
| SOW- Irrigation REV.pdf | ||
| 36C26221Q0220 0002.docx | DOCX document | |
| 36C26221Q0220 0001.docx | DOCX document | |
| P07- WAGE DETERMINATION-LOS ANGELES.pdf | ||
| 36C26221Q0220_1.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
08-01-16
32 05 23 - 1
SECTION 32 05 23
CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Subbase for concrete pavements.
2. Curbs, gutters, and combination curbs and gutters wheel stops.
3. Pedestrian Pavement: Walks, pedestrian crossings, wheelchair curb ramps,
1.2 RELATED REQUIREMENTS
A. Subgrade Preparation and Subbase Compaction: Section 31 20 00, EARTHWORK.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. American Association of State Highway and Transportation Officials
(AASHTO):
1. M147-65-UL-04 - Materials for Aggregate and Soil-Aggregate Subbase, Base and Surface Courses.
2. M233-86 - Boiled Linseed Oil Mixture for Treatment of Portland Cement
Concrete.
C. American Concrete Institute (ACI):
1. 305R-10 - Guide to Hot Weather Concreting.
2. 306R-10 - Guide to Cold Weather Concreting.
D. American National Standards Institute (ANSI):
1. B101.3 - Wet DOCF of Common Hard Surface Floor Materials (Including
Action and Limit Thresholds for the Suitable Assessment of the
Measured Values).
E. ASTM International (ASTM):
1. A615/A615M-16 - Deformed and Plain Carbon Steel Bars for Concrete
Reinforcement.
2. A996/A996M-15 - Rail-Steel and Axle-Steel Deformed Bars for Concrete
Reinforcement.
3. A1064/A1064M-16 - Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete.
4. C33/C33M-16 - Concrete Aggregates.
5. C94/C94M-16 - Ready Mixed Concrete.
6. C143/C143M-15a - Slump of Hydraulic Cement Concrete.
7. C150/C150M-16 - Portland Cement.
8. C171-16 - Sheet Materials for Curing Concrete.
9. C260/C260M-10a - Air Entraining Admixtures for Concrete.
32 05 23 - 2
10. C309-11 - Liquid Membrane Forming Compounds for Curing Concrete.
11. C494/C494M-15a - Chemical Admixtures for Concrete.
12. C618-15 - Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in
Concrete.
13. C979/C979M-16 - Pigments for Integrally Colored Concrete.
14. C989/C989M-14 - Slag Cement for Use in Concrete and Mortars.
15. C1240-15 - Silica Fume Used in Cementitious Mixtures.
16. D1751-04(2013) e1 - Preformed Expansion Joint Filler for Concrete
Paving and Structural Construction (Nonextruding and Resilient
Bituminous Types).
17. D5893/D5893M-10 - Cold Applied, Single Component, Chemically Curing
Silicone Joint Sealant for Portland Cement Concrete Pavements.
18. D6690-15 - Joint and Crack Sealants, Hot Applied, for Concrete and
Asphalt Pavements.
1.4 PREINSTALLATION MEETINGS
A. Conduct preinstallation meeting at project site before beginning Work of this section.
1. Required Participants:
a. Contracting Officer's Representative.
b. Contractor.
c. Installer.
2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.
a. Installation schedule.
b. Installation sequence.
c. Preparatory work.
d. Protection before, during, and after installation.
e. Installation.
f. Terminations.
g. Transitions and connections to other work.
h. Inspecting and testing.
i. Other items affecting successful completion.
3. Document and distribute meeting minutes to participants to record decisions affecting installation.
1.5 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES.
B. Submittal Drawings:
1. Show size, configuration, and fabrication and installation details.
32 05 23 - 3
2. Show reinforcing.
3. Include jointing plan for concrete pavements, curbs and gutters.
C. Test reports: Certify products comply with specifications.
1. Concrete materials.
2. Select subbase materials.
3. Field test reports.
D. Certificates: Certify products comply with specifications.
1. Expansion joint filler.
2. Reinforcement.
3. Curing materials.
E. Qualifications: Substantiate qualifications comply with specifications.
Installer with project experience list.
1.6 QUALITY ASSURANCE
A. Installer Qualifications:
1. Regularly installs specified products.
2. Installed specified products with satisfactory service on five similar installations.
a. Project Experience List: Provide contact names and addresses for completed projects.
1.7 DELIVERY
A. Deliver steel reinforcement to prevent damage.
B. Before installation, return or dispose of distorted or damaged steel reinforcement.
C. Bulk Products: Deliver bulk products away from buildings, utilities, pavement, and existing turf and planted areas. Maintain dry bulk product storage away from contaminants.
1.8 STORAGE AND HANDLING
A. Protect products from damage during handling and construction operations.
1.9 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."
PART 2 - PRODUCTS
2.1 CONCRETE MATERIALS
A. Portland Cement: ASTM C150/C150M, Type I or II.
B. Reinforcing Steel: ASTM A615/A615M or ASTM A996/A996M, Grade 280 (40);
Grade 420 (60); Grade 520 (75); Grade 550 (80); Grade 690 (100); deformed.
C. Expansion Joint Filler: ASTM D1751.
32 05 23 - 4
2.2 SELECT SUBBASE
A. Subbase: AASHTO M147; Grade A Grade B Grade C Grade D Grade E Grade F.
1. Select granular material composed of sand, sand-gravel, crushed stone, crushed or granulated slag, with or without soil binder, or combinations of these materials.
SUBBASE GRADING REQUIREMENTS
Sieve Size Percentage Passing by Mass
Grades
(mm) (in) A B C D E F
50 2 100 100
25 1 75-95 100 100 100 100
9.5 3/8 30-65 40-75 50-85 60-100
4.47 No. 4 25-55 30-60 35-65 50-85 55-100 70-100
2.00 No. 10 15-40 20-45 25-50 40-70 40-100 55-100
0.425 No. 40 8-20 15-30 15-30 25-45 20-50 30-70
0.075 No. 200 2-8 5-20 5-15 5-20 6-20 8-25
2.3 FORMS
A. Forms: Wood, plywood, metal, or other materials, approved by Contracting
Officer's Representative, of grade or type suitable to obtain type of finish specified.
1. Plywood: Exterior grade, free of defects and patches on contact surface.
2. Lumber: Sound, grade-marked, S4S stress graded softwood, minimum 50 mm
(2 inches) thick, free from warp, twist, loose knots, splits, or other defects.
B. Provide forms suitable in cross-section, depth, and strength to resist springing during depositing and consolidating concrete.
1. Do not use forms varying from straight line more than 3 mm in 3000 mm
(1/8 inch in 10 feet), horizontally and vertically.
C. Provide flexible or curved forms for forming radii.
2.4 CONCRETE MIXES
A. Design concrete mixes according to ASTM C94/C94M, Option C.
B. Concrete Type: Non-air-entrained Air-entrained. See Table I.
2.5 ACCESSORIES
A. Equipment and Tools: Obtain Contracting Officer's Representative's, approval of equipment and tools needed for handling materials and performing work before work begins.
32 05 23 - 5
B. Maintain equipment and tools in satisfactory working condition.
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for product installation.
B. Protect existing construction and completed work from damage.
C. Prepare, construct, and finish subgrade. See Section 31 20 00, EARTHWORK.
D. Maintain subgrade in smooth, compacted condition, in conformance with the required section and established grade until the succeeding operation has been accomplished.
3.2 SETTING FORMS
A. Form Substrate:
1. Compact form substrate to uniformly support forms along entire length.
2. Correct substrate imperfections and variations by cutting, filling, and compacting.
B. Form Setting:
1. Set forms to indicated line and grade with tight joints. Rigidly brace forms preventing movement.
2. Remove forms when removal will not damage concrete and when required for finishing.
3. Clean and oil forms before each use.
4. Correct forms, when required, immediately before placing concrete.
C. Form Tolerances:
1. Variation from Indicated Line: Maximum 6 mm (1/4 inch).
2. Variation from Indicated Grade: Maximum 1/8 inch in 10 feet.
3.3 PLACING REINFORCEMENT
A. Keep reinforcement clean from contamination preventing concrete bond.
B. Install reinforcement shown on drawings.
C. Support and securely tie reinforcing steel to prevent displacement during concrete placement.
D. Obtain Contracting Officer's Representative's reinforcement placement approval before placing concrete.
3.4 JOINTS - GENERAL
A. Place joints, where shown on approved submittal Drawings.
1. Conform to details shown.
2. Install joints perpendicular to finished concrete surface.
B. Make joints straight and continuous from edge to edge of pavement.
32 05 23 - 6
3.5 CONTRACTION JOINTS
A. Tool or cut joints to width, depth, and radius edge shown on drawings using grooving tool, jointer, or saw.
B. Construct joints in curbs and gutters by inserting 1/8 inch steel plates conforming to curb and gutter cross sections.
1. Keep plates in place until concrete can hold its shape.
C. Finish joint edges with edging tool.
D. Score pedestrian pavement with grooving tool or jointer.
3.6 EXPANSION JOINTS
A. Form expansion joints with expansion joint filler of thickness shown on drawings.
1. Locate joints around perimeter of structures and features abutting site work concrete.
2. Create complete, uniform separation between structure and site work concrete.
B. Extend expansion joint material full depth of concrete with top edge of joint filler below finished concrete surface where sealant is indicated on
Drawings.
C. Cut and shape material matching cross section.
D. Anchor with approved devices to prevent displacing during placing and finishing operations.
E. Round joint edges with edging tool.
3.7 PLACING CONCRETE - GENERAL
A. Preparation before Placing Concrete:
1. Obtain Contracting Officer's Representative approval.
2. Remove debris and other foreign material.
3. Uniformly moisten substrate, without standing water.
B. Convey concrete from mixer to final location without segregation or loss of ingredients. Deposit concrete to minimize handling.
C. During placement, consolidate concrete by spading or vibrating to minimize voids, honeycomb, and rock pockets.
1. Vibrate concrete against forms and along joints.
2. Avoid excess vibration and handling causing segregation.
D. Place concrete continuously between joints without bulkheads.
E. Replace concrete with cracks, chips, bird baths, and other defects to nearest joints, approved by Contracting Officer's Representative.
32 05 23 - 7
3.8 PLACING CONCRETE FOR CURB AND GUTTER, PEDESTRIAN PAVEMENT, AND EQUIPMENT
PADS
A. Place concrete in one-layer conforming to cross section shown on Drawings after consolidating and finishing.
B. Deposit concrete near joints without disturbing joints. Do not place concrete directly onto joint assemblies.
C. Strike concrete surface to proper section ready for consolidation.
D. Consolidate concrete by tamping and spading or with approved mechanical finishing equipment.
E. Finish concrete surface with wood or metal float.
F. Construct concrete pads and pavements with sufficient slope to drain, preventing standing water.
3.9 FORM REMOVAL
A. Keep forms in place minimum 12 hours after concrete placement. Remove forms without damaging concrete.
B. Do not use bars or heavy tools against concrete to remove forms. Repair damage concrete found after form removal.
3.10 CONCRETE FINISHING - GENERAL
A. Follow operation sequence below, unless otherwise indicated on Drawings:
1. Consolidating, floating, striking, troweling, texturing, and joint edging.
B. Use edging tool with 1/4 inch radius, unless otherwise shown on Drawings.
C. Keep finishing equipment and tools clean and suitable for use.
3.11 CONCRETE FINISHING - PEDESTRIAN PAVEMENT
A. Walks, Wheelchair Curb Ramps.
1. Finish concrete surfaces with metal float, troweled smooth, and finished with a broom moistened with clear water.
2. Finish slab edges and formed transverse joints with edger.
3. Broom surfaces transverse to traffic direction.
a. Use broom finish to eliminate flat surface produced by edger.
b. Produce uniform corrugations, maximum 1/16-inch-deep profile.
4. Provide surface uniform in color and free of surface blemishes, form marks, and tool marks.
5. Paving Tolerances:
a. Variation from Indicated Plane: Maximum 3/16 inch in 10 feet.
b. Variation from Indicated Thickness: Maximum 1/4 inch.
32 05 23 - 8
3.12 CONCRETE FINISHING - CURBS AND GUTTERS
A. Round edges of gutter and top of curb with edging tool.
B. Gutter and Curb Top:
1. Float surfaces and finish with smooth wood or metal float until true to grade and section and uniform color.
2. Finish surfaces, while still plastic, longitudinally with bristle brush.
C. Curb Face:
1. Remove curb form and immediately rub curb face with wood or concrete rubbing block removing blemishes, form marks, and tool marks and providing uniform color.
D. Replace curbs and gutters within joint boundary when curbs and gutters exceed specified tolerances.
E. Correct depressions causing standing water.
3.13 CLEANING
A. After completing curing:
1. Sweep concrete clean, removing foreign matter from the joints.
2. Seal joints as specified.
3.14 PROTECTION
A. Remove protective materials immediately before acceptance.
B. Repair damage.
1. Replace concrete containing excessive cracking, fractures, spalling, and other defects within joint boundary, when directed by Contracting
Officer's Representative, and at no additional cost to the Government.
- - - E N D - - -
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section Includes: |
| 1. Subbase for concrete pavements. |
| 2. Curbs, gutters, and combination curbs and gutters wheel stops. |
| 3. Pedestrian Pavement: Walks, pedestrian crossings, wheelchair curb ramps, |
| 1.2 RELATED REQUIREMENTS |
| A. Subgrade Preparation and Subbase Compaction: Section 31 20 00, EARTHWORK. |
| 1.3 APPLICABLE PUBLICATIONS |
| A. Comply with references to extent specified in this section. |
| B. American Association of State Highway and Transportation Officials (AASHTO): |
| 1. M147-65-UL-04 - Materials for Aggregate and Soil-Aggregate Subbase, Base and Surface Courses. |
| 2. M233-86 - Boiled Linseed Oil Mixture for Treatment of Portland Cement Concrete. |
| C. American Concrete Institute (ACI): |
| 1. 305R-10 - Guide to Hot Weather Concreting. |
| 2. 306R-10 - Guide to Cold Weather Concreting. |
| D. American National Standards Institute (ANSI): |
| 1. B101.3 - Wet DOCF of Common Hard Surface Floor Materials (Including Action and Limit Thresholds for the Suitable Assessment of the Measured Values). |
| E. ASTM International (ASTM): |
| 1. A615/A615M-16 - Deformed and Plain Carbon Steel Bars for Concrete Reinforcement. |
| 2. A996/A996M-15 - Rail-Steel and Axle-Steel Deformed Bars for Concrete Reinforcement. |
| 3. A1064/A1064M-16 - Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete. |
| 4. C33/C33M-16 - Concrete Aggregates. |
| 5. C94/C94M-16 - Ready Mixed Concrete. |
| 6. C143/C143M-15a - Slump of Hydraulic Cement Concrete. |
| 7. C150/C150M-16 - Portland Cement. |
| 8. C171-16 - Sheet Materials for Curing Concrete. |
| 9. C260/C260M-10a - Air Entraining Admixtures for Concrete. |
| 10. C309-11 - Liquid Membrane Forming Compounds for Curing Concrete. |
| 11. C494/C494M-15a - Chemical Admixtures for Concrete. |
| 12. C618-15 - Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete. |
| 13. C979/C979M-16 - Pigments for Integrally Colored Concrete. |
| 14. C989/C989M-14 - Slag Cement for Use in Concrete and Mortars. |
| 15. C1240-15 - Silica Fume Used in Cementitious Mixtures. |
| 16. D1751-04(2013) e1 - Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types). |
| 17. D5893/D5893M-10 - Cold Applied, Single Component, Chemically Curing Silicone Joint Sealant for Portland Cement Concrete Pavements. |
| 18. D6690-15 - Joint and Crack Sealants, Hot Applied, for Concrete and Asphalt Pavements. |
| 1.4 PREINSTALLATION MEETINGS |
| A. Conduct preinstallation meeting at project site before beginning Work of this section. |
| 1. Required Participants: |
| a. Contracting Officer's Representative. |
| b. Contractor. |
| c. Installer. |
| 2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting. |
| a. Installation schedule. |
| b. Installation sequence. |
| c. Preparatory work. |
| d. Protection before, during, and after installation. |
| e. Installation. |
| f. Terminations. |
| g. Transitions and connections to other work. |
| h. Inspecting and testing. |
| i. Other items affecting successful completion. |
3. Document and distribute meeting minutes to participants to record decisions affecting installation.
| 1.5 SUBMITTALS |
| A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. |
| B. Submittal Drawings: |
| 1. Show size, configuration, and fabrication and installation details. |
| 2. Show reinforcing. |
| 3. Include jointing plan for concrete pavements, curbs and gutters. |
| C. Test reports: Certify products comply with specifications. |
| 1. Concrete materials. |
| 2. Select subbase materials. |
| 3. Field test reports. |
| D. Certificates: Certify products comply with specifications. |
| 1. Expansion joint filler. |
| 2. Reinforcement. |
| 3. Curing materials. |
| E. Qualifications: Substantiate qualifications comply with specifications. |
| Installer with project experience list. |
| 1.6 QUALITY ASSURANCE |
| A. Installer Qualifications: |
| 1. Regularly installs specified products. |
| 2. Installed specified products with satisfactory service on five similar installations. |
| a. Project Experience List: Provide contact names and addresses for completed projects. |
| 1.7 DELIVERY |
| A. Deliver steel reinforcement to prevent damage. |
| B. Before installation, return or dispose of distorted or damaged steel reinforcement. |
| C. Bulk Products: Deliver bulk products away from buildings, utilities, pavement, and existing turf and planted areas. Maintain dry bulk product storage away from contaminants. |
| 1.8 STORAGE AND HANDLING |
| A. Protect products from damage during handling and construction operations. |
| 1.9 WARRANTY |
| A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction." |
| PART 2 - PRODUCTS |
| 2.1 CONCRETE MATERIALS |
| A. Portland Cement: ASTM C150/C150M, Type I or II. |
| B. Reinforcing Steel: ASTM A615/A615M or ASTM A996/A996M, Grade 280 (40); Grade 420 (60); Grade 520 (75); Grade 550 (80); Grade 690 (100); deformed. |
| C. Expansion Joint Filler: ASTM D1751. |
| 2.2 SELECT SUBBASE |
| A. Subbase: AASHTO M147; Grade A Grade B Grade C Grade D Grade E Grade F. |
| 1. Select granular material composed of sand, sand-gravel, crushed stone, crushed or granulated slag, with or without soil binder, or combinations of these materials. |
| 2.3 FORMS |
| A. Forms: Wood, plywood, metal, or other materials, approved by Contracting Officer's Representative, of grade or type suitable to obtain type of finish specified. |
| 1. Plywood: Exterior grade, free of defects and patches on contact surface. |
| 2. Lumber: Sound, grade-marked, S4S stress graded softwood, minimum 50 mm (2 inches) thick, free from warp, twist, loose knots, splits, or other defects. |
| B. Provide forms suitable in cross-section, depth, and strength to resist springing during depositing and consolidating concrete. |
| 1. Do not use forms varying from straight line more than 3 mm in 3000 mm (1/8 inch in 10 feet), horizontally and vertically. |
C. Provide flexible or curved forms for forming radii.
| 2.4 CONCRETE MIXES |
| A. Design concrete mixes according to ASTM C94/C94M, Option C. |
| B. Concrete Type: Non-air-entrained Air-entrained. See Table I. |
| 2.5 ACCESSORIES |
| A. Equipment and Tools: Obtain Contracting Officer's Representative's, approval of equipment and tools needed for handling materials and performing work before work begins. |
| B. Maintain equipment and tools in satisfactory working condition. |
| PART 3 - EXECUTION |
| 3.1 PREPARATION |
| A. Examine and verify substrate suitability for product installation. |
| B. Protect existing construction and completed work from damage. |
| C. Prepare, construct, and finish subgrade. See Section 31 20 00, EARTHWORK. |
| D. Maintain subgrade in smooth, compacted condition, in conformance with the required section and established grade until the succeeding operation has been accomplished. |
| 3.2 SETTING FORMS |
| A. Form Substrate: |
| 1. Compact form substrate to uniformly support forms along entire length. |
| 2. Correct substrate imperfections and variations by cutting, filling, and compacting. |
| B. Form Setting: |
| 1. Set forms to indicated line and grade with tight joints. Rigidly brace forms preventing movement. |
| 2. Remove forms when removal will not damage concrete and when required for finishing. |
| 3. Clean and oil forms before each use. |
| 4. Correct forms, when required, immediately before placing concrete. |
| C. Form Tolerances: |
| 1. Variation from Indicated Line: Maximum 6 mm (1/4 inch). |
| 2. Variation from Indicated Grade: Maximum 1/8 inch in 10 feet. |
| 3.3 PLACING REINFORCEMENT |
| A. Keep reinforcement clean from contamination preventing concrete bond. |
| B. Install reinforcement shown on drawings. |
| C. Support and securely tie reinforcing steel to prevent displacement during concrete placement. |
| D. Obtain Contracting Officer's Representative's reinforcement placement approval before placing concrete. |
| 3.4 JOINTS - GENERAL |
| A. Place joints, where shown on approved submittal Drawings. |
| 1. Conform to details shown. |
| 2. Install joints perpendicular to finished concrete surface. |
B. Make joints straight and continuous from edge to edge of pavement.
| 3.5 CONTRACTION JOINTS |
| A. Tool or cut joints to width, depth, and radius edge shown on drawings using grooving tool, jointer, or saw. |
| B. Construct joints in curbs and gutters by inserting 1/8 inch steel plates conforming to curb and gutter cross sections. |
| 1. Keep plates in place until concrete can hold its shape. |
| C. Finish joint edges with edging tool. |
| D. Score pedestrian pavement with grooving tool or jointer. |
| 3.6 EXPANSION JOINTS |
| A. Form expansion joints with expansion joint filler of thickness shown on drawings. |
| 1. Locate joints around perimeter of structures and features abutting site work concrete. |
| 2. Create complete, uniform separation between structure and site work concrete. |
| B. Extend expansion joint material full depth of concrete with top edge of joint filler below finished concrete surface where sealant is indicated on Drawings. |
| C. Cut and shape material matching cross section. |
| D. Anchor with approved devices to prevent displacing during placing and finishing operations. |
| E. Round joint edges with edging tool. |
| 3.7 PLACING CONCRETE - GENERAL |
| A. Preparation before Placing Concrete: |
| 1. Obtain Contracting Officer's Representative approval. |
| 2. Remove debris and other foreign material. |
| 3. Uniformly moisten substrate, without standing water. |
| B. Convey concrete from mixer to final location without segregation or loss of ingredients. Deposit concrete to minimize handling. |
| C. During placement, consolidate concrete by spading or vibrating to minimize voids, honeycomb, and rock pockets. |
| 1. Vibrate concrete against forms and along joints. |
| 2. Avoid excess vibration and handling causing segregation. |
| D. Place concrete continuously between joints without bulkheads. |
| E. Replace concrete with cracks, chips, bird baths, and other defects to nearest joints, approved by Contracting Officer's Representative. |
| 3.8 PLACING CONCRETE FOR CURB AND GUTTER, PEDESTRIAN PAVEMENT, AND EQUIPMENT PADS |
| A. Place concrete in one-layer conforming to cross section shown on Drawings after consolidating and finishing. |
| B. Deposit concrete near joints without disturbing joints. Do not place concrete directly onto joint assemblies. |
| C. Strike concrete surface to proper section ready for consolidation. |
| D. Consolidate concrete by tamping and spading or with approved mechanical finishing equipment. |
| E. Finish concrete surface with wood or metal float. |
| F. Construct concrete pads and pavements with sufficient slope to drain, preventing standing water. |
| 3.9 FORM REMOVAL |
| A. Keep forms in place minimum 12 hours after concrete placement. Remove forms without damaging concrete. |
| B. Do not use bars or heavy tools against concrete to remove forms. Repair damage concrete found after form removal. |
| 3.10 CONCRETE FINISHING - GENERAL |
| A. Follow operation sequence below, unless otherwise indicated on Drawings: |
| 1. Consolidating, floating, striking, troweling, texturing, and joint edging. |
| B. Use edging tool with 1/4 inch radius, unless otherwise shown on Drawings. |
| C. Keep finishing equipment and tools clean and suitable for use. |
| 3.11 CONCRETE FINISHING - PEDESTRIAN PAVEMENT |
| A. Walks, Wheelchair Curb Ramps. |
| 1. Finish concrete surfaces with metal float, troweled smooth, and finished with a broom moistened with clear water. |
| 2. Finish slab edges and formed transverse joints with edger. |
| 3. Broom surfaces transverse to traffic direction. |
| a. Use broom finish to eliminate flat surface produced by edger. |
| b. Produce uniform corrugations, maximum 1/16-inch-deep profile. |
| 4. Provide surface uniform in color and free of surface blemishes, form marks, and tool marks. |
| 5. Paving Tolerances: |
| a. Variation from Indicated Plane: Maximum 3/16 inch in 10 feet. |
| b. Variation from Indicated Thickness: Maximum 1/4 inch. |
| 3.12 CONCRETE FINISHING - CURBS AND GUTTERS |
| A. Round edges of gutter and top of curb with edging tool. |
| B. Gutter and Curb Top: |
| 1. Float surfaces and finish with smooth wood or metal float until true to grade and section and uniform color. |
| 2. Finish surfaces, while still plastic, longitudinally with bristle brush. |
| C. Curb Face: |
| 1. Remove curb form and immediately rub curb face with wood or concrete rubbing block removing blemishes, form marks, and tool marks and providing uniform color. |
| D. Replace curbs and gutters within joint boundary when curbs and gutters exceed specified tolerances. |
| E. Correct depressions causing standing water. |
| 3.13 CLEANING |
| A. After completing curing: |
| 1. Sweep concrete clean, removing foreign matter from the joints. |
| 2. Seal joints as specified. |
| 3.14 PROTECTION |
| A. Remove protective materials immediately before acceptance. |
| B. Repair damage. |
| 1. Replace concrete containing excessive cracking, fractures, spalling, and other defects within joint boundary, when directed by Contracting Officer's Representative, and at no additional cost to the Government. |