AMENDMENT 0004 36C26221B0006 .docx
DOCX document 6 MB Posted
- Attached to
- Z1DA--ERHM Infrastructure Upgrades, LAACC Federal contract opportunity
- Solicitation number
- 36C26221B0006_1
About this file
This federal contract opportunity solicitation is for infrastructure upgrades at the VA Greater Los Angeles Healthcare System's Los Angeles Ambulatory Care Center facility. Work includes general construction, alterations, mechanical and electrical work, and utility systems necessary to improve infrastructure supporting the Department of Veterans Affairs' New Electronic Health Record Modernization. The project value is between $2,000,000 to $5,000,000. The North American Industry Classification code is 236220 for Commercial and Institutional Building Construction, with a size standard of $39.5 million. The solicitation will be issued on May 21, 2021 via Contract Opportunities and is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. A site visit date will be provided in the solicitation. The point of contact is provided for any questions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT 3A - E-202_Revision per RFI 013.pdf | ||
| ATTACHMENT B - Cyber Power Envirosensor Specifications Sheet.pdf | ||
| ATTACHMENT 1 - Electrical Plan Markup.pdf | ||
| ATTACHMENT 2 - GVS with Lithium Ion Battery Solution.pdf | ||
| ATTACHMENT 3 - E-202 First Floor Enlarged Electrical Plans.pdf | ||
| ATTACHMENT 4- MP03 Justification and Approval MCT - Copy_Redacted.pdf | ||
| ATTACHMENT A - Cyber Power UPS Specifications Sheet.pdf | ||
| AMENDMENT 0003 TO 36C26221B0006.docx | DOCX document | |
| ATTACHMENT 1 - SIGN-IN SHEET PRE-BID CONFERENCE AND JOB WALK 691GE-20-202.pdf | ||
| ATTACHMENT 2 - DESIGN NARRATIVE 691GE-20-202 Amb-EHRM.pdf | ||
| ATTACHMENT 2A - APPENDIX B - PHOTOS 691GE-20-202.pdf | ||
| 36C26221B0006 0002.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT 0004 TO
36C26221B0006
PROJECT 691GE-20-202
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 07/30/2021
691GE-20-202
00262 Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815 00262 Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815 To all Offerors/Bidders
36C26221B0006 06-21-2021
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 10:00 AM (PDT), AUGUST 13, 2021
NOT APPLICABLE
Amendment 0004 is issued to post Contractors' RFI and VA's responses to Contractors' RFIs.
A ttached herein are Attachment 1 – Electrical Plan Markup, Attachment 2 - GVS with Lithium Battery Solution, Attachment 3 - E-202 First Floor Enlarged Electrical Plans and Attachment 3A - E-202 Revision Per RFI 13 Attachment 4 - J&A includes Attachment A - Cyber Power UPS Specifications Sheet and Attachment B - Cyber Power Envirosensor Specification Sheet.
ALL OTHER TERMS AND CONDITIONS SHALL REMAIN UNCHANGED.
MARIA CRUZ-THOMPSON
CONTRACTING OFFICER
)RFI
CONTRACTORS’ RFIs and VA RESPONSES TO RFIs ARE AS FOLLOWS:
CONTRACTOR RFI No. 1: At the Site Visit conference it was stated that the VA will require two full shifts every day from 0600 to 1700 and 1700 to 0600. We did not find this requirement in the RFP or the Specifications. Since this will add significant cost to the project, will the VA confirm the two-shift requirement will be mandated for this project? Will the two shifts occur Monday thru Friday or will this be 7 days a week? Will federal holiday shifts be required?
VA RESPONSE – RFI No. 1: The times will be first shift 0700-1700 10hrs / second shift 1700-0300 10hrs Monday to Saturday / no Sunday and holidays.
CONTRACTOR RFI No. 2: Clarification on the room designation for electrical rooms, see below:
1) Drawing E103 designates room A354 as a storage room however the footprint resembles the electrical closet numbered as S-06. 2) Drawing E104 does not show where room A472 is located, is it the room south of room A416C? Please advise.
VA RESPONSE – RFI No. 2: Yes, the Electrical Room is right next to room A416C. The Electrical closet for the third floor is S-06.
CONTRACTOR RFI No. 3: Per general note #1 on drawing E101, 2 set of 6- 4"conduits 6' apart per the details need to installed from the Computer Room A114 to each Telecom Room (TR). Is there an existing chase(s) from room A114 to the fifth floor that can be utilized to install conduit risers to every the TR? Will chases need to be erected for this project if a chase does not exist? If not, please advise on the locations where the designer may have proposed the 4" conduits to be routed from the 1st floor up to the 5 floor and where proposed penetrations are to be made at each floor level and any requirements for chases.
VA RESPONSE – RFI No. 3: Each floor has two Telephone Closet with a chase adjacent to most of of them. Most of the Closets and chases are stacked up. See attached PDF. Contractor can field verify available spaces at the Closets to see if the new conduits can be run through them. If chases are available to use, Contractor shall verify if they are OK to be used for Telecom Backbone route, before using them. Confirmation with VA IT and with the facility is also required before using any of the Closets and the chases for the conduit route. All floor/ceiling penetrations shall be sealed with appropriate fire stop assembly as per design.
If proposed Closets and/or chases can be used, no new chase will be required.
See Attachment 1 – Electrical Plan Markup as well as pdf file above.
CONTRACTOR RFI No. 4: Per keynote 11 on drawing E202, and/or similar keynotes on E203, E204, E205 & E206, it states to provide grounding and bonding to nearby electrical panels feeding the TR. Is there an existing grounding system in the electrical rooms that these panels are located in? Can it be tied-into to that grounding systems or is a dedicated 3/4"conduit with #6AWG needs to be installed from the TR to the electrical panel?
Does this include grounding for panel P2CE and 6EP?
VA RESPONSE – RFI No. 4: The Grounding system that must be created in each TR room is provide on drawing E505 Grounding and bonding Riser Diagram. This explains how to create the isolated ground from the switch gear to the TMGB to the TGB. Your panels will get the ground from its source. The isolated ground is for the communication side and all its equipment.
CONTRACTOR RFI No. 5:. Per site visit it was observed that the corridors, as C3-2, contained framed hard lid ceilings with light fixtures (see attached photos in Amendment #1). Per note conduits (A and B side) are to maintained a 6' separation which cannot be meet with this ceiling system. Is the intent to utilized the corridor east, for example C3-23 in drawing E103, for the installation of these conduits? Please advise.
VA RESPONSE – RFI No. 5: It may be easier to install new conduits above drop ceilings than hard lid ceilings. Corridor C3-23 has drop ceiling. The new conduits can be routed along this corridor.
CONTRACTOR RFI NO. 6: Can a product/data schematic be provided for the new UPS-PA and UPS-PB in order to determine the power requirements and disconnect switch type/size?
VA RESPONSE – RFI No. 6: Note 20 on drawing E201 provides the size of each UPS A & B. I have provided a cut sheet.
See Attachment 2 – GVS with Lithium Ion Battery Solution as well as pdf file above.
CONTRACTOR RFI No. 7: There will be a significant amount of 4" EMT conduit for DATA risers and other sizes and benders for this project that will require a large amount of laydown area. Please provide details of amount of space and the area where the laydown will be for this project.
VA RESPONSE – RFI No. 7: The laydown area will be the back side of the building. There will be only room for two conex boxes.
CONTRACTOR RFI No. 8: During the site walk the VA mentioned that there will be two shifts to perform the SOW. Do we assume that all conduit installation through out the building including the parking structure to be done after hours. Please confirm the time start time and the stoppage time when this work can be performed. Will 10hr shifts be acceptable?
VA RESPONSE – RFI No. 8: The times will be first shift 0700-1700 10hrs / second shift 1700-0300 10hrs Monday to Saturday / no Sunday and holidays.
CONTRACTOR RFI No. 9: Contractor is to have day and night shifts because the medical services and support services of the hospital will remain operation during performing contracted work.
Please set the time of day and night shift and describe works allowed during day time and night time.
VA RESPONSE – RFI No. 9: The times will be first shift 0700-1700 10hrs / second shift 1700-0300 10hrs Monday to Saturday / no Sunday and holidays.
CONTRACTOR RFI No. 10: There is not enough area for parking and lay down at the hospital.
Please indicate parking area and lay down area for the contracted work performance.
VA RESPONSE – RFI No. 10: The Parking will be discussed when the job is awarded. There is only room for two conex boxes on the back side of the building
CONTRACTOR RFI No. 11: In drawing E102, Keynote #9 in the 2nd floor call center area states that “all existing telecom outlets and cabling serving the call center as indicated inside the dashed line to remain.” AP locations are shown in the call center area.
0. Do the APs in those areas need new cables? Or are they existing to be left in place as well?
VA RESPONSE – RFI No. 11: The TR in the Phone Center feed the AP’s and will not require new Cabling.
CONTRACTOR RFI No. 12: On drawing E100, there is one (1) quad outlet noted in the Corridor and one (1) in the Chiller Area Office.
1. Which TE room are those drops getting fed from?
1. Is the existing pathway useable to get to those locations?
VA RESPONSE – RFI No. 12: The data comes from the Main Computer Room (MCR) that feeds the Chiller Maintenance Office. I would assume the path is reusable.
CONTRACTOR RFI No. 13: On Drawing E202, Keynote #7 specifies 12”W x 6”D cable tray but the part number provided (CF 105/300) is for 4”W x 4”D cable tray.
1. What size would the VA prefer?
VA RESPONSE – RFI No. 13: The correct part number is CF 150/300 with 12”W x 6” cable tray per OIT design guide. Please see Attachment 3 and Attachment 3A for revised drawings.
CONTRACTOR RFI No. 14: The drawings state the backbone fiber running from the Main Computer Room A114 consists of one (1) 24-strand OM4 and one (1) 12-Strand OS1 running through 2” innerduct in 4” conduit. For two fiber cables this seems large and will take up a lot of room in the 4” conduit.
1. Would the VA accept 1” innerduct for this instead? That way it will fit the cables and allow more room to run other current/future fiber cables.
VA RESPONSE – RFI No. 14: Recommend providing two 1” innerducts with the OM4 and OS1 cables respectively and one 1” innerduct with pull string for future use. Proposed innerducts are subject to VA IT approvals.
CONTRACTOR RFI No. 15: On drawing E204, Keynote #9 mentions installing the 6” diameter conduit sleeves above the ladder rack.
1. Does the VA mean to reference the new cable tray? Or is ladder rack supposed to be installed as well?
VA RESPONSE – RFI No. 15: New mesh trays will be provided above data racks per keyed note #7 of sheet E204. New conduit sleeves will be provided from 6” above the mesh trays to 6” above the drop ceiling.
CONTRACTOR RFI No. 16: In the TR room detailed drawings (E201-E206), there are data outlet symbols with an (E) next to them.
1. Are all of these existing outlets to remain?
1. If not, what is the (E) signifying?
VA RESPONSE – RFI No. 16: Yes, the outlets will remain as the E indicates existing. Note 14 states that, but I do see that note 14 isn’t indicated on all details.
CONTRACTOR RFI No. 17: Regarding Access Doors / Door Hardware - Per the information in the RFP, there is only (1) door on the Door Schedule. Is there only (1) door slated to receive a card reader?
VA RESPONSE – RFI No. 17: Yes, there is only one new door getting installed. This new door will be for the new TR on the fourth floor. You will be installing the conduits and boxes to support the new PIV equipment that will be installed by another project.
CONTRACTOR RFI No. 18: What control system is currently in operation?
VA RESPONSE - RFI No. 18: The control system is Johnson Control system.
CONTRACTOR RFI No. 19: Verify that the Owner will be responsible for removing ALL equipment, unbolted furniture, personal effects, etc. from the affected areas prior to construction.
VA RESPONSE – RFI No. 19: The Government will be responsible to remove all personnel effects and electronic equipment. The Contractor will be responsible to relocated / move unbolted furniture, bolted furniture, module furniture and any other obstacles that my hinder the installation of data ports and other project needs.
CONTRACTOR RFI No. 20: Has the facilities ICRA team assigned classifications to the affected and adjacent spaces to set the level of ICRA measures to be put in place by the general contractor?
VA RESPONSE – RFI No. 20: No, the COR or Engineering Personnel will assist in classification. The General Contractor will have to confirm with the COR and Infection Control personnel (IC).
CONTRACTOR RFI No. 21: Specification section 01 45 00, 1.4.C states:
“CQC Personnel: In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist in the CQC System Manager for the following areas, as applicable: electrical, mechanical, civil, structural, environmental, architectural, materials technician submittals clerk, Commissioning Agent/LEED specialist, and low voltage systems. These individuals or specified technical companies are employees of the prime or subcontractor; be responsible to the CQC System Manager; be physically present at the construction site during work on the specialized personnel’s areas of responsibility; have the necessary education or experience in accordance with the Experience Matrix listed herein.”
Is it the intent of the Government for us to budget these personnel to be on-site during the entire duration of work in each specialty area in addition to the full time QC manager? Consequently, adding $millions to the cost of general conditions over the duration of this project.
VA RESPONSE – RFI No. 21: By hiring the Commission Agent firm they will provide the specialists that will be needed to support this specified requirement.
CONTRACTOR RFI No. 22: Specification section 01 45 00, 1.4.B states:
“The CQC System Manager is required to be a graduate engineer, graduate architect, or a graduate of construction management.”
Does this statement require simply a bachelor's degree or a graduate degree such as a master's or a PhD?
VA RESPONSE – RFI No. 22: Yes, the individual has to be able to perform the position of CQC System Manager and have the qualification. A bachelor’s degree or graduate degree such as master’s or a PhD would meet the qualification requirement.
CONTRACTOR RFI No. 23: Reference Specification section 01 45 00:
Paragraph 1.8.B states that the Contractor is to appoint a Contractor's Commissioning Manager, a Contractor's Commissioning Representative, and a Commissioning agent as members of the Commissioning Team.
Paragraph 1.9.A states that the VA is to appoint an individual, company, or firm to act as the Commissioning Agent.
These specification sections are in conflict. It is our experience that the VA typically contracts the Commissioning Agent directly and the Contractor assigns a Commissioning Manager to interface with the Commissioning Agent.
Confirm that the Commissioning Agent will be appointed by and contracted directly with the VA.
VA RESPONSE – RFI No. 23: No, the Commission Agent will be provided by the Contractor under section 1 91 00 Para. 1.8 Commissioning Team. Also. Responsibilities for Contractor in Para. 1.11. Removal of Para. 1.9 (A) should be struck from the spec.
CONTRACTOR RFI No. 24: In accordance with specification section 01 35 26-10, paragraph 1.6.C, confirm that a 3 separate, full time individuals are required to fulfill the staffing requirements of Superintendent, Quality Control, and SSHO and that they are to be dedicated to this project.
VA RESPONSE – RFI No. 24: Yes, that is correct. Work of a long duration and performance within a Government facility that on the advice of VA construction safety representatives involves hazardous operations that might endanger the safety of the public, patients and/or Government personnel or property, the SSHO and Superintendent and/or Quality Control Manager must be separate persons.
CONTRACTOR RFI No. 25: How is the VA going to accommodate the current price escalation being experienced in the marketplace with regards to commodities such as wood, steel, plastics, etc.?
VA Response – RFI No. 25: This procurement is “Firm-Fixed-Price” and is not subject to any adjustment on the basis of the contractor’s cost experience in performing the contract.
CONTRACTOR RFI No. 26: How is the VA going to accommodate the current extended lead times and material manufacturing and delivery delays that are occurring in the construction industry?
VA RESPONSE RFI No. 26: Extended lead times, material manufacturing, and delivery delays will be evaluated on a case-by-case basis if any arises during the project.
CONTRACTOR RFI No. 27: Has a Limited Source Justification (FAR 6.302-1(c), 6.303) been prepared for any materials identified under this solicitation? If so, identify which systems to which they apply and provide all related documentation, including any required Approval (FAR 6.304) or Certification (FAR 6.303(b)(12)).
VA RESPONSE – RFI No. 27: See Attachment 4 – J&A which includes Attachments A&B.
CONTRACTOR RFI No. 28: Please confirm that the Government will allow proposers a minimum of seven (7) days to respond to the RFP starting from the date that the Government responds to 100% of the RFIs received.
VA RESPONSE – RFI No. 28: Yes
Page 1 of
Page 1 of
19 - 691GE-20-202 Apx A2 Elec Cut Shts-4.pdf mekong
Polygon
Line
REVISIONS
SHEET:
FILENAME/PATH:
REV DESCRIPTION
PROJECT:
TITLE:
DATE
ENGINEER:
APPROVED:
DWG NO:
DRAWN:
DRWN ENGRDATE
REV.
APPR DATE
THIS DRAWING AND SPECIFICATIONS HEREIN ARE THE PROPERTY OF
SCHNEIDER ELECTRIC AND SHALL NOT BE COPIED, REPRODUCED OR
USED IN WHOLE OR IN PART, AS THE BASIS FOR THE MANUFACTURE
OR SALE OF ITEMS WITHOUT WRITTEN PERMISSION FROM SCHNEIDER
ELECTRIC. THIS DRAWING IS BASED UPON LATEST AVAILABLE
INFORMATION AND IS SUBJECT TO CHANGE WITHOUT NOTICE.
AutoCAD SHX Text
FRONT VIEW
LEFT SIDE VIEW
REAR VIEW
21.65[550] MINIMUM CLEARANCE RECOMMENDED
MINIMUM SERVICE CLEARANCE PER NATIONAL, STATE & LOCAL CODES
FRONT
WHILE INSTALLING ATTACH ONLY THIS SIDE TO THE RIGHT SIDE OF THE MBC
WHILE INSTALLING REMOVE RIGHT SIDE COVER FROM UPS AND RE-ATTACH THIS SIDE
A
B
QRMI89384
R MILLER
04-APR-19
M LEPARD
PROJ
ANGLE
N/A
GVS DISTRIBUTION
OF 3
GALAXY VS
42 POSITION DISTRIBUTION CABINET
INPUT: 208VAC, 3PH
OUTPUT: 208VAC, 3PH,
GENERAL ARRANGEMENT
THIS DRAWING IS BASED ON DRAWING NUMBER PLACEHOLDER - INITIAL RELEASE
NOTES: 1. INSTALLATION SHALL COMPLY WITH ALL APPLICABLE NATIONAL, STATE AND LOCAL CODES. INSTALLATION SHALL COMPLY WITH ALL APPLICABLE NATIONAL, STATE AND LOCAL CODES. 2. REFER TO PRODUCT DOCUMENTATION FOR ADDITIONAL DETAILS PRIOR TO INSTALLATION AND SITE PREPARATION WORK. REFER TO PRODUCT DOCUMENTATION FOR ADDITIONAL DETAILS PRIOR TO INSTALLATION AND SITE PREPARATION WORK. 3. ALL DIMENSIONS ARE IN INCHES [MILLIMETERS]. ALL DIMENSIONS ARE IN INCHES [MILLIMETERS]. 4. FRONT ACCESS REQUIRED FOR SERVICE. FRONT ACCESS REQUIRED FOR SERVICE. MINIMUM REQUIRED FRONT CLEARANCE IS 38.58[980]. REAR CLEARANCE REQUIRED IS 5.91[150]. 5. ALL DIMENSIONS EXCLUDES SCREW PROJECTIONS OUTSIDE THE ENCLOSURE. ALL DIMENSIONS EXCLUDES SCREW PROJECTIONS OUTSIDE THE ENCLOSURE. 6. CABLE ENTRY IS FROM TOP OR BOTTOM OF THE UNIT. CABLE ENTRY IS FROM TOP OR BOTTOM OF THE UNIT. 7. WEIGHT OF THE UNIT IS 264 LBS [120 kg]. WEIGHT OF THE UNIT IS 264 LBS [120 kg]. 8. OPERATING TEMPERATURE: 32 F TO 104 F [0 C TO 40 C]. OPERATING TEMPERATURE: 32°F TO 104°F [0°C TO 40°C].9. PROTECTION CLASS: IP20. PROTECTION CLASS: IP20. 10. COLOR: RAL 9003 WHITE. COLOR: RAL 9003 WHITE. 12. WHILE INSTALLING WITH UPS AND MBC, REMOVE RIGHT SIDE COVER OF THE UPS UNIT AND ATTACH THE MBC UNIT TO THE RIGHT SIDE OF THE UPS UNIT. THEN ATTACH DISTRIBUTION UNIT(S) TO THE RIGHT SIDE OF THE MBC UNIT. RE-ATTACH RIGHT SIDE COVER OF THE UPS TO THE RIGHT SIDE OF THE DISTRIBUTION UNIT. 13. INTERCONNECTING CABLES ARE SUPPLIED. INTERCONNECTING CABLES ARE SUPPLIED. 14. FOR 208V DISTRIBUTION ONLY FOR 208V DISTRIBUTION ONLY
6.30x13.78 [160x350] TOP CABLE ENTRY AREA
BOTTOM VIEW
TOP VIEW
TOP VIEW
OPTIONAL SEISMIC KIT (GVSOPT003)
DISTRIBUTION CABINET
6.30x9.06 [160x230] BOTTOM CABLE ENTRY AREA
FRONT SWIVELING WHEEL
REAR SWIVEL WHEEL
.67
NOTES: 1. INSTALLATION SHALL COMPLY WITH ALL APPLICABLE NATIONAL, INSTALLATION SHALL COMPLY WITH ALL APPLICABLE NATIONAL, STATE AND LOCAL CODES. 2. REFER TO PRODUCT DOCUMENTATION FOR ADDITIONAL DETAILS REFER TO PRODUCT DOCUMENTATION FOR ADDITIONAL DETAILS PRIOR TO INSTALLATION AND SITE PREPARATION WORK. 3. ALL DIMENSIONS ARE IN INCHES [MILLIMETERS]. ALL DIMENSIONS ARE IN INCHES [MILLIMETERS]. 4. DRILL/PUNCH HOLES IN PLATE. REMOVE PLATE FROM CABINET DRILL/PUNCH HOLES IN PLATE. REMOVE PLATE FROM CABINET BEFORE DRILLING/PUNCHING. 5. FIXATION OF ANCHORING BRACKETS IS OPTIONAL IN NON-SEISMIC FIXATION OF ANCHORING BRACKETS IS OPTIONAL IN NON-SEISMIC LOCATIONS.
TOP-BOTTOM VIEWS & ANCHORING
FRONT VIEW (DOOR REMOVED)
42 POS DISTRIBUTION CABINET
COLUMN WIDTH 42 POS QO PANEL BOARD
INTERNAL FRONT VIEW
NEUTRAL BUSS
GROUND BUSS
42 POSITION QO PANELBOARD
NOTES: 1. INSTALLATION SHALL COMPLY WITH ALL APPLICABLE NATIONAL, STATE AND LOCAL CODES. INSTALLATION SHALL COMPLY WITH ALL APPLICABLE NATIONAL, STATE AND LOCAL CODES. 2. REFER TO PRODUCT DOCUMENTATION FOR ADDITIONAL DETAILS PRIOR TO INSTALLATION REFER TO PRODUCT DOCUMENTATION FOR ADDITIONAL DETAILS PRIOR TO INSTALLATION AND SITE PREPARATION WORK. 3. ALL DIMENSIONS ARE IN INCHES [MILLIMETERS]. ALL DIMENSIONS ARE IN INCHES [MILLIMETERS]. 4. PANELBOARD IS AT 208V ONLY. CAN MOUNT INDIVIDUAL BREAKERS UP TO 60A EA FOR PANELBOARD IS AT 208V ONLY. CAN MOUNT INDIVIDUAL BREAKERS UP TO 60A EA FOR A TOTAL OF 225A MAX.
INTERNAL VIEWS 1-2
OL3000RTXL2UHVN
SMART APP ONLINE UPS
Prevent business interruptions and safeguard mission-critical enterprise network equipment.
SPECIFICATIONS
GENERAL
UPS Topology Double Conversion
Energy Saving Yes, ECO Mode Efficiency >97%
INPUT
Input Voltage Range
120 – 139 VAC for 0–60% load 140 – 159 VAC for 0–70% load 180 – 189 VAC for 0–90% load 190 – 280 VAC for 0–100% load
Frequency Range 40 – 70 Hz (auto sensing)
Input Power Factor 0.99
Cold Start Yes
Plug Type NEMA L6-20P
Cord Length (ft) 10
Cord Length (m) 3
The CyberPower OL3000RTXL2UHVN is a rack/tower UPS with double conversion topology. It provides sine wave output to critical applications and equipment that require seamless power correction. The Extended Battery Module (EBM) expands runtime, and Fast Charge Technology restores full backup power faster. This model comes with an extendable LCD control panel, Smart Battery Management charging technology, and energy-saving GreenPower UPS™ ECO Mode.
The OL3000RTXL2UHVN offers generator compatibility and delivers clean AC power with zero transfer time. A factory installed RM card allows remote management and configuration of the UPS via a standard web browser, command line interface (CLI), or network management system (NMS). Its sine wave output keeps sensitive equipment working by preventing unnecessary shutdowns that can occur with simulated sine wave output.
With a $400,000 lifetime connected equipment guarantee and a three-year warranty, you can trust CyberPower’s commitment to high quality.
OUTPUT
VA 3,000 VA
Watts 2,700 W
Rated Power Factor 0.9
On Battery Waveform Sine wave
On Battery Voltage 200, 208, 220, 230, 240 V ±2% (configurable)
On Battery Frequency 50/60 Hz ± 0.25 Hz (auto-sensing or configurable)
Harmonic Distortion THD < 3% at Linear Load, < 5% at Non-linear Load
Crest Factor 3:1
Outlets - Total 3
Outlet Type NEMA L6-20R (2), NEMA L6-30R (1)
©2019 Cyber Power Systems (USA), Inc. CyberPower is a registered trademark and brand of Cyber Power Systems (USA), Inc. All rights reserved. All other trademarks are the property of their respective owners. CyberPower reserves the right to change, without notice, marketing programs, product offerings and specifications. www.cyberpowersystems.com
TYPICAL APPLICATIONS
• Corporate and Enterprise Servers
• Network and Storage Devices
• Edge Closets
• PBX and VoIP Installations
FEATURES
• 3000VA / 2700W
• Double Conversion Topology
• Sine wave output, zero transfer time
• Configurable Output - 200, 208, 220, 230, 240 V, 50/60 Hz
• GreenPower UPS™ ECO Mode
• RM205CARD for remote monitoring
• 2U Rack Mount/Tower Convertible
• Outlets: (2) NEMA L6-20R,
(1) NEMA L6-30R
• PowerPanel® Business Edition
Management Software
Highlight
SPECIFICATIONS CONT.
OUTPUT (cont.)
Overload Protection
Line Mode:
105% to 125% load for 1 min 126% to 150% load for 10 sec
Battery Mode:
105% to 130% load for 10 sec 131% to 150% load for 2 sec
Bypass Internal Bypass (Automatic and Manual)
Transfer Time 0 ms
BATTERY
Runtime at Half Load 11 min
Runtime at Full Load 3.5 min
Battery Type Sealed lead acid
Battery Size 12V/9Ah
Battery Quantity 6
Replacement Battery Cartridge RB1290X6A
Replacement Battery Cartridge Quantity 1
Hot Swappable Yes
Typical Recharge Time 4 h (0% to 90%)
Smart Battery Management (SBM) Mode Yes
Extended Battery Option BP72V60ART2U
SURGE PROTECTION & FILTERING
Surge Protection 1335 Joules, per IEC 61000-4-5 Level 3
Phone RJ11 / Ethernet RJ45 1-In / 1-Out (combo)
EMI/RFI Filtration Yes
MANAGEMENT & COMMUNICATIONS
LCD Control Panel Supports: Multi-Language Interface, 25 Types of Function Setting, 24 Types of Read Out and 5 Event Logs.
Rotatable LCD Control Panel Option Yes
Removable LCD Control Panel Option Yes - Requires a separate DB26 Cable
HID Compliant USB Port Yes
Serial Port Yes
EPO Port Yes
Dry Contacts Yes
Cables Included USB cable, Serial cable, Phone cable
LED Indicators
Power On (white) Line Mode (green) Battery Mode (yellow) Bypass Mode (yellow) Fault (red) Replace Battery (red)
Audible Alarms
Battery Mode Battery Low Overload UPS Fault
Software PowerPanel® Business Edition
Upgradeable Firmware Yes
Expansion Slot RMCARD205 pre-installed
PHYSICAL
Form Factor Rack/Tower
Color Black
Enclosure Construction Steel
Mounting Hardware Included
Dimensions (WxHxD) (in.) 17 x 3.5 x 23.62 (in)
Dimensions (WxHxD) (mm.) 432 x 89 x 600 (mm)
Weight (lbs) 68.2
Weight (kg) 30.93
Rack Size 2U
SHIPPING DIMENSIONS
Dimensions (WxHxD) (in.) 9.24 x 35.77 x 22 (in)
Dimensions (WxHxD) (mm.) 234.7 x 908.56 x 558.8 (mm)
Weight (lbs) 81
Weight (kg) 36.74
©2019 Cyber Power Systems (USA), Inc. CyberPower is a registered trademark and brand of Cyber Power Systems (USA), Inc. All rights reserved. All other trademarks are the property of their respective owners. CyberPower reserves the right to change, without notice, marketing programs, product offerings and specifications. www.cyberpowersystems.com
Callout
(2) RMU spaces
ENVIRONMENTAL
Operating Temperature 32 – 104 °F (0 – 40 °C)
Operating Relative Humidity 0 – 90% (non-condensing)
Operating Elevation 0 – 10,000 ft (0 – 3,000 m)
Storage Temperature -4°F to 113 °F (-20°C to 45 °C)
Storage Relative Humidity 0 – 95% (non-condensing)
Storage Elevation 0 – 50,000 ft (0 – 15,000 m)
UPS Online Thermal Dissipation 790 BTU/hr
ECO Mode Thermal Dissipation (100% Load) 207 BTU/h
Audible noise at 1m from surface of unit 38 to 55 dBA (0 to 100% load)
CERTIFICATIONS
Safety UL 1778 5th Ed.
CSA C22.2 NO.107.3-05
FCC Part 15 Class A
Environmental ROHS Compliant
WARRANTY
Product Warranty 3 Years Limited
Extended 2-Year Warranty WEXT5YR-U4B
Connected Equipment Guarantee Lifetime
CEG Amount $400,000
©2019 Cyber Power Systems (USA), Inc. CyberPower is a registered trademark and brand of Cyber Power Systems (USA), Inc. All rights reserved. All other trademarks are the property of their respective owners. CyberPower reserves the right to change, without notice, marketing programs, product offerings and specifications. www.cyberpowersystems.com
SPECIFICATIONS CONT.
17_Cabinet_1_lithium Battery
Isometric View
General Arrangement
Top View & Anchoring Details
Internal View & Details
Control Power Connection-3PH
Interface Details -1 Rack
Interface Details -2, 3 & 4 Racks
Schematic Diagram-1 & 2 Racks
Schematic Diagram-3 & 4 Racks
Schematic Diagram-2 Racks with Conduits
Schematic Diagram-3 Racks with Conduits
Schematic Diagram-4 Racks with Conduits
Typical Galaxy VS UPS details
17_Cabinet_2_40KW UPS
Main Mechanical
Top-Bottom and Anchoring Details
IP22 Option
Internal Views
Internal and interface details
17_Cabinet_3_Bypass & XFMR cabinet
General Arrangement
Top-Bottom & Anchoring
Internal Views
Interface Details
17_Cabinet_4_42 Pole distribution
Sheets and Views
QRMI89384_REV00_GVS_42_POSITION_DISTRIBUTION_CABINET-General Arrangement
QRMI89384_REV00_GVS_42_POSITION_DISTRIBUTION_CABINET-Top-Bottom View & Anchoring
QRMI89384_REV00_GVS_42_POSITION_DISTRIBUTION_CABINET-Internal Views-1
18_1_3KW_UPS_TR
image1.emf
Elec Plan markup for RFI 03 response_7_9_21.pdf
MAIN LOBBY
C1-71
PASSANGER
ELEVATOR
LOBBY
C1-1
WAITING
C1-59
RECEPTION
B102
B100
FILES
B124
CORRIDOR
C1-58
C1-72
TOILET
A101
A100
C1-76
CONTROL ROOM
A104
POLICE
A103
AGENT
CASHIER
A105
SERVICE
CA-79
OFFICE
A113A
STAFF
A112
CHIEF
A102A
A102
C1-90
COMPUTER ROOM
A114
MEDICAL/ GENERAL
STORAGE
A126
ENTRY
C1-91
MED GAS
FLAM. STOR.
A121
A120
HAC
A118
A119
A126A
LOCKABLE
STOR.
A126B
A114A
A127C
A127D
PROS. REP.
A127B
PROS. REP.
A127A
C1-94
A111
A110
CLERKS
A127
A127E
DRESSING
A129A
WORK ROOM
A129
VOLUNTEER
COORDINATOR
A130
VETS ASSIST
A128
A113B
A113C
A113D
A113E
KEYPUNCH&
EQUIPMENT
A113
A113G
A113F
A115B
LOCK SHOP
A115D
ENGINEERING
SHOP
A115
ENGINEERING
OPERATION SSECTION
A115B
SUPERVISING ENG.
OPERATION
A115A
PAINT
A115E
PARKING EQUIP.
A117
C1-84A
A116
A114B
C1-84
VA POLICE
A106
SUPERVISOR
A106B
A106C
LOCKER
A106A
TRASH HOLDING
A108
C1-60
C1-49
EL. CL.
A131A
A131B
A131C
ON CALL
A131D
ISOLATION
BEDROOM
A131GTOILET
A131E
A131L
ANTREROOM
A131K
A131M
RECOVERY BEDS
A131
C1-40
A131P
CONTROL
STATION
A131F
EQUIP.
A133
A132
A134
A134A
A134C
PRE-OP
HOLD
A135
A134B
CLEAN
UTILITY
A136
PATIENT
A131H
A131I
A131J
C1-45
C1-42
O.R.
A141
SPD
A139
LIGHT/ DARK
ROOM
A140
HOLDING
A138
RAD.
EQUIP
A137
ENDOSCOPY #2
A142
A142A
C1-33
OPERATING
ROOM #2
A153
OPERATING
ROOM #1
A152
SURGICAL
C1-34
LIFE
SUPPORT
A145
ANESTHESIOLOGIST
A154
ANESTH. GAS
A155
ANESTHESIA
WORK ROOM
A156
INSTR. PREP/
A157
MECHANICAL
A158
A151
STER.
A151C
A144A
DECONTAM
A144
ENDOSCOPY #1
A143
CART
WASH
A151B
TELE. CL.
A147
PROCESSING
A151D
A146
A143A
A151A
LOUNGE
A150
C1-30
MALE
LKRS/ SHWR/ TOILET
A148
FEMALE
L/S/T
A149
C1-28
A158-A
SERV. OFF
B128H
STUDENT
B128G
CLINICAL PHARM.
TEACH COOR. OFFICE
B128E
RESIDENT
B128C
SURGEON
A160
DICTATION
A160A
A159
B128A
CONSULTATION
B126
B127
C1-22
DRUG
INFORMATION
B128B
CLERICAL
WORK AREA
B440
CLIN. PHARM.
B128I
CLERICAL/
CLASSROOM
B128K
B128J
C1-23
C1-20
DISPENSING
B128S
ACTIVE
B1280
C1-2
C1-3
ACTIVE
B128M
B128N1
PRE-PACKAGING
BULK COMPOUNDING
B128N
INACTIVE
B128P
CONTROLLED
SUBSTANCE STOR.
B128D
DRUG RECEIVING
AND BREAKOUT
B128L
ELEC. CL.
B129
B130
B128
B131
B132
B135
DISPENSING
B134
VAULT
B134A
C1-14
B135A
B133
SPECIMEN
B136
REHAB
TECH
B137
PSYCHOLOGIST
B139
D.D.T.C.
B143
PSYCHOLOGIST
B141
SOCIAL
WORKER
B144
B145
B147
B148
B149
B150
CONFERENCE
GROUP THE.
B153
C1-11
B142
B140
B138
NURSE
B158
B157
TREATMENT
B155
B151
B152
B154
B156
RECEPT. POLICE
CONTROL ROOM
B156A
C1-5
C1-9
B156B
C1-4
C1-56
PHYSICIANS
ASSISTANT
B125
IT ROOM
B122
B119
OBSERV &
B108
B107
B107C
B111
HSE
B110
EXAM
B109
C1-63
MED
B106
SOILED
B105
B104
B117
B115
B113
C1-62
SECURITY
HOLDING
B103A
PATIENT
HYGENIE
B103
C1-64
B114
STAFF NURSE
WALKIN CLOSET
B116
B118
B120
B121
C1-55
FIRE SPRINKLER
CLOSET
A110A
B146
B112
MEDICAL/ GENERAL
A126
ENTRY
C1-91
SOILED LINEN
A125
PEST CONTROL
A124
PEST CONTROL
WORKROOM
A123
MED GAS
A122
FLAM. STOR.
A121
A120
A118
A119
A126A
LOCKABLE
A126B
A131A
A131B
A131C
ON CALL
A131E
A131L
SCALE: 3/32= 1'-0"
ELECTRICAL PLAN
M
T
C
H
L
I
N
E
S
H
PARTIAL FIRST FLOOR ELECTRICAL PLAN
F
U
12-J MAUCHLY
IRVINE, CALIFORNIA 92618
TEL: (949) 450-8420
FAX: (949) 450-8424
A R C H I T E C T U R E + E N G I N E E R I N G C O N S T R U C T I O N M A N A G E M E N T
KEYNOTES (SHEET E-101)
X
1. PROVIDE NEW DATA CABINETS IN THE MAIN COMPUTER ROOM (MCR) "A114" TO
SERVE DATA OUTLETS FOR ALL THE AREAS LEFT TO THE DASHED LINE AS
INDICATED ON THE DRAWING. SEE SHEET E-201 FOR DEMO WORK AND FOR
DATA CABINETS LAYOUT IN THE ROOM.
2. PROVIDE NEW DATA RACKS IN THE TELECOM ROOM (TR) "B122" TO SERVE DATA
OUTLETS FOR FOR ALL THE AREAS RIGHT TO THE DASHED LINE AS INDICATED
ON THE DRAWING. SEE SHEET E-202 FOR DEMO WORK AND FOR DATA RACKS
LAYOUT IN THE ROOM.
3. EXISTING 4-PORT DATA OUTLET. PROVIDE NEW 4-PORT TELECOM OUTLET WITH
COLORED CAT6A DATA JACKS ((1) GRAY, (1) WHITE, (1) BLUE AND (1) BLANK)
AND NEW FACEPLATE TO REPLACE THE EXISTING DATA OUTLET AT THE SAME
LOCATION. REUSE EXISTING OUTLET BACKBOX AS POSSIBLE, IF IT IS IN GOOD
CONDITION. OTHERWISE, REPLACE THE BACKBOX AS REQUIRED. PROVIDE
STAINLESS STEEL FACEPLATE FOR THE NEW OUTLET. TYPICAL FOR ALL DATA
OUTLETS ON THIS FLOOR.
4. PROVIDE (3) NEW CAT6A HORIZONTAL CABLES IN GRAY, WHITE AND BLUE
COLORS TO REPLACE EXISTING DATA CABLES TO THE OUTLET. CONNECT
EACH COLORED CABLE TO THE DATA JACK WITH THE SAME COLOR IN THE
OUTLET. REUSE EXISTING PATHWAY (CONDUIT OR WIREWAY) FROM THE
OUTLET TO SPACE ABOVE THE CEILING, IF POSSIBLE. IF THE EXISTING
PATHWAY IS LESS THAN 3/4" DIAMETER, PROVIDE A NEW 1" CONDUIT IN THE
WALL TO REPLACE THE EXISTING ONE FROM SPACE ABOVE THE CEILING TO
THE OUTLET. TYPICAL FOR ALL DATA OUTLETS ON THIS FLOOR.
5. REUSE EXISTING BACKBOX FOR LEGACY VOICE OUTLET FOR NEW TELECOM
OUTLET. FOR INFORMATION ONLY, EXISTING VOICE OUTLET WITH "NUMBER OF
PORTS / NUMBER OF JACKS" IS AS INDICATED. PROVIDE NEW OUTLET AND
CABLING PER KEYED NOTES 3 AND 4 TO REPLACE THE EXISTING ONE.
(TYPICAL FOR ALL)
(TYP.)
(TYP.)
6. EXISTING FURNITURE MOUNTED DATA OUTLET. E.C. SHALL FIELD VERIFY INSTALLATION OF
THE EXISTING OUTLET AND PROVIDE MOUNTING ACCESSORY AND REPAIRS IF REQUIRED
WHILE PROVIDING NEW CABLES, TELECOM JACKS AND FACEPLATE.
7. EXISTING ABOVE CEILING SUSPEND MOUNTED 6"X6" WIREWAY WITH HINGED COVER FOR
TELEPHONE, COMPUTER AND MATV SYSTEM CONDUCTORS. WIREWAY ROUTE IS BASED ON
AS-BUILT DRAWINGS AND LIMITED A/E SURVEY. SEE SHEET E-702 FOR EXISTING WIREWAY
INSTALLATION PER AS-BUILT SHEET "1-E116". E.C. SHALL FIELD VERIFY EXISTING WIREWAY
ROUTE, ITS SUPPORTS AND CONDITION. REPORT TO FACILITY AND CONSTRUCTION
MANAGER IF ANY DISCREPANCY OR PROBLEM FOUND, PRIOR TO REUSING THE EXISTING
WIREWAY FOR NEW TELECOM CABLE ROUTE. TYPICAL FOR ALL.
8. E.C. SHALL CAREFULLY REMOVE EXISTING COMMUNICATION CABLES TO AVOID DAMAGING
ANY EXISTING TELEPHONE, MATV AND ANY OTHER CABLES TO REMAIN IN THE WIREWAY.
ROUTE NEW CAT 6A CABLES IN THE WIREWAY, IF WIREWAY FILL RATIO IS NO MORE THAN
50%. PROVIDE NEW J-HOOKS FOR ANY ADDITIONAL CAT 6A CABLES WHEN WIREWAY FILL
RATIO WITH NEW TELECOM CABLES IS OVER 50% OR WHERE THERE IS NO EXISTING
WIREWAY. SEE SHEET E-702 FOR J-HOOK INSTALLATION DETAIL.TYPICAL FOR ALL.
9. FOR BIDDING PURPOSE, 20% OF THE EXISTING BACKBOXES AND EXISTING PATHWAYS
(CONDUITS AND WIREWAYS) WILL BE REPLACED. PRIOR TO START OF A CONSTRUCTION
PHASE/SEQUENCE, THE CONTRACTOR SHALL CONDUCT SURVEY OF THE EXISTING
BACKBOXES AND SIZE OF THE EXISTING PATHWAYS CONNECTED TO THE BACKBOXES, AND
IDENTIFY THE BACKBOXES AND PATHWAYS REQUIRING REPLACEMENT WITH PHOTOGRAPHS
AND ROOM NUMBERS ON PLANS. SUBMIT THE DOCUMENT FOR VA'S REVIEW AND APPROVAL,
PRIOR TO START OF THAT CONSTRUCTION PHASE/SEQUENCE.
10. PROVIDE NEW OR REPLACE EXISTING DATA OUTLETS AND CABLING AT FRONT DESK AND AT
SECURITY GATE TO PARKING GARAGE (NOT SHOWN ON THE PLAN) BY NEW ONES.
KEYNOTES (CONT.) (SHEET E-101)
(TYPICAL)
GENERAL NOTES
1. UNLESS OTHERWISE NOTED, PROVIDE TWO SETS OF BACKBONE CABLES
FROM THE MAIN COMPUTER ROOM A114 TO EACH TELECOM ROOM (TR) IN
THE BUILDING. EACH SET OF BACKBONE CABLE CONSISTS OF A
24-STRAND OM4 MULTI-MODE FIBER OPTIC CABLE AND A 12-STRAND OS1
SINGLE-MODE FIBER OPTIC CABLE WITHIN 2" INNERDUCTS IN (1) 4"
CONDUIT. ROUTE THE TWO 4" CONDUITS FOR THE BACKBONE CABLES
THROUGH FLOOR(S), ABOVE CEILING IN CORRIDORS, AND WITH MINIMUM
6' APART, AS PRACTICAL, FOR PATH DIVERSITY TO MEET PART "4.4.4" OF
"VA INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES
(VERSION 3.0)" REQUIREMENT. COORDINATE EXACT CONDUIT ROUTE IN
THE FIELD.
2. PROVIDE NEW PLENUM RATED CAT6A HORIZONTAL CABLES, UL LISTED
CMP-LP (0.7A), TO REPLACE ALL EXISTING DATA CABLES IN THE BUILDING.
PROVIDE NEW PATHWAY (CONDUITS, J-BOXES AND PULL BOXES, ETC.) AS
REQUIRED, NEW TELECOM JACKS AND STAINLESS STEEL FACEPLATES
FOR CABLE REPLACEMENT.
3. CONTRACTOR MAY REUSE EXISTING WIREWAYS AS SHOWN ON THE
PLANS AND PROVIDE NEW J-HOOKS FOR HORIZONTAL CABLE ROUTES
ABOVE SUSPENDED CEILINGS. J-HOOKS SHALL BE NO MORE THAN 5'
APART AND SHALL BE PROVIDED WITH INDEPENDENT SUPPORTS ON
BUILDING STRUCTURE FOR THE J-HOOKS. CONTRACTOR SHALL FOLLOW
CABLE MANUFACTURER'S SPECIFICATIONS FOR CABLE LOADING TO
ADEQUATELY SUPPORT CABLE'S WEIGHT THROUGH THE EXISTING
WIREWAYS AND THROUGH THE NEW J-HOOKS.
4. PROVIDE CONDUIT SLEEVES WHILE CABLE PENETRATIONS THROUGH
WALLS, CEILINGS AND FLOORS. PROVIDE APPROPRIATE FIRE-STOPPINGS
FOR CONDUIT PENETRATIONS THROUGH FIRE RATED WALLS, CEILINGS
AND FLOORS. PROVIDE LABEL FOR EACH FIRE-STOPPING. SEE GENERAL
NOTE #28 ON SHEET E-001 FOR REQUIREMENTS.
5. NO ZIP TIE IS ALLOWED FOR TELECOM CABLES. USE VELCRO CABLE TIES.
PLENUM-RATED CABLE TIES SHALL BE USED AT PLENUM SPACES.
6. ALL NEW ELECTRICAL CONDUCTORS AND TELECOM CABLES RUN ON P2, P1
AND ROOF LEVELS SHALL BE ROUTED IN RGS CONDUITS, U.O.N. ANY
SURFACE MOUNTED TELECOM CABLES SHALL BE ROUTED IN CONDUITS OR
RACEWAYS. NO TELECOM CABLES SHALL BE ROUTED EXPOSE.
7. E.C. SHALL PROVIDE NEW TELECOM SYSTEM INCLUDING DATA CABINETS, DATA
RACKS, EQUIPMENT, CABLES AND PATHWAYS PRIOR TO DISCONNECTING AND
REMOVING EXISTING ONES TO MINIMIZE SERVICE DOWNTIME FOR THE AREA
TO BE WORKED. COORDINATE WITH VA OIT AND THE FACILITY.
8. FOR ALL NEW BACKBONE CABLE AND HORIZONTAL CABLE CONNECTIONS AT
BOTH ENDS (AT TELECOM CABINETS/RACKS AND AT OUTLETS), E.C. SHALL
PROVIDE PERMANENT LABELS WITH SPECIFIC IDENTIFICATION FOR EACH
CABLES. PROVIDE LABELING LOGGING FILE IN EXCEL AS REQUIRED. SEE
GENERAL NOTE #29 ON SHEET E-001 FOR REQUIREMENTS.
9. ALL ELECTRICAL EQUIPMENT AND DEVICES SHALL BE LABELED
APPROPRIATELY TO IDENTIFY ITS POWER SOURCE (PANEL NAME, LOCATION
AND CIRCUIT NUMBER ETC.) NEW LABELS SHALL MEET VA STANDARD
REQUIREMENTS AND MATCH EXISTING AT THE FACILITY
10. SEE SHEET "GI101" FOR CONSTRUCTION PHASING REQUIREMENT.
PARTIAL FIRST FLOOR
ELEV.
UP
DN.
OPEN
A2
B2
C2
D2
B3
C3
D1
E1
F1
L2
L4
LL1
D3
WAP
+48"
4/1
+36"
+36" 4/1
+36" 1/1
3/3
+60"
MOUNTED ON POWER POLE
OUTLET BROKEN
4/2
TIB
FACP
FOR ELEVATORS
NEW
NEW
+72"
CCTV CONSOLE
THE SPACE WAS FULL OF CLOTH DURING SURVEY.
(1) RJ45 RJ45 LOOSE JACK
6/3
4/2
SURFACE MOUNTED. BROKEN.
SURFACE MOUNTED
BROKEN
BROKEN
BROKEN.
4/4
+42"
C1
A1
B1
(1) RJ45 RJ45 LOOSE JACK
6/3
FIRST FLOOR ELECTRICAL PLAN
E101
Revisions:
Date one eighth inch = one foot three inches = one foot
6" one and one half inches = one foot one inch = one foot three quarters inch = one foot one half inch = one foot three eighths inch = one foot one quarter inch = one foot
VA FORM 08-6231, OCT 1978
Drawing Title
Approved: Project Director
Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
ARCHITECT/ENGINEERS/CONSULTANTS:
Office of
Facilities
Management
EHRM INFRASTRUCTURE
UPGRADES
VA LAACC MEDICAL FACILITY
03-11-2021
691GE-20-202
RK
HY
SECOND FLOOR ELECTRICAL PLAN
KEYNOTES (SHEET E-102)
1. PROVIDE NEW DATA RACKS IN THE TELECOM ROOM (TR) "B201" TO SERVE ALL
THE DATA OUTLETS ON THE 2ND FLOOR. SEE SHEET E-203 FOR DEMO WORK
AND FOR DATA RACKS LAYOUT IN THE ROOM.
2. EXISTING 4-PORT DATA OUTLET. PROVIDE NEW 4-PORT TELECOM OUTLET
WITH COLORED CAT6A DATA JACKS ((1) GRAY, (1) WHITE, (1) BLUE AND (1)
BLANK) AND NEW FACEPLATE TO REPLACE THE EXISTING DATA OUTLET AT
THE SAME LOCATION. REUSE EXISTING OUTLET BACKBOX AS POSSIBLE, IF IT IS
IN GOOD CONDITION. OTHERWISE, REPLACE THE BACKBOX AS REQUIRED.
PROVIDE STAINLESS STEEL FACEPLATE FOR THE NEW OUTLET. TYPICAL FOR
ALL DATA OUTLETS ON THIS FLOOR.
3. PROVIDE (3) NEW CAT6A HORIZONTAL CABLES IN GRAY, WHITE AND BLUE
COLORS TO REPLACE EXISTING DATA CABLES TO THE OUTLET. CONNECT
EACH COLORED CABLE TO THE DATA JACK WITH THE SAME COLOR IN THE
OUTLET. REUSE EXISTING PATHWAY (CONDUIT OR WIREWAY) FROM THE
OUTLET TO SPACE ABOVE THE CEILING, IF POSSIBLE. IF THE EXISTING
PATHWAY IS LESS THAN 3/4" DIAMETER, PROVIDE A NEW 1" CONDUIT IN THE
WALL TO REPLACE THE EXISTING ONE FROM SPACE ABOVE THE CEILING TO
THE OUTLET. TYPICAL FOR ALL DATA OUTLETS ON THIS FLOOR.
4. REUSE EXISTING BACKBOX FOR LEGACY VOICE OUTLET FOR NEW TELECOM
OUTLET. FOR INFORMATION ONLY, EXISTING VOICE OUTLET WITH "NUMBER OF
PORTS / NUMBER OF JACKS" IS AS INDICATED. PROVIDE NEW OUTLET AND
CABLING PER KEYED NOTES 2 AND 3 TO REPLACE THE EXISTING ONE.
5. EXISTING ABOVE CEILING SUSPEND MOUNTED 6"X6" WIREWAY WITH HINGED
COVER FOR TELEPHONE, COMPUTER AND MATV SYSTEM CONDUCTORS.
WIREWAY ROUTE IS BASED ON AS-BUILT DRAWINGS AND LIMITED A/E SURVEY.
SEE SHEET E-702 FOR EXISTING WIREWAY INSTALLATION PER AS-BUILT SHEET
"1-E116". E.C. SHALL FIELD VERIFY EXISTING WIREWAY ROUTE, ITS SUPPORTS
AND CONDITION. REPORT TO FACILITY AND CONSTRUCTION MANAGER IF ANY
DISCREPANCY OR PROBLEM FOUND, PRIOR TO REUSING THE EXISTING
WIREWAY FOR NEW TELECOM CABLE ROUTE. TYPICAL FOR ALL
6. E.C. SHALL CAREFULLY REMOVE EXISTING COMMUNICATION CABLES TO AVOID
DAMAGING ANY EXISTING TELEPHONE, MATV AND ANY OTHER CABLES TO
REMAIN IN THE WIREWAY. ROUTE NEW CAT 6A CABLES IN THE WIREWAY, IF
WIREWAY FILL RATIO IS NO MORE THAN 50%. PROVIDE J-HOOKS FOR ANY
ADDITIONAL CAT 6A CABLES WHEN WIREWAY FILL RATIO WITH NEW TELECOM
CABLES IS OVER 50% OR WHERE THERE IS NO EXISTING WIREWAY. SEE
SHEET E-702 FOR J-HOOK INSTALLATION DETAIL.TYPICAL FOR ALL
7. EXISTING 18"X18"12" SCREW COVER PULL-BOX FOR CONDUIT CONNECTION TO
WIREWAY PER AS-BUILT SHEET 1-E66. REUSE EXISTING PULLBOX AS POSSIBLE.
8. FOR BIDDING PURPOSE, 20% OF THE EXISTING BACKBOXES AND EXISTING
PATHWAYS (CONDUITS AND WIREWAYS) WILL BE REPLACED. PRIOR TO START
OF A CONSTRUCTION PHASE/SEQUENCE, THE CONTRACTOR SHALL CONDUCT
SURVEY OF THE EXISTING BACKBOXES AND SIZE OF THE EXISTING PATHWAYS
CONNECTED TO THE BACKBOXES, AND IDENTIFY THE BACKBOXES AND
PATHWAYS REQUIRING REPLACEMENT WITH PHOTOGRAPHS AND ROOM
NUMBERS ON PLANS. SUBMIT THE DOCUMENT FOR VA'S REVIEW AND
APPROVAL, PRIOR TO START OF THAT CONSTRUCTION PHASE/SEQUENCE.
EXISTING
(1) 4" C.O.
FROM THE MAIN COMPUTER ROOM A114 TO EACH TELECOM ROOM (TR)
IN THE BUILDING. EACH SET OF BACKBONE CABLE CONSISTS OF A
PROVIDE NEW PATHWAY (CONDUITS, J-BOXES AND PULL BOXES, ETC.)
AS REQUIRED, NEW TELECOM JACKS AND STAINLESS STEEL
FACEPLATES FOR CABLE REPLACEMENT.
6. ALL NEW ELECTRICAL CONDUCTORS AND TELECOM CABLES RUN ON P2,
P1 AND ROOF LEVELS SHALL BE ROUTED IN RGS CONDUITS, U.O.N. ANY
SURFACE MOUNTED TELECOM CABLES SHALL BE ROUTED IN CONDUITS
OR RACEWAYS. NO TELECOM CABLES SHALL BE ROUTED EXPOSE.
GENERAL NOTES (CONT.)
7. E.C. SHALL PROVIDE NEW TELECOM SYSTEM INCLUDING DATA
CABINETS, DATA RACKS, EQUIPMENT, CABLES AND PATHWAYS
PRIOR TO DISCONNECTING AND REMOVING EXISTING ONES TO
MINIMIZE SERVICE DOWNTIME FOR THE AREA TO BE WORKED.
COORDINATE WITH VA OIT AND THE FACILITY.
8. FOR ALL NEW BACKBONE CABLE AND HORIZONTAL CABLE
CONNECTIONS AT BOTH ENDS (AT TELECOM CABINETS/RACKS AND
AT OUTLETS), E.C. SHALL PROVIDE PERMANENT LABELS WITH
SPECIFIC IDENTIFICATION FOR EACH CABLES. PROVIDE LABELING
LOGGING FILE IN EXCEL AS REQUIRED. SEE GENERAL NOTE #29 ON
SHEET E-001 FOR REQUIREMENTS.
APPROPRIATELY TO IDENTIFY ITS POWER SOURCE (PANEL NAME,
LOCATION AND CIRCUIT NUMBER ETC.) NEW LABELS SHALL MEET
VA STANDARD REQUIREMENTS AND MATCH EXISTING AT THE
FACILITY
10.SEE SHEET "GI101" FOR CONSTRUCTION PHASING REQUIREMENT.
(TYP. OF 2)
(TYP. OF 3)
EXISTING
(1) 4" C.O.
KEYNOTES (SHEET E-102 CONT.)
9. UNLESS OTHERWISE NOTED, ALL EXISTING TELECOM OUTLETS AND
CABLING SERVING THE CALL CENTER AS INDICATED INSIDE THE
DASHED LINE TO REMAIN.
10. UNLESS OTHERWISE NOTED, EXISTING TR ROOM "B263E" FOR CALL
CENTER AND ALL ASSOCIATED DEVICES IN THE TR ROOM TO REMAIN.
PROVIDE NEW TWO SETS OF BACKBONE CABLES ROUTED
SEPARATELY FROM MCR A114 TO THE TR ROOM. EACH BACKBONE
CABLE CONSISTS OF 24-STRAND OM4 MULTIMODE AND 12-STRAND
OS1 SINGLE MODE FIBER OPTIC CABLES IN (1) 4" CONDUIT.
A3
DN
GROUP
A227
ADP TRAINING
IRM SERVICE
A259
CLINIC
RECEPTION
C2-72
A259A
TELE.CL
A261
CANTEEN
A255
H.A.C.
A258
A250
BREAK ROOM
A242
C2-50
INTERNIST
A212
ASSESSMENT
B216
B240
TEAM
B246
B243
B249
CASE
MANAGER
A233
C2-70
C2-45
C2-86
PHYSICIAN ASST
MEDICAL SERVICE
A214
ROOM #4
A237
A262
PASSENGER ELEVATOR LOBBY
C2-1
ELEVATOR LOBBY
C2-3
A240
ROOM #1
A248
ELEC.CL
A260
C2-86A
ROOM #2
A246
C1-26
A213
C2-55
INTERVIEW
A222
A252
CANTEEN
A254
AFGE
LOCAL 2297
A263
PODIATRIST
A239
C2-83
SPD NURSING
A232
EMPLOYEE'S
A257
C2-52
C2-42
A204
STRETCHER STORAGE
C2-43
(TEMP)
EKG PROCEDURE
A216
GROUP
B226
A253
HUD VASH SPA 4
STAFF VETERAN
MEETING ROOM
A264
C2-53
C2-80
A238
A224
MEDICAL
B203
A218
PHYSICIAN
A208
A217
A211
C2-44
A266
A267
B224
A220
C2-32
MEDITATION
B200
B221
C2-34
ASSESS
A215
A206
A221
B207
B211
B255
A223
B225
A219
B218
B205
C2-37
A202
NEURO
SERVICE (?)
B239
B217
B212
PULMONARY
LAB (?)
B212
B209
B214
C2-2
B219
B244
B213
B230
B231
B220
C2-16
B223
B229
C2-22
PRIMARY CARE
TEAM B
B234
B264
B265
CALL CENTER
B263F
B256
B228
B227
B238A
C2-63
B241
B222
C2-24
IRM
B258
B236E
B263
B242
B263J
B250
VEST
B252
B266
B247
B263G
HOUSE (?)
B235
CLERK
B261A
B261B
B248
RECORD REVIEW
B263C
PLAN
B245
C2-4
B267
BREAK ROOM
B263A
COPY
B245A
VESTIBULE
C2-65
CHIEF MED.
REC
B263D
C2-67
RE-PRODUCTION &
B260
B263H
B261
B263B
B263I
B259
AFGE
LOCAL 2297
A258
C2-56
SECRETARY
A251
A265
MSA
A249
A247
A245
SURGERY SERVICE
A243
C2-54
A234
A241
ROOM #3
A244
A235
WHC RN
A228
A230
GYNECOLOGY
A229
A210
A209
A205
A207
A203
C2-39
B208
CASE
MANAGER
B210
C2-35
PHARMACIST
B201
B206
MED. ADMIN
SERV.
A201
PRACTITIONER
B202
EQUIPMENT
B204
B238
B237
HOUSE
B236
PHYSICIAN (?)
B232
B233
C2-21
RE-PRODUCTION &
EMBOSSING
B262
PODIATRY
EQUIP. STOR.
A231
A226
A225
1/1
4/4
SECOND FLOOR ELECTRICAL PLAN
E102
MIND/ BODY THERAPY
A353
C3-51
PASSENGER
C3-1
A341
RESEARCH
A340
O
R
D
A336A
TELECOM CL.
A336B
GARDEN ROOM
S02
LIBRARY
A337 C
WALK-IN
REFRIGERATOR
A330B
A330
TECH
A330A
A330
A328
C3-40
SPECIMEN
COLLECTION
A327
C3-27
LAB & RADIOLOGY
S-03
S-06
S14
CYSTOSCOPY
A306
C3-23
FILM
VIEWING
A316A
A307B
RADIOLOGY
FLUOROSCOPY
A305
LIBRARY
A316
ULTRASOUND
A311
A310B
SCRUB &
GOWNING
A306A
C3-21
A307
A310
C3-15
C3-22
C3-4
B303
C3-2
C3-5
SOUND SUIT
AREA
B358A
C3-6
C3-12
S-09
B362A
RES
B326
OPTOM
STUD.
B320
EYE EXAM
B317
B312
EVOKED
POTENTIAL
B315
C3-68
C3-64
OPHTHALMOLOGY
B327
C3-67
B318A
CUBICLE
B318
B316
B324
VIS
FIELDS
B313
ASSIST. CHIEF
FOR RESEARCH
A342
A336C
C3-24
C3-16
C3-11
B304
C3-28
TELE CL.
S-05
B358
B321
OPTOMETRIST
B323
OPTOMETRY
B325
RECEPT.
B310A
B328
C3-63
C3-18
B316A
B322
DARKNESS
ADAPTATION
B314
EAR & THROAT
B310
B318A
B319
B311
SOUND
SUITE 3
B353A
SUITE 3
B353B
SUITE 2
B352
SUITE 2
B352A
B362A
SUITE 1
B362
B353
C3-48
C3-3
A354
A352
C3-52
INVESTIGATOR
A343
A345
A346
COMMON USE
A347
A344
LAB
A338C
A338D
CUBICLE
A338B
PHOTOCOPY
MICROFORM
A338
LIBRARIAN
A338A
ADP
A331
C3-42
HOUSE STF/
STUDENT CUBICLE
A329A
A329
C3-44
C3-43
CHEMISTIRY
HEMOTOLOGY
URINE AND FECES
A331A
MICROBIOLOGY
A331C
TOXICOLOGY
IMMUNOLOGY
A331D
STERILIZATION &
SOLUTION PREP.
A329F
A303
DRESS
A322A
A326
CHEST
X-RAY
A325
A323
A322
A321
A320
X-RAY
TECNOLOGIST
A319
LIGHT
A324
DARK
A304C
A304D
A304A
A304B
TOLIET
A306B
UROLOGIST
A303
SOILED
A308
A311A
A307A
A310A
TR
A312
C-40
PHYS.
A313
PHYS.
A314
CONSULT
A315
PROG
C-06
GRAPHIC
ILLUSTRATIONS
B357
C3-20
MEDIA
STUDIO
B359
TRANIEE
B358
B308
B306
B307
B305
INSTRUMENT
CALIBRATION
B361
C3-7
HEARING AID
CLERK
S-10
AUDIO
B348
B351
B346
B347
B344
ACOUSTICAL
IMPEDANCE
TESTING
B350
ELECTRO
NYSTO.
B349
AURAL
REHAB
B345
APHASIA
B343
OFF
B342
B341
B340
B339
SPEECH
PATH.
B338
B337
B335
EAR
MOLD
FABRICATION
B333
C3-10
RECEPTIONIST
B330
EAR & THROAT
B330
E.N.T.
B329
B334
THIRD FLOOR ELECTRICAL PLAN
KEYNOTES (SHEET E-103)
1. PROVIDE NEW DATA RACKS IN THE TELECOM ROOM (TR) "A312" TO
SERVE ALL THE DATA OUTLETS ON THE 3RD FLOOR. SEE SHEET E-204
FOR DEMO WORK AND FOR DATA RACKS LAYOUT IN THE ROOM.
2. EXISTING 4-PORT DATA OUTLET. PROVIDE NEW 4-PORT TELECOM
OUTLET WITH COLORED CAT6A DATA JACKS ((1) GRAY, (1) WHITE AND
(1) BLUE AND (1) BLANK) AND NEW FACEPLATE TO REPLACE THE
EXISTING DATA OUTLET AT THE SAME LOCATION. REUSE EXISTING
OUTLET BACKBOX AS POSSIBLE, IF IT IS IN GOOD CONDITION.
OTHERWISE, REPLACE THE BACKBOX AS REQUIRED. PROVIDE
STAINLESS STEEL FACEPLATE FOR THE NEW OUTLET. TYPICAL FOR
3. PROVIDE (3) NEW CAT6A HORIZONTAL CABLES IN GRAY, WHITE AND
BLUE COLORS TO REPLACE EXISTING DATA CABLES TO THE OUTLET.
CONNECT EACH COLORED CABLE TO THE DATA JACK WITH THE SAME
COLOR IN THE OUTLET. REUSE EXISTING PATHWAY (CONDUIT OR
WIREWAY) FROM THE OUTLET TO SPACE ABOVE THE CEILING, IF
POSSIBLE. IF THE EXISTING PATHWAY IS LESS THAN 3/4" DIAMETER,
PROVIDE A NEW 1" CONDUIT IN THE WALL TO REPLACE THE EXISTING
ONE FROM SPACE ABOVE THE CEILING TO THE OUTLET. TYPICAL FOR
4. REUSE EXISTING BACKBOX FOR LEGACY VOICE OUTLET FOR NEW
TELECOM OUTLET. FOR INFORMATION ONLY, EXISTING VOICE OUTLET
WITH "NUMBER OF PORTS / NUMBER OF JACKS" IS AS INDICATED.
PROVIDE NEW OUTLET AND CABLING PER KEYED NOTES 2 AND 3 TO
REPLACE THE EXISTING ONE.
5. EXISTING ABOVE CEILING SUSPEND MOUNTED 6"X6" WIREWAY WITH
HINGED COVER FOR TELEPHONE, COMPUTER AND MATV SYSTEM
CONDUCTORS. WIREWAY ROUTE IS BASED ON AS-BUILT DRAWINGS
AND LIMITED A/E SURVEY. SEE SHEET E-702 FOR EXISTING WIREWAY
INSTALLATION PER AS-BUILT SHEET "1-E116". E.C. SHALL FIELD
VERIFY EXISTING WIREWAY ROUTE, ITS SUPPORTS AND CONDITION.
REPORT TO FACILITY AND CONSTRUCTION MANAGER IF ANY
DISCREPANCY OR PROBLEM FOUND, PRIOR TO REUSING THE
EXISTING WIREWAY FOR NEW TELECOM CABLE ROUTE. TYPICAL FOR
ALL
6. E.C. SHALL CAREFULLY REMOVE EXISTING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .