About this file

This is an Amendment to a Solicitation/Modification of Contract issued by the Department of Veterans Affairs Network Contracting Office 21 on March 25, 2026, for Solicitation Number 36C26126Q0497 regarding combustion tuning and instrument calibrations for boilers at Veterans Affairs Sierra Nevada Health Care System in Reno, Nevada. The amendment provides questions and answers submitted by interested offerors prior to the March 25, 2026 deadline at 10:00 AM PDT. The contracting officer is Gary Christensen.

The scope of work focuses exclusively on boiler combustion tuning and instrument calibrations without safety device testing. Work covers three Nebraska boilers and two tanks (DA tank and Condensate tank) with semi-annual tuning and calibration cycles. Specific instruments requiring calibration include drum level transmitters, pressure transmitters, water level controllers, and feedwater valves for each piece of equipment, plus flue gas oxygen sampling and boiler/economizer stack temperature transmitters. Key clarifications from the Questions and Answers include: the five Price/Cost Schedule line items each reference different periods of performance rather than individual pieces of equipment; repairs will be procured separately and not included in this contract; no site visit will be offered; transmitters use HART communication protocol; and contractors have flexibility in scheduling semi-annual maintenance within a single site visit provided N+1 boiler capacity is maintained. Billing for technician response to non-emergent and emergent issues and the specific response time expectations for Section 8 requirements were addressed but details on billing methodology were not fully clarified in the amendment.

View the file

Other files

File Type Posted
WD 2015-5593 REV 27 12.03.25.pdf PDF
36C26126Q0497_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority)

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 03-25-2026 Department of Veterans Affairs Network Contracting Office 21

Department of Veterans Affairs Network Contracting Office 21

To all Offerors/Bidders

36C26126Q0497 02-26-2026

X X X X

a. The purpose of this amendment is to provide questions submitted prior to the deadline of 10:00 AM PDT on 03/25/26.

b. See Continuation Page for submitted questions and answers.

Gary Christensen

CONTRACTING OFFICER

QUESTIONS ANS ANSWERS:

1. Will Source testing need to be included in this bid?

VA RESPONSE: Not sure what you mean by source testing.

1. Will any part or all of the instrument calibration or testing need to be in accordance with BEI standards?

VA RESPONSE: This is not a BEI safety device test, this is to calibrate feedwater valves, transmitters, and feedwater controls along with tuning on 3 boilers.

1. Will money need to be added into the bid for Planned and Unplanned repairs VA RESPONSE: No, repairs will be procured separately from this contract

1. Under the Price/Cost Schedule section there are 5 lines. I would assume that the first three would be for the 3 Nebraska boilers and the last two would be for the DA tank and the Condensate tank. Is this correct? If so, we could obviously perform instrumentation calibration, however, the combustion tuning and testing would not apply. With that being the case, the numbers given on these lines will be less.

VA RESPONSE: No, Line Items are in reference all requirements of the statement of work. EACH line item references a new period of performance. The scope specifies the 5 pieces of equipment and what is needed for each piece of equipment.

1. If repair money shall be added to the bid, will that apply to all 5 lines?

VA RESPONSE: No, repairs will be procured separately from this contract.

1. Will a site visit for this bid be scheduled? It would be ideal for all interested parties to perform a site visit for accurate pricing.

VA RESPONSE: No site visit is being offered for this procurement.

1. Is this contract strictly boiler combustion tuning and instrument calibrations or will it involve safety device testing as well according to the VHA 1810 & BEI latest manual?

VA RESPONSE: Yes, strictly boiler combustion tuning and instrument calibrations.

1. Does the site already have a boiler safety device testing contractor in place? If so, who is the incumbent?

VA RESPONSE: No, it was put on the safety contract which will be annual inspections by NBI certified inspector and safety device testing. In contracting now.

1. May a semi-annual combustion tuning & calibrations be performed in a single week site visit? For example, Boiler 1 tuning and calibrations on Monday, Boiler 2 on Tuesday, Boiler 3 Wednesday, etc. N+1 will be maintained.

That will be up to the contractor on what time they need to do the job.

1. What communication do the transmitters use?

The HART (Highway Addressable Remote Transducer) communication protocol is a widely used digital communication protocol in industrial automation, specifically designed for data exchange between process control devices (such as sensors, instruments, etc.) and control systems.

1. Please provide a list of all transmitters to be calibrated.

The transmitters needed are in the scope.

1. In the scope of work Section # 7 tuning and calibrations requirements: line B, it cuts off and no information is given of what the VA does to prepare the boilers. Please provide the remaining scope.

Boilers 1, 2, 3 will be Semi-annual tuning, burner combustion and 02 trim calibrations on natural gas and oil as well as testing the Low flue Gas Oxygen Level Interlock.

1. In the scope of work Section # 8 for Response time: What is the expectation when responding to the non-emergent and emergent issues? Such as sending a technician to site or responding to an inquiry via phone call & email.

List of Instruments and controls to be inspected and calibrated:

12. Boiler 1 drum level transmitter, pressure transmitter, and water level controller, feedwater valve

12. Boiler 2 drum level transmitter, pressure transmitter, water level controller, feedwater valve

12. Boiler 3 drum level transmitter, pressure transmitter, and water level controller, feedwater valve

12. DA tank drum level transmitter, pressure transmitter and water level controller, feedwater valve

12. Condensate tank drum level transmitter, pressure transmitter and water level controller, feedwater valve

12. Flue gas oxygen sampling, analyzing.

12. Boiler and economizer stack temperature transmitters.

1. If a technician needs to be sent for Section 8 response time, how do we bill for this?

We rotate boilers for contractors and help with venting off steam.

File details come from the government source that posted it. Updated .