This document is a clarification on Utility Water Testing requirements within a Statement of Work. The document details sampling and testing frequencies for utility water across multiple buildings (Mather Building 650, Mather Building 645, Martinez Building 19, and Redding CBOC), with different testing periodicities for various point-of-use (POU) fixtures and monitoring points. While most utility water sources are tested quarterly, AER (Automated Endoscope Reprocessor) water sources require monthly testing, which was the source of initial confusion in the original document.
The testing follows the Association for the Advancement of Medical Instrumentation (AAMI) ST108 (2023) standard, and specifically notes that endotoxin sampling of utility water is not necessary. The testing locations include first encountered sinks, AER fixtures, GI utility rooms, and pre-treatment monitoring points, with each location assigned a specific testing frequency (either monthly or quarterly) based on its function and criticality. The clarification emphasizes that AER water sources, while technically utility water, demand more frequent testing to ensure water quality and safety.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW Water Quality Testing 12-15-26.docx | DOCX document | |
| 36C26126Q0130 0001.pdf | ||
| 36C26126Q0130.pdf | ||
| QASP - Water Quality Testing.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Can you please confirm if the Utility Water testing is done monthly or quarterly? A & B attached are contradictory:
C. UTILITY WATER TESTING
1. Sampling
a. The Contractor shall collect HPC samples monthly as indicated in this Statement of
Work. Utility Water testing shall be performed in conformance with the Association for the Advancement of Medical Instrumentation (AAMI) ST108 (2023). In accordance with
ST108, endotoxin sampling of utility water is not necessary.
b. The Contractor shall collect samples quarterly for Utility Water testing at select locations for:
Response:
For Clarification, the confusion lies in the fact that the water designated for service of the AERs is technically utility water, but we are requiring it to be tested monthly. Therefore, the updated designations in the verbiage below apply:
C. UTILITY WATER TESTING
1. Sampling
a. The Contractor shall collect HPC samples monthly as indicated in this Statement of
Work. Utility Water testing shall be performed in conformance with the Association for the Advancement of Medical Instrumentation (AAMI) ST108 (2023). In accordance with
ST108, endotoxin sampling of utility water is not necessary. AER water sources are technically utility water but require more frequent testing than other utility water sources.
Periodicities for each sample point are indicated in parentheses in paragraph C.1.b below:
b. The Contractor shall collect samples quarterly for Utility Water testing at select locations for:
i. Mather Building 650 there is one (1) point-of-use fixture and one (1) monitoring point on the utility water:
a. POU #7: SPS Utility First Encountered Sink (Quarterly)
b. Monitoring Point #3: RO Utility Pre-Treatment (Quarterly)
ii. Mather Building 645 there are three (3) five (5) point-of-use fixtures and one (1) monitoring point on the utility water:
a. POU #8: AER 1 (Monthly)
b. POU #9: AER 2 (Monthly)
c. POU #10: AER 3 (Monthly)
d. POU #11: GI Utility First Encountered Sink, AER Room (Monthly)
e. POU #12: GI Utility Decon Room (Monthly)
iii. Martinez Building 19 there are four (4) point-of-use fixtures and one (1) monitoring point on the utility water:
a. POU #3: SPS Utility First Encountered Sink (Quarterly)
b. POU #4: AER 1 (Monthly)
c. POU #5: AER 2 (Monthly)
d. POU #6: GI Utility First Encountered Sink (Monthly)
e. Monitoring Point #3: DI Utility Pre-Treatment (Quarterly)
iv. Redding CBOC there are four (4) point-of-use fixtures and one (1) monitoring point on the utility water:
a. POU #5: SPS Utility First Encountered Sink (Quarterly)
b. POU #6: AER 1 (Monthly)
c. POU #7: AER 2 (Monthly)
d. POU #8: GI Utility First Encountered Sink (Monthly)
e. Monitoring Point #3: RO Utility Pre-Treatment (Quarterly)