36C26125N0436 459-24-001 Modernize Generator System VAMC Honolulu - 030-EP-012 Addendum 1. pdf.pdf
PDF 1 MB Posted
- Attached to
- Z2DZ--Modernize Generator Project
- Solicitation number
- 36C26126R00310005
About this file
This document is a construction drawing set for the modernization of emergency generators at the Honolulu Veterans Affairs Medical Center, located at 1 Jarrett White Road, Honolulu, Hawaii 96819. The project, identified as 459-24-001 and drawing number 030-EP-012, involves enlarging electrical plans for Building 30 and covers both Phase 1 and Phase 2 installation sequences for generator and fuel tank systems.
The work requires installation of a new 1200A, 480V, 3-phase switchboard interior with matching main circuit breaker and new branch breakers to feed existing circuits. The contractor must provide a new generator control panel, new quick connect enclosure for 1200A load bank testing, and a new 316 stainless steel electrical enclosure to house fuel monitoring wiring and a 208V panel. All existing generator equipment must be relocated or temporarily removed to accommodate a 2-hour fire-rated wall reinforcement. The generator manufacturer basis of design is Caterpillar, with all work on existing generators to be performed by local authorized dealer Hawthorn Cat to maintain UL listing. Temporary power systems must be operational prior to construction, with all generator-related work, testing, commissioning, and transfer switch operations performed after normal business hours. The contractor must submit a temporary generator location request within seven days of Notice to Proceed for VA consideration with USAG, and submit full design details for the switchboard enclosure retrofit and main fuel tank enclosure for approval prior to construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 000-EJ-002 - Addendum No 01 - Stamped.pdf | ||
| 36C26126R0031 0005.pdf | ||
| 030-EP-011 - Addendum No 01 - Stamped.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C B
J J
J J
PROJECT KEY PLAN
HONOLULU VETERANS AFFAIRS
1 JARRETT WHITE RD | HONOLULU, HI 96819
E
(N) ELECTRICAL ENCLOSURE(N) FUEL PUMP
000-EJ-001
24 25
SWBD 'GENERATOR'
000-EJ-001
(1) 2"C VEEDER ROOT FEEDER
(1) 2"C PUMP FEEDER
(1) 2"C SPARE
(R) ATS-FP
(1)1"C.
SEE CONTINUATION ON
SHEET 030-EP-011
SEE CONTINUATION ON
SHEET 030-EP-011
(3) 2"C.
(2) 2"C.
30-DT-1
30-TM-1
(R) EXIT SIGN 12
F A
MECH/FIRE
PROTECT. ROOM
1A29
EMERGENCY
GENERATOR
1A28
(X) FUEL MONITORING
CONTROL PANEL
(X) DAYTANK
(R) ATS-FP
2(E) SWBD 'GENERATOR'3
(R) EXIT SIGN10
F A
EMERGENCY
GENERATOR
1A28
MECH/FIRE
PROTECT. ROOM
1A29
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANT
CONSULTANT: A/E:
GDM-AE, INC.
1308 NE 134TH ST SUITE A
VANCOUVER, WA 98685
P: 541.436.4723
MICHAEL REBSTOCK, PE
WWW.GDM-AE.COM
FULLY
SPRINKLERED
CONSTRUCTION
FACILITIES
MANAGEMENT
(CFM) 459 PATTERSON RD.
HONOLULU, HI 96819-1522
35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT
07-10-2025 08-28-2025
95% CONSTRUCTION DOCUMENTS 10-16-2025
100% CONSTRUCTION DOCUMENTS 11-26-2025
FINAL BID DOCUMENTS 12-22-2025
ADDENDUM 1 - SOLICITATION RFI 05-15-2026
A u to d e s k D o c s /2
-0
V
A H o n o lu lu G e n e ra to rs
/2 -0
H o n o lu lu
H
I M
G S
V A
M C
E le c tr ic a l_ r2
.r v t
030-EP-012
BUILDING 30 ENLARGED ELECTRICAL
PLANS
MER AJW
MODERNIZE GENERATORS
VA PACIFIC ISLAND HEALTH CARE SYSTEM
FINAL BID DOCUMENTS 459-24-001
12-22-2025
1/4" = 1'-0"2
ENLARGED PHASE 2 PLAN - BLDG 30 FUEL TANK
1/4" = 1'-0"4
ENLARGED PHASE 2 PLAN - BLDG 30 GENERATOR
NORTH NORTH
NORTH NORTH
1/4" = 1'-0"1
ENLARGED PHASE 1 PLAN - BLDG 30 FUEL TANK
1/4" = 1'-0"3
ENLARGED PHASE 1 PLAN - BLDG 30 GENERATOR
GENERAL NOTES
1. TEMPORARY GENERATOR LOCATIONS SHOWN IN DRAWINGS ARE
PROPOSED LOCATIONS ONLY. CONTRACTOR TO PERFORM
ASSESSMENT AND PROPOSE A PLACEMENT LOCATION. CONTRACTOR
SHALL SUBMIT A REQUEST FOR TEMPORARY GENERATOR LOCATION TO
COR WITHIN 7 DAYS OF NTP FOR VA CONSIDERATION WITH USAG.
2. TEMPORARY POWER SYSTEM MUST BE ONLINE PRIOR TO
CONSTRUCTION. COORDINATION WITH VA ON ANY REQUIRED OUTAGES
OF EMERGENCY POWER WITH VA PRIOR TO INSTALLATION.
3. TEMPORARY POWER CONNECTIONS SHALL REMAIN OPERATIONAL
UNTIL NEW GENERATORS HAVE BEEN COMPLETELY INSTALLED AND
READY FOR CUTOVER FROM TEMPORARY EQUIPMENT.
4. ALL WORK RELATED TO CONNECTING TEMPORARY GENERATOR
SYSTEM SHALL BE PERFORMED AFTER NORMAL BUSINESS HOURS. ALL
WORK TESTING AND COMMISIONING GENERATOR AND OPERATION OF
TRANSFER SWITCHES SHALL BE PERFORMED AFTER NORMAL BUSINESS
HOURS.
5. ALL GENERATOR WORK ON EXISTING GENERATOR SHALL BE
PERFORMED BY THE LOCAL CATERPILLAR DEALER HAWTHORN CAT TO
MAINTAIN UL LISTING.
6. THE GENERATOR MANUFACTURE FOR THE BASIS OF DESIGN IS
CATERPILLAR. THE CONTRACTOR IS RESPONSIBLE FOR ALL COST
ASSOCIATED DUE TO ALTERNATE SELECTION AND REJECTED
SUBMITTALS.
KEY NOTES
1 DISCONNECT EXISTING DAYTANK CIRCUIT. DEMO BRANCH CIRCUIT TO
NEAREST JUNCTION BOX.
2 EXISTING CONDUCTORS TO EMERGENCY SIDE OF 'ATS-FP' TO BE
REMOVED BACK TO SOURCE. EXISTING CONDUIT TO REMAIN FOR
REUSE.
3 EXISTING GENERATOR SWITCHBOARD INTERIOR TO BE REMOVED.
EXISTING CONDUIT AND CONDUCTORS TO REMAIN TO BE
RECIRCUITED TO NEW INTERIOR IN SAME PLACE.
4 DEMO EXISTING PULLBOX AFTER MECHANICAL REMOVES EXISTING
WIRING. DEMO THE 2 EXISTING 2"GRC 24" BELOW SURFACE.
5 DISCONNECT EXISTING CIRCUIT TO VEEDER ROOT PANEL.
DEMOLITION OF PANEL AND WIRING TO BE PERFORMED BY
MECHANICAL.
6 DISCONNECT EXISTING FUEL TANK WIRING. DEMO TO BE DONE BY
MECHANICAL.
7 DEMO EXISTING JUNCTION BOX.
8 EXISTING FIRE PUMP ATS TO BE RELOCATED TEMPORARILY 2' AWAY
FROM WALL TO ALLOW FOR 2-HOUR FIRE RATED REINFORCEMENT.
EXTEND EXISTING NORMAL POWERED FEEDER AND CONNECT
TEMPORARY POWER TO EMERGENCY SIDE AS REQUIRED FOR
COMPLETE OPERATION. THIS WORK IS TO BE COMPLETED AFTER
NORMAL BUSINESS HOURS.
9 ALL EXISTING CONDUITS, JUNCTION BOXES, MISCELLANEOUS
ENCLOSURES AND FIRE PROTECTION EQUIPMENT MOUNTED ON WALL
TO BE TEMPORARILY REMOVED AND RELOCATED TO ALLOW FOR
2-HOUR FIRE RATED REINFORCEMENT.
10 EXISTING EXIT SIGN TO BE TEMPORARILY REMOVED TO FACILITATE
2-HOUR FIRE RATED WALL REINFORCEMENT. MAINTAIN EXISTING
CONDUIT AND CONDUCTORS FOR REUSE.
11 EXISTING RECEPTACLE TO BE TEMPORARILY REMOVED TO FACILITATE
2-HOUR FIRE RATED WALL REINFORCEMENT. MAINTAIN EXISTING
CONDUIT AND CONDUCTORS FOR REUSE.
12 REPLACE EXISTING EXIT SIGN IN SAME LOCATION AS REMOVED.
RECONNECT EXISTING CONDUIT AND CONDUCTORS.
13 REPLACE EXISTING RECEPTACLE IN SAME LOCATION AS REMOVED.
RECONNECT EXISTING CONDUIT AND CONDUCTORS.
14 RELOCATE EXISTING FIRE PUMP TRANSFER SWITCH BACK TO ITS NEW
LOCATION AFTER 2-HOUR FIRE RATED REINFORCEMENT OF WALL.
EXTEND CONDUIT AND CONDUCTORS AS REQUIRED FOR COMPLETE
OPERATION OF ATS. UTILIZE TEMPORARY POWER FOR THE
EMERGENCY SIDE UNTIL GENERATOR SWITCHBOARD INTERIOR
INSTALLATION IS COMPLETE. WORK SHALL BE COMPLETED AFTER
NORMAL BUSINESS HOURS.
15 ALL EXISTING CONDUITS, JUNCTION BOXES, MISCELLANEOUS
ENCLOSURES AND FIRE PROTECTION EQUIPMENT REMOVED FROM
WALL TO BE REPLACED IN SAME LOCATION AS REMOVED AFTER
2-HOUR FIRE RATED REINFORCEMENT OF WALL.
16 PROVIDE NEW 1200A, 480V, 3-PHASE SWITCHBOARD INTERIOR WITH
1200A MAIN CIRCUIT BREAKER. PROVIDE NEW BRANCH BREAKERS OF
SAME SIZE AS REMOVED TO FEED EXISTING BRANCH CIRCUITS TO
REMAIN. RECONNECT EXISTING SWITCHBOARD AND BRANCH FEEDERS
TO SAME CIRCUITS AS REMOVED BOARD. REFER TO ONE-LINE ON
000-EJ-002 FOR ADDITIONAL INFORMATION.
17 PROVIDE NEW GENERATOR CONTROL PANEL MOUNTED IN AVAILABLE
SPACE IN NEW GENERATOR SWITCHBOARD. PROVIDE CONDUIT AND
CONDUCTORS AS REQUIRED FOR COMPLETE OPERATION OF
GENERATOR CONTROLS. CONTROL PANELS AND TERMINATIONS OF
CONDUCTORS SHALL BE DONE BY GENERATOR VENDOR.
18 PROVIDE CONDUCTORS IN EXISTING CONDUIT FROM NEW 50A
BREAKER TO EMERGENCY-SIDE OF 'ATS-FP'.
19 PROVIDE NEW QUICK CONNECT ENCLOSURE ON END OF EXISTING
SWITCHBOARD ENCLOSURE. PROVIDE PROVISIONS FOR 1200A LOAD
BANK.
20 PROVIDE NEW 50A BREAKER IN EXISTING GENERATOR TO FEED
EMERGENCY-SIDE OF EXISTING TRANSFER SWITCH 'ATS-FP'. PROVIDE
CONDUIT AND CONDUCTORS TO NEW SWITCHBOARD INTERIOR AND
FROM NEW GENERATOR SWITCHBOARD INTERIOR THROUGH EXISTING
CONDUIT TO REMAIN.
21 RECONNECT EXISTING DAYTANK CIRCUIT TO NEW DAYTANK.
22 EXTEND CONNECTION FROM EXISTING VEEDER ROOT TO NEW
VEEDER ROOT PANEL IN SAME LOCATION.
23 ROUTE 2"C THROUGH DUCTBANK.
24 ROUTE PUMP FEEDER FROM NEW PANEL 'FT' TO FUEL PUMP IN 3/4"
SEAL TIGHT CONDUIT. COORDINATE WITH MECHANICAL ON EXACT
LOCATION. SEE SHEET 030-EP-011 FOR FEEDER INFORMATION AND
ROUTING FROM BUILDING 30 TO MAIN FUEL TANK.
25 PROVIDE NEW ELECTRICAL FREE STANDING 316 STAINLESS STEEL
ENCLOSURE WITH PULL SECTION FOR FUEL MONITORING WIRING AND
A POWER SECTION TO HOUSE A 208V PANEL. SEE DETAIL 4 ON SHEET
000-EJ-001 FOR ADDITIONAL INFORMATION. SEE DETAIL 4 ON 000-S-011
FOR ADDITIONAL STRUCTURAL INFORMATION AND REQUIREMENTS.
7. THE BASES OF DESIGN FOR THE GENERATOR SWITCHBOARD
ENCLOSURE RETRO FIT AND MAIN FUEL TANK ENCLOSURE WAS BY TR
ELECTRICAL SERVICES LOCATED IN BOX ELDER, SOUTH DAKOTA.
MANUFACTURE SHALL BE A UL891 AND 508 SHOP. ALL COSTS
ASSOCIATED WITH ALTERNATE MANUFACTURERS ARE THE
RESPONSIBILITY OF THE CONTRACTOR. VA IS NOT LIABLE FOR ANY
ALTERNATIVES. CONTRACTOR TO SUBMIT FULL DESIGN FOR
APPROVAL PRIOR TO CONSTRUCTION.
Revisions: Date:
| Sheets |
| 030-EP-012 - BUILDING 30 ENLARGED ELECTRICAL PLANS |
File details come from the government source that posted it. Updated .