This document is a Quality Assurance Surveillance Plan (QASP) for a Building Maintenance Service contract between the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 (VAPIHCS) and a contractor.
The QASP outlines the government's roles and responsibilities, the contractor's representatives, the performance standards and acceptable quality levels, the methods of quality assurance surveillance, and the rating system for determining if the contractor's performance exceeds, meets, or does not meet the standards. It provides details on documenting both acceptable and unacceptable performance, and the frequency of performance assessment meetings between the Contracting Officer's Representative (COR) and the contractor.
The related federal contract opportunity is for building maintenance services at multiple locations on the Pacific Islands, including carpentry/painting, plumbing, electrical, HVAC, life safety equipment, asbestos/mold testing, and locksmith services. The contract is for a 12-month period with a total of 240 hours of work per month across the various service areas.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA Report.docx | DOCX document | |
| S05 QA Report.docx | DOCX document | |
| Past Performance Survey.docx | DOCX document | |
| 36C26124Q0849.docx | DOCX document | |
| WD 2015-5689 Rev 23 7222024.txt | TXT text file | |
| Past Performance Survey.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
Project Title: Building Maintenance Service
Contract Number:
Contract Description: The Veteran Affairs Pacific Islands Healthcare System (VAPIHCS) has a requirement for FF&E management, inventory control, relocation, installation, teardown and removal of existing furniture. The VAPIHCS requires a contractor to provide a full range of services to:
Assemble/disassemble, install, relocate and remove existing office FF&E, equipment and related materials from a location, transport the items to a new location and install/place them according to the direction of the Contracting Officer Representative (COR) or Designated Technical Expert (DTE).
Trash removal and disposal as per VAIPHCS policy. The number of services provided will vary from month to month. General Services Administration (GSA) Vendors capable of performing all the following Specialty Item Numbers (SIN) are eligible to bid:
Contractor’s Name:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored.
· How monitoring will take place.
· Who will conduct the monitoring.
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO:
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: William Blas Jr; contact info: william.blas@va.gov, (808) 583-3142
c. Other Key Government Personnel: Chandalyn Guzman; contact info: email: chandalyn.guzman@va.gov, (808) 336-1850.
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
· Program Manager(s) –
· Contract Assigned Personnel –
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets, or does not meet these standards. The Quality Assurance Specifications and Requirements, paragraph 13, in the contract, includes performance standards to be followed. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
Quality Assurance Surveillance Plan (QASP)
| TASK(S) |
| QUALITY STANDARDS |
| ACCEPTABLE QUALITY |
LEVEL
| METHOD OF SURVEILLANCE |
| INCENTIVES/ DISNCENTIVES |
Contractor shall provide qualified employees in accordance with (IAW) performance work statement (PWS) section 2
| The contractor shall meet the requirement throughout the period of performance |
| 95% |
| COR direct observation through 100% surveillance |
| Incentives: Favorable contactor performance evaluation |
Disincentive: Unfavorable contractor performance evaluation
Contractors shall have and provide all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely IAW PWS
| 95% |
| COR direct observation |
through 100% surveillance Incentives:
Favorable contactor performance evaluation
Disincentive: Unfavorable contractor performance evaluation
| Contractor shall meet the requirements and perform IAW PWS section 3 |
| The contractor shall meet the requirement throughout the period of |
performance
| 95% |
| COR direct observation through 100% surveillance |
| Incentives: Favorable contactor performance evaluation |
Disincentive: Unfavorable contractor performance evaluation
| Contractor shall meet the report requirements and perform IAW PWS section 4 |
| The contractor shall meet the requirement throughout the period of |
performance
| 95% |
| COR direct observation through 100% surveillance |
| Incentives: Favorable contactor performance evaluation |
Disincentive: Unfavorable contractor performance evaluation
| Contractor shall meet the equipment requirements and perform IAW PWS section 5 |
| The contractor shall meet the requirement throughout the period of |
performance
| 95% |
| COR direct observation through 100% surveillance |
| Incentives: Favorable contactor performance evaluation |
Disincentive: Unfavorable contractor performance evaluation
5. INCENTIVES/DISINCENTIVES
The Government shall use favorable contractor performance evaluations as acknowledgement of positive performance. Performance outcomes shall be based on exceeding, meeting, or not meeting performance standards.
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. Direct Observation. (Can be performed periodically or through 100% surveillance.)
b. 100% INSPECTION: 100% inspection is a QA method designed to evaluate all outputs of the contract requirement. This method requires a total inspection of Contractor’s performance.
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
Positive outcome: No more than 1 incident of not meeting the performance standard during the period of performance.
Neutral outcome: No more than 2 incidents of not meeting the performance standard during the period of performance.
Negative outcome: More than 3 incidents of not meeting the performance standard during the period of performance.
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE
When unacceptable performance occurs, the COR shall inform the Contracting Officer (CO). This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR and the CO shall document the discussion and place it in their respective file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the CO. The CO will in turn review and submit to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CDR in writing. The CDR shall specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR shall also state how long after receipt the contractor must present this corrective action plan to the CO and COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
1. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
· During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
· The COR shall meet with the contractor monthly to assess performance and shall provide a written assessment.