This document contains an amendment to a solicitation for three mobile operating room trailers. The amendment provides answers to potential offerors' questions to clarify requirements. The mobile operating room trailers will be procured under FAR Part 12 and Part 13 for the VA Northern California Health Care System. Each trailer must be 40 feet or longer and include transportation, commissioning, setup and training. Offerors must acknowledge receipt of the amendment by the specified date. The applicable NAICS code is 321991 and size standard is 1,000 employees. The Federal Supply Code is 2330. Quotes are due 30 days after issuance of the solicitation unless extended by amendment. Clarifications provided include confirming wheelchair accessibility via lift for each trailer, allowing separate modular units to meet ceiling height requirements, identifying the building automation system as Johnson Controls Metasys, specifying fire detection and suppression requirements, and noting medical gas and equipment mounting requirements.

View the file

Other files

File Type Posted
36C26121Q0615 0004.docx DOCX document
36C26121Q0615 0003.docx DOCX document
36C26121Q0615 0002.docx DOCX document
36C26121Q0615 0001.docx DOCX document
PM_Part813.5_Atch1_FAR13.5_JA_OVER_SAT - Olympus_Redacted.pdf PDF
36C26121Q0615.docx DOCX document
PM_Part813.5_Atch1_FAR13.5_JA_OVER_SAT - Stryker_Redacted.pdf PDF
VA OSDBU Small Business Subcontracting Plan.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 06-10-2021 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno

NV

89502-2597 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno

NV

89502-2597 To all Offerors/Bidders

36C26121Q0615 06-10-2021

X x x

The purpose of this amendment is to answer RFIs #32 through #

RFI #32: “The trailer shall support wheelchair access (lift) if it was standalone.” Does this mean that each of the three trailers shall include a gurney lift as used in a Mobile CT or Mobile MRI trailer?

Answer: A gurney lift would be appropriate for each trailer.

RFI #33: In order to meet the minimum 9’6” ceiling height required across the entire OR, may the OR trailer consist of multiple modular units that arrive separately then are connected on site?

Answer: No the unit should be stand alone unit expandable to meet ceiling height limits with minimal work for activating the unit.

RFI #34: Please identify the brand and model number with which the bacNET system needs to connect.

Answer: Johnson Controls Metasys system for Building automation.

RFI #35: What type of fire protection system is required? Wet or dry?

Answer: See Utility Requirements in the scope of work. The trailer shall include a fire detection system to include a main detection control panel, 3 horn strobe locations, 2 pull stations, 3 photoelectric smoke detectors. The trailer shall also include 2 CO/smoke detector, and two (2) 5lb ABC type dry-chemical fire extinguisher with wall mounts.

RFI #36: Are we to include the ramp in the trailer or will a lift work in place of the ramp?

Answer: See answer to RFI 19 and RFI 32.

RFI #37: Can the Stryker camera system use the Stryker software instead of the nStream Easy suite?

Answer: Please see the brand name justifications attached to the solicitation. There are reasons for which we are requiring brand names for specific systems.

RFI #38: Where will the medical gases be supplied from? Are these portable tanks or connecting to the hospital main supply?

Answer: See Operating Room Specifications in the scope of work. The trailer shall also include two surgical single mount booms, one for Anesthesia, and one for the Nursing boom, each with an additional surgical monitor attachment capable of supporting a 31” 4K Olympus monitor (4096 x 2160 resolution) on each boom mount. Each boom shall meet VA requirements for data/power/medical gas. The Anesthesia boom shall have outlets for air, oxygen, and vacuum. The nursing boom shall have a connection to nitrogen.