This solicitation notice seeks quotes for three mobile operating room trailers for the Department of Veterans Affairs Northern California Health Care System. The trailers must be delivered by December 2021 and include transportation, setup, commissioning, and training. They require mobile surgical units over 40 feet in length with two 350 amp electrical service panels, an operating room meeting 9.5 foot minimum ceiling height requirements, and equipment storage, clean, and soiled utility rooms. Quotes are due within 30 days of issuance of the solicitation documents, which will be posted to beta.SAM.gov on or around May 4, 2021. The applicable NAICS code is 321991 and size standard is 1,000 employees.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26121Q0615 0005.docx | DOCX document | |
| 36C26121Q0615 0003.docx | DOCX document | |
| 36C26121Q0615 0002.docx | DOCX document | |
| 36C26121Q0615 0001.docx | DOCX document | |
| PM_Part813.5_Atch1_FAR13.5_JA_OVER_SAT - Olympus_Redacted.pdf | ||
| 36C26121Q0615.docx | DOCX document | |
| PM_Part813.5_Atch1_FAR13.5_JA_OVER_SAT - Stryker_Redacted.pdf | ||
| VA OSDBU Small Business Subcontracting Plan.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 06-09-2021 Department of Veterans Affairs
VA
Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno NV 89502-2597 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System Kirman Avenue Reno NV 89502-2597 To all Offerors/Bidders
36C26121Q0615 06-09-2021
X X
The purpose of this amendment is to:
a) Answer RFIs 18 through 31.
b) Extend quote due date to June 16, 2021 at 4PM PST.
RFI #18: The SOW states that the “Trailer shall include two (2) 350 Amp panels, 208/110V for electrical services.”
However, the listed individual branches of power only add up to a total of 200 Amps. Do you require the trailer to support a total of 700 Amps via two (2) 350 Amp, 208 Volt 3-Phase electrical service panels? Please clarify beyond your Answer to RFI#4.
Answer: The contractor will provide min. (2) panels @ 225A 3 phase panels @ 208/120V & m
ax. of (2) panels @ 350A 3 Phase panels @ 208/120V. Each Contractor system might be different, but each quote shall be w/in this electrical criteria.
RFI #19: In the SOW it states the requirement for a wheelchair ramp that is ADA Compliant with a width of 4’ to be installed on site. RFI #5 Answer states that, “A separate construction project will occur with the main construction project to build out the corridor connecting the trailers.” Is the wheelchair ramp required? If yes, is the wheelchair ramp required to meet the Surgical and Endovascular Services Design Guide 2.2.2 Architectural corridor requirement of 8’ clear width for gurneys?
Answer: The trailer shall support wheelchair access (lift) if it was standalone. The ramp will be built separate to the trailer delivery.
RFI #20: In the Q&A’s, the RFI #1 Answer states that, “Because they are not permanent building structures, we did not require it to the full 650 square feet requirements called out by the VA Surgical and Endovascular Services Design Guide since we need ancillary support space (dirty/clean/storage) for each standalone OR trailer. All others should be relevant.” In section the VA design guide section 2.2.2 Architectural Ceilings states, “The finished ceiling height of an Operating Room should be a minimum of 10 ft (3050 mm) above the floor.” However, in the same document, page 21 Size of Operating Rooms, it states, “Minimum clear floor to finished ceiling height shall be not less than 9’6” above the finish floor excluding the plenum space above, however 10’0” clear floor to finish ceiling is preferred.” What is the minimum ceiling height allowable for the OR?
Answer: The OR room ceiling height shall not be less than 9’ 6”.
RFI #21: In the Q&A’s, the RFI #1 Answer states that, “Because they are not permanent building structures, we did not require it to the full 650 square feet requirements called out by the VA design guides since we need ancillary support space (dirty/clean/storage) for each standalone OR trailer. All others should be relevant.” In section the VA design guide section 2.2.2 Architectural Corridors states, “Shall be designed to a minimum of 8 feet clear width.” Are all corridors supporting patient gurneys required to be a minimum of 8 feet clear width?
Answer: No, corridors within the trailer shall not be less than ADA requirement and egress requirements. A gurney will be required to travel through any corridor/turns through the trailer to the OR suite.
RFI #22: The SOW states “The OR shall be able to accommodate the da Vinci Surgical Robot System … The Patient Cart is 98 inches tall …” Does the requirement include the ability to place the Patient Cart and other robot components anywhere within the OR, which requires the OR ceiling to be a minimum of 98” everywhere?
Answer: The DaVinci robot and equipment will need to enter the trailer as well and travel to the OR suite. Where the robot will be stored when not in use should be at the minimum height as well, and would not be right in the OR suite. So path of travel, doorways, equipment storage rooms, will need to meet that requirement.
RFI #23: Do you require third-party Professional Engineer (PE) signed stamped drawings certifying the conformance with NRPA-99, TJC, NEC, OSHA, CAP, Federal and VA specifications?
Answer: We do require a PE stamp on the design of the system within mobile structure to ensure code compliance is met and within conformance.
RFI #24: Do you require bacNET capability for remote monitoring of the all room temperature, humidity, and pressure data?
Answer: Yes, bacNET capability is required.
RFI #25: The SOW states “Each respondent must have an established business, with an office and full-time staff.” Is the office and staff required to be located within a specific distance from the hospital for rapid response? Does that FSE requirement only apply to the medical equipment within the trailer? Or does it apply to the entire trailer?
Answer: The trailer company shall support the trailer and internal infrastructure. Medical equipment installed with the trailer shall include warranty/manuals provided to the VA upon delivery and the VA will work with the vendor after delivery.
RFI #26: The RFI #8 Answer states that the trailer has to meet DOT requirements for transport including height restrictions. Can transport of the trailer meet the DOT requirements requiring minimal oversize permitting estimated to be less than $50 per California move?
Answer: The intent is to eventually move these trailers through different facilities in California, so they must meet California DOT requirements. Oversize permits are permitted.
RFI #27: In reference to the Equipment Room, Chapter 286: Surgical and Endovascular Services Design Guide identifies an “Equipment Room, Robotics (ORRE1), 180 NSF (16.8 NSM) Provide one per each Inpatient Surgical Facility Robotics Operating Room if Complex surgical complexity is authorized.” Is this the Equipment Room the solicitation specified at 150 SF?
Answer: The equipment storage room is intended for equipment that is mounted to the ceiling that is required to be de-installed and stored within the trailer upon transport. It can be used as extra storage of equipment needs when fully deployed. The 180sq ft is not required as there will be an external equipment storage room not part of the trailer.
RFI #28: Also, neither Room ORRE1, nor any Equipment Storage Room is listed in the VA HVAC Design Manual November 1, 2017, Rev. May 1, 2019. Please provide the requirement for air exchanges, temperature, humidity, pressure for this Equipment Room.
Answer: Equipment room shall meet Surgical Suite, Semi-Restricted Corridor requirements (as it usually is adjacent and accessed through a semi-restricted corridor). Refer to VA Design Manual, HVAC, Chapter 6 Table.
RFI #29: Does the area identified as the Clean Workroom requiring Omnicell cabinets need to meet the HVAC requirements for the ANCW2 Anesthesia Clean Room?
Answer: No, this would be a Surgical Suite, Clean Core requirement. Refer to VA Design manual, HVAC, Chapter 6 Table.
RFI #30: Is the ORSA1 Scrub Sink Area required to meet the minimum 20 NSF area identified in Section 23 of the Surgical and Endovascular Services Design Guide?
Answer: Yes.
RFI #31: Is the ORSA1 Scrub Sink Area required to meet the location requirements specified in the Surgical and Endovascular Services Design Guide?
Answer: Yes.