36C26121Q0615 0001.docx

DOCX document 28 KB Posted

Attached to
2330--3 Mobile Operating Room Trailers for VA Northern California Health Care System
Solicitation number
36C26121Q0615
Issued by

About this file

This solicitation seeks three mobile operating room trailers to be provided to the VA Northern California Health Care System. The trailers must be at least 40 feet in length and include transportation to the specified location, as well as setup, commissioning, and training. The applicable NAICS code is 321991 for manufactured home manufacturing, with a size standard of 1,000 employees. Quotes are due 30 days after issuance of the solicitation on May 4, 2021, as posted on beta.SAM.gov. The delivery date for the trailers is December 2021. This notice provides information on an upcoming solicitation and is not a request for quotes.

View the file

Other files

File Type Posted
36C26121Q0615 0005.docx DOCX document
36C26121Q0615 0004.docx DOCX document
36C26121Q0615 0003.docx DOCX document
36C26121Q0615 0002.docx DOCX document
PM_Part813.5_Atch1_FAR13.5_JA_OVER_SAT - Olympus_Redacted.pdf PDF
36C26121Q0615.docx DOCX document
PM_Part813.5_Atch1_FAR13.5_JA_OVER_SAT - Stryker_Redacted.pdf PDF
VA OSDBU Small Business Subcontracting Plan.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 05-18-2021 Department of Veterans Affairs

VA

Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno NV 89502-2597 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System Kirman Avenue Reno NV 89502-2597 To all Offerors/Bidders

36C26121Q0615 05-18-2021

X x x

The purpose of this amendment is to answer Requests for Information (RFI)s.

RFI #1: Can you tell us the specific VA Regulations the OR trailers will be regulated under? Or are the regulate d by the Federal Medical guidelines for an OR?

Answer:

https://www.cfm.va.gov/til/dGuide.asp

Surgical and Endovascular Services, 2020-04 revision. However, because they are not permanent building structures, we did not requ ire it to the full 650 square feet requirements called out by VA design guides since we need ancillary support space (dirty/clean/storage) for each standalone OR trailer. All others should be relevant.

RFI #2: How will WAGD (waste anesthetic gas disposal) be handled?

Answer: WAGD system will tie into the Vacuum system provided with units.

RFI #3: If the Operating Room Trailer (ORT) is to be adjacent to the main hospital, is it possible for the ORT to utilize utilities from the facility in place of providing a 50-gallon freshwater, 58-gallon blackwater tanks?

Answer: Yes, it is adjacent to the building, but not a location close to existing connections. These trailers are intended to be mobile and will have to be self-sufficient and not rely on the campus connection it will be deployed to.

RFI #4: The shore power electrical requirement is listed as (2) 350 Amp panels – 208/110V. A typical Mobile Surgery Unit (MSU) requires 190 Amp service. Can we get a breakdown for the additional 510 Amps and what it would be used for?

Answer: The modular unit will be built for its needs, we will have adequate shore power to provide to each unit. Based on the vendor selected, they will provide the power needs for their unit to the facility.

RFI #5: Because the Pre/Post-Operative functions will occur within the main hospital, what is the plan for a connecting corridor for transport of patients and how does it impact the design of the ORT?

Answer: A separate construction project will occur with the main construction project to build out the corridor connecting the trailers.

RFI #6: What is the overall height of the customer supplied Da Vinci Cart that the facility plans on using?

Answer: Patient Cart (max 247 cm), Vision Cart (max 223 cm), Surgeon Console (Max 178 cm).

RFI #7: Why isn’t the more stringent design temperature and humidity for operating rooms in ASHRAE* 170-2017 Standard, “Ventilation of Healthcare Facilities” being considered over the operating range for the Da Vinci Surgical System since its temperature and humidity ranges are much smaller and are critical for infection control and patient care considerations?

Answer: Equipment operating requirements were included as reference. The OR must meet VA OR design requirements mentioned in the answer to RFI #1 during operations.

RFI #8: Does the trailer have to meet DOT requirements for transport, including height restrictions?

Answer: Yes.

RFI #9: Does the supplier of the Sole Source Justification items (Olympus Video Routing System and Stryker Surgical Lights/Booms) currently satisfy the required 95% uptime?

Answer: During the warranty period, yes.

RFI #10: Does the 95% uptime include planned maintenance?

Answer: No, this only includes time when the OR trailer is intended to be used for patient care, not when its planned to be down.

RFI #11: What is the contingency plan, if all the equipment listed doesn’t fit within the confines of a DOT compliant unit?

Answer: Discussions with suppliers state they have installed this equipment in a DOT compliant unit. The equipment may be stored in compliance within the trailer as it is transported and can be installed upon set up of the trailer once in place.

RFI #12: How frequently will the trailers be moved from one facility to another?

Answer: Approximately 2-3 years.

RFI #13: On page #3, B.1 Contract Administration, 3. C states that Invoices shall be paid “At time of delivery/inspection/acceptance”. Can a Milestone achievement and related payment schedule be developed to achieve progress payments throughout the manufacturing phases?

Answer: No, contract financing will not be available for this procurement. IAW FAR 32.003 Simplified acquisition procedures financing, unless agency regulations otherwise permit, contract financing shall not be provided for purchases made under the authority of part 13.

RFI #14: With the extremely volatile and unpredictable building materials market today due to COVIS-19, how should contingencies for possible significant material increases between quoting and award date be handled?

Answer: IAW FAR Clause 52.212-1 (c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers.

RFI #15: Since XXX’s “operating room trailers” (Mobile Surgical Unit) are listed on the Government Services Administration (GSA) schedule, why wasn’t XXX contacted?

Answer: Two sources soughts were posted, one to SAM.gov and one to GSA. Market research was also conducted on VetBiz and the SBA Small Dynamic Business Search. Through all of this market research, XXX operating trailer were not found.

RFI #16: I see in the solicitation it says, “these trailers will initially be used as temporary surgical suites during the renovation and will be used as impact surgical suites for future projects.” Is the Department of VA looking to purchase 3 Mobile Operating Room Trailers or rent them? If they are looking to rent, what dates will they need the Operating Room Trailers?

Answer: We are purchasing the trailers, not renting them.