36C26120B0007-A0002004.pdf
PDF Posted
- Solicitation number
- 36C26120B0007
About this file
This document provides details for a federal contract opportunity to replace fire sprinkler pipes and sprinkler heads at a Veterans Affairs facility. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 intends to issue an Invitation for Bid on December 5, 2019 to award a single, firm-fixed price contract for Project 612-20-015. The contractor shall provide all labor, materials, permits and licenses to replace fire sprinkler PVC pipes and sprinkler heads in Building 200 at the VA Northern California Health Care System located at 150 Muir Rd, Martinez, CA 94533. The period of performance is 300 days from issuance of the notice to proceed. This project is set aside as a total small business opportunity for Service-Disabled-Veteran-Owned businesses with a size standard of $16.5 million. The estimated value of construction is between $500,000 and $1,000,000.
36C26120B0007 A0002 13_3 PCRA.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26120B0007-A0002006.pdf | ||
| 36C26120B0007-A0002001.pdf | ||
| 36C26120B0007-A0002007.pdf | ||
| 36C26120B0007-A0002000.docx | DOCX document | |
| 36C26120B0007-A0002002.pdf | ||
| 36C26120B0007-A0002005.pdf | ||
| 36C26120B0007-A0002003.pdf | ||
| 36C26120B0007-A0001000.docx | DOCX document | |
| 36C26120B0007-008.jpg | JPG image | |
| 36C26120B0007-007.jpg | JPG image | |
| 36C26120B0007-012.pdf | ||
| 36C26120B0007-009.jpg | JPG image | |
| 36C26120B0007-003.pdf | ||
| 36C26120B0007-004.pdf | ||
| 36C26120B0007-002.pdf | ||
| 36C26120B0007-001.docx | DOCX document | |
| 36C26120B0007-010.pdf | ||
| 36C26120B0007-005.pdf | ||
| 36C26120B0007-011.pdf | ||
| 36C26120B0007-006.jpg | JPG image |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Construction Risk Assessment (PCRA) VA Northern California Health Care System
Attachment A Policy Statement 138-56 March 1, 2019
Pre-Construction Risk Assessment
Project Name: Planned Project Start Date:
Project Number:
PM / COR P.O.C.: P.O.C. extension:
Location of Construction: Estimated Duration:
Safety/Life Safety Risk Assessment-Safety officer should be involved in the design/planning of all projects
Y N FIRE AND LIFE SAFETY IMPACTS
Will egress routes and exit signage from occupied areas remain unchanged? If No, ILSM is needed.
Will exit stairs remain unobstructed with appropriate fire protection? If No, ILSM is needed.
Will fire & smoke compartments remain intact & unchanged? If No, ILSM is needed.
Will fire alarm and detection systems remain functional & unimpaired; outages <4 hours?
If No, ILSM is needed.
Will fire suppression systems remain functional & unimpaired; outages <10 hours? If No, ILSM is needed.
Will construction area be separated by solid non-combustible smoke tight partitions? If No, ILSM is needed.
Will emergency access by Fire Department remain unobstructed? If No, ILSM is needed.
Will hot work be performed? If Yes, submit hot work permit to Safety
Will the project introduce other significant hazards? If Yes, describe below
Y N CONSTRUCTION ACTIVITY
Will there be any anticipated utility shutdowns? (Communications, electrical, heating/cooling, HVAC, medical gases, vacuum, water, sewer)
If Yes, describe necessary mitigation below
Will there be nuisance noise levels for adjacent areas? If Yes, describe necessary mitigation below Will vibration levels be affect operations of sensitive medical equipment? If Yes, describe necessary mitigation below
Y N PHYSICAL SECURITY IMPACTS
Will the construction compromise security? If Yes, describe necessary mitigation below
Y N CONTRACT COMPLIANCE
Will contract clauses be included for enforcement of identified risks? If Yes, describe necessary mitigation below
Y N ENVIRONMENTAL
Will the project require a NEPA assessment? Contact GEMS for a determination. If Yes, submit draft NEPA to GEMS
Will the project require a permit from the Air Quality District? Contact GEMS for a determination. If Yes, submit draft to GEMS
Will this project require a storm water permit? Contact GEMS for a determination. If Yes, submit draft to GEMS
Y N HAZARDOUS MATERIALS
Will this contract disturb known asbestos containing material (ACM)? Contact Safety for a determination. If Yes, describe necessary intervention:
Will this contract complete work with a biological area such as a lab? If Yes, Facility Specific Training required.
Will contract require the use of hazardous chemicals? If Yes, review by facility IH is required
Y N INFECTION CONTROL
Will this contract require an Infection Control Risk Assessment? If Yes, ICRA shall be completed prior to construction start.
Additional Requirements and Description of Mitigation:
Construction Safety Specialist / Safety Specialist Signature: Date:
Infection Control Representative Signature: Date:
VA Police Signature: Date:
Project Section Manager Signature: Date:
| Safety/Life Safety Risk Assessment-Safety officer should be involved in the design/planning of all projects |
| Y |
| N |
| FIRE AND LIFE SAFETY IMPACTS |
| Y |
| N |
| CONSTRUCTION ACTIVITY |
| Y |
| N |
| Y |
| N |
| Y |
| N |
| Y |
| N |
| Y |
| N |
| Project Name: Bldg 20 CLC Fire Sprinkler Replacement | |
| PM COR POC: Henry Lapira | |
| POC extension: 2209 | |
| Location of Construction: Bldg 20 CLC - VA Martinez | |
| Estimated Duration: 300days | |
| Additional Requirements and Description of Mitigation: | |
| Project Number: 612-20-015 | |
| Date1_af_date: 31Jan2020 | |
| 2019-12-16T08:07:01-0800 | |
| GARRETT S. OLVERA 1014406 |
| 2019-12-16T09:52:57-0800 | |
| JEFFREY S. DAILEY 459086 |
| Date6_af_date: 12/16/19 |
| Date7_af_date: |
| Date8_af_date: |
| Date9_af_date: |
| Check Box1: Off |
| Check Box2: Yes |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Yes |
| Check Box6: Off |
| Check Box7: Yes |
| Check Box8: Off |
| Check Box9: Yes |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Yes |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Yes |
| Check Box17: Off |
| Check Box18: Yes |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Yes |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Yes |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Yes |
| Check Box31: Off |
| Check Box32: Yes |
| Check Box33: Off |
| Check Box34: Yes |
| Check Box35: Off |
| Check Box36: Yes |
| Check Box37: Off |
| Check Box38: Yes |
| Check Box39: Off |
| Check Box40: Yes |
| Check Box41: Yes |
| Check Box42: Off |
| Text43: |
File details come from the government source that posted it. Updated .