Project 612-20-015 Replace Fire Sprinkler PVC Pipes and Sprinkler Heads Bldg 20
Solicitation number
36C26120B0007
Issued by

About this file

This document provides details for a federal contract opportunity to replace fire sprinkler pipes and sprinkler heads at a Veterans Affairs facility. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 intends to issue an Invitation for Bid on December 5, 2019 to award a single, firm-fixed price contract for Project 612-20-015. The contractor shall provide all labor, materials, permits and licenses to replace fire sprinkler PVC pipes and sprinkler heads in Building 200 at the VA Northern California Health Care System located at 150 Muir Rd, Martinez, CA 94533. The period of performance is 300 days from issuance of the notice to proceed. This project is set aside as a total small business opportunity for Service-Disabled-Veteran-Owned businesses with a size standard of $16.5 million. The estimated value of construction is between $500,000 and $1,000,000.

36C26120B0007 A0002 13_3 PCRA.pdf

View the file

Other files

File Type Posted
36C26120B0007-A0002006.pdf PDF
36C26120B0007-A0002001.pdf PDF
36C26120B0007-A0002007.pdf PDF
36C26120B0007-A0002000.docx DOCX document
36C26120B0007-A0002002.pdf PDF
36C26120B0007-A0002005.pdf PDF
36C26120B0007-A0002003.pdf PDF
36C26120B0007-A0001000.docx DOCX document
36C26120B0007-008.jpg JPG image
36C26120B0007-007.jpg JPG image
36C26120B0007-012.pdf PDF
36C26120B0007-009.jpg JPG image
36C26120B0007-003.pdf PDF
36C26120B0007-004.pdf PDF
36C26120B0007-002.pdf PDF
36C26120B0007-001.docx DOCX document
36C26120B0007-010.pdf PDF
36C26120B0007-005.pdf PDF
36C26120B0007-011.pdf PDF
36C26120B0007-006.jpg JPG image
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Construction Risk Assessment (PCRA) VA Northern California Health Care System

Attachment A Policy Statement 138-56 March 1, 2019

Pre-Construction Risk Assessment

Project Name: Planned Project Start Date:

Project Number:

PM / COR P.O.C.: P.O.C. extension:

Location of Construction: Estimated Duration:

Safety/Life Safety Risk Assessment-Safety officer should be involved in the design/planning of all projects

Y N FIRE AND LIFE SAFETY IMPACTS

Will egress routes and exit signage from occupied areas remain unchanged? If No, ILSM is needed.

Will exit stairs remain unobstructed with appropriate fire protection? If No, ILSM is needed.

Will fire & smoke compartments remain intact & unchanged? If No, ILSM is needed.

Will fire alarm and detection systems remain functional & unimpaired; outages <4 hours?

If No, ILSM is needed.

Will fire suppression systems remain functional & unimpaired; outages <10 hours? If No, ILSM is needed.

Will construction area be separated by solid non-combustible smoke tight partitions? If No, ILSM is needed.

Will emergency access by Fire Department remain unobstructed? If No, ILSM is needed.

Will hot work be performed? If Yes, submit hot work permit to Safety

Will the project introduce other significant hazards? If Yes, describe below

Y N CONSTRUCTION ACTIVITY

Will there be any anticipated utility shutdowns? (Communications, electrical, heating/cooling, HVAC, medical gases, vacuum, water, sewer)

If Yes, describe necessary mitigation below

Will there be nuisance noise levels for adjacent areas? If Yes, describe necessary mitigation below Will vibration levels be affect operations of sensitive medical equipment? If Yes, describe necessary mitigation below

Y N PHYSICAL SECURITY IMPACTS

Will the construction compromise security? If Yes, describe necessary mitigation below

Y N CONTRACT COMPLIANCE

Will contract clauses be included for enforcement of identified risks? If Yes, describe necessary mitigation below

Y N ENVIRONMENTAL

Will the project require a NEPA assessment? Contact GEMS for a determination. If Yes, submit draft NEPA to GEMS

Will the project require a permit from the Air Quality District? Contact GEMS for a determination. If Yes, submit draft to GEMS

Will this project require a storm water permit? Contact GEMS for a determination. If Yes, submit draft to GEMS

Y N HAZARDOUS MATERIALS

Will this contract disturb known asbestos containing material (ACM)? Contact Safety for a determination. If Yes, describe necessary intervention:

Will this contract complete work with a biological area such as a lab? If Yes, Facility Specific Training required.

Will contract require the use of hazardous chemicals? If Yes, review by facility IH is required

Y N INFECTION CONTROL

Will this contract require an Infection Control Risk Assessment? If Yes, ICRA shall be completed prior to construction start.

Additional Requirements and Description of Mitigation:

Construction Safety Specialist / Safety Specialist Signature: Date:

Infection Control Representative Signature: Date:

VA Police Signature: Date:

Project Section Manager Signature: Date:

Safety/Life Safety Risk Assessment-Safety officer should be involved in the design/planning of all projects
Y
N
FIRE AND LIFE SAFETY IMPACTS
Y
N
CONSTRUCTION ACTIVITY
Y
N
Y
N
Y
N
Y
N
Y
N
Project Name: Bldg 20 CLC Fire Sprinkler Replacement
PM COR POC: Henry Lapira
POC extension: 2209
Location of Construction: Bldg 20 CLC - VA Martinez
Estimated Duration: 300days
Additional Requirements and Description of Mitigation:
Project Number: 612-20-015
Date1_af_date: 31Jan2020
2019-12-16T08:07:01-0800
GARRETT S. OLVERA 1014406
2019-12-16T09:52:57-0800
JEFFREY S. DAILEY 459086
Date6_af_date: 12/16/19
Date7_af_date:
Date8_af_date:
Date9_af_date:
Check Box1: Off
Check Box2: Yes
Check Box3: Off
Check Box4: Off
Check Box5: Yes
Check Box6: Off
Check Box7: Yes
Check Box8: Off
Check Box9: Yes
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Yes
Check Box14: Off
Check Box15: Off
Check Box16: Yes
Check Box17: Off
Check Box18: Yes
Check Box19: Off
Check Box20: Off
Check Box21: Yes
Check Box22: Off
Check Box23: Off
Check Box24: Yes
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Yes
Check Box31: Off
Check Box32: Yes
Check Box33: Off
Check Box34: Yes
Check Box35: Off
Check Box36: Yes
Check Box37: Off
Check Box38: Yes
Check Box39: Off
Check Box40: Yes
Check Box41: Yes
Check Box42: Off
Text43:

File details come from the government source that posted it. Updated .