36C26120B0007-012.pdf
PDF Posted
- Solicitation number
- 36C26120B0007
About this file
This document contains a federal contract opportunity notice and a related hot work permit form. The federal contract opportunity notice indicates that Network Contracting Office 21 intends to issue an Invitation for Bid for Project 612-20-015 to replace fire sprinkler PVC pipes and sprinkler heads in Building 20 at a VA facility located in Martinez, California. The solicitation will be issued on or around December 5, 2019 as a total set-aside for Service-Disabled Veteran-Owned Small Businesses. The requirement is for a single firm-fixed price contract with a period of performance of 300 days from notice to proceed. The magnitude of construction is estimated between $500,000 and $1 million. The NAICS code is 238220 for fire sprinkler system installation with a small business size standard of $16.5 million. The related hot work permit form provides safety precautions and approval requirements for cutting, welding, soldering or brazing work with portable gas or arc equipment at the same VA facility.
36C26120B0007 13_5 Hot Work Permit Electronic PS 138 37.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26120B0007-A0002006.pdf | ||
| 36C26120B0007-A0002001.pdf | ||
| 36C26120B0007-A0002007.pdf | ||
| 36C26120B0007-A0002000.docx | DOCX document | |
| 36C26120B0007-A0002004.pdf | ||
| 36C26120B0007-A0002002.pdf | ||
| 36C26120B0007-A0002005.pdf | ||
| 36C26120B0007-A0002003.pdf | ||
| 36C26120B0007-A0001000.docx | DOCX document | |
| 36C26120B0007-008.jpg | JPG image | |
| 36C26120B0007-007.jpg | JPG image | |
| 36C26120B0007-009.jpg | JPG image | |
| 36C26120B0007-003.pdf | ||
| 36C26120B0007-004.pdf | ||
| 36C26120B0007-002.pdf | ||
| 36C26120B0007-001.docx | DOCX document | |
| 36C26120B0007-010.pdf | ||
| 36C26120B0007-005.pdf | ||
| 36C26120B0007-011.pdf | ||
| 36C26120B0007-006.jpg | JPG image |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Northern California Health Care System Policy Statement 138-37 October 27, 2017 Attachment A
HOT WORK PERMIT
Permit Request Date:
Building: Number:
Department: Floor:
Work to be accomplished:
Is fire watch required? Permit Expires:
Responsible party for fire watch:
The location where this work is to be done has been examined, necessary precautions taken, and permission is granted for this work.
Typed/Printed Name & Signature of Approving Official
Time Started: Time Finished:__________________________
ATTENTION
Before approving any hot work permit, the approving official or designee shall inspect the work area and confirm that precautions have been taken to prevent fire in accordance with NFPA 51 B.
PRECAUTIONS
Sprinklers in service.
Cutting and welding equipment in good repair.
WITHIN 35 FT. OF WORK
Floor swept clean of combustibles.
Combustible floors wet down, covered with damp sand, metal or other shields.
No combustible materials or flammable liquids.
Combustibles and flammable liquids protected with covers, guards or metal shields.
All wall and floor openings covered.
Covers suspended beneath work to collect sparks.
WORK ON WALLS
OR CEILINGS
Construction noncombustible and without combustible covering.
Combustibles moved away from the opposite side of wall.
WORK ON ENCLOSED
EQUIPMENT (tanks, containers, ducts, etc.)
Equipment cleaned of all combustibles.
Containers purged of flammable vapors.
FIRE WATCH
( I f n e c e s s a r y )
To be provided during and 30 minutes after operation.
Supplied with fire extinguisher and/or small hose.
Trained in the use of the equipment and in sounding the fire alarm.
FINAL CHECK-UP
Work area and all adjacent areas to which sparks and heat might have spread
(including floors above and below and on opposite sides of walls) were inspected 60 minutes after the work was completed and were found fire safe.
Typed/Printed Name & Signature of Approving Official
YES NO
(Not to exceed 24 hours)
For Cutting, Welding, Soldering, Brazing With Portable Gas Or Arc Equipment
| Building: |
| Number: |
| Department: |
| Floor: |
| Work to be done: |
| Responsible party for fire watch: |
| Yes: Off |
| No: Off |
| Start Time: |
| Finish Time: |
| Printed Name: |
| Printed Name 1: |
| DATE: |
File details come from the government source that posted it. Updated .