About this file

36C26119B0019 0007 S05 -AMENDMENT 0007, Question-Answers for RFI.pdf

View the file

Other files

File Type Posted
36C26119C0100-000.docx DOCX document
36C26119B0019-0007000.docx DOCX document
36C26119B0019-0006000.docx DOCX document
36C26119B0019-0006001.pdf PDF
36C26119B0019-0006002.pdf PDF
36C26119B0019-0005000.docx DOCX document
36C26119B0019-0004001.pdf PDF
36C26119B0019-0004000.docx DOCX document
36C26119B0019-0003000.docx DOCX document
36C26119B0019-0003001.pdf PDF
36C26119B0019-0002003.pdf PDF
36C26119B0019-0002005.pdf PDF
36C26119B0019-0002004.pdf PDF
36C26119B0019-0002002.pdf PDF
36C26119B0019-0002000.docx DOCX document
36C26119B0019-0002001.pdf PDF
36C26119B0019-0001000.docx DOCX document
36C26119B0019-013.docx DOCX document
36C26119B0019-018.jpg JPG image
36C26119B0019-007.docx DOCX document
36C26119B0019-017.jpg JPG image
36C26119B0019-003.docx DOCX document
36C26119B0019-001.docx DOCX document
36C26119B0019-010.docx DOCX document
36C26119B0019-002.docx DOCX document
36C26119B0019-015.docx DOCX document
36C26119B0019-011.docx DOCX document
36C26119B0019-016.jpg JPG image
36C26119B0019-020.jpg JPG image
36C26119B0019-008.docx DOCX document
36C26119B0019-004.docx DOCX document
36C26119B0019-014.docx DOCX document
36C26119B0019-006.docx DOCX document
36C26119B0019-012.docx DOCX document
36C26119B0019-005.docx DOCX document
36C26119B0019-022.docx DOCX document
36C26119B0019-009.docx DOCX document
36C26119B0019-019.jpg JPG image
36C26119B0019-021.pdf PDF
36C26119B0019-000.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT NO. 0007

Solicitation 36C26119B0019 Project: 640‐19‐913 Building #7, Chiller #2, Air Cooled Water Chiller Replacement

General

The following changes, additions or deletions shall be made to the following Contract Documents.

All other conditions shall remain the same.

1. SPECIFICATIONS

a. N/A

2. DRAWINGS

a. N/A

3. OFFEROR QUESTION AND CLARIFICATION

a. Question: Submitting/Proposing a Start/Stop, Status and Alarm, therefore there is no need to order the chiller with a Modbus communication card. If the customer wants integration to the unit, then this will be an additional cost. Please confirm if we are to keep the controls as is or upgrade to an integration?

b. Response: The SOW states: Vendor capability to program new equipment electronics to communicate with currently installed facility electronics. Also, the SOW states (1.7 K.): Per Divisions 23 64 00 the Contractor shall install a new Air Cooled Water Chiller and all associated connectors. 1. The Contractor shall be responsible for all electrical connections or modifications for the installation of equipment.

It is standard for most commercial HVAC equipment to come furnished as BACnet and Modbus capable, allowing the equipment to be connected to any brand of building management system. Therefore, the Air Cooled Water Chillers submittals needs to show BACnet and Modbus capable, otherwise it might not connect to the building management system.

‐END OF AMENDMENT NO. 0007‐

File details come from the government source that posted it.