About this file

36C26119B0017 0003 Consolidated RFIs - all answered.pdf

View the file

Other files

File Type Posted
36C26119B0017-0005000.docx DOCX document
36C26119B0017-0004034.pdf PDF
36C26119B0017-0004035.pdf PDF
36C26119B0017-0004033.docx DOCX document
36C26119B0017-0003002.pdf PDF
36C26119B0017-0003006.pdf PDF
36C26119B0017-0003004.pdf PDF
36C26119B0017-0003005.pdf PDF
36C26119B0017-0003000.docx DOCX document
36C26119B0017-0003003.pdf PDF
36C26119B0017-0002001.pdf PDF
36C26119B0017-0002000.docx DOCX document
36C26119B0017-0001000.docx DOCX document
36C26119B0017-064.pdf PDF
36C26119B0017-066.pdf PDF
36C26119B0017-058.pdf PDF
36C26119B0017-060.pdf PDF
36C26119B0017-068.pdf PDF
36C26119B0017-062.pdf PDF
36C26119B0017-059.pdf PDF
36C26119B0017-061.pdf PDF
36C26119B0017-057.pdf PDF
36C26119B0017-067.docx DOCX document
36C26119B0017-063.pdf PDF
36C26119B0017-065.pdf PDF
36C26119B0017-056.docx DOCX document
36C26119B0017-001.docx DOCX document
36C26119B0017-000.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

Source Selection Sensitive Information—See FAR 2.101 & 3.104

PROPOSAL REQUEST FOR INFORMATION (RFI) FORM

SOLICITATION: 36C26119B0017 – Renovation Building 209 at McClellan Park

NOTE: ALL PRE-PROPOSAL INQUIRIES SHALL BE SUBMITTED VIA EMAIL TO

robert.parke2@va.gov BY AN EDITABLE USE OF THIS FORM. Please identify, in numerical sequence, each set of inquiries that you send.

Question(s) is/are on the solicitation [ X ] Question(s) is/are on the drawings, specifications, technical data [ ]

Company Name and Offeror: _K S Telecomm, Inc.

From (person submitting question): _Bradley Metcalf, PM

Date of Proposal Inquiry: _21 August 2019_________________________________________

Phone Number: _916.975.4830__________________________

Proposal Inquiry: (Type inquiry below)

Proposal RFI #1 – The solicitation states that this procurement is a 100% Total Service Disabled

Veteran Owned Small Business Set-Aside. Does this mean that the GC and all subcontractors need to be Disabled Veteran Owned Small Business companies?

Proposal RFI #2 –

Proposal RFI #3 -

Add additional as necessary

Answer: The GC providing the bid is required to be an SDVOSB.

mailto:robert.parke2@va.gov

Source Selection Sensitive Information—See FAR 2.101 & 3.104

PROPOSAL REQUEST FOR INFORMATION (RFI) FORM

SOLICITATION: 36C26119B0017 – Renovation Building 209 at McClellan Park

NOTE: ALL PRE-PROPOSAL INQUIRIES SHALL BE SUBMITTED VIA EMAIL TO

robert.parke2@va.gov BY AN EDITABLE USE OF THIS FORM. Please identify, in numerical sequence, each set of inquiries that you send.

Question(s) is/are on the solicitation [ ]

Question(s) is/are on the drawings, specifications, technical data [ X ]

Company Name and Offeror: __Patriot Construction, Inc.______________________________

From (person submitting question): Kristen Silvan ___________________________________

Date of Proposal Inquiry: __08/21/19________________________________________

Phone Number: _(209) 712-6078__________________________

Proposal Inquiry: (Type inquiry below)

Proposal RFI #1 – Please provide the height of the SS corner guards. It is not called out in the plans or specs.

Response: Provide 5’-0 High SS Corner Guards, Subject to VA Approval

Proposal RFI #2 –

Proposal RFI #3 -

Add additional as necessary

Proposal RFI #3 – Will the VA provide their own special inspection firm for this project? Or should the GC include the cost in their bid?

GC shall include special inspection

Proposal RFI # –

Proposal RFI # -

Proposal RFI #4 – The telecom drawings seem to contradict each other. For example, on drawing

EDS-100, Demolition Key Note #3 tells us “Existing Voice/Data Outlets shall be removed and replaced with new system” Then on drawing ES-100, Keynote #3 tells us “All devices with “E” subscript are existing and shall remain protected during construction”. This note refers to the same locations the previous demo page told us to remove. So, one spot on the drawing tells us to remove everything, then another spot on the drawing tells us to save some locations.

Also, some of the locations shown on the installation plans are marked as “E” (existing), however on the demo plans which is supposed to show the existing conditions, that location is not shown as existing at all Can we get better clarification on what we are doing for every note? These issues are consistent throughout this scopes drawings.

Proposal RFI # – All the existing voice/data outlets, Fire Alarm devices in Room #’s 011, 012, 013, 014 & 015 shown on Sheet ES-100 with “E” subscript are to remain. The devices in the hatched area on both the sheets EDS-100 & ES-100 are to remain as the hatched area is not in

Scope of Work.

Proposal RFI #5 – Sheet Note #6 on EL-100 indicates to replace existing fixtures in mechanical room 9B, however the fixture type is not shown. Please advise if these fixtures are to be replaced and if so, provide the fixture type.

Proposal RFI # – The fixtures in Room #9B are to be replaced with fixture Type “C” and one (1) fixture by the exit from Room #9B will be of Type “C1”.

Date of Proposal Inquiry: __08/22/19________________________________________

Proposal RFI #6 – Please provide the deck height at the metal stud walls that are from floor to deck.

Response: As-Built Drawing are not available. For bidding purpose use 15 feet as deck to deck height.

Date of Proposal Inquiry: __08/23/19________________________________________

Proposal RFI #7 – Several areas in the specs, section 09 06 00 Schedule for Finishes is referenced but this spec section was not provided. Please provide.

Response: Specification includes SECTION 09 06 00, SCHEDULE FOR FINISHES, It is also attached to this response.

Date of Proposal Inquiry: __08/23/19________________________________________

Proposal RFI #8 – The phasing states that the building is being split into East and West. Please advise where these splits will be as it is not shown on the plans.

Response: See Drawing Number GI103 regarding phasing information.

Date of Proposal Inquiry: __08/29/19________________________________________

Proposal RFI #9 – In regard to the window shades, the window schedule on sheet A601 shows only two interior windows types at the basement level and details 12 on AE501 and 11 on

AE503 provide two different mounting details. We are assuming that detail 11 on AE503 is for the interior basement shades while detail 12 on AE501 suggests an install at the referenced exterior windows. There are no window designations for the exterior windows on floors 1 and 2.

Sheet AE401 note 23 says there is to be shades at all exterior windows. In addition, please provide the heights on the exterior windows? There is no elevation (except for the breakroom) that provides the window height.

Response:

There are primarily 2 types of exterior window (see plans for location and quantity)

- 11’-0 Wide x 6’-0” High

- 7’-2” wide x 6’-0” High

At the main entrance: There are 2 types of exterior window

- 15’-0 Wide x 12’-0” High (2 story area)

- 6’-0” wide x 8’-0” High (both sides of the entrance door)

See photos below for reference

Date of Proposal Inquiry: __08/30/19________________________________________

Proposal RFI #10 - The electrical drawings show a (N) fire alarm devices and a Securitron fire alarm panel and annunciator panel; our fire alarm subs have informed us that this fire alarm system is only offered in the UK. Is the owner providing the Fire Alarm panels and devices?

Proposal RFI # – Securitron Fire Alarm panel was VA’s preference. Replace existing Silent

Knight Fire Alarm panel and the annunciator with new Fire Alarm Panel along with the annunciator or any approved equal system. The existing initiating devices for the system have to be replaced with the new system being provided.

Date of Proposal Inquiry: __08/30/19________________________________________

Proposal RFI #11 – There are some discrepancies between the plans and specs in regard to the plumbing fixtures. The fixtures called out in the specs are mostly manual and cheaper. The plan schedule is asking for more expensive sensor type fixtures and some are not Buy America.

Please advise.

Proposal RFI # – Follow the Plumbing Fixture specified in the plans and all fixtures should be

“Buy America”

NOTE: ALL PRE-PROPOSAL INQUIRIES SHALL BE SUBMITTED VIA EMAIL TO

robert.parke2@va.gov BY AN EDITABLE USE OF THIS FORM. Please identify, in numerical sequence, each set of inquiries that you send.

Question(s) is/are on the solicitation [ ] Question(s) is/are on the drawings, specifications, technical data [ X ]

Company Name and Offeror: Mesa Energy Systems, Inc.

From (person submitting question): Philip Bakarich

Date of Proposal Inquiry: 08/20/19

Phone Number: 916-224-0752

Proposal Inquiry: Option 4

RFI #1 – Reference drawing sheets MD101, MH101, M100: There is a Terminal Unit TU-207 shown to remain.

Please clarify if TU-207 is included in the Option 4 ECC scope of work shown on sheet M100.

RFI #2 – Reference drawing sheet M100, Detail 1: MS/TP communication (typical), existing controller protocol, existing control system to remain, Note 2: Reuse existing communication network:

The existing terminal units and ductwork are being removed and re-configured and new controllers, control valves, communication network and low voltage power wire will be required.

Please clarify.

RFI #3 – Is the BACnet control system low voltage control wiring that is concealed, but accessible, required to be installed in EMT conduit, or is properly installed open-air plenum rated cable also acceptable? Is conduit required for the interior wall zone thermostats?

RFI#2 RESPONSE:

Correct, existing terminal units and ductwork are being removed and replaced, and will require new low voltage wiring to new terminal unit controllers and temperature sensors. These shall be replaced with new terminal unit controllers to match the existing system. Central System Level Controllers (NAEs) are existing to remain and existing Engineering Control System is existing to remain.

RFI#1 RESPONSE:

TU-207 is Existing to Remain, but shall remain on the Central Engineering Control Center (existing to remain)

RFI#3 RESPONSE

Per Specfication 23 09 23 (pg. 34), all wiring cabling shall be installed in conduit. Conduits carrying control wiring and cabling shall be dedicated to the control wiring and cabling .

PROPOSAL REQUEST FOR INFORMATION (RFI) FORM

NOTE: ALL PRE-PROPOSAL INQUIRIES SHALL BE SUBMITTED VIA EMAIL TO

robert.parke2@va.gov BY AN EDITABLE USE OF THIS FORM. Please identify, in numerical sequence, each set of inquiries that you send.

Question(s) is/are on the solicitation [ ] Question(s) is/are on the drawings, specifications, technical data [ ]

Company Name and Offeror: KDM ELECTRIC, INC.

From (person submitting question): K Menicucci

Date of Proposal Inquiry: 08/27/2019

Phone Number: 916.690.8271

Proposal Inquiry: (ELECTRICAL)

Proposal RFI #1 – Provide Lighting Control Specification, including system description, including acceptance testing, training and commissioning.

Proposal RFI #2 – Reference Drawing FS-100 Key Note #7: Clarify? New Fire Alarm “Securitron” Panel Model #Securifire 3000. The Securifire 3000 FACP is distributed by “Securiton”! Securiton is an international off shore company! www.securiton.com

Proposal RFI #3 – The VFD for New Chiller1 is part of the Chiller Package and is not required to be Installed by the EC. Y/N?

Varinder Typewritten Text RFI #1: Refer to Key Note #2 for theLighting Control Panel. Specifiction Section 26 09 23 is attached for the Lighting Controls.

Varinder Typewritten Text

Varinder Typewritten Text

Varinder Typewritten Text

Varinder Typewritten Text RFI #2:This make of the Fire Alarm system was VA's preference. Replace the existing Silent Knight Fire Alarm panel with new Fire Alarm Panel or Notifier (approved equal). The initiating devices for the system have to be replaced with the Fire Alarm System being provided.

RFI #3: Ye, VFD is integral with the Chiller package. Electrical contractor is responsible for the raceway & wiring to provide power.

Source Selection Sensitive Information—See FAR 2.101 & 3.104

PROPOSAL REQUEST FOR INFORMATION (RFI) FORM

SOLICITATION: 36C26119B0017 – Renovation Building 209 at McClellan Park

NOTE: ALL PRE-PROPOSAL INQUIRIES SHALL BE SUBMITTED VIA EMAIL TO

robert.parke2@va.gov BY AN EDITABLE USE OF THIS FORM. Please identify, in numerical sequence, each set of inquiries that you send.

Question(s) is/are on the solicitation [ 1 ]

Question(s) is/are on the drawings, specifications, technical data [ EP-100 ]

Company Name and Offeror: ______Hangtown Electric___________

From (person submitting question): _Lloyd Mason____________

Date of Proposal Inquiry: __________9/21/19_________________

Phone Number: 9168020999______

Proposal Inquiry: (Type inquiry below)

Proposal RFI #1 – Herman Miller power pole with 3 duplex’s each side- is there a national account to order form, or is it supplied with the furniture and installed by EC ?

VA will purchase power poles and contractor install

Proposal RFI #2 –

Proposal RFI #3 -

Add additional as necessary mailto:robert.parke2@va.gov

Building 209 RFI #1
PROPOSAL REQUEST FOR INFORMATION (RFI) FORM
RFI #2 response_Answered
RFI #3_answered
RFI #4 Answered
RFI #5 Answered
RFI #6 Answered
RFI #7 Answered
RFI #8 -answered
Response to RFI #9
Response to RFI #10
Response to RFI #11
RFI Mesa Answered