This is a Price Cost Schedule template for Request for Proposal No. 36C26026R0117, which is a construction project (663A4-27-001) for Under Dispenser Containment (UDC) and Sump Installation at the VA Puget Sound Health Care System's American Lake Campus in Tacoma, Washington. The schedule requires offerors to provide fixed-price line item costs broken down by 26 Construction Specification Institute (CSI) Divisions, including General Requirements, Existing Conditions, Concrete, Plumbing Facility Fuel Piping, Electrical, Electronic Safety and Security, Earthwork, Exterior Improvements, and Utilities. Additional cost categories include mobilization/demobilization, insurance/bonds, taxes/fees, operations and maintenance manuals, red line drawings, overhead rate, and profit rate. The template specifies a 90-day period of performance and requires offerors to complete all yellow-highlighted areas; blank entries will render the proposal noncompliant. The principal NAICS code is 237120 (Oil and Gas Pipeline and Related Structures Construction), and the single line item covers the complete UDC Repair and Sump Installation work priced on a job basis. Offerors must accurately verify all formulas and transfer totals from the Proposal Price Schedule tab to the Items tab, as both tabs are mandatory for proposal compliance. All pricing is fixed-price, and field office overhead and general conditions are treated as a single cost category applied only once to the contract and any changes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| INSTRUCTIONS | |
| 1 | Awardee is Responsible for determining accuracy of formulas to calculate all totals as well as accurately transfering totals from the Proposal Price Schedule tab to the Items tab. |
| 2 | The term “Division” used with each line item in the Proposal Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record. |
| 3 | The proposal price schedule is for informational purposes only and does not constitute separate billable deliverables. |
| 4 | Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable. |
| 5 | All pricing is fixed price. |
| 6 | The Items tab identifies the services to be acquired in this solicitation and is required per FAR 4.1001. |
| 7 | Both the Proposal Price Schedule tab and the Items tab are required to be fully completed for a proposal to be considered compliant with the proposal submission instructions. Each tab has yellow highlighted areas indicating where information shall be entered by the offeror. All yellow highlighted areas must be completed. If not applicable to the offer, N/A or $0.00 shall be entered. A blank space will be considered as incomplete and the proposal will be considered noncompliant. |
Price Schedule
| PRICE SCHEDULE BREAKDOWN |
| Request For Proposal No.: 36C26026R0117 |
Project Number / Title: Construction Project 663A4-27-001 Under Dispenser Containment (UDC) and Sump Installation Project Location: VAPSHCS, American Lake Campus, VA
| Rates | Base Item | |
| Price | ||
| Division 1 General Requirements (HASP, ECP, regulatory notifications and records, submittals, outage coordination, quality control, closeout) | $0.00 | |
| Division 2 Existing Conditions (dispenser disconnect and drain-down, saw cutting and concrete removal, product piping removal and disposal) | $0.00 | |
| Division 3 Concrete (form and pour disturbed areas, match grades) | $0.00 | |
| Division 4 Masonry | $0.00 | |
| Division 5 Metals | $0.00 | |
| Division 6 Woods, Plastic and Composites | $0.00 | |
| Division 7 Thermal and Moisture Protection | $0.00 | |
| Division 8 Openings | $0.00 | |
| Division 9 Finishes | $0.00 | |
| Division 10 Specialties | $0.00 | |
| Division 11 Equipment (dispenser removal, protection and reinstallation, hose retrievers) | $0.00 | |
| Division 12 Furnishings | $0.00 | |
| Division 13 Special Construction | $0.00 | |
| Division 14 Conveying Equipment | $0.00 | |
| Division 21 Fire Suppression | $0.00 | |
| Division 22 Plumbing Facility Fuel Piping (double-wall OPW piping and fittings, extractor valve removal and reinstallation) | $0.00 | |
| Division 23 HVAC | $0.00 | |
| Division 25 Integrated Automation | $0.00 | |
| Division 26 Electrical Electrical (dispenser disconnect and reconnect, probe raceways, communication conduit, junction box, conductors and terminations) | $0.00 | |
| Division 27 Communications | $0.00 | |
| Division 28 Electronic Safety and Security- Electronic Safety and Security (UDC and sump leak sensors, TLS-4 programming and verification) | $0.00 | |
| Division 31 Earthwork - (hydro-excavation, excavation safety, backfill, compaction) | $0.00 | |
| Division 32 Exterior Improvements - (surface restoration) | $0.00 | |
| Division Item 33 Utilities - (extractor valve containment sump, traffic-rated manhole, UDC assemblies | $0.00 |
SubTotals N/A $0.00
Period of Performance (FAR 52.211-10) 90 days
| Mobilization / Demobilization | N/A | $0.00 |
| Insurance / Bonds | N/A | $0.00 |
| Taxes / Other Fees (provide itemized list) | N/A | $0.00 |
| O&M Manuals and Red Line Drawings | N/A | $0.00 |
| Overhead | Rate _______% | N/A |
| Profit | Rate _______% | N/A |
| SubTotals | $0.00 |
Other Items not Requested Above (provide itemized list) $0.00
CONTRACT TOTALS $0.00
Items
| Item Number | Description | Quantity | Unit of Measure | Line Item Is | Total Price | PRINCIPAL NAICS CODE | PRODUCT/SERVICE CODE |
| 00001 | UDC Repair and Sump Installation in accordance with the Statement of Work (SOW) | 1 | Job | Priced | $ - 0 | 237120 | Z1DA |