This is Amendment 0001 to Solicitation 36C26027R0029, a Request for Proposal issued by the Department of Veterans Affairs, VA Puget Sound Health Care System, for Under Dispenser Containment (UDC) and Sump Installation at the American Lake Campus in Tacoma, Washington. The amendment extends the proposal submission deadline to November 19, 2026, at 15:00 PST and provides government responses to 12 Requests for Information (RFIs), along with an amended Statement of Work and revised Davis-Bacon wage determination. Key scope clarifications include that the contractor must furnish and install new UDCs, containment sump, product piping, two new Veeder-Root TLS-4 probes/sensors, leak detection sensors, and replace Dispenser No. 1; the government will not provide existing as-built drawings, and contractors must verify all site conditions independently before proposal submission. The contractor is responsible for all piping and connections needed to accomplish the work and for any equipment that does not fit existing conditions or lacks COR approval.
This SDVOSB set-aside requires offerors to maintain active SBA SDVOSB certification in the SBA database and SAM registration under NAICS 237120 (Oil and Gas Pipeline and Related Structures Construction) at both proposal submission and award. The contract is firm-fixed-price and includes Davis-Bacon Act wage determinations; a bid bond is required with proposals. Regulated piping tightness testing must be performed or directly supervised by a U3-certified provider in accordance with Washington State Department of Ecology requirements and manufacturer recommendations, including hydrostatic testing where applicable. A U7-certified site assessment provider is not required for base scope but would be needed if field conditions indicate a suspected release; identification of a U7 provider is not required for proposal responsiveness but enhances technical evaluation ratings. Proposals must include product submittals with manufacturer, model number, and part number for all furnished equipment, a 90-day project schedule, and identification of U1- and U3-certified personnel.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
11-16-2026
663A4-27-001 36C260 Network Contracting Office 20
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661
36C260 Network Contracting Office 20
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661 To all Offerors/Bidders
36C26027R0029 11-04-2026
X
X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 11-19-2026 15:00 PST
This amendment is to provide government response to RFIs, extend the close date for the receipt of offerors, amend the Statement of work and provide a revised wage determination.
1.) The close date for the reciept of offers is hereby extended to 11/19/2026 at 15:00 PST.
2.) The statement of work is hereby amended to include additional requirements and provide clarificaiton.
3.) Attachment D is hereby revised to include required wage determinations.
4. All other terms and conditions remain in effect.
See amended and revised attachments A and D for changes.
See continuation pages for RFIs and government responses.
Derek Crockett Contracting Officer
CONTINUATION PAGES
1. Existing Fuel System Drawings:
Are there any existing UST/fuel system as-built or record drawings available, including the underground fuel piping and associated electrical/monitoring plans? If available, please provide them for our review.
Government Response: The Government has no as-built or record drawings of the existing UST and fuel system to provide. Offerors must base their proposals on their own inspection of the site and on the information in the solicitation. This is required by FAR 52.236-3, Site Investigation and Conditions Affecting the Work, and VAAR 852.236-93, Site Visit (Construction). The Contractor must verify all existing site conditions before ordering or installing equipment. Per Proposal Instructions item 7, the Contractor is responsible for the cost of any equipment that does not fit existing conditions or is not approved by the COR.
2. Department of Ecology Inspection Report:
The SOW references deficiencies identified during a Washington State Department of Ecology inspection. Can the original inspection report and any associated corrective-action documentation be provided?
Government: The Government can provide the Ecology inspection report after contract award. The Statement of Work (Attachment A) defines the full scope of work and the requirements. Offerors must prepare their proposals, including the Price Schedule (Attachment B), the equipment submittals, and the 90-day project schedule, from the SOW and the other solicitation documents. The Government will not evaluate proposals against the contents of the inspection report.
3. Existing Fuel Piping Repairs - Task 8:
Task 8 identifies new piping between the extractor valves and UDCs but also requires verification and repair of existing fuel lines and connections from the tanks to the dispensers.
Please confirm whether repairs outside the specified piping replacement limits are included in the base scope and, if so, identify the known deficiencies and required repair limits.
Government Response: The Contractor must complete all piping and connections needed to accomplish the work outlined in the Statement of Work (Attachment A). This includes the new piping between the extractor valves and the UDCs, and the verification and repair of existing fuel lines and connections from the tanks to the dispensers, as the SOW requires. The Contractor must also provide the new monitoring sensors, piping, extensions, and connections, and perform all other work the SOW requires. This work is part of the base scope and the firm-fixed price. The Contractor must field verify existing conditions before pricing and before ordering or installing equipment. If the Contractor discovers an unknown condition or new information that requires piping work beyond the SOW, the Contractor must notify the Contracting Officer
4. Leak Detection and Monitoring - Tasks 9–10:
Task 9 references raceways for three new monitoring probes, while Tasks 9–10 also require UDC and containment sump sensors. Please clarify the intended application of the three probes and identify which monitoring components are to be furnished new versus reused.
Government Response: Sump sensers must be procured and installed for fuel leak detection by the contractor. The Contractor must procure and install new leak detection sensors in each new UDC and in the extractor valve containment sump, as the Statement of Work (Attachment A) requires. The Contractor must also furnish and install the Veeder-Root TLS-4 components and monitoring probes the SOW requires, and must integrate and program them so they monitor the new sensors. These items are listed in Proposal Instructions item 7, Part 3, and the Contractor must identify each by manufacturer, model number, and part number in the proposal.
5. Dispenser No. 1 - Task 11:
The SOW identifies an inoperative system reset at Dispenser No. 1. Is there an existing diagnosis or identified corrective action available?
Please clarify the extent of repairs anticipated beyond normal reconnection and commissioning.
Government Response: The Government requires the Contractor to replace and commission Dispenser No. 1. See Statement of Work_Amended (Attachment A).See Task 11 – Dispenser No. 1 Replacement and Commissioning on Statement of Work_Amended.
Offerors should review the following areas of the amended SOW. All other sections are unchanged.
1. Task 2, Fuel Dispenser Removal. The last bullet now excludes Dispenser No. 1 from “secure and protect dispensers for reinstallation,” because Dispenser No. 1 will be replaced under Task 11.
2. Task 11, Fuel Dispenser Replacement & Commissioning. This task now requires the Contractor to furnish, install, and commission a replacement for Dispenser No. 1, and to reinstall the other existing dispensers.
3. Section 6, Deliverables, item 4 (Manufacturer Product Submittals). The replacement dispenser has been added to the equipment list and to the information required for each item (manufacturer, model number, and part number).
4. Section 6, Deliverables, item 6 (Equipment Data Record). The replacement dispenser has been added to the list of installed equipment requiring manufacturer, model, part number, serial number, and warranty information.
Offerors must include the cost of this work in their total firm-fixed price.
6.) RFI 01 – U3 Certification and Tightness Testing Requirements Please clarify the specific regulated tightness testing required under this contract and identify the components requiring testing by a U3-certified service provider. The SOW includes installation of new UDCs, containment sump, and product piping, but does not include repair or replacement of the existing USTs.
· Please confirm whether the Government requires a formal tank and/or product-line tightness test under WAC 173-360A-0635/0650, or whether testing is limited to the newly installed piping and secondary-containment components in accordance with the applicable installation, manufacturer, and Ecology requirements.
Government Response: The Government does not require a tightness test of the existing underground storage tanks. The SOW does not include repair or replacement of the tanks.
The work does include testing of the new installation. Task 14 of the SOW requires tightness testing of the newly installed containment systems, piping, and associated components, in accordance with Washington State Department of Ecology requirements and manufacturer recommendations, including hydrostatic testing where applicable. Per Section 4 of the SOW, regulated piping tightness testing shall be performed or directly supervised by a provider holding ICC U3 certification. Offerors must identify U1- and U3-certified personnel as required by Proposal Instructions item 7, Part 1. The cost of this testing is included in the firm-fixed price.
· If U3 certification is required for specific testing under this scope, please identify the applicable test and component.
Government Response: Please see above response.
7.) RFI 02 – U7 Site Assessment Certification Requirement The SOW states that a U7-certified service provider is required if conditions encountered require a formal site assessment. WAC 173-360A-0730 identifies specific circumstances requiring a site assessment, including investigation of a suspected release, permanent closure, and change-in-service. None of these activities appear to be included in the base scope unless evidence of a release or contamination is encountered during the work.
· Please confirm that a site assessment and U7-certified service provider are not required as part of the base contract scope and would only be required if field conditions or another regulatory trigger necessitate a site assessment.
Government Response: A site assessment and a U7-certified provider are not required as part of the base scope. Per Section 4 of the SOW, if conditions encountered require a formal site assessment, such as a suspected release, that work must be performed or directly supervised by a provider holding Washington State Site Assessment (U7) certification, or another qualification accepted under WAC 173-360A-0930. If evidence of a suspected release is encountered, the Contractor must follow Task 2: stop work in the affected area, protect the site, and notify the VA COR and CO immediately in writing by email and by phone. Any added work will be addressed at that time.
-Please also confirm whether identification/commitment of a U7 provider is required for proposal responsiveness if no site assessment is presently anticipated.
Government Response: Identification of a U7 provider is not required for proposal responsiveness. To be rated Acceptable under Technical Capability, an offeror must identify at least one U1 and one U3 holder. Identifying or committing to a U7 provider is considered for the Good and Outstanding ratings, as stated in the evaluation criteria.
8.) RFI 03 – Veeder-Root TLS-4 Equipment Submittal Requirement The Proposal Instructions require technical submittals identifying specific manufacturer, model number, part number, data sheet, sourcing information, and lead time for Veeder-Root TLS-4 components and monitoring probes. The SoW requires the Contractor to program the newly installed UDC and containment-sump sensors into the existing Veeder-Root TLS-4, install new or existing tank probes only as required to restore existing monitoring functions, and verify/repair deficient TLS-4 wiring within the defined work limits. The SOW does not appear to require furnishing a new TLS-4 monitoring console.
· If the existing TLS-4 console is Government/Owner equipment to remain in place, please confirm that a product submittal for a new TLS-4 console is not required and that the proposal submittal requirement is limited to any new TLS-4-compatible sensors, probes, interface components, modules, or other components actually proposed to be furnished as part of the work.
Government Response: This requirement does not include procuring or furnishing a new TLS-4 monitoring console. The Contractor must connect, install, program, and verify functionality with the existing Government-owned TLS-4 console so that it is programmed and working properly in accordance with the general standards. The proposal submittal requirement applies to the TLS-4-compatible probes, sensors, and any other components the Contractor will furnish.
The Contractor must connect, install, program, and verify functionality with the existing Government-owned TLS-4 console. The Statement of Work has been amended to add the following requirement under Task 9: the Contractor must provide and install QTY 2 EA new TLS-4 Veeder-Root probes/sensors. See Statement of Work_Amended (Attachment A), Task 9, Electrical and Communication Systems. Leak detection sensors within each UDC and within the containment sump remain required under Task 10. Offerors must propose and price the equipment and quantities described in Tasks 9 and 10 of the SOW. This work is included in the firm-fixed price.
· If a new TLS-4 console or specific TLS-4 components are intended to be furnished by the Contractor, please identify the required equipment and quantity so that it can be included in the proposal.
Government Response: See above response.
9.) RFI 04 – Past Performance Is the Offeror required to hold the certifications and past performance required in the Technical Capabilities section or can the Offeror use their subcontractor’s certifications and past performance for evaluation?
Government Response: An Offeror may submit past performance that shows its own firm’s experience, including work the Offeror performed as a prime contractor or as a subcontractor. For each project, the Offeror must state its role and the percentage of work it performed, as required by Proposal Instructions item 8.
Past performance that belongs to a third-party firm or to a proposed subcontractor will not be credited to the Offeror. If an Offeror submits only that kind of experience, the Government will treat the Offeror as having no relevant past performance. The Offeror will receive an “Unknown Confidence (Neutral)” rating.
10.) Because SBA does not separately certify joint ventures, could you please confirm that an otherwise eligible joint venture will not be excluded solely because it lacks a separate SBA certification or database listing, provided its managing venturer is SBA-certified and the joint venture satisfies the applicable requirements of 13 CFR 128.402?
Government response: (c) A joint venture may be considered eligible if it meets the requirements in 13 CFR part 128, and the managing joint venture partner makes the representations. Additionally, any joint offeror firm must be meet the following requirements to be considered for evaluation:
1. Certification. The SDVOSB managing venturer must have active SBA SDVOSB certification in the SBA database at proposal submission and at award. This is how the “certified in the SBA database” requirement (SF 1442 Block 10; Notice items 1–2) is met for a joint venture.
2. SAM registration. The joint venture must be registered in SAM. Its registration must list NAICS 237120 and represent it as small under that code (Notice item 2; SF 1442 Block 10).
11. Wage Determination – Attachment D:
Attachment D is identified as a Davis-Bacon wage determination but contains Service Contract Act Wage Determination 2015-5539, Revision 33. Please confirm the applicable wage determination for the construction work and provide the governing Davis-Bacon schedule if required.
Government Response: This is a construction contract, so the Davis-Bacon Act (DBA) wage determination governs the construction work.
The Service Contract Act (SCA) does not apply to the construction work. DBA Applies, see ATTACHMENT D -DBA Wage Determinations Pierce County. REVISED.
12.) would like to respectfully request an extension of the proposal submission deadline for the Under Dispenser Containment (UDC) and Sump Installation project at VAMC American Lake.
The deadline for the receipt of offers has been extended to Thursday, 11/19/2026, at 15:00 PST. Offerors will be accepted by email only at derek.crockett@va.gov . See amendment 0001.