Attachment 9 - Division Cost Breakout Version 2..xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C26026R0035
About this file
This is a Price Schedule Breakdown template for a fixed-price construction contract to replace a 40-ton condenser at Building 200 of the Puget Sound VA Medical Center's American Lake Campus in Tacoma, Washington. The template is structured according to Construction Specification Institute (CSI) divisions and requires contractors to provide detailed cost breakdowns across multiple work categories, including General Requirements, Existing Conditions, Concrete, Metals, Woods/Plastics/Composites, Thermal and Moisture Protection, Specialties, Special Construction, Plumbing, Heating/Ventilating/Air Conditioning, and Electrical work. All line items in the provided template are currently listed at $0.00, indicating this is a blank form awaiting contractor pricing submission.
The instructions clarify that contractors are responsible for formula accuracy and proper transposition of totals to the Price Summary. Field office overhead and general conditions are treated as a single cost category applied only once to the contract and any changes. The price schedule serves informational purposes only and does not constitute separate billable deliverables. Additionally, contractors must account for insurance, bonds, taxes, other fees, operation and maintenance manuals, red-line drawings, overhead, subcontract mark-up, profit, and any other items not specifically requested, with all costs ultimately rolled into the contract total for Solicitation 36C26026R0035.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| PRICE SCHEDULE BREAKDOWN INSTRUCTIONS | |
| INSTRUCTIONS | |
| 1 | Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary |
| 2 | The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record. |
| 3 | The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables. |
| 4 | Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable. |
| 5 | All pricing is fixed price. |
Proposal Price Schedule
| PRICE SCHEDULE BREAKDOWN |
| Solicitation 36C26026R0035 - Project 663A4-23-201 |
Replace 40 Ton Condenser Puget Sound VA Medical Center - American Lake Campus, Tacoma, WA
| Site & Infrastructure Subgroup | ||
| Rates | Base Item | |
| General Requirements & Facility Construction | Price | |
| Division Item 1 General Requirements (furnish and install) | N/A | $0.00 |
| Division Item 2 Existing Conditions (furnish and install) | N/A | $0.00 |
| Division Item 3 Concrete (furnish and install) | N/A | $0.00 |
| Division Item 5 Metals (furnish and install) | N/A | $0.00 |
| Division Item 6 Woods, Plastic and Composites (furnish and install) | N/A | $0.00 |
| Division Item 7 Thermal and Moisture Protection (furnish and install) | N/A | $0.00 |
| Division Item 10 Specialties (furnish and install) | N/A | $0.00 |
| Division Item 13 Special Construction (furnish and install) | N/A | $0.00 |
| Facility Services Subgroup | ||
| Division Item 22 Plumbing (furnish and install) | N/A | $0.00 |
| Division Item 23 Heating, Ventilating and A/C (furnish and install) | N/A | $0.00 |
| Division Item 26 Electric | N/A | $0.00 |
TOTAL DIVISIONS $0.00
| Insurance / Bonds | $0.00 |
| Taxes / Other Fees (provide itemized list) | $0.00 |
| O&M Manuals and Red Line Drawings | $0.00 |
| Overhead | $0.00 |
| SubContract Mark-Up | $0.00 |
| Profit | $0.00 |
| SubTotals | $0.00 |
Other Items not Requested Above (provide itemized list) $0.00
| CONTRACT TOTALS | $0.00 | |
| TOAL | $0.00 |