This document is a Regulated Building Materials Survey Report for the Seattle VA Medical Center (VAMC) roof replacement project. The survey, conducted by Mabbett & Associates in July 2019, examined roofs of Buildings 1, 20, 22, 23, 33, and 100 for asbestos-containing materials (ACM) and lead-containing paint. Key findings include the identification of twelve homogenous material areas containing asbestos, primarily consisting of silver roofing felt/mastic, caulk, and adhesives associated with lightning protection system anchors across various buildings and roof locations. The survey involved collecting 135 representative bulk samples, with forty-nine material types analyzed using polarized light microscopy (PLM) and transmission electron microscopy (TEM). A limited lead-containing paint survey was also performed, with samples collected from roof-related surfaces. The survey was part of the VA Project No. 663-18-102, with the solicitation number 36C26025R0064, involving the Department of Veterans Affairs Veterans Health Administration.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
p
REGULATED BUILDING MATERIALS
SURVEY REPORT
VA Puget Sound Health Care Campus Seattle, WA Roofs of Buildings 1, 20, 22, 23, 33 & 100
A/E Project to Replace Roofs VA Project No. 663-18-102 1660 South Columbian Way Seattle, WA 98108
July 31, 2019 Mabbett Project No. R2019016.000.001
Prepared for:
11031 S. Pikes Peak Drive, Suite 202 Parker, CO 80138
Mabbett & Associates, Inc.
5 Alfred Circle Bedford, MA 01730-2318 T. 781-275-6050 Massachusetts | Virginia | Rhode Island | New Jersey
© 2019, Mabbett & Associates, Inc.
www.mabbett.com
REGULATED BUILDING MATERIALS SURVEY REPORT
Roof Replacement for Buildings 1, 20, 22, 23, 33 & 100 | VA Puget Sound Health Care | Seattle, WA
© 2019, Mabbett & Associates, Inc. Page i July 31, 2019 Project No. R2019016.000.001 S:\ADMINA\2019016 Seattle VAMC\000\001\Seattle VAMC Roof Survey Report - Final.doc
ACKNOWLEDGEMENT
This Regulated Building Materials Survey Report has been prepared by Mabbett & Associates, Inc. (Mabbett®) for the A/E Design Services to Replace the Roofs of Buildings 1, 20, 22, 23, 33, and 100 at the Seattle Campus of the VA Puget Sound Healthcare System located in Seattle, Washington, VA Project No. 663-18-102. The information presented herein is based on the facts and information conveyed to or received by Mabbett during the preparation of this report. If any of the information provided to Mabbett that was used in preparing this report is incorrect, incomplete, or subject to change, Mabbett would wish to alter its opinion(s) accordingly. In addition, the professional opinions and information contained in this report are based solely on the requirements of the applicable regulations and technical data as known to Mabbett as of the date of this report and considered applicable to this report.
The attached Regulated Building Materials Survey Report was prepared by the following Mabbett personnel:
Jordan N. Herbert Environmental Health & Safety Specialist
This report has been reviewed and approved by:
Michael F. Delaney Director, Building Sciences Group
© 2019, Mabbett & Associates, Inc. Page ii July 31, 2019 Project No. R2019016.000.001 S:\ADMINA\2019016 Seattle VAMC\000\001\Seattle VAMC Roof Survey Report - Final.doc
TABLE OF CONTENTS
SECTION PAGE
1.0 INTRODUCTION
2.0 ASBESTOS SURVEY
2.1 Sampling Methodology
2.2 Summary of Asbestos Containing Materials (ACM) Findings
3.0 LEAD CONTAINING PAINT SURVEY
4.0 CONCLUSIONS AND RECOMMENDATIONS
4.1 Asbestos
4.2 Lead Containing Paint
5.0 LIMITATIONS
TABLES
Table 1 – Summary of Identified ACM Table 2 – Summary of Lead Paint Chip Analytical Results
APPENDICES
Appendix A – Summary of Asbestos Sampling Results Appendix B – PLM Laboratory Reports and Chain of Custodies Appendix C – Lead Paint Chip Laboratory Report and Chain of Custody Appendix D – Representative Photographs of ACM
© 2019, Mabbett & Associates, Inc. Page 1 July 31, 2019 Project No. R2019016.000.001 S:\ADMINA\2019016 Seattle VAMC\000\001\Seattle VAMC Roof Survey Report - Final.doc
1.0 INTRODUCTION
Mabbett and Associates, Inc. (Mabbett®) performed a limited survey for Regulated Building Materials (RBM) as part of the project to Replace Roofs of Buildings 1, 20, 22, 23, 33, and 100 at the Seattle Campus of the VA Puget Sound Health Care System located in Seattle, Washington, VA Project No. 663-18-102. The site survey was performed on June 5 and June 6, 2019 and July 9 and July 10, 2019 by United States Environmental Protection Agency (US EPA) trained asbestos inspector, Mr. Michael F. Delaney, and consisted of the following activities:
A review of previous facility regulated building materials reports;
An Asbestos Containing Material (ACM) survey of suspect roofing materials (Analysis by polarized light microscopy [PLM] and Transmission Electron Microscopy [TEM]); and Limited Lead Containing Paint (LCP) sampling (Analysis by atomic absorption [AA]).
This survey was limited to areas of the roofs of Buildings 1, 20, 22, 23, 33, and 100 that were outlined in the Statement of Work dated August 1, 2018.
2.0 ASBESTOS SURVEY
2.1 Sampling Methodology
Site inspection work was performed on June 5 and June 6, 2019 and July 9 and July 10, 2019 by US EPA accredited asbestos inspectors, Mr. Michael F. Delaney. In accordance with the scope of work, suspect ACM was sampled and collected in general conformance with 40 CFR Part 61 “National Emissions Standards for Hazardous Air Pollutants (NESHAP)”, 40 CFR Part 763 “Asbestos Hazard Emergency Response Act (AHERA)”, and applicable Washington regulations.
The collected bulk samples were submitted under standard chain of custody procedures to ProScience Analytical Services, Inc. (ProScience) of Woburn, MA. ProScience is accredited by the American Industrial Hygiene Association (AIHA) and participates in the National Voluntary Laboratory Accreditation Program (NVLAP). Sample analysis was conducted by PLM, in accordance with EPA Method 600/R-93/116, using stop positive methodology. Confirmatory analysis of some samples by TEM was conducted as required.
All bulk sample results from this inspection are summarized in Appendix A, Summary of Asbestos Sampling Results.
The Environmental Protection Agency (EPA), Occupational Safety and Health Administration (OSHA), and The Puget Sound Clean Air Agency defines ACM as any material that contains greater than one percent (>1%) asbestos. As such, the analytical laboratory identified bulk samples of suspected ACM as positive for asbestos when they met or exceeded the regulatory criteria of greater than one percent (>1%) asbestos. Laboratory reports and the chain of custodies are provided in Appendix B of this report.
2.2 Summary of Asbestos Containing Materials (ACM) Findings
Mabbett identified forty-nine (49) types of homogenous materials and collected one hundred thirty-five (135) representative bulk samples. The laboratory analytical data indicated that twelve (12) of the homogenous areas were identified or assumed to be ACM. All samples were analyzed by PLM. Four (4) samples were re-analyzed by TEM, as recommended by the laboratory. Estimated quantities of materials identified as ACM are presented in Table 1 below:
© 2019, Mabbett & Associates, Inc. Page 2 July 31, 2019 Project No. R2019016.000.001 S:\ADMINA\2019016 Seattle VAMC\000\001\Seattle VAMC Roof Survey Report - Final.doc
Table 1 Summary of Identified ACM
VA Puget Sound Health Care Seattle Campus
Building Location Description of Material Estimated Quantity Amount Units
1 3rd Floor West Roof Grey Caulk at Brick Facade 150 LF 1 3rd Floor East Roof Black Mastic on Flashing 40 LF
100 Lower Roof Perpendicular to 100F Silver Roofing Felt/Mastic 250 SF
100 Fan Room Roof Silver Roofing Felt/Mastic 320 SF
Tower A Upper and Lower Roofs
Silver Roofing Felt/Mastic 70 SF
100 Adhesive Associated with Lightning Protection System Anchors 35 EA
100 Tower B Upper and Lower Roofs and
Adjacent Narrow Roof
Silver Roofing Felt/Mastic 2,000 SF
100 Adhesive Associated with Lightning Protection System Anchors 90 EA
Tower C Upper and
Lower Roofs
Silver Roofing Felt/Mastic 100 SF
100 Adhesive Associated with Lightning Protection System Anchors 55 EA
Core D Roof
Silver Roofing Felt/Mastic 170 SF
100 Adhesive Associated with Lightning Protection System Anchors 45 EA
100E Energy Plant Roof
Silver Roofing Felt/Mastic 2,000 SF
100E Adhesive Associated with Lightning Protection System Anchors 200 EA
100F F Building Roof
Silver Roofing Felt/Mastic 1,260 SF
100F Adhesive Associated with Lightning Protection System Anchors 55 EA
100G D & T Building Roof
Silver Roofing Felt/Mastic 1,200 SF
100G Adhesive Associated with Lightning Protection System Anchors 75 EA
Notes: F = Linear Feet SF = Square Feet EA = Each
A summary table of all asbestos samples is supplied in Appendix A. Laboratory analytical results and chain of custodies are present in Appendix B. Representative photographs of identified ACM are provided in Appendix D of this report where applicable.
3.0 LEAD CONTAINING PAINT SURVEY
The limited LCP survey and sampling was conducted on July 9 and July 10, 2019. The limited LCP survey included the collection of paint chips from building surfaces that may be impacted by the proposed work. Paint chip samples were submitted under standard chain of custody procedures to ProScience of Woburn, MA. Analysis was conducted using AA EPA method SW846-7420/3051.
The results of the limited LCP sampling are summarized in Table 2, with laboratory reports provided in Appendix C.
© 2019, Mabbett & Associates, Inc. Page 3 July 31, 2019 Project No. R2019016.000.001 S:\ADMINA\2019016 Seattle VAMC\000\001\Seattle VAMC Roof Survey Report - Final.doc
Table 2
Summary of Lead Paint Chip Analytical Results Buildings 1, 20, 22, 23, 33 & 100
VA Puget Sound Health Care Seattle Campus Building /
Structure # Sample # Location Substrate and Component Result (% wt.)
Building 1 Pb-01 2nd Floor East Roof Ladder Paint <0.073
Building 1 Pb-02 3rd Floor Roof Ladder Paint <0.048
Building 1 Pb-03 3rd Floor East Roof Catwalk Paint 0.12
Building 20 Pb-04 Roof Roof Ladder Paint 0.031
Building 20 Pb-05 Adjacent Flat Roof Roof Ladder Paint 0.10
Building 23 Pb-06 Roof Roof Ladder Paint <0.027
Building 23 Pb-07 Roof Roof Catwalk Paint 0.027
Building 100 Pb-08 Nurses Tower Roof Ladder Paint 1.45
Building 100 Pb-09 Core D Curb and Railing Paint <0.023
Building 100 Pb-10 Tower B Roof Ladder Paint 2.60
4.0 CONCLUSIONS AND RECOMMENDATIONS
4.1 Asbestos
Identified ACM must be abated and properly disposed of prior to disturbance by state licensed and properly trained contractors. All abatement must be performed in accordance with Federal, State and local requirements. Any suspect materials encountered during demolition or renovation activities that were not identified in this report as being non-ACM, should be assumed to be ACM unless sample results prove otherwise. Suspect ACM that may be present within the walls, above inaccessible hard ceilings, or in other inaccessible locations, should be assumed to contain asbestos if discovered during any demolition or renovation process or until otherwise verified.
4.2 Lead Containing Paint
The purpose of the limited LCP survey was to identify similar areas of LCP. During the on-site survey, representative samples of similar coatings were collected and analyzed for lead content. The regulations addressing LCP in non-residential buildings are focused on occupational exposures involved with paint-disturbing activities and related waste-disposal activities.
Occupational exposure to lead in construction is regulated by OSHA regulation 29 CFR 1926.62 “Lead in Construction”, as well as other applicable state and local regulations. These regulations involve the air monitoring of
© 2019, Mabbett & Associates, Inc. Page 4 July 31, 2019 Project No. R2019016.000.001 S:\ADMINA\2019016 Seattle VAMC\000\001\Seattle VAMC Roof Survey Report - Final.doc workers to determine exposure levels when disturbing paint containing measurable concentrations of lead. A LCP survey cannot determine the safe level of lead for the purpose of paint-disturbing activities, but is intended to provide guidance as to the locations of LCP. Employers and contractors may use this information to better determine where worker exposures to airborne lead may occur and, through the interpretation of LCP concentration data, assess the potential magnitude of exposure to their employees and identify the controls necessary to limit health risks.
A concentration of lead greater than or equal to 0.5 mg/Kg percent by weight or 1.0 mg/cm2 exceeds EPA and HUD residential standards is considered an indicator of risk. Representative samples of LCP waste to be generated during building renovation, or following demolition but prior to disposal, should be collected and analyzed using toxicity characteristic leaching procedure (TCLP) in accordance with 40 CFR Part 261. Management and disposal of lead containing waste must be done in accordance with all applicable local, state, and federal regulations.
OSHA regulations may require certain procedures for any paint that contains lead, even if it is below these levels. All LCP identified, regardless of the lead content, should either be sampled and analyzed by TCLP and then handled/disposed of accordingly, or segregated from other large-scale debris and then managed as hazardous waste in accordance with federal, state and local hazardous waste disposal regulations.
5.0 LIMITATIONS
This survey report is the result of a diligent and thorough inspection for regulated building materials of the areas and materials that may be impacted by the proposed roof replacement of Buildings 1, 20, 22, 23, 33 and 100. Inaccessible areas and interior materials were not included in this survey. Although a comprehensive inspection was performed, Mabbett does not claim to have identified all hazardous materials that could be present (for example, materials potentially located within the inaccessible areas). Mabbett has conducted this assessment with reasonable care and has performed this project in accordance with generally accepted industry standards. There can be no assurances, and Mabbett makes no assurances, that the information, research, and technology used to prepare this report may not change in the future, thus affecting the results reported herein.
© 2019, Mabbett & Associates, Inc. APPENDIX A July 31, 2019 Project No. R2019016.000.001 Seattle VAMC Roof Survey Report - Final.doc
APPENDIX A
Summary of Asbestos Sampling Results
© 2019, Mabbett & Associates, Inc. Appendix A - Page 1 of 5 July 31, 2019 Mabbett Project No. R2019016.000.001 Seattle VAMC Roof Survey Report - Final.doc
APPENDIX A
Summary of ACM Sampling Results
Buildings 1, 20, 22, 23, 33 & 100
VA Puget Sound Health Care Seattle Campus
Building Sample No. Sample Location Description of Material Percent and Type of Asbestos
1 1-01A Penthouse Roof Bitumen Roofing on Deck NAD 1 1-01B Penthouse Roof Bitumen Roofing on Deck NAD 1 1-01C Penthouse Roof Bitumen Roofing on Deck NAD 1 1-02A 9th Floor West Roof White Caulk on Parapet Cap NAD 1 1-02B 9th Floor West Roof White Caulk on Parapet Cap NAD 1 1-03A 10th Floor Roof White Caulk at Flashing NAD 1 1-03B 10th Floor Roof White Caulk at Flashing NAD 1 1-04A 9th Floor East Roof Bitumen Roofing NAD 1 1-04B 9th Floor West Roof Bitumen Roofing NAD 1 1-04C 9th Floor West Roof Bitumen Roofing NAD 1 1-04D 8th Floor East Roof Bitumen Roofing NAD 1 1-04E 8th Floor West Roof Bitumen Roofing NAD 1 1-04F 3rd Floor West Roof Bitumen Roofing NAD 1 1-04G 2nd Floor West Roof Bitumen Roofing NAD 1 1-04H 3rd Floor East Roof Bitumen Roofing NAD 1 1-05A 9th Floor East Roof Wood Fiber Insulation NAD 1 1-05B 9th Floor West Roof Wood Fiber Insulation NAD 1 1-05C 8th Floor East Roof Wood Fiber Insulation NAD 1 1-06A 9th Floor East Roof Base Layer NAD 1 1-06B 9th Floor West Roof Base Layer NAD 1 1-06C 9th Floor West Roof Base Layer NAD 1 1-06D 8th Floor East Roof Base Layer NAD 1 1-06E 8th Floor West Roof Base Layer NAD 1 1-06F 3rd Floor West Roof Base Layer NAD 1 1-06G 2nd Floor East Roof Base Layer NAD 1 1-06H 3rd Floor East Roof Base Layer NAD 1 1-07A 9th Floor East Roof Railing System Mastic NAD 1 1-07B 9th Floor East Roof Railing System Mastic NAD 1 1-08A 8th Floor West Roof Black Caulk on Parapet Cap NAD 1 1-08B 8th Floor West Roof Black Caulk on Parapet Cap NAD 1 1-09A 3rd Floor West Roof Grey Caulk at Brick Facade 10% Chrysotile 1 1-09B 3rd Floor West Roof Grey Caulk at Brick Facade 10% Chrysotile 1 1-10A 2nd Floor East Roof White Caulk at Brick Facade NAD 1 1-10B 2nd Floor East Roof White Caulk at Brick Facade NAD 1 1-11A 2nd Floor West Roof Grey Caulk at Railing Base NAD 1 1-11B 2nd Floor West Roof Grey Caulk at Railing Base NAD
© 2019, Mabbett & Associates, Inc. Appendix A Page 2 of 5 July 31, 2019
APPENDIX A
Summary of ACM Sampling Results
Buildings 1, 20, 22, 23, 33 & 100
VA Puget Sound Health Care Seattle Campus
Building Sample No. Sample Location Description of Material Percent and Type of Asbestos
1 1-12A 3rd Floor East Roof Black Mastic on Flashing 10% Chrysotile 1 1-12B 3rd Floor East Roof Black Mastic on Flashing 10% Chrysotile
20 20-01A Roof Metal Roof Coating NAD 20 20-01B Roof Metal Roof Coating NAD 20 20-01C Roof Metal Roof Coating NAD 20 20-02A Flat Roof Rolled Asphalt NAD 20 20-02B Flat Roof Rolled Asphalt NAD 22 22-01A Roof Metal Roof Coating NAD 22 22-01B Roof Metal Roof Coating NAD 22 22-01C Roof Metal Roof Coating NAD 23 23-01A Roof Built-Up Roofing NAD 23 23-01B Roof Built-Up Roofing NAD 23 23-01C Roof Built-Up Roofing NAD 23 23-02A Roof Insulation NAD 23 23-02B Roof Insulation NAD 23 23-03A Roof Base Layer NAD 23 23-03B Roof Base Layer NAD 23 23-03C Roof Base Layer NAD 23 23-04A Roof Rolled Asphalt NAD 23 23-04B Roof Rolled Asphalt NAD 33 33-01A Roof Rubber Membrane Seam NAD 33 33-01B Roof Rubber Membrane Seam NAD 33 33-01C Roof Rubber Membrane Seam NAD 33 33-02A Roof Parapet Caulking NAD 33 33-02B Roof Parapet Caulking NAD 33 33-02C Roof Parapet Caulking NAD
100 100FR-01A Fan Room Roof Built-Up Roofing NAD 100 100FR-01B Fan Room Roof Built-Up Roofing NAD 100 100FR-02A Fan Room Roof Silver Roofing Felt 2% Chrysotile 100 100FR-02B Fan Room Roof Silver Roofing Felt 2% Chrysotile
100 100LR-01A Lower Roof Perpendicular to 100F Built-Up Roofing NAD
100 100LR-01B Lower Roof Perpendicular to 100F Built-Up Roofing NAD
100 100LR-02A Lower Roof Perpendicular to 100F Silver Roof Felt .01% Chrysotile*
© 2019, Mabbett & Associates, Inc. Appendix A Page 3 of 5 July 31, 2019
APPENDIX A
Summary of ACM Sampling Results
Buildings 1, 20, 22, 23, 33 & 100
VA Puget Sound Health Care Seattle Campus
Building Sample No. Sample Location Description of Material Percent and Type of Asbestos
100 100LR-02B Lower Roof Perpendicular to 100F Silver Roof Felt <1% Chrysotile**
100 100-01A Tower A Roof Built-Up Roofing NAD 100 100-01B Tower A Roof Built-Up Roofing NAD
100 100-01C Tower C (Lower Level Roof) Built-Up Roofing NAD
100 100-01D Core D Roof Built-Up Roofing NAD
100 100-01E Tower A Roof (Lower Level Roof) Built-Up Roofing NAD
100 100-01F Tower B Roof (Lower Level Roof) Built-Up Roofing NAD
100 100-01G Tower C Roof Built-Up Roofing NAD 100 100-02A Tower A Roof Insulation NAD
100 100-02B Tower C (Lower Level Roof) Insulation NAD
100 100-02C Core D Roof Insulation NAD 100 100-03A Tower A Roof Base Layer NAD 100 100-03B Tower A Roof Base Layer NAD
100 100-03C Tower C (Lower Level Roof) Base Layer NAD
100 100-03D Core D Roof Base Layer NAD
100 100-03E Tower A Roof (Lower Level Roof) Base Layer NAD
100 100-03F Tower B Roof (Lower Level Roof) Base Layer NAD
100 100-03G Tower C Roof Base Layer NAD
100 100-04A Tower C (Lower Level Roof) Asphalt at Parapet NAD
100 100-04B Tower C (Lower Level Roof) Asphalt at Parapet NAD
100 100-05A Tower B Roof Silver Roof Mastic 16.08% Chrysotile*
100 100-05B Tower B Roof Silver Roof Mastic NAD 100 100-06A Tower C Roof Anchor Mastic NAD 100 100-06B Tower C Roof Anchor Mastic (Silver) 7% Chrysotile 100 100-06C Tower C Roof Anchor Mastic NAD
100 100-07A Tower C (Lower Level Roof) Grey Caulk at Parapet Cap NAD
© 2019, Mabbett & Associates, Inc. Appendix A Page 4 of 5 July 31, 2019
APPENDIX A
Summary of ACM Sampling Results
Buildings 1, 20, 22, 23, 33 & 100
VA Puget Sound Health Care Seattle Campus
Building Sample No. Sample Location Description of Material Percent and Type of Asbestos
100 100-07B Tower C (Lower Level Roof) Grey Caulk at Parapet Cap NAD
100 100-08A Core D Roof Silver Roof Felt 2% Chrysotile 100 100-08B Core D Roof Silver Roof Felt 2% Chrysotile
100E 100E-01A Energy Plant Roof Built-Up Roofing NAD 100E 100E-01B Energy Plant Roof Built-Up Roofing NAD 100E 100E-01C Energy Plant Roof Built-Up Roofing NAD 100E 100E-02A Energy Plant Roof Insulation NAD 100E 100E-02B Energy Plant Roof Insulation NAD 100E 100E-03A Energy Plant Roof Base Layer NAD 100E 100E-03B Energy Plant Roof Base Layer NAD 100E 100E-04A Energy Plant Roof Silver Roof Felt 2% Chrysotile 100E 100E-04B Energy Plant Roof Silver Roof Felt 2% Chrysotile 100E 100E-05A Energy Plant Roof Asphalt Roll Roofing NAD 100E 100E-05B Energy Plant Roof Asphalt Roll Roofing NAD
100E 100E-06A Energy Plant Roof Lightning Protection System Adhesive 20% Chrysotile
100E 100E-06B Energy Plant Roof Lightning Protection System Adhesive 20% Chrysotile
100E 100E-06C Energy Plant Roof Lightning Protection System Adhesive 20% Chrysotile
100E 100E-07A Energy Plant Roof Path Mats NAD 100E 100E-07B Energy Plant Roof Path Mats NAD 100E 100E-08A Energy Plant Roof Path Mat Adhesive NAD 100E 100E-08B Energy Plant Roof Path Mat Adhesive NAD 100F 100F-01A Roof Built-Up-Roofing NAD 100F 100F-01B Roof Built-Up-Roofing NAD 100F 100F-02A Roof Base Layer NAD 100F 100F-02B Roof Base Layer NAD 100F 100F-03A Roof Silver Roof Felt 2% Chrysotile 100F 100F-03B Roof Silver Roof Felt 2% Chrysotile
100F 100F-04A Roof Lightning Protection System Adhesive 15% Chrysotile
100F 100F-04B Roof Lightning Protection System Adhesive 15% Chrysotile
100G 100G-01A D & T Building Roof Built-Up Roofing NAD 100G 100G-01B D & T Building Roof Built-Up Roofing NAD 100G 100G-01C D & T Building Roof Built-Up Roofing NAD
© 2019, Mabbett & Associates, Inc. Appendix A Page 5 of 5 July 31, 2019
APPENDIX A
Summary of ACM Sampling Results
Buildings 1, 20, 22, 23, 33 & 100
VA Puget Sound Health Care Seattle Campus
Building Sample No. Sample Location Description of Material Percent and Type of Asbestos
100G 100G-02A D & T Building Roof Base Layer NAD 100G 100G-02B D & T Building Roof Base Layer NAD 100G 100G-02C D & T Building Roof Base Layer NAD 100G 100G-03A D & T Building Roof Soft Concrete Deck NAD 100G 100G-03B D & T Building Roof Soft Concrete Deck NAD 100G 100G-03C D & T Building Roof Soft Concrete Deck NAD
100G 100G-04A D & T Building Roof Perimeter Silver Roof Coating Trace Chrysotile
(<1%)*
100G 100G-04B D & T Building Roof Mechanical Curb Silver Roof Coating 1.54%
Chrysotile* Notes: NAD = No Asbestos Detected
* Material Analyzed by TEM **Material Assumed ACM
© 2019, Mabbett & Associates, Inc. APPENDIX B July 31, 2019
APPENDIX B
PLM Laboratory Reports and Chain of Custodies
© 2019, Mabbett & Associates, Inc. APPENDIX C July 31, 2019
APPENDIX C
Lead Paint Chip Laboratory Report and Chain of Custody
© 2019, Mabbett & Associates, Inc. APPENDIX D July 31, 2019
APPENDIX D
Representative Photographs of ACM
© 2019, Mabbett & Associates, Inc. Appendix D – Page 1 of 4 July 31, 2019
Sample 1-09: Grey Caulk at Brick Façade at Building 1 - 3rd Floor West Roof.
Sample 1-12: Black Mastic on Flashing at Building 1 - 3rd Floor East Roof.
© 2019, Mabbett & Associates, Inc. Appendix D – Page 2 of 4 July 31, 2019
Sample 100FR-02: Silver Roofing Felt/Mastic at Building 100 - Fan Room Roof.
Sample 100-05: Silver Roof Felt/Mastic at Building 100 - Tower B Roof.
© 2019, Mabbett & Associates, Inc. Appendix D – Page 3 of 4 July 31, 2019
Sample 100-08: Silver Roof Felt at Building 100 – Core D Roof.
Sample 100E-06: Lighting Protection System Adhesive at Building 100E – Energy Plant Roof.
© 2019, Mabbett & Associates, Inc. Appendix D – Page 4 of 4 July 31, 2019
Sample 100F-03: Silver Roof Felt/Mastic at Building 100F.
Sample 100G-04: Silver Roof Coating at D & T Building Roof Mechanical Curb.
| 1.0 INTRODUCTION |
| 2.0 ASBESTOS SURVEY |
| 2.1 Sampling Methodology |
| 2.2 Summary of Asbestos Containing Materials (ACM) Findings |
| 3.0 LEAD CONTAINING PAINT SURVEY |
| 4.0 CONCLUSIONS AND RECOMMENDATIONS |
| 4.1 Asbestos |
| 4.2 Lead Containing Paint |
5.0 LIMITATIONS