36C26025Q0817_2.docx

DOCX document 47 KB Posted

Attached to
687-23-101, Repair Exterior Features
Solicitation number
36C26025Q0817_2
Issued by

About this file

This is a Sources Sought announcement from the Department of Veterans Affairs (VA) for a construction contract to repair exterior features at the Seattle VA Medical Center. The solicitation (36C26025Q0817) is targeted at small businesses, specifically Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with a NAICS code of 236220 and a small business size standard of $45 million. The project involves upgrading exterior security systems across the campus parking lots (Lots B, C, D, and E), including traffic changes, emergency telephones, and additional security cameras, with work spread across five potential phases.

Responses are due by November 3, 2025, at 8:00 AM PST, and must be submitted via email to Susan Howe. Interested firms are required to provide a 5-page response detailing contact information, business size/classification, capabilities statement, estimated project time, and past performance. The project's expected contract length is 325 calendar days from the Notice to Proceed, with work to be performed at 1660 S Columbian Way, Seattle, WA. Contractors must adhere to strict VA guidelines, including working around ongoing medical center operations, following infection control protocols, and performing most disruptive work during off-peak hours.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT*

CON 687-23-101 Repair Exterior Features

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
98661
SOLICITATION NUMBER*
36C26025Q0817
RESPONSE DATE/TIME/ZONE
11-03-2025 8:00 PACIFIC TIME, LOS ANGELES, USA
ARCHIVE
30 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSB
PRODUCT SERVICE CODE*
Y1DZ
NAICS CODE*
236220
CONTRACTING OFFICE ADDRESS
Network Contracting Office 20

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661

POINT OF CONTACT*

Susan Howe susan.howe2@va.gov 360-816-2754

PLACE OF PERFORMANCE

ADDRESS
Department of Veterans Affairs

Jonathan M. Wainwright Memorial VAMC

77 Wainwright Drive

Walla Walla WA

POSTAL CODE
99362

COUNTRY

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

This is a Sources Sought announcement only. This is not a request for proposals, quotations, or bids; nor a synopsis of a proposed contract action under FAR Subpart 5.2 and no contract shall be awarded from this notice. No reimbursement will be made for any costs associated with providing information in response to this Sources Sought Notice or any follow up information requests. No solicitation is currently available. Draft documents (SOW, Drawings, Specifications, etc.) are subject to change. This notice is for market research purposes to gain knowledge of interest, capabilities, and qualifications of interested Small Business firms. Responses to this Sources Sought may shape the acquisition strategy in developing a competitive requirement. Not responding to this notice does not preclude participation in any future or potential solicitation. It is the intent of the VA to use the information gathered for market research purposes only.

Veterans’ Health Administration, Regional Procurement Office West, Network Contracting Office 20, is conducting market research for a construction contract to repair exterior features, as well as providing the necessary mechanical and architectural necessary to accomplish these repairs. Work is located at Seattle VA Medical Center - located at 1660 S Columbian Way, Seattle, WA 98108. For the principal components of work see the attached draft statement of work, specifications, and drawings. Documents are currently in draft state and industry comment / suggestions are greatly encouraged and welcomed.

Sources are being sought for firms with a North American Industry Classification System (NAICS) code of 236220 – Commercial and Institutional Building Construction, a Product Service Code (PSC) of Y1DA. and a Small Business Size Standard of $45 million. Aforementioned sources are highly encouraged to respond to this notice.

After review of the responses to this notice, and if the Government still plans to proceed with this project, a separate pre-solicitation announcement will be published on www.SAM.gov. Responses to this announcement are not an adequate response to any future solicitation announcement.

Responses are requested with the following information and shall not exceed a total of 5 (five) pages. Email subject line needs to contain the solicitation number 36C26025Q0817.

Please provide the following information:

1. Contact information: Name, address, SAM.gov UEI number, and points of contact with telephone numbers and e-mail addresses.

2. Business Size/Classification (based on NAICS 236220):

Is your firm eligible for participation in one of the following small business programs? If so, please indicate the program.

[ ] yes [ ] no Small Business (SB) [ ] yes [ ] no HUBZone [ ] yes [ ] no Small Business 8(a) [ ] yes [ ] no Small Disadvantaged Business (SDB) [ ] yes [ ] no Women-Owned (WO) Small Business [ ] yes [ ] no Service-Disabled Veteran Owned Small Business (SDVOSB) [ ] yes [ ] no Veteran Owned Small Business (VOSB) [ ] yes [ ] no Other (please specify)

3. Capabilities Statement: Description of capabilities to perform construction services as described above and project experience demonstrating relevant experience similar to those described. Include bonding capability information that is consistent with estimated magnitude between $1,000,000 and $5,000,000.

· Govt. does not have a waiver to Buy American.

· SDVOSB or VOSB businesses please include statement on maintaining compliance with VAAR 852.219-75 VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction, 852.219-76 VA Notice of Limitations on Subcontracting – Certificate of Compliance for Supplies and Products.

· All other socio-economic businesses please include statement on maintaining compliance with FAR 52.219-14 Limitations on Subcontracting.

4. Time: Based on the information provided, please estimate the total project time in days.

5. Past Performance/experience: Provide information on contracts of similar scopes of work or construction contracts, briefly describe no more than three (3) contracts (or specific task orders) completed within the past five years of the issue date of this Sources Sought notice. The past performance information should include:

· Project Title/Contract Number

· Location: City, State

· General description of the construction to demonstrate relevance to the proposed project

· Offerors’ role

· Dollar value of contract

· Name of the company, agency, or government entity for which the work was performed

· What types of information is required to submit accurate offers?

If submitting past performance/experience on a project in the role of a subcontractor, include the Prime Contractor’s name and a quantifiable amount (percentage) of the project your company contributed to the overall scope of work.

Note: Do not include Proprietary, classified, confidential, or sensitive information in responses.

NO RESPONSES WILL BE ACCEPTED BY FAX.

Responses will not be returned. Telephonic responses will not be honored. Please respond by email only. Send responses to the Contract Specialist, Susan Howe at susan.howe2@va.gov Responses will be accepted until November 3, 2025 at 8:00am PST.

Sources Sought - Solicitation Number: 36C26025Q0817, Project 687-23-101 Repair Exterior Features

Page 1 of

STATEMENT OF WORK (SOW)

1 May 2025

VA Puget Sound HCS – Seattle Division Project Number:
663-21-100

1. Contract Title Upgrade Exterior Security System

2. Background The VA Puget Sound HCS – Seattle Division is upgrading the external security system across the bulk of its campus. This upgrade is constituted of traffic changes, emergency telephones, and additional security cameras across the campus’ B, C, D, and E parking lots. All planned upgrades must ultimately tie into the existing campus infrastructure, such as power and IT/Security control. All work shall be performed according to contract drawings and specifications.

3. Scope The project will consist of renovations spread out across the Seattle campus’ parking lots with the goal of improving our external security to better safeguard veterans and staff. The project will include architectural, structural, mechanical, and electrical revisions to site infrastructure and security systems across the campus exterior. All necessary utilities must be extended and connected from surrounding areas and within adjacent buildings. Successful integration with COR and site IT and security personnel will be essential for successful project implementation.

Work includes the following but is not limited to: electrical, telecommunications, security, and modification of walkways and roadways. New finishes should match existing finishes and color schemes in the parking lots and campus grounds unless otherwise noted. Any construction submittals for architectural features shall be reviewed by VA interior design. Refer to the drawings and specifications for details on the extent of construction.

4. Specific Tasks The Seattle Veterans Affairs Medical Center is a Hospital First! This project will be accomplished within an existing facility with ongoing operations. Any and all construction activities shall be secondary to the mission of the Medical Center. This means: some activities shall only be performed outside of normal business hours; some activities may be curtailed if they interfere with normal activities and may be delayed for other times or conditions. Other potential issues requiring control include, but are not limited to: noise pollution; noxious fumes; and vibrations. Restrictions on activities may be imposed even if they are below OSHA allowable limits. The CO or designated representative shall have the final authority over the needs of the Medical Center. Additionally, construction safety, infection control and site security shall be prime requirements of the Work, and as such any infraction may be considered a material breach of the Work and cause for termination for cause by the Government.

Unless otherwise specifically identified, the Contractor shall provide all tools, materials, equipment, labor and supervision of every kind necessary to provide complete and operational systems for the Medical Center meeting the intent of this Statement of Work, the Specifications, and Drawings. Space is limited at VAPSHCS Seattle. Bid documents shall indicate that contractor will not be provided a lay down area. Contractor on-site office or on-site storage / office container shall not be allowed. Contractor to provide ‘just-in-time delivery and pickup’ and store materials at their warehouse. Onsite Contractor storage area will be limited to their construction site. In Seattle, office space will be provided as available in the triple wide trailer at the northeast corner of campus. Any and all work not specifically identified but necessary for a complete system shall be included as if specifically identified in the Contract Documents.

TESTING

The Contractor shall be responsible for all testing and inspection services in connection with this project as stated in the Specifications. Testing and inspection services shall be done in the presence of the COR and include but are not limited to the following key metrics: proper function of audio/visual feed from each device per phase and the overall integration and functionality of all security additions into the existing infrastructure around project conclusion. The Contractor shall provide both paper and electronic copies of all test reports to the COR.

DISPOSAL OF EQUIPMENT AND MATERIALS

The Contractor is responsible for the correct disposal of all materials associated with this project. Details on documenting waste streams as well as a list of recycling/disposal facilities will be provided to the Contractor at the start of work.

COORDINATION OF WORK

If any questions or concerns arise, the Contractor is to coordinate with the COR for direction. Any and all disruptions to the normal functions of the Seattle VAMC (road closures, utility connections, etc.) shall be brought to the attention of the COR at least 28 days prior to work. Refer to the Specifications for the acceptable time frames of notification.

5. Performance Monitoring The Contractor is required to monitor all performance and certify the work was done in accordance with the contract. In addition, monitoring is done by the COR. To supplement contractors required safety program, at least weekly, the COR shall perform Safety and Interim Life Safety inspection and Environmental inspections. In addition, the COR shall perform periodic inspections of the Work as further detailed per contract drawings and specifications. The Contractor is required to obtain the services of an independent testing and inspection company to perform additional inspections in accordance with the International Building Code 2018 ed, drawings and specifications.

Construction Progress Meetings:

1. The Contractor’s Project Manager and Site Superintendent shall provide weekly construction progress meetings with the COR for the entire period of performance.

a. The Contractor’s Construction Safety Officer is required to attend, and the Contractor’s Construction Safety Officer is required to attend the monthly meetings with the VA Safety Director.

b. Subcontractors are not required to attend. Subcontractors Project managers are required to attend.

c. Include minutes of the meeting and issue not later than three days after the meeting.

d. Construction progress meetings minutes shall contain: list of attendees, list any issues or concerns, indicate days remaining per the contract, detail any safety incidents, RFI log, Shop Drawing Log, detailed 2 week look ahead and shutdown schedule.

2. At 25%, 50%, 75% and 95%, coordinate with the COR for walk through inspection with the VA Shops. The Contractor shall have the Foreman from all trades in attendance. The VA Shops that will attend is the following: Electrical, Electronics, Mechanical, Operations, and Structural Maintenance Shops. The purpose of the meeting / walkthrough is the VA Shops Leads talk with the respective Contractor Trade Forman / Superintendent Daily Report:

1. The Contractor shall provide a Daily Report. The Daily Report shall contain: list any issues or concerns, indicate days remaining per the contract, detail any safety incidents, detail daily construction safety inspections including items checked and corrective actions taken, and include relevant construction progress photo(s). Email the Daily Report to the COR no later than 9 am the next working day. Contractors are not required to submit a Daily Report for Saturdays, Sundays, or federal holidays where no work takes place.

6. Security Requirements The Contractor shall only access Medical Center Buildings directly associated with the Work. The Contractor shall not enter or attempt to enter any patient care area. Additionally, the Contractor shall provide construction site security as further identified in the Specification section 01 00 00 GENERAL REQUIREMENTS or on the Drawings. Security badge is required for the superintendent, project manager and any individuals that will be working 180 days or more on this project.

The C&A requirements do not apply. A security accreditation package is not required.

7. Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI) The primary Government-Furnished Equipment is identified above. The Government shall not furnish any additional equipment or services to the Contractor not specifically stated in the Project Specifications.

Government-Furnished Information is in this Statement of Work as well as the equipment listing on the drawings; the Specifications for this project are identified in the specifications and the drawings for this project.

8. Other Pertinent Information or Special Considerations There are no special considerations necessary to accomplish the Work.

a. Identification of Possible Follow-on Work The currently developed plans allot for five phases within the main project: Phase 1 including improvements to Parking Lot C and Lot D West, Phase 2 including Lot B, Phase 3 including Lot D East and Lot E West, Phase 4 including Lot E Central, and Phase 5 including Lot E East. Depending on the bid deductives pursued, the VAPSHCS may reserve instillation of additional cameras and/or the instillation of traffic gates as potential follow-on work.

b. Identification of Potential Conflicts of Interest (COI) There are no known Potential Conflicts of Interest.

c. Identification of Non-Disclosure Requirements The Contractor shall not have access to sensitive and/or proprietary information.

d. Packaging, Packing and Shipping Instructions All deliveries shall be specifically addressed to the Contractor and not the Medical Center. The Medical Center shall make best efforts to refuse delivery of Contractor goods or materials. Any materials inadvertently received by the Medical Center will be identified to the Contractor for immediate pick-up. The Medical Center takes no responsibility in the receipt of any goods or materials that are the Contractor’s. Additionally, the Contractor shall be responsible for receipt, offloading at the site and storage of all Government-Furnished Equipment.

e. Inspection and Acceptance Criteria There are inspections performed per specifications that will be required, including but not limited to the overall calibration and testing of the upgraded security features such as call boxes. The COR will be responsible also sign off on any inspections performed.

9. Risk Control The Contractor shall refer to specifications for guidelines on safety and risk control. Particular attention shall be paid to the VA Infection Control Risk Assessment (ICRA) policy: VHA Directive 7715 (1) has changed the expectations of infection control methods from those previously utilized. The primary functional change to these standards is that for Class III and above, exhausting discharge air from temporary air return or negative pressurization systems into shared or recirculating HVAC systems, or other shared exhaust systems is prohibited. Additionally, any unfiltered air exhaust cannot be discharged within 25 feet of any building entrance or air intake. A complete requirement sheet for different ICRA control levels will be provided during the bid process for Contractor to develop estimates and plans; Contractor will inform the station point of contact as soon as possible if this was not the case. The Contractor’s compliance plan will be evaluated during the initial pre-construction meetings to ensure compliance with these ICRA standards. The Contractor shall submit the ICRA and PCRA forms for VA infection prevention and VA safety team review and approval as requested by COR.

10. Place of Performance Work shall be performed at the Seattle VA Medical Center, Seattle, WA, physical address 1660 S Columbian Way, Seattle, WA 98108.

VA Puget Sound Health Care System Additional Requirements

1. Project number and the contract number in the subject line of all emails.

2. Contractor shall comply with the VAPSHCS Smoking Policy. No smoking is allowed on VHA campuses at any time.

3. Normal construction work hours are 7:00AM to 3:00PM Monday through Friday, unless other specified in the SOW.

a. Normal work hours can be modified only by written approval of the COR.

b. No work by the Contractor on Federal Holidays, and no work on the weekend when the Federal Holiday is on the respective Monday or Friday.

c. Work in stairs, or interior / exterior public areas shall be allowed between 6:00 PM through midnight, concluding by 6:00 AM on the following day.

d. Any work including, and not limited to: Noise, vibration, dust, odors, core drilling, hammer-drilling, saw-cutting, equipment moving in public corridors, soil compaction, or similar noise-producing activities shall be performed between 6:00 PM through midnight, concluding by 6 AM on the following day.

e. Crane lifts, any work that closes drive isles, closes building entries or closes public corridors shall be during low patient time and performed on Sundays.

4. All building systems will be maintained in full operation at all times:

a. Request system shutdowns in writing not less than 21 calendar days in advance.

b. Shutdown work shall be during low patient demand times. Work requiring major utility shutdowns shall be completed after hours or during weekends.

5. Provide uniform heat detection in the area of work, connected to the existing supervised building master fire alarm system, for the duration of the work whenever the: Ceiling tiles are removed, or sprinkler system is disabled.

6. Fire-seal all penetrations through any wall or floor with UL Listed fire-rated materials or assemblies manufactured for the purpose.

7. Process for excavation is as follows:

a. Identify the areas where excavation is required, and mark for COR review

b. Contractor shall verify buried utilities with VA record documents and municipal record documents.

c. Contactor shall contact all utilities for locator services in the area of work.

d. There is existing non-utility owned buried services, and the Contractor shall provide locator services such as ground-penetrating radar and radio frequency techniques.

e. Before excavation the contractor core paved areas to verify concrete/pavement depth. Coordinate the location of the holes with the COR before drilling.

f. Hand dig all non-paved areas prior to excavation

8. Deliveries, Parking, Elevators:

a. Deliveries will be made only at the M&O Loading Dock Building 1 or Building 100 main loading dock, and coordinated with the COR. At the time of delivery: provide vehicle information to the VA Police and remove the vehicle as soon as delivery is complete. Move materials in public corridors during low patient time and performed between 6 pm through midnight concluding by 6 AM on the following day.

b. No on-site parking or parking in the VA garage or VA parking lot. The existing VA parking areas are at capacity and reserved for patients and staff.

c. Contractor shall use Freight Elevators. Do not move materials and employees in passenger elevators unless given written approval by COR.

9. Contractor shall provide construction dumpsters with a surrounding safety fence. Pavement to be protected from damage of loading and unloading the dumpster and dumpster weight. Located on the M&O Loading Dock Building 1. Provide recycling and receipts from the salvage / deposal service in compliance with VA’s GEMS Policy.

10. No on-site office or on-site storage / office container shall be allowed. Provide ‘just-in-time delivery and pickup’. Coordinate with COR for staging within the area of work.

11. No music radios. Two-way communications radios are allowed where broadcast frequency is approved by COR.

12. All work in the crawl spaces shall be planned and carried out as OSHA Permit Required Confined Space.

13. Contractor shall notify the COR if asbestos is noticed or suspected in the area of work. The Contractor shall be responsible and bear all costs associated with testing, reporting, and abatement of all hazardous materials, if required. VA will provide the existing asbestos report to the Contractor upon request.

14. Before starting work the Contractor shall give 21 days’ notice to the COR so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

15. No photography of VA premises is allowed without written permission of the COR.

16. VA reserves the right to close down or shut down the project site and ask Contractor’s employees to leave the premises in the event of an emergency or operational requirement. The Contractor may return to the site only with the written approval of the COR.

17. Compatible System procurements shall be as follows:

a. Locks and Keys: Door hardware shall be compatible with Best® 7-pin, F keyway, interchangeable core. Final pinout and keying is provided by the VA. Provide and turn over new blank cores to VA not less than 21 days in advance of construction completion. The final pinout and key blanks shall be provided by VA.

b. Building Automation: Components, programming and start up: native BACnet communications protocol for Building Automation and Control (BAC) connected to the existing Johnson Controls head end equipment

11. Period of Performance The expected contract length shall be no longer than 325 calendar days from receipt of the Notice to Proceed. All materials shall be brought in and out of the construction zone after normal function medical facility hours. Work requiring major utility shutdowns shall be completed after hours or during weekends. Work shifts during operational hours should take place from 7AM-3PM.

PERIOD OF PERFROMANCE CHART (IN CALENDAR DAYS AFTER AWARD)

Level Complete
Calendar days
VA Review
Resubmit if Comments
Total Days after NTP

1. Notice to Proceed/Preconstruction Conference – Contractor Buyout / Core Submittal Creation/ Required Submittals Submit/Review/ VA Agenda / Core Doc / Site Visit for ICRA/PCRA Review: Submittal Register & Schedule

21
0
0
21
2. Product Data Material Submittals
28
21
7
77
3. Material & Equipment Procurement
28
0
0
105
4. Mobilization On-Site including Performance of Work
14
0
0
119
5. Period of Performance – Site-work
186
0
0
315
6. Conctactor Demobilization; Pre-Acceptance / Acceptance Test / Inspect
5
5
0
225

12: Applicable Performance Standards

1. All work shall comply with

a. All VA Policies including and not limited to: VA Construction Safety and VA Infection Control Policies.

b. Codes, Standards and Executive Orders (Topic 1) found http://www.cfm.va.gov/til/cPro.asp

2. All persons including subcontractors shall have completed the 30 Hour OSHA Construction Safety Training program or 10 Hour OSHA Construction safety Training program per their designed role.

3. The Prime Contractor shall have a designated Superintendent and SSHO on site when any work is being performed. The Prime Contractor shall have a dedicated CQCM onsite at all times when new work or repairs to existing surfaces is being performed.

4. The Contractor shall provide mitigating activities as outlined in the CONSTRUCTION SAFETY PRECAUTIONS and CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT / DUST CONTROL PRECAUTIONS including but not less than the following:

a. Fire extinguishers, pedestal mounted in the area of work.

b. Walk off dust mats, inside and outside all entry / exit points to the workspace, changed not less than daily or more frequently as required by the construction or COR.

c. No trash, used packaging, or construction spoils shall be stored on site unless in a designated dumpster. Dumpsters shall be promptly emptied and replaced when full.

5. All work will be provided with one-year parts and labor warranty from date of acceptance by VA.

6. All work in the crawl spaces shall be planned and carried out as OSHA Permit Required Confined Space.

7. The Contractor shall be responsible for commissioning and to make all the corrections receiving the commissioning report as per the VA satisfaction.

8. All building systems will be maintained in full operation at all times. Request system shutdowns including hot work permit in writing not less than 28 calendar days in advance. Work requiring major utility shutdowns shall be completed after hours or during weekends.

9. Crane lifts, any work that closes drive isles, closes building entries or closes public corridors shall be during low patient time, off peak hours, and perform during Weekends.

10. Any work related to noise, vibration, dust, odors, core drilling, hammer-drilling, saw-cutting, equipment moving in public corridors, soil compaction, or similar noise-producing activities shall be performed between 6:00 PM through midnight, concluding by 6 AM on the following day.

- End of Section -