About this file
This document is an Amendment (SF 30) for Solicitation 36C26025Q0046 for Annual Restriping Services at the Seattle and American Lake Campuses for the Department of Veterans Affairs. The amendment provides responses to industry questions, clarifies technical requirements, and introduces two new attachments: a Past Performance Questionnaire and Campus Estimates spreadsheet. Key clarifications include: glass beads are to be applied to streets only, contractors must hydro blast existing markings (not simply paint over them), all lines must be painted including hard-to-reach areas, and the contractor is responsible for site preparation and adhering to industry standards.
The solicitation is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with a NAICS code of 561210 and a small business size of $47 million. Offers are due on 04/04/2025 at 15:00 PST and must be submitted via email to derek.crockett@va.gov. The requirement involves providing annual restriping services for parking lots, roads, crosswalks, parking garages, speed bumps, hash marks, bus stops, and other painted road markings at a firm-fixed price. There is no incumbent contractor for these services, and offerors must be SDVOSB certified in the SBA database at the time of offer and award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment A Campus Estimates.excel.xlsx | XLSX spreadsheet | |
| Attachment J Past Performance Questionnaire.docx | DOCX document | |
| Attachment I - B.3 STATEMENT OF WORK (SOW)_AMENDED.docx | DOCX document | |
| 36C26025Q0046 0001.docx | DOCX document | |
| Attachment C - UNIFIED FACILITIES GUIDE SPECIFICATIONS 11th ed.pdf | ||
| Attachment D -CONSTRUCTION WASTE MANAGEMENT.pdf | ||
| Attachment 1 - WD King County 2015-5535 Rev 23 12.23.2024 .docx | DOCX document | |
| Attachment E - VA Handbook 6500.6 Contractor Rules of Behavior.pdf | ||
| 36C26025Q0046.docx | DOCX document | |
| Attachment A - Campus Estimates.pdf | ||
| Attachment G- American Lake Campus Site Plan.pdf | ||
| Attachment 2 - WD Pierce County 2015-5539 Rev 26 12.23.2024.docx | DOCX document | |
| Attachment H - Site Visit Instructions.docx | DOCX document | |
| Attachment F - Seattle Campus Site Plan.pdf | ||
| Attachment B - Unified Facilities Guide Specifications.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 4
03/27/2025
36C260
Network Contracting Office 20
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661
To all Offerors/Bidders 36C26025Q0046
03-04-2025 X
X X
X ONE
The purpose of this amendment is to respond to industry questions and provide new attachements.
See continuation pages for questions and answers.
See new Attachment: Attachment J Past Performance Questionnaire See new Attachment: Attachment A Campus Estimates.excel.xlsx
All other terms and conditions remain in effect.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Ty Draszt
1.) It says: This work shall consist of furnishing and applying paint and reflective glass beads on pavement surfaces, in the form of traffic lanes, parking bays, areas restricted to handicapped persons, crosswalks, stop sign blocks, directional arrows, no parking areas (hash-mark blocks), Fire Zones, building access points and other detail pavement markings currently in place and in accordance with the details as shown or as prescribed by the VHA Contracting Officer’s Representative (COR). But it also says in 4.3 Products it says: Glass beads to be applied to streets only.
Is the government’s intention to have reflective bead in all markings? Normally this in only applied on roads.?
Glass beads to be applied on streets only.
2.) Statement of Work: Where applicable, apply the black paint in as many coats as necessary to completely obliterate the existing markings.
Is the government saying all areas can be blacked out to cover lines and not required to hydroblast?
Contractor is required to hydro blast.
Is it ok to paint over all existing thermoplastic ? We were told this on the site walk?.
No, it is not ok to paint over existing thermoplastic.
3.) On the American Lake lots the striping was done before wheel stops where installed. Is the government ok with allowing us to stripe up to what our machines can reach or are you wanting us to hand paint in all the lines the machines cannot reach?
All lines are required to be painted. The Government requires a contractor that has the necessary industry experience to complete all work and all contractor work must adhere to all industry and general standards outlined in the RFQ and Statement of Work (SOW).
4.) Is there any incumbent on this opportunity? If yes, what is the contract number?
There is no incumbent providing annual restriping services for both the Seattle and American Lake Campus.
5.) Agency has stated "At least two (2) projects shall be provided for the Prime (the entity signing the SF1449). If the offeror is a Joint Venture (JV), recent and relevant project experience shall be submitted for projects completed by the JV entity. If the JV does not have experience, such projects shall be submitted for each JV partner." Our company does not have past performance in this area but has the capability to perform the services. Our Subcontractor has the relevant past performances. Will providing 5 past performance references from our subcontractor be counted or evaluated?
Please see Section “E.8 Basis Of Selection” of RFQ 36C26025Q0046 for how past performance will be evaluated.
6.) Question 1: Phasing Plan: Could you provide a phasing plan. We need to know how many shifts that you want these jobs done in.
The SOW requires the contractor to submit a project schedule prior to commencement of any work for the VHA COR review and approval. It is the contractor’s responsibility to understand the scope of work and requirement and provide a project schedule for VHA COR review and approval.
7.) Question 2: Time of work: If this is going to be night work that is time and a half, and if it is weekends it will be double time. This will greatly affect the bid, and the price.
This requirement is firm-fixed priced acquisition, and it is the offeror’s responsibility to understand the scope of the project and all requirements.
Question 3: Curb Painting: There are alot of curbs that need to be painted. At Lakewood, there is probably about a mile of painted curb. They are all very dirty and very mossy. How would they like these curb cleaned? Do they just want to have the broomed off. If they want them pressure washed, do they need water collection to be done? What if curbs are damaged during cleaning?
The contractor is responsible for implementing and adhering to all industry standards, and general standards as outlined in RFQ 36C26025Q0046 and the statement of work. Work includes a contractor to provide all site preparation required to perform annual restriping services.
8.) Attachment A – Campus Estimates does not have any information on it.
See new excel attachment: See Attachment: Attachment A Campus Estimates.excel.xlsx
As stated on the RFQ, Attachment – A are estimates only and the contractor shall provide annual restriping services for all painted parking lots, roads, crosswalks, parking garages, speed bumps, hash marks, bus stops, and other painted road markings for the entire Seattle and American Lake campuses at the Firm-Fixed Price in the Price/Cost Schedule regardless of inaccuracies of the estimates in Attachment A.
9.) Also, on page 59 of the solicitation it says:
For non-Federal Government projects, commercial projects, and Federal Government projects without a CPARS Evaluation: provide a PPQ (see solicitation Attachment 6). The Offeror should complete Blocks 1-4 of the PPQ and send it to the non-Federal project client or commercial project client. The client should complete Blocks 5-8 along with the two-page questionnaire.
What is Attachment 6?
See new attachment: Attachment J Past Performance Questionnaire
10.) Requesting pavement marking /striping plan on building 104.
RFQ 36C26025Q0046 states the contractor shall provide annual restriping services for the entire Seattle Campus to include the Seattle Parking Garage. The contractor is responsible for verifying all measurements of each campus and all locations.
11.) I noticed pg 2 of the Solicitation says the bid is due by 15:00 PM (which I assumed to be 1500 hours), but the SF1449 Box 8 says 12:00 PM. Can you confirm which is the time this is due, please?
Offers are due on or before 04/04/2025 at 15:00 PST.
Specific Instructions: Submit signed and dated offers to Contract Specialist Derek Crockett via email only to derek.crockett@va.gov on or before the close date of this solicitation on 04/04/2025 at 15:00 PST. Offers shall be complete, self-sufficient, and respond directly to the requirements of this solicitation.”