S06 36C26025Q0026 Amendment 0004.pdf

PDF 173 KB Posted

Attached to
Jonathan M. Wainwright Memorial VAMC (Walla Walla, WA), Snow Removal and Deicer Services
Solicitation number
36C26025Q0026
Issued by

About this file

This document is an Amendment to Solicitation 36C26025Q0026 for Snow Removal and Deicer Services at the Jonathan M. Wainwright Memorial VA Medical Center in Walla Walla, Washington. The amendment provides additional questions and answers, updates the period of performance, clarifies the Statement of Work, and removes conflicting language from the pricing schedule. The solicitation is a 100% small business set-aside with a base period from November 1, 2024 to October 31, 2025, and two 1-year option periods. Key details include: estimated labor hours and pricing for snowplows, snow transport vehicles, and deicer application; requirements for employee badging and sign-in/sign-out procedures; and guidance on government-provided assistance. The solicitation is issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 20.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 3

10-28-2024

36C260

NCO 20 Network Contracting Office

ATTN: V4CONT

1601 E. Fourth Plain Blvd

Bldg.17, Suite B428

Vancouver WA 98661

36C260

NCO 20 Network Contracting Office

ATTN: V4CONT

1601 E. Fourth Plain Blvd

Bldg.17, Suite B428

Vancouver WA 98661

To all Offerors/Bidders 36C26025Q0026

10-28-2024 X

X 1

1. The purpose of this amendment is to provide further questions and answers, update period of performance (PoP), clarify section 5.2 of the PWS as a result of question received and remove "of Calcium Magnesium Acetate" from line item

0011, 1011 and 2011 descriptions which conflicts with the PWS.

2. See questions and answers 6-16 below. See updated RFQ "S02 36C26025Q0026 Walla Walla VA Snow Removal 28Oct24" document. The revised RFQ document includes changes in "red" to PoP, PWS section 5.2 and Line Item 0011, 1011 and

2011.

3. Period of performance start data is anticipated as 8 November 2024.

4. There are no other changes as a result of this amendment. All other terms and conditions remain unchanged.

CONTINUATION PAGE

Question & Answers 6-16

Q6. Attached is a map of the area, I outlined in red what I assumed the boundary would be for the work area, please let me know if that is correct. Also, if you happen to already know the length/width of the roads and sidewalks that the work is to be performed on please email that over.

A6. Reference Appendix A and B for site maps. Reference section 5.0 for approximate square footage. There are various roads which have differing width. All sidewalks are standard width of 5 feet.

Q7. What is the assumption of when the work will be performed? Is it every time it snows or is cold enough for ice, once a week, as needed, or at request by the customer? Also, is the salting expected to be beforehand as a preventative measure when temperatures are anticipated to be below freezing?

A7. It is assumed the contractor will be called out by the COR. It shall be assumed to be prepared to be activated if snow is predicting more than 1” of snow. If snow begins to accumulate more than 1” of snow, the COR will call out for snow removal.

Q8. Is the work area on public open property or is it on gated federal property that would require the workers to be badged for access?

A8. It is required for all employees and subcontractors be badged. Badges are received either from the COR or the Police. If COR is unavailable receive badge from Police Office, building 78.

Q9. Could you please provide me with what company won the bid for this last year and at what price?

A9. Previous contract information: 36C26024P0123, Accord Federal Services, Total Contract Value: $63,753.50.

Q10. Please confirm that all services performed under this contract will be upon request by the government only. No preventive services can be performed by the contractor without a specific request from the government, correct?

A10. While the government requires to make the decision to call out for services, it is in the best interest of building relations between government and contractor to have discussions and for the contractor to provide advice and consultation to the government on preventative services.

Q11. Please clarify line item 0001. Is the government indicating that during year 1, the maximum expected labor hours for 1 snowplow truck and 1 operator is 48? If so, please clarify how the maximum of 48 was calculated. (Price/Cost Schedule)

A11. The number of hours for all line items is based on the site’s estimate. Reference PWS section 8.10. for details when an increase contract modification is needed.

Q12. Please clarify line item 0003. Is the government indicating that during year 1, the maximum expected labor hours for 1 Truck for transporting snow and 1 operator is 2? If so, please clarify how the maximum of 2 was calculated. (Price/Cost Schedule)

A12. The number of hours for all line items is based on the site’s estimate. Reference PWS section 8.10. for details when an increase contract modification is needed.

Normally transporting snow is not an issue as there are multiple places on site to move snow to areas which do not disrupt operations. This is part of the discussions had after award with the COR, per the SOW.

Q13. The SOW states the “Government may or may not furnish assistance with clearing snow or applying ice melt” and that “Bodies available will be up to 3 personnel. Equipment available is

2 snowplows, two utility vehicles with snowplows, and 2 ice melt spreaders”

For the purpose of estimating ceilings, should offerors factor in government assistance and equipment or not? (P.11)

A13. As this is a fixed price contract with time and material, no the contractor should not account for the assistance with their offer.

Q14. As it pertains to callouts in “anticipation of snow”, if the contractor is called out by the COR and reports to the site but the anticipated snow does not materialize, will contractor be able to bill for reporting to the site? (P.13)

A14. As this contract states, the callout states that callout is expected to occur when there is 1” of snow. The contractor is expected to provide good communication and clarification with the COR. If a preemptive callout occurs and there is not snow actively falling during the original callout time, then the COR should be contacted for an amended plan.

Q15. Regarding sign in/out procedures, the SOW states that “If they fail to sign out, they will not be charged to the VA that day.” If the contractor discovers a sign-out oversight within a reasonable amount of time, will they be able to rectify with the government in order to receive payment for services rendered? (P.13 section 5.2)

A15. Amended to “if individuals or equipment fail to sign out by turning in badges and informing what equipment is being removed from site then the Contractor shall not invoice for those individuals and/or equipment that day. However, the VA will allow the Contractor (2) two opportunities to correct this deficiency before the Government enacts this section. It is the responsibility of the Contractor to train all employees and/or Subcontractors on sign in/out procedures to ensure labor hours on invoices are substantiated.” See updated PWS section 5.2.

Q16. Please confirm: If offeror’s Reps and Certs are complete and up to date in SAM, are there any Reps and Certs required to be submitted with the quote? (P. 75-76 Reps and Certs)

A16. Guidance is available in section E.8 FAR 52.212-3, paragraph 1. Submit with quote only as indicated.

<end Q&A>