Attachment 5 - Division Breakdown .xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Z2DZ--CON-NRM 653-22-116 Create Therapeutic Mindfulness Garden
Solicitation number
36C26024R0029
Issued by

About this file

This document is an attachment titled "Division Breakdown" that provides instructions and a pricing schedule breakdown for a federal contract opportunity.

The pricing schedule breakdown is for a project to Create a Therapeutic Mindfulness Garden at the Roseburg VA Medical Center, under Solicitation Number 36C26024R0029. The pricing breakdown includes line items for general requirements, metals, furnishings, and exterior improvements. Offerors are responsible for determining the accuracy of the formulas and transposing totals to the price summary. The contract line items are for information purposes only and do not constitute separate billable deliverables. Field office overhead and general conditions will be applied only once to the contract and any changes. All pricing is fixed price. The pricing schedule provides line items for insurance/bonds, taxes/fees, O&M manuals, overhead rate, subcontract markup rate, and profit rate, in addition to the division line items. Offerors can also include other items not requested.

View the file

Other files

File Type Posted
36C26024R0029 0002.docx DOCX document
Addendum 1 sketch.pdf PDF
Attachment 1-SOW - 653-22-116 Create Therapeutic Mindfulness Garden.docx DOCX document
Attachment 3-Roseburg VA 100PCT PLANS - REV 3-1-2024.pdf PDF
Attachment 4-Wage Determination .pdf PDF
Attachment 2-FINAL SPECS 100.pdf PDF
36C26024R0029 0001.docx DOCX document
Attachment 6-Past Performance Questionnaire.docx DOCX document
36C26024R0029.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Proposal Price Schedule

PRICE SCHEDULE BREAKDOWN

Project Number 653-22-116 /Create Therapeutic Mindfulness Garden Project Location: Roseburg VAMC

CLIN 0001CLIN 0002
RatesBase Item
General Requirements & Facility ConstructionPricePrice
Division Item 1 General Requirements (furnish and install)N/A$0.00$0.00
Division Item 5 Metals (furnish and install)N/A$0.00$0.00
Division Item 12 Furnishes (furnish and install)N/A$0.00$0.00
Division Item 32 Exterior ImprovmentsN/A$0.00$0.00

TOTAL DIVISIONS $0.00 $0.00

Insurance / BondsN/A$0.00$0.00
Taxes / Other Fees (provide itemized list)N/A$0.00$0.00
O&M Manuals and Red Line DrawingsN/A$0.00$0.00
OverheadRate _______%N/AN/A
Overhead (daily rate)Per Day $0.00N/AN/A
SubContract Mark-UpRate _______%N/AN/A
ProfitRate _______%N/AN/A
SubTotals$0.00$0.00

Other Items not Requested Above (provide itemized list) $0.00 $0.00

CONTRACT TOTALS$0.00$0.00
TOAL$0.00