Z2DZ--CON NRM 668-21-101 Building 7 Renovation
Solicitation number
36C26024R0019
Issued by

About this file

This document provides an amendment to a solicitation for construction services. The amendment provides clarification questions and answers from potential offerors, revised drawings and specifications, site visit sign-in sheets, and hazardous material surveys. Key details include the project is for building renovations at the Mann-Grandstaff VA Medical Center in Spokane, Washington, with a 365-day performance period. The requirement is set aside 100% for Service-Disabled Veteran Owned Small Businesses. Offerors must be registered in the System for Award Management and certified as a small business by the Small Business Administration by the time of proposal submission. The amendment clarifies testing responsibilities, deductive alternate requirements, and personnel qualifications. It also provides a contractor storage area location, prevailing electricity rates, and clarifies fire suppression and alarm standards.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 8

0001 2-13-2024 668-21-101

36C260

Network Contracting Office 20

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661

To all Offerors/Bidders

36C26024R0019

1-20-2024

X

X X

Proposal due date 3/4/2024 @ 12:00 PM Pacific Time

X 1

Project: 668-21-101 Building 7 Renovation Location: Mann-Grandstaff VA Medical Center, Spokane, WA

The purpose of Amendment 0001 of solicitation 36C26024R0019 is to:

1. Provide site visit sign in sheet.

2. Provide questions and answers.

3. Provide updated pricing schedule.

See continuation page for the full description of this amendment.

36C26024R0019 Amendment 0001

SF30 BLOCK 14 CONTINUATION PAGE(S)

It has been determined necessary and in the best interest of the Government to amend solicitation 36C26024R0019. Accordingly, the solicitation amended in the following particulars and in no others:

A. Site visit sign in sheet provided as an attachment to this amendment.

B. Updated pricing schedule provided as an attachment to this amendment.

C. Questions and Answers

1. Specification Section 01 00 00, Part 1.2-D states that the Testing Laboratory will be retained by the VA. Will the VA clarify if the contractor or the VA will be retaining the Testing Laboratory?

Government response: In accordance with specification section 01 00 00 para 1.2.D, the Contractor is required to notify the VA prior to placement and installation of certain work to allow the VA to perform quality assurance confirmation by a VA retained testing laboratory. Contractor is responsible for retaining a testing laboratory to perform all quality control tests as outlined in the specifications and drawings.

2. RFP, SF 1442, Part 2.1 Price Schedule does not depict any Deductive Alternates.

Specification Section 01 00 00, Part 1.3 lists (3) Deductive Alternates. Will the VA clarify if Deductive Alternates are to be submitted with this bid package? If so, does the VA request the Deductive Alternates be expressed in negative numbers, to be deducted as selected from the Base Bid CLIN?

Government response: See attached Price Schedule.

3. Drawing Sheet G.002, Alternates lists (6) different Deductive Alternates while the Specifications list (3) Deductive Alternates. Will the VA clarify if it is required to submit for any Deductive Alternates, for (3) Deductive Alternates as depicted in 01 00 00, Part 1.3, or for (6) Deductive Alternates as depicted on G.002? If any Deductive Alternates are to be submitted by the Offeror, will the VA provide a Price Schedule for alternates? Amendment will be issued to include deductive alternates.

Government response: There are only three (3) alternates as indicated in specification section 01 00 00 para 1.3.B. Refer to attached revised drawing sheet G.002.

4. Will the VA clarify if the Contractor’s Site Superintendent, if duly qualified, may also serve in the roles of SSHO and CQC, or will a separate individual be required for either of those two roles?

Government response: Requirements of specification section 01 35 26 para 1.9.A for SSHO and specification section 01 45 00 para 3.4.B for CQC System Manager are applicable to this project.

5. Will the VA provide a drawing with a location for the Contractors lay down yard in order for the Contractor to include costs to establish temporary electricity to the designated location? Will the VA also clarify if there will be sufficient parking spaces provided for work vehicles or will the Contractor need to arrange the means to shuttle people, materials, and equipment to the work site(s)?

Government response: Refer to the attached sketch indicating the approximate construction site & Contractor storage area. Requirements of specification section 01 00 00 para 1.6 for Contractor storage area and specification section 01 00 00 paras 1.5.D.3 & 1.5.F for Contractor parking are applicable to this project.

6. Will the VA clarify if the HEPA filtered exhaust from the negative pressure ICRA containment areas may be exhausted through existing facility exhaust ducts?

Government response: HEPA filtered exhaust from the negative pressure ICRA containment areas may utilize existing Bldg. 7 exhaust ducts; any exhaust ducts that will be incorporated into the new system must be cleaned prior to completion.

7. Specification Section 01 35 26, Part 1.16 requires TB resting requirements for all personnel assigned to work on this project. This project will take place in an unoccupied building separate from other patient areas. Will the VA confirm TB testing will be required for all GC and subcontractor personnel?

Government response: Requirements of specification section 01 35 26 para 1.16 are applicable to this project.

8. Will the VA provide the Site Visit sign-in roster via amendment?

Government response: Refer to attached 668-21-101 Site Visit Attendance Sheet.

9. Specification Section 01 35 26, Part 1.15 states HEPA filtration will be required for intake vents or building openings where dust may be introduced. If wet method dust mitigation is employed, will intake vents require HEPA filtration? If so, will the VA provide a site plan designating intake vents that will require filtration?

Government response: In accordance with specification section 01 35 26 para 1.15.

the Contractor shall verify that dust will not enter the medical facility. If appropriate controls (i.e., wet suppression, vacuum systems, etc.) are implemented and dust does not leave the construction site, then HEPA filtration on nearby intake vents or building openings is not required. However, if dust does leave the construction site, then HEPA filtration will be required on nearby intake vents and building openings dependent on environmental conditions (i.e., wind direction & strength, etc.).

10. Specification Section 01 00 00, Part 1.22-A, B, & C requires the Contractor, under certain circumstances, to install electric meters for construction electricity usage and pay the prevailing rates charged to the Govt. Will the VA clarify if the Contractor will be required to install meters and pay for any electricity for this project, and if so, will the VA provide the rate being paid by the Govt.?

Government response: Requirements of specification section 01 00 00 para 1.22.B, 1.22.C, and 1.22.E for meters are applicable to this project. Prevailing rate for chargeable electrical service is $0.08239 per kWh.

11. At the end of Specification Section 01 35 26, there is an ICRA permit with Level IV checked for implementation. Will the VA consider Level III for this project to reduce the project costs since this is a stand-alone unoccupied building?

Government response: Requirements of specification section 01 35 26, ICRA Permit, Level of Precautions – Level IV are applicable to this project.

12. Specification Section 01 45 00, Part 3.4-A & D requires the Contractor to retain additional specialized individuals who must be present at all times during work in these individual’s specific area of responsibility. For this project, this requirement would mean the Contractor must retain an Architect (or Const. Professional with 5 years’ experience), a Civil Engineer, a Structural Engineer, a Mechanical Engineer, an Electrical Engineer, and an Environmental Engineer, all to be present onsite during activities in their respective areas of responsibility. Since this will add significantly high costs to this project, will the VA clarify whether this will be a requirement for this project?

Government response: Requirements of specification section 01 45 00 para 3.4 for QC Organization are applicable to this project. The VA recommends Contractor carefully review the requirements as outlined.

13. Specification Section 01 45 35, Part 1.1-A requires a registered design professional who must perform structural observations during construction. It goes on to say that the registered design professional performing these observations will be a representative of the Designer of Record (DOR) for the building being constructed.

Will the VA confirm that this A/E (DOR) observer will not be at an additional cost for the Contractor to include in their offer?

Government response: Requirements of specification section 01 45 35 para 1.1A &

1.4 for a Designer of Record (DOR) are applicable to this project and are contracted by the VA.

14. Specification Section 01 91 00 – General Commissioning Requirements, Part 1.8-C states that the VA will engage the Commissioning Agent (CxA) under a separate contract. Will the VA confirm that this project will receive formal commission and if so, will the VA clarify if the CxA will be engaged by the VA or by the Contractor?

Government response: Requirements of specification section 01 91 00 are applicable to this project. The Commissioning Agent (CxA) is contracted by the VA.

15. Specification Section 02 21 13 – Site Surveys, Part 3.3 appears to be unedited by the Spec Writer. Does the VA actually require the Contactor’s Surveyor to perform an ALTA survey, a boundary survey, a Topographic survey, and a Utility survey for this project? It seems the Designer of Record has already performed/obtained these surveys and included them in the drawings. Will the VA clarify if any of the abovementioned surveys must be conducted, or will the Contractor’s Surveyor only be responsible for construction staking based upon the provided benchmarks?

Government response: Requirements of specification section 02 21 13 are not applicable to this project. Only construction staking based on existing benchmarks is required. Specification section has been deleted, refer to attached revised specification section 00 01 10 Table of Contents.

16. Will the VA confirm that in areas where the ceilings are scheduled for removal, sprinkler heads must be turned upward in order to maintain fire suppression requirements?

Government response: Areas where ceilings are being removed, sprinkler heads must be turned upward during construction to maintain fire suppression requirements. Refer to attached revised drawing sheet AD.101.

17. On the Door Schedule, Sheet A.331, there is call out for LG-1 glazing but the doors are A1 flush. Will the VA clarify if vision kits are required for these doors or are these doors required to be flush doors?

Government response: Vision kits are required as indicated on drawing sheet A.331 Door Schedule. Flush style door type A1 is only designating that the doors are flush swing doors. Thus, these doors can have vision panels per the vision panel type 2 shown in the schedule and diagrams. Glazing type LG-1 references back to the specification, which is noted already on the sheet.

18. Will the VA confirm that there will be adequate future accessibility via the crawl space, to service/replace VAV boxes and heating valves once installed on the east side of the building?

Government response: Adequate future accessibility has been incorporated into the design of ductwork to allow for a path to access VAVs and heating valves for maintenance and replacement.

19. Looking through the bid documents I see you have included specifications for the asbestos and lead paint removal. There doesn’t appear to be a hazardous materials survey included in the documents. Will this be provided prior to bidding or treated as a differing site condition and handled as a change order after the project is awarded?

Government response: Requirements of specification section 02 82 13.19 for asbestos abatement and specification section 02 83 33.13 lead-based paint abatement are applicable to this project. Refer to attached hazardous material surveys.

20. Did you find out if an asbestos survey has been completed for the project?

Government response: See response to bidder inquiry 19.

21. Is there any way we could schedule an additional walkthrough at a later date?

Government response: There will be no additional walkthrough for this solicitation.

22. Sheet A.201, Floor Plan Keynote #4 and Sheet A.331 Window Schedule both require the installation of “anti-shatter film” to remaining windows. Will the VA provide a specification, including mil thickness and blast requirements for this window film treatment?

Government response: Forthcoming from A-E.

23. What is the height to the structure above?

Government response: Structure slopes and varies, height from Finish floor to bottom of structure at perimeter wall at existing north addition and existing east addition is approximately 8’-2”. Height from existing crawl space finish floor to bottom of structure is approximately 3’-8.5”. Refer to wall section A.601/3 and S-100/3 for heights of structure at the proposed mechanical addition.

24. What is the finish level for GWB?

Government response: Refer to specification section 09 29 00 para 3.5.

25. Is the gypsum board at the perimeter walls to be demoed and replaced with new gypsum?

Government response: Refer to drawing sheet AD.101, only walls indicated by Keyed Demolition Note 5 are to have gypsum board removed. Cut, patch, and repair for new power and data outlets.

26. Will the wood doors come pre-finished or will they be required to receive clear coats on site?

Government response: Refer to specification section 08 14 00 paras 2.3 & 2.4.

27. Is there an idea on when this project will commence? This will help us accurately estimate.

Government response: The VA anticipates award by 03/31/2024; however, refer to Standard Form 1442 Section 13 of the solicitation for offer requirements.

28. Are there as-built drawings available for the existing roofing?

Government response: Yes, refer to attached drawing sheets.

29. Was the roofing included in the building asbestos survey? If not, will this be done, and the information made available before the bid is due?

Government response: No, refer to Bidder Inquiry 19 response.

30. Has there been a core sample taken if the existing roofing? If so, what is the composition and depth of the existing roof insulation?

Government response: No, refer to Bidder Inquiry 19 response.

31. Is there another roof under the current TPO roof?

Government response: According to facility records, original building has built-up roofing; East addition has built-up roofing; and North addition is original TPO roofing.

32. 28 31 00 1.1 E The main fire alarm control panel unit is existing to remain.

28 31 00 2.3 A Each building expansion shall be provided with a fire alarm control unit.

The existing control panel is located in building 2.

Is a new fire alarm control unit needed to be installed into building 7?

Government response: Refer to drawing sheets EY.201 & EY.300.

33. Due to the EST-3 Panel being discontinued, if a new fire alarm control unit is required is it possible to install a EST-4 panel and link it into the EST-3 Network via the Fireworks Computer located in building 44?

Government response: New fire alarm control panel shall be compatible with existing systems and be able to communicate signals and alarms appropriately with monitoring station in accordance with NFPA 72.

34. If so is there a IP network link between building 7 and building 44 that could be used? That meets Listing for this purpose.

Government response: Yes.

35. Drawings show Speaker/Strobes in the layout.

The current devices in the building are Horn/Strobes. Without installing a new fire alarm control unit, this would require running the existing audio network from building 1 through buildings 31 & 4 to building 2 and speaker circuits run from building 2 to install speaker/Strobes.

Is building 7 required to be updated to add Speaker/Strobe?

Government response: Yes, pull fiber from building 1 through manholes to 7.

36. 28 31 00 2.3 H 1 Remote Alarm Transmission By-Pass Switch.

The VAMC EST-3 fire alarm system is a networked fire system that runs class A network through all panels at a pier to pier level.

Meaning there is no MAIN FIRE ALARM CONTROL UNIT to by-pass, The rest of these function switches currently are located in building 44 due to the fact that building 44 oversees the campus fire alarm system.

Is this by-pass switch required?

Government response: If the main unit to by-pass does not exist, then a by-pass switch is not applicable.

D. Attachments:

668-21-101_Site Visit Attendance Sheet.

Updated Price Schedule.

Bidder Inquiry 3_668-21-101_G.002 rev1.

Bidder Inquiry 5_668-21-101_Approx Construction Site-Contractor Storage Area.

Bidder Inquiry 8_668-21-101_Site Visit Attendence Sheet.

Bidder Inquiry 15_668-21-101_000110 rev1.

Bidder Inquiry 16_668-21-101_AD.101 rev 1.

Bidder Inquiry 19_668-21-101_HazMat Surveys.

Bidder Inquiry 28_Pages from 2007 VA260-C-0208 East Addition to Building 7 As-Built Drawings.

Bidder Inquiry 28_Pages from B07 2010 North Addtion to Building 7 Drawings.