463-15-111_1.6_01 00 00 - Project As-Built Drawings_Part1 of 5.pdf

PDF 8 MB Posted

Attached to
J045--Repairs on Steam Boiler Humidification System
Solicitation number
36C26021Q0492
Issued by

About this file

This solicitation notice provides details for a firm fixed-price contract to be awarded for steam humidification system repair services at the Alaska VA Healthcare System located in Anchorage, Alaska. The solicitation number is 36C26021Q0492 and will result from Request for Quote J045. Interested vendors should ensure registration in the System for Award Management is current, including applicable NAICS code 238220. The period of performance will be from date of award through September 3, 2021. The tentative solicitation issue date is April 20, 2021 and quotes are due by April 29, 2021. A site visit schedule will be provided. Offers from VIP-verified SDVOSB sources will be considered. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20 will award the contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dan Text Box

RECORD DRAWINGS SET

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Project Director

1 DECEMBER 2017Revisions: Date:

MECHANICAL GENERAL NOTES, ,

SYMBOLS, ABBREVIATIONS & DRAWING

LIST

M-1

Steam Humidification System

ANCHORAGE, ALASKA

Building 100

JNM JNM

FINAL CONSTRUCTION

DOCUMENTS

463-15-111

DRAWING LIST

DWG.NO. DESCRIPTION

GENERAL NOTES

ABBREVIATIONS

ABBR. DESCRIPTION ABBR. DESCRIPTION

D

E

1000 E. Walnut Street, Suite 227, Pasadena, CA 91106 t: 888.900.3823 f: 626.463.2739 www.schwabeng.com

O

E

T

A

T

S

TH

A

A

K

S

A

L

F

R E G I S T E R ED P RO F E S S I ONA L ENG I N

E E

R

Tracy L. McKeon

ME-11388

AutoCAD SHX Text

1. DURING THE EXECUTION OF THIS CONTRACT, THE SITE AND BUILDING's WILL BE OCCUPIED AND DURING THE EXECUTION OF THIS CONTRACT, THE SITE AND BUILDING's WILL BE OCCUPIED AND IN USE. WORK DONE UNDER THIS CONTRACT SHALL BE PERFORMED WITHOUT INCONVENIENCE TO THE OWNER. ALL EXISTING MACHINES, MATERIALS AND FURNISHINGS, OF WHATEVER NATURE, SHALL BE PROTECTED AT ALL TIMES. DAMAGE INCURRED TO THE OWNER'S PROPERTY SHALL BE REPLACED OR REPAIRED BY AND AT THE EXPENSE OF THE CONTRACTOR TO THE SATISFACTION OF THE OWNER. ALL WORK SHALL BE COORDINATED WITH THE CONTRACTING OFFICER AND IS SUBJECT TO HIS CONTINUOUS APPROVAL. 2. THE CONTRACTOR SHALL DEVELOP A SCHEDULE OF DEMOLITION, NEW INSTALLATION AND THE CONTRACTOR SHALL DEVELOP A SCHEDULE OF DEMOLITION, NEW INSTALLATION AND CHANGEOVER OF THE MECHANICAL, PLUMBING, AND UTILITY SYSTEMS WITHOUT DOWNTIME. THE CONTRACTOR SHALL DEVELOP AND PRESENT A CONSTRUCTION PLAN WITH ALL PHASING, STAGING AND SEQUENCING OF WORK FOR APPROVAL PRIOR TO THE COMMENCEMENT AND BEGINNING IMPLEMENTATION OF HIS WORK. THE CONTRACTOR SHALL DETERMINE PRIOR TO SUBMITTING HIS BID, THE SPECIFIC TIME AVAILABILITY OF ALL AREAS AND SPACES AND DETERMINE WHAT WORK MUST ME DONE ON PREMIUM TIME AND INCLUDE ALL RELATED COSTS IN THE BID PRICE. 3. THE CONTRACTOR IS COMPLETELY RESPONSIBLE FOR ALL CHARACTERISTICS OF THE EQUIPMENT THE CONTRACTOR IS COMPLETELY RESPONSIBLE FOR ALL CHARACTERISTICS OF THE EQUIPMENT THAT HE INTENDS TO INSTALL. THE CONTRACTOR SHALL MAKE ALL CHANGES AND ADJUSTMENTS TO ACCOMMODATE THE PROPOSED EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER. THIS APPLIES TO ALL SUPPORT SERVICES AND FACILITIES NECESSARY TO PROPERLY INSTALL THE EQUIPMENT TO FUNCTION ADEQUATELY AS PART OF THE SYSTEMS FOR WHICH THEY WERE DESIGNED AND SELECTED. THESE CHARACTERISTICS INCLUDE SUCH THINGS AS WEIGHT, DIMENSIONS, ELECTRICAL, MECHANICAL, PLUMBING, AND UTILITY SERVICES, ETC. ACCOMMODATING SERVICES INCLUDE SUCH THINGS AS DIMENSIONS, LOCATIONS AND SIZES OF SUPPORTING MEMBERS, CONNECTION SIZES, ELECTRICAL SERVICE SIZE AND PROTECTION, ELECTRICAL CONNECTION LOCATION, UTILITY AND PLUMBING CONNECTION SIZES AND LOCATIONS, ETC. ALL DRAWINGS AND SHALL BE DESIGNED AND STAMPED BY REGISTERED ENGINEERS IN THE APPROPRIATE DISCIPLINE EMPLOYED BY THE CONTRACTOR AND SHALL BE INCLUDED AS PART OF THE EQUIPMENT SUBMITTALS. ALL CHANGES SHALL BE SUBJECT TO THE APPROVAL OF THE RFP A/E AND THE CONTRACTING OFFICER. 4. COMPLETE, DETAILED AND COMPLETELY MARKED SUBMITTALS ARE REQUIRED. MULTIPLE COMPLETE, DETAILED AND COMPLETELY MARKED SUBMITTALS ARE REQUIRED. MULTIPLE SUBMITTALS ARE ACCEPTABLE. EACH CUT SHEET MUST BE MARKED TO COMPLETELY IDENTIFY THE ITEM PROPOSED. WHEN MULTIPLE ITEMS ARE REQUIRED, CORRELATE EACH ITEM WITH THE PLANS AND SPECS. EVERYTHING THAT IS PRESENTED IN EACH SUBMITTAL MUST BE COMPLETE AND ADEQUATELY MARKED OR THE ENTIRE SUBMITTAL WILL BE REJECTED WITHOUT REVIEW. COMPLETE MEANS: A) ALL ITEMS MUST BE CLEARLY MARKED FOR TAG NUMBER, MODEL NUMBER, SIZE, PART NUMBER, ACCESSORIES, OPTIONS, MATERIALS, CLASS, RATINGS, DESIGN DATA, PERFORMANCE, AND ANY OTHER INSTALLATION DETAILS AS NECESSARY TO EVALUATE THE SUITABILITY OF THE ITEM TO MEET THE INTENT OF THE DESIGN; B) MULTIPLE ITEMS REQUIRE INDIVIDUAL TAG NUMBERS, MULTIPLE, KEYED MARKS OR MULTIPLE SHEETS AND SEPARATE DESIGNATIONS WHERE EACH ITEM OR GROUP OF ITEMS WILL BE INSTALLED; C) THE QUANTITY AND LOCATION OF EACH ITEM MUST BE DESIGNATED; D) INCLUDE PERFORMANCE CAPABILITIES CERTIFIED BY THE MANUFACTURER; E) EACH ITEM MUST BE REFERENCED TO THE SPECIFICATION PARAGRAPH USING THE COMPLETE PARAGRAPH NUMBER. ANY SUBMITTAL ITEM JUDGED AS NOT COMPLETE MAY CAUSE THE ENTIRE SUBMITTAL TO BE IMMEDIATELY REJECTED WITHOUT REVIEW. ONLY ONE RE-SUBMITTAL IS ALLOWED. SUBMITTAL DATA WHICH ARE MARKED “NO EXCEPTIONS TAKEN” DO NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY NO EXCEPTIONS TAKEN” DO NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY DO NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY TO COMPLY WITH THE PLANS AND SPECIFICATIONS. 5. THE CONTRACTOR SHALL SUBMIT FOR APPROVAL DETAILED LAYOUT DRAWINGS OF ALL WORK THE CONTRACTOR SHALL SUBMIT FOR APPROVAL DETAILED LAYOUT DRAWINGS OF ALL WORK INCLUDING PIPING, FLUES, DUCTWORK, ELECTRICAL, STRUCTURAL, ETC. PER THE SPECIFICATIONS, PRIOR TO ANY INSTALLATION WORK. A REGISTERED STRUCTURAL ENGINEER EMPLOYED BY THE CONTRACTOR SHALL PROVIDE THE DESIGN OF THE ANCHORAGE, CURB ANCHORAGE, FLUE, DUCTWORK, AND EQUIPMENT SUPPORTS AND SEISMIC BRACING AND ANCHORAGE BASED ON THE CONTRACTOR'S LAYOUT DRAWING AND THE APPROVED EQUIPMENT. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL NEW STRUCTURAL STEEL MEMBERS AS REQUIRED TO SUPPORT THE AIR HANDLERS, DUCTWORK, CONDUITS, EQUIPMENT, ETC. CALCULATIONS FOR THE SUPPORT AND SEISMIC BRACING AND ANCHORAGE OF ALL CHILLERS PUMPS, DUCTWORK, EQUIPMENT, ETC. PREPARED BY THE CONTRACTOR'S REGISTERED STRUCTURAL ENGINEER, SHALL BE SUBMITTED WITH THE LAYOUT DRAWINGS. SEE THE SPECIFICATIONS. SMACNA GUIDELINES MAY BE USED FOR THE DUCTWORK. THE EQUIPMENT SHALL NOT BE INSTALLED BY THE CONTRACTOR UNTIL THE SHOP DRAWINGS AND STAMPED CALCULATIONS HAVE BEEN APPROVED BY THE RFP A/E. NOTE: THIS APPLIES TO ALL AIR HANDLERS WHICH ARE HEAVIER THAN THE SPECIFIED. 6. DO NOT BEGIN FABRICATION, CUT ANY MEMBERS OR BEGIN INSTALLATION UNTIL THE DO NOT BEGIN FABRICATION, CUT ANY MEMBERS OR BEGIN INSTALLATION UNTIL THE SUBMITTALS AND SHOP DRAWINGS HAVE BEEN APPROVED. ANY WORK CONSTRUCTED OR INSTALLED PRIOR TO THE APPROVAL OF SUBMITTALS AND SHOP DRAWINGS SHALL BE AT THE CONTRACTOR'S RISK AND SHALL BE REMOVED AND REINSTALLED OR RECONSTRUCTED AT THE CONTRACTOR'S EXPENSE AT THE REQUEST OF THE CONTRACTING OFFICER TO THE COMPLETE SATISFACTION OF THE CONTRACTING OFFICER. 7. THE CONTRACTOR SHALL PROVIDE OR ENLARGE EXISTING ROOF OPENINGS, INCLUDING FRAMING, THE CONTRACTOR SHALL PROVIDE OR ENLARGE EXISTING ROOF OPENINGS, INCLUDING FRAMING, FLASHING, COUNTER FLASHING AND WATERPROOFING. 8. ALL WORK SHALL BE DONE WITH COMPLETE COMPLIANCE WITH THE PUBLISHED EDITIONS OF ALL WORK SHALL BE DONE WITH COMPLETE COMPLIANCE WITH THE PUBLISHED EDITIONS OF APPLICABLE CODES AND STANDARDS WHETHER STATUTORY OR NOT. ALL WORK SHALL BE INSTALLED TO COMPLY WITH THE UNIFORM BUILDING, MECHANICAL, PLUMBING, ELECTRICAL AND FIRE CODES, NATIONAL ELECTRICAL CODE, UNDERWRITER'S LABORATORY, INC., AMERICAN NATIONAL STANDARD INSTITUTE, INC., NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION, BASIC ELECTRICAL REGULATIONS AND CODES AND STANDARDS OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA). IF ANY PART OF THE INSTALLATION DOES NOT MEET CODE, NOTIFY THE CONTRACTING OFFICER PRIOR TO BEGINNING THE INSTALLATION. IF ANY PART OF THE PROJECT CANNOT BE INSTALLED TO CONFORM WITH THE RFP PLANS AND/OR SPECIFICATIONS, NOTIFY THE CONTRACTING OFFICER PRIOR TO BIDDING. 9. ALL EXISTING DUCTWORK, PIPING CONDUIT AND MECHANICAL, PLUMBING AND ELECTRICAL ALL EXISTING DUCTWORK, PIPING CONDUIT AND MECHANICAL, PLUMBING AND ELECTRICAL EQUIPMENT NOT TO BE REUSED OR REMAIN IN SERVICE SHALL BE REMOVED FROM THE MEDICAL CENTER. THE CONTRACTING OFFICER HAS THE OPTION TO RECLAIM ANY DEMOLISHED MATERIALS OR EQUIPMENT FOR THE GOVERNMENT IN WHICH CASE IT SHALL BE DELIVERED TO THE LOCATION DESIGNATED BY THE CONTRACTING OFFICER. 10. THE CONTRACTOR SHALL PAY FOR ALL DAMAGE INCLUDING WATER DAMAGE TO PROPERTY AND THE CONTRACTOR SHALL PAY FOR ALL DAMAGE INCLUDING WATER DAMAGE TO PROPERTY AND EQUIPMENT CAUSED BY HIS WORK THROUGHOUT THE CONSTRUCTION AND WARRANTEE PERIOD. 11. REPAIR ALL DAMAGE TO THE SATISFACTION OF THE CONTRACTING OFFICER. REPAIR ALL DAMAGE TO THE SATISFACTION OF THE CONTRACTING OFFICER. 12. PROVIDE ALL LABOR AND MATERIALS TO INSTALL THE EQUIPMENT ACCORDING TO THE PROVIDE ALL LABOR AND MATERIALS TO INSTALL THE EQUIPMENT ACCORDING TO THE MANUFACTURERS INSTRUCTIONS AND TO INSURE THE EQUIPMENT WILL OPERATE AS DESIGNED. 13. THE CONTROLS CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR MAKING THE CONTROL SYSTEM THE CONTROLS CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR MAKING THE CONTROL SYSTEM COMPLETE AND FULLY OPERABLE. THE CONNECTION TO THE EXISTING CAMPUS CONTROL SYSTEM SHALL BE COMPLETE SUCH THAT ALL NEW MONITORING AND CONTROL POINTS ARE RECOGNIZED BY THE EXISTING CAMPUS CONTROL SYSTEM AND THAT ALL NEW POINTS CAN BE READ, ACTUATED AND RESET FROM THE EXISTING CAMPUS CONTROL SYSTEM. THE CONTRACTOR SHALL BE PREPARED TO DEMONSTRATE ALL ITEMS IN THE SEQUENCE OF OPERATION. INTERIM CONTROLS DEMONSTRATIONS AND VERIFICATIONS WILL BE REQUIRED AT THE COMPLETION OF EACH OF TWO ZONES. THE COR SHALL BE NOTIFIED WHEN EACH PHASE THE SYSTEM HAS BEEN COMPLETELY CHECKED OUT, ADJUSTED, CALIBRATED AND PUT IN FINAL WORKING CONDITION WITH ALL THE TROUBLESHOOTING COMPLETED; THIS SHALL BE DONE AT THE COMPLETION OF EACH OF ZONE. WHEN ALL WORK IS COMPLETE A SUBSEQUENT JOBSITE MEETING WILL BE SCHEDULED WITH TWO WEEKS NOTICE AT WHICH TIME THE CONTROLS CONTRACTOR WILL DEMONSTRATE THE OPERATION OF THE CONTROL SYSTEMS TO ALL CONCERNED. IF ANY ITEMS OF THE CONTROL SEQUENCE CANNOT BE SUCCESSFULLY DEMONSTRATED OR REQUIRE FURTHER TROUBLESHOOTING, A SUBSEQUENT CONTROLS INSPECTION WILL BE REQUIRED AND WILL BE AT THE CONTRACTOR'S EXPENSE. THIS PROVISION SHALL BE A CONDITION OF FINAL ACCEPTANCE. THE CONTROLS CONTRACTOR SHALL BE CERTIFIED IN INSTALLATION, PROGRAMMING AND OPERATION OF THE EXISTING CONTROL SYSTEM. PROVIDE PROPER REFERENCES AND AT LEAST 5 YEARS OF EXPERIENCE IN SIMILAR INSTALLATIONS AND WORK. 14. THE CONTRACTOR SHALL GUARANTEE TO REPAIR OR REPLACE AT HIS OWN EXPENSE ANY PART THE CONTRACTOR SHALL GUARANTEE TO REPAIR OR REPLACE AT HIS OWN EXPENSE ANY PART OR PORTION OF THE INSTALLED OR MODIFIED SYSTEM THAT DEVELOPS ANY DEFECTS OR MALFUNCTIONS DUE TO FAULTY MATERIALS OR WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE (NOT THE DATE OF BENEFICIAL USE) AND AS REQUIRED BY THE SPECIFICATIONS. 15. ALL HOT WORK SHALL BE COORDINATED WITH THE VA SAFETY MANAGER AND SHALL REQUIRE ALL HOT WORK SHALL BE COORDINATED WITH THE VA SAFETY MANAGER AND SHALL REQUIRE A HOT WORK PERMIT.

AutoCAD SHX Text

1. DURING THE EXECUTION OF THIS CONTRACT, THE SITE AND BUILDING's WILL BE OCCUPIED AND DURING THE EXECUTION OF THIS CONTRACT, THE SITE AND BUILDING's WILL BE OCCUPIED AND IN USE. WORK DONE UNDER THIS CONTRACT SHALL BE PERFORMED WITHOUT INCONVENIENCE TO THE OWNER. ALL EXISTING MACHINES, MATERIALS AND FURNISHINGS, OF WHATEVER NATURE, SHALL BE PROTECTED AT ALL TIMES. DAMAGE INCURRED TO THE OWNER'S PROPERTY SHALL BE REPLACED OR REPAIRED BY AND AT THE EXPENSE OF THE CONTRACTOR TO THE SATISFACTION OF THE OWNER. ALL WORK SHALL BE COORDINATED WITH THE CONTRACTING OFFICER AND IS SUBJECT TO HIS CONTINUOUS APPROVAL. 2. THE CONTRACTOR SHALL DEVELOP A SCHEDULE OF DEMOLITION, NEW INSTALLATION AND THE CONTRACTOR SHALL DEVELOP A SCHEDULE OF DEMOLITION, NEW INSTALLATION AND CHANGEOVER OF THE MECHANICAL, PLUMBING, AND UTILITY SYSTEMS WITHOUT DOWNTIME. THE CONTRACTOR SHALL DEVELOP AND PRESENT A CONSTRUCTION PLAN WITH ALL PHASING, STAGING AND SEQUENCING OF WORK FOR APPROVAL PRIOR TO THE COMMENCEMENT AND BEGINNING IMPLEMENTATION OF HIS WORK. THE CONTRACTOR SHALL DETERMINE PRIOR TO SUBMITTING HIS BID, THE SPECIFIC TIME AVAILABILITY OF ALL AREAS AND SPACES AND DETERMINE WHAT WORK MUST ME DONE ON PREMIUM TIME AND INCLUDE ALL RELATED COSTS IN THE BID PRICE. 3. THE CONTRACTOR IS COMPLETELY RESPONSIBLE FOR ALL CHARACTERISTICS OF THE EQUIPMENT THE CONTRACTOR IS COMPLETELY RESPONSIBLE FOR ALL CHARACTERISTICS OF THE EQUIPMENT THAT HE INTENDS TO INSTALL. THE CONTRACTOR SHALL MAKE ALL CHANGES AND ADJUSTMENTS TO ACCOMMODATE THE PROPOSED EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER. THIS APPLIES TO ALL SUPPORT SERVICES AND FACILITIES NECESSARY TO PROPERLY INSTALL THE EQUIPMENT TO FUNCTION ADEQUATELY AS PART OF THE SYSTEMS FOR WHICH THEY WERE DESIGNED AND SELECTED. THESE CHARACTERISTICS INCLUDE SUCH THINGS AS WEIGHT, DIMENSIONS, ELECTRICAL, MECHANICAL, PLUMBING, AND UTILITY SERVICES, ETC. ACCOMMODATING SERVICES INCLUDE SUCH THINGS AS DIMENSIONS, LOCATIONS AND SIZES OF SUPPORTING MEMBERS, CONNECTION SIZES, ELECTRICAL SERVICE SIZE AND PROTECTION, ELECTRICAL CONNECTION LOCATION, UTILITY AND PLUMBING CONNECTION SIZES AND LOCATIONS, ETC. ALL DRAWINGS AND SHALL BE DESIGNED AND STAMPED BY REGISTERED ENGINEERS IN THE APPROPRIATE DISCIPLINE EMPLOYED BY THE CONTRACTOR AND SHALL BE INCLUDED AS PART OF THE EQUIPMENT SUBMITTALS. ALL CHANGES SHALL BE SUBJECT TO THE APPROVAL OF THE RFP A/E AND THE CONTRACTING OFFICER. 4. COMPLETE, DETAILED AND COMPLETELY MARKED SUBMITTALS ARE REQUIRED. MULTIPLE COMPLETE, DETAILED AND COMPLETELY MARKED SUBMITTALS ARE REQUIRED. MULTIPLE SUBMITTALS ARE ACCEPTABLE. EACH CUT SHEET MUST BE MARKED TO COMPLETELY IDENTIFY THE ITEM PROPOSED. WHEN MULTIPLE ITEMS ARE REQUIRED, CORRELATE EACH ITEM WITH THE PLANS AND SPECS. EVERYTHING THAT IS PRESENTED IN EACH SUBMITTAL MUST BE COMPLETE AND ADEQUATELY MARKED OR THE ENTIRE SUBMITTAL WILL BE REJECTED WITHOUT REVIEW. COMPLETE MEANS: A) ALL ITEMS MUST BE CLEARLY MARKED FOR TAG NUMBER, MODEL NUMBER, SIZE, PART NUMBER, ACCESSORIES, OPTIONS, MATERIALS, CLASS, RATINGS, DESIGN DATA, PERFORMANCE, AND ANY OTHER INSTALLATION DETAILS AS NECESSARY TO EVALUATE THE SUITABILITY OF THE ITEM TO MEET THE INTENT OF THE DESIGN; B) MULTIPLE ITEMS REQUIRE INDIVIDUAL TAG NUMBERS, MULTIPLE, KEYED MARKS OR MULTIPLE SHEETS AND SEPARATE DESIGNATIONS WHERE EACH ITEM OR GROUP OF ITEMS WILL BE INSTALLED; C) THE QUANTITY AND LOCATION OF EACH ITEM MUST BE DESIGNATED; D) INCLUDE PERFORMANCE CAPABILITIES CERTIFIED BY THE MANUFACTURER; E) EACH ITEM MUST BE REFERENCED TO THE SPECIFICATION PARAGRAPH USING THE COMPLETE PARAGRAPH NUMBER. ANY SUBMITTAL ITEM JUDGED AS NOT COMPLETE MAY CAUSE THE ENTIRE SUBMITTAL TO BE IMMEDIATELY REJECTED WITHOUT REVIEW. ONLY ONE RE-SUBMITTAL IS ALLOWED. SUBMITTAL DATA WHICH ARE MARKED “NO EXCEPTIONS TAKEN” DO NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY NO EXCEPTIONS TAKEN” DO NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY DO NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY TO COMPLY WITH THE PLANS AND SPECIFICATIONS. 5. THE CONTRACTOR SHALL SUBMIT FOR APPROVAL DETAILED LAYOUT DRAWINGS OF ALL WORK THE CONTRACTOR SHALL SUBMIT FOR APPROVAL DETAILED LAYOUT DRAWINGS OF ALL WORK INCLUDING PIPING, FLUES, DUCTWORK, ELECTRICAL, STRUCTURAL, ETC. PER THE SPECIFICATIONS, PRIOR TO ANY INSTALLATION WORK. A REGISTERED STRUCTURAL ENGINEER EMPLOYED BY THE CONTRACTOR SHALL PROVIDE THE DESIGN OF THE ANCHORAGE, CURB ANCHORAGE, FLUE, DUCTWORK, AND EQUIPMENT SUPPORTS AND SEISMIC BRACING AND ANCHORAGE BASED ON THE CONTRACTOR'S LAYOUT DRAWING AND THE APPROVED EQUIPMENT. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL NEW STRUCTURAL STEEL MEMBERS AS REQUIRED TO SUPPORT THE AIR HANDLERS, DUCTWORK, CONDUITS, EQUIPMENT, ETC. CALCULATIONS FOR THE SUPPORT AND SEISMIC BRACING AND ANCHORAGE OF ALL CHILLERS PUMPS, DUCTWORK, EQUIPMENT, ETC. PREPARED BY THE CONTRACTOR'S REGISTERED STRUCTURAL ENGINEER, SHALL BE SUBMITTED WITH THE LAYOUT DRAWINGS. SEE THE SPECIFICATIONS. SMACNA GUIDELINES MAY BE USED FOR THE DUCTWORK. THE EQUIPMENT SHALL NOT BE INSTALLED BY THE CONTRACTOR UNTIL THE SHOP DRAWINGS AND STAMPED CALCULATIONS HAVE BEEN APPROVED BY THE RFP A/E. NOTE: THIS APPLIES TO ALL AIR HANDLERS WHICH ARE HEAVIER THAN THE SPECIFIED. 6. DO NOT BEGIN FABRICATION, CUT ANY MEMBERS OR BEGIN INSTALLATION UNTIL THE DO NOT BEGIN FABRICATION, CUT ANY MEMBERS OR BEGIN INSTALLATION UNTIL THE SUBMITTALS AND SHOP DRAWINGS HAVE BEEN APPROVED. ANY WORK CONSTRUCTED OR INSTALLED PRIOR TO THE APPROVAL OF SUBMITTALS AND SHOP DRAWINGS SHALL BE AT THE CONTRACTOR'S RISK AND SHALL BE REMOVED AND REINSTALLED OR RECONSTRUCTED AT THE CONTRACTOR'S EXPENSE AT THE REQUEST OF THE CONTRACTING OFFICER TO THE COMPLETE SATISFACTION OF THE CONTRACTING OFFICER. 7. THE CONTRACTOR SHALL PROVIDE OR ENLARGE EXISTING ROOF OPENINGS, INCLUDING FRAMING, THE CONTRACTOR SHALL PROVIDE OR ENLARGE EXISTING ROOF OPENINGS, INCLUDING FRAMING, FLASHING, COUNTER FLASHING AND WATERPROOFING. 8. ALL WORK SHALL BE DONE WITH COMPLETE COMPLIANCE WITH THE PUBLISHED EDITIONS OF ALL WORK SHALL BE DONE WITH COMPLETE COMPLIANCE WITH THE PUBLISHED EDITIONS OF APPLICABLE CODES AND STANDARDS WHETHER STATUTORY OR NOT. ALL WORK SHALL BE INSTALLED TO COMPLY WITH THE UNIFORM BUILDING, MECHANICAL, PLUMBING, ELECTRICAL AND FIRE CODES, NATIONAL ELECTRICAL CODE, UNDERWRITER'S LABORATORY, INC., AMERICAN NATIONAL STANDARD INSTITUTE, INC., NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION, BASIC ELECTRICAL REGULATIONS AND CODES AND STANDARDS OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA). IF ANY PART OF THE INSTALLATION DOES NOT MEET CODE, NOTIFY THE CONTRACTING OFFICER PRIOR TO BEGINNING THE INSTALLATION. IF ANY PART OF THE PROJECT CANNOT BE INSTALLED TO CONFORM WITH THE RFP PLANS AND/OR SPECIFICATIONS, NOTIFY THE CONTRACTING OFFICER PRIOR TO BIDDING. 9. ALL EXISTING DUCTWORK, PIPING CONDUIT AND MECHANICAL, PLUMBING AND ELECTRICAL ALL EXISTING DUCTWORK, PIPING CONDUIT AND MECHANICAL, PLUMBING AND ELECTRICAL EQUIPMENT NOT TO BE REUSED OR REMAIN IN SERVICE SHALL BE REMOVED FROM THE MEDICAL CENTER. THE CONTRACTING OFFICER HAS THE OPTION TO RECLAIM ANY DEMOLISHED MATERIALS OR EQUIPMENT FOR THE GOVERNMENT IN WHICH CASE IT SHALL BE DELIVERED TO THE LOCATION DESIGNATED BY THE CONTRACTING OFFICER. 10. THE CONTRACTOR SHALL PAY FOR ALL DAMAGE INCLUDING WATER DAMAGE TO PROPERTY AND THE CONTRACTOR SHALL PAY FOR ALL DAMAGE INCLUDING WATER DAMAGE TO PROPERTY AND EQUIPMENT CAUSED BY HIS WORK THROUGHOUT THE CONSTRUCTION AND WARRANTEE PERIOD. 11. REPAIR ALL DAMAGE TO THE SATISFACTION OF THE CONTRACTING OFFICER. REPAIR ALL DAMAGE TO THE SATISFACTION OF THE CONTRACTING OFFICER. 12. PROVIDE ALL LABOR AND MATERIALS TO INSTALL THE EQUIPMENT ACCORDING TO THE PROVIDE ALL LABOR AND MATERIALS TO INSTALL THE EQUIPMENT ACCORDING TO THE MANUFACTURERS INSTRUCTIONS AND TO INSURE THE EQUIPMENT WILL OPERATE AS DESIGNED. 13. THE CONTROLS CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR MAKING THE CONTROL SYSTEM THE CONTROLS CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR MAKING THE CONTROL SYSTEM COMPLETE AND FULLY OPERABLE. THE CONNECTION TO THE EXISTING CAMPUS CONTROL SYSTEM SHALL BE COMPLETE SUCH THAT ALL NEW MONITORING AND CONTROL POINTS ARE RECOGNIZED BY THE EXISTING CAMPUS CONTROL SYSTEM AND THAT ALL NEW POINTS CAN BE READ, ACTUATED AND RESET FROM THE EXISTING CAMPUS CONTROL SYSTEM. THE CONTRACTOR SHALL BE PREPARED TO DEMONSTRATE ALL ITEMS IN THE SEQUENCE OF OPERATION. INTERIM CONTROLS DEMONSTRATIONS AND VERIFICATIONS WILL BE REQUIRED AT THE COMPLETION OF EACH OF TWO ZONES. THE COR SHALL BE NOTIFIED WHEN EACH PHASE THE SYSTEM HAS BEEN COMPLETELY CHECKED OUT, ADJUSTED, CALIBRATED AND PUT IN FINAL WORKING CONDITION WITH ALL THE TROUBLESHOOTING COMPLETED; THIS SHALL BE DONE AT THE COMPLETION OF EACH OF ZONE. WHEN ALL WORK IS COMPLETE A SUBSEQUENT JOBSITE MEETING WILL BE SCHEDULED WITH TWO WEEKS NOTICE AT WHICH TIME THE CONTROLS CONTRACTOR WILL DEMONSTRATE THE OPERATION OF THE CONTROL SYSTEMS TO ALL CONCERNED. IF ANY ITEMS OF THE CONTROL SEQUENCE CANNOT BE SUCCESSFULLY DEMONSTRATED OR REQUIRE FURTHER TROUBLESHOOTING, A SUBSEQUENT CONTROLS INSPECTION WILL BE REQUIRED AND WILL BE AT THE CONTRACTOR'S EXPENSE. THIS PROVISION SHALL BE A CONDITION OF FINAL ACCEPTANCE. THE CONTROLS CONTRACTOR SHALL BE CERTIFIED IN INSTALLATION, PROGRAMMING AND OPERATION OF THE EXISTING CONTROL SYSTEM. PROVIDE PROPER REFERENCES AND AT LEAST 5 YEARS OF EXPERIENCE IN SIMILAR INSTALLATIONS AND WORK. 14. THE CONTRACTOR SHALL GUARANTEE TO REPAIR OR REPLACE AT HIS OWN EXPENSE ANY PART THE CONTRACTOR SHALL GUARANTEE TO REPAIR OR REPLACE AT HIS OWN EXPENSE ANY PART OR PORTION OF THE INSTALLED OR MODIFIED SYSTEM THAT DEVELOPS ANY DEFECTS OR MALFUNCTIONS DUE TO FAULTY MATERIALS OR WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE (NOT THE DATE OF BENEFICIAL USE) AND AS REQUIRED BY THE SPECIFICATIONS. 15. ALL HOT WORK SHALL BE COORDINATED WITH THE VA SAFETY MANAGER AND SHALL REQUIRE ALL HOT WORK SHALL BE COORDINATED WITH THE VA SAFETY MANAGER AND SHALL REQUIRE A HOT WORK PERMIT.

AutoCAD SHX Text

EXISTING WORK

AutoCAD SHX Text

NEW WORK

AutoCAD SHX Text

NUMBERED NOTE

AutoCAD SHX Text

TEMPERATURE SENSOR

AutoCAD SHX Text

PRESSURE SENSOR

AutoCAD SHX Text

HUMIDITY SENSOR

AutoCAD SHX Text

POC

AutoCAD SHX Text

EQUIPMENT TAG

AutoCAD SHX Text

AutoCAD SHX Text T

AutoCAD SHX Text P

AutoCAD SHX Text H

AutoCAD SHX Text

XXX

AutoCAD SHX Text

XX

AutoCAD SHX Text M-1

AutoCAD SHX Text

MECHANICAL GENERAL NOTES, SYMBOLS, ABBREVIATIONS & DRAWING LIST

AutoCAD SHX Text M-3

AutoCAD SHX Text

3A SOUTH PENTHOUSE-DEMO OF EXISTING HUMIDIFIER

AutoCAD SHX Text M-5

AutoCAD SHX Text

3B PENTHOUSE-DEMO OF EXISTING HUMIDIFIERS

AutoCAD SHX Text M-6

AutoCAD SHX Text

3D WEST & EAST PENTHOUSE-DEMO OF EXISTING HUMIDIFIERS

AutoCAD SHX Text

POD

AutoCAD SHX Text M-2

AutoCAD SHX Text

SCHEDULES

AutoCAD SHX Text M-7

AutoCAD SHX Text

3C PENTHOUSE-DEMO OF EXISTING HUMIDIDIFIERS

AutoCAD SHX Text M-8

AutoCAD SHX Text

3D EAST FIRST FLOOR PLAN-DEMO OF EXISTING HUMIDIFIERS

AutoCAD SHX Text M-4

AutoCAD SHX Text

3A NORTH PENTHOUSE-DEMO OF EXISTING HUMIDIFIERS

AutoCAD SHX Text M-9

AutoCAD SHX Text

3A SOUTH PENTHOUSE

AutoCAD SHX Text M-10

AutoCAD SHX Text

3A NORTH PENTHOUSE

AutoCAD SHX Text M-11

AutoCAD SHX Text

3B PENTHOUSE

AutoCAD SHX Text M-12

AutoCAD SHX Text

3D WEST & EAST PENTHOUSE

AutoCAD SHX Text M-13

AutoCAD SHX Text

3C PENTHOUSE

AutoCAD SHX Text

SCOPE OF WORK:

AutoCAD SHX Text 1.

AutoCAD SHX Text REPLACEMENT OF ATOMIZING HUMIDIFICATION SYSTEMS IN NINE (9) AIR HANDLING UNITS IN THE PENTHOUSES AND REPLACEMENT OF TWO DUCT HUMIDIFIERS SERVING OR ROOM 1D22 AND PROCEDURE 1D218 DUE TO BUILD UP OF MINERAL DEPOSITS CAUSED BY HARD WATER. THE REPLACEMENT SYSTEM SHALL CONSIST OF AN ELECTRIC STEAM HUMIDIFIER SYSTEM THAT SHALL BE PLACED IN THE EXISTING AIR HANDLING UNITS AND TWO DUCT MOUNTED ELECTRIC STEAM HUMIDIFIERS.

AutoCAD SHX Text

AI

AutoCAD SHX Text

AFF

AutoCAD SHX Text

AO

AutoCAD SHX Text

BOT

AutoCAD SHX Text

CFM

AutoCAD SHX Text

HP

AutoCAD SHX Text

NC

AutoCAD SHX Text P

AutoCAD SHX Text

POC

AutoCAD SHX Text

SD

AutoCAD SHX Text (R)

AutoCAD SHX Text T

AutoCAD SHX Text

TOM

AutoCAD SHX Text

TYP

AutoCAD SHX Text

UTR

AutoCAD SHX Text V

AutoCAD SHX Text

EX

AutoCAD SHX Text

ANALOG INPUT

AutoCAD SHX Text

ABOVE FINISHED FLOOR

AutoCAD SHX Text

ANALOG OUTPUT

AutoCAD SHX Text

BOTTOM

AutoCAD SHX Text

CUBIC FEET PER MINUTE

AutoCAD SHX Text

HORSEPOWER

AutoCAD SHX Text

NOISE CRITERION

AutoCAD SHX Text

PRESSURE

AutoCAD SHX Text

POINT OF CONNECTION

AutoCAD SHX Text

SUPPLY DIFFUSER

AutoCAD SHX Text

REPLACE

AutoCAD SHX Text

TEMPERATURE

AutoCAD SHX Text

TOP OF MACHINERY

AutoCAD SHX Text

TYPICAL

AutoCAD SHX Text

UP THROUGH ROOF

AutoCAD SHX Text

VIRTUAL (SOFTWARE)

AutoCAD SHX Text

EXPANSION TANK

AutoCAD SHX Text

POD

AutoCAD SHX Text

POINT OF DISCONNECTION

AutoCAD SHX Text

NAC

AutoCAD SHX Text

NETWORK AREA CONTROLLER

AutoCAD SHX Text

UCU

AutoCAD SHX Text

UNITARY CONTROL UNIT

AutoCAD SHX Text

TT

AutoCAD SHX Text

TEMPERATURE TRANSMITTER

AutoCAD SHX Text

CP

AutoCAD SHX Text

CONTROL PANEL

AutoCAD SHX Text

CHP

AutoCAD SHX Text

CHILLED WATER PUMP

AutoCAD SHX Text

AH

AutoCAD SHX Text

AIR HANDLER

AutoCAD SHX Text

CH

AutoCAD SHX Text

CHILLER

AutoCAD SHX Text

BT

AutoCAD SHX Text

BUFFER TANK

AutoCAD SHX Text

AS

AutoCAD SHX Text

AIR SEPARATOR

AutoCAD SHX Text

WG

AutoCAD SHX Text

WATER GAUGE

AutoCAD SHX Text

CPT

AutoCAD SHX Text

CHEMICAL TREATMENT TANK

AutoCAD SHX Text

RG

AutoCAD SHX Text

RETURN GRILLE

AutoCAD SHX Text (D)

AutoCAD SHX Text

DDC

AutoCAD SHX Text

DI

AutoCAD SHX Text

DO

AutoCAD SHX Text

DTR

AutoCAD SHX Text (E)

AutoCAD SHX Text

EG

AutoCAD SHX Text

ESP

AutoCAD SHX Text

ETR

AutoCAD SHX Text

EWC

AutoCAD SHX Text

DEMOLISH

AutoCAD SHX Text

DIRECT DIGITAL CONTROL

AutoCAD SHX Text

DIGITAL INPUT

AutoCAD SHX Text

DIGITAL OUTPUT

AutoCAD SHX Text

DUCT THROUGH ROOF

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

EXHAUST GRILLE

AutoCAD SHX Text

EXTERNAL STATIC PRESSURE

AutoCAD SHX Text

EXISTING TO REMAIN

AutoCAD SHX Text

EVAPORATIVE WATER COOLER

AutoCAD SHX Text

ECC

AutoCAD SHX Text

ENGINEER CONTROL CENTER

AutoCAD SHX Text

DP

AutoCAD SHX Text

DIFFERENTIAL PRESSURE

AutoCAD SHX Text

FS

AutoCAD SHX Text

FLOW STATUS

AutoCAD SHX Text

CT

AutoCAD SHX Text

CURRENT TRANSMITTER

AutoCAD SHX Text M-14

AutoCAD SHX Text

3D EAST FIRST FLOOR PLAN

AutoCAD SHX Text M-15

AutoCAD SHX Text

MECHANICAL DETAILS

AutoCAD SHX Text S

AutoCAD SHX Text

STEAM PIPING

AutoCAD SHX Text

CR

AutoCAD SHX Text

CONDENSATE RETURN PIPING

AutoCAD SHX Text M-16

AutoCAD SHX Text

MECHANICAL DETAILS

AutoCAD SHX Text M-17

AutoCAD SHX Text

MECHANICAL DETAILS

AutoCAD SHX Text

STEAM

AutoCAD SHX Text

CONDENSATE RETURN

AutoCAD SHX Text

COLD WATER

AutoCAD SHX Text H

AutoCAD SHX Text

STEAM HUMIDIFIER

AutoCAD SHX Text B

AutoCAD SHX Text

ELECTRIC STEAM BOILER

AutoCAD SHX Text

SF

AutoCAD SHX Text

WATER SOFTENER

AutoCAD SHX Text T

AutoCAD SHX Text

PRE-CHARGED WATER STORAGE TANK

AutoCAD SHX Text

HC

AutoCAD SHX Text

ELECTRIC STEAM GENERATOR

AutoCAD SHX Text

WS

AutoCAD SHX Text

REVERSE OSMOSIS SYSTEM

AutoCAD SHX Text P

AutoCAD SHX Text

DELIVERY PUMP

AutoCAD SHX Text

BD

AutoCAD SHX Text

CENTRIFUGAL BOILER BLOW OFF

AutoCAD SHX Text

F & T TRAP

AutoCAD SHX Text

PUMP

AutoCAD SHX Text

GATE VALVE

AutoCAD SHX Text

UNION

AutoCAD SHX Text

CHECK VALVE

AutoCAD SHX Text

BALL VALVE

AutoCAD SHX Text

PRESSURE GAUGE

AutoCAD SHX Text

HL

AutoCAD SHX Text

LL

AutoCAD SHX Text T

AutoCAD SHX Text

TEMPERATURE SENSOR

AutoCAD SHX Text

HIGH LIMIT HUMIDISTAT

AutoCAD SHX Text

LOW LIMIT HUMIDISTAT

AutoCAD SHX Text

FLOW MEASURING STATION

AutoCAD SHX Text

CONTROL VALVE

AutoCAD SHX Text

PT

AutoCAD SHX Text

SP

AutoCAD SHX Text

DIFFERENTIAL PRESSURE SENSOR

AutoCAD SHX Text M

AutoCAD SHX Text

FT

AutoCAD SHX Text

PRESSURE TEMP

AutoCAD SHX Text

RELIEF VALVE

AutoCAD SHX Text

PHONE: (907) 562-3252

AutoCAD SHX Text

ANCHORAGE, ALASKA 99503

AutoCAD SHX Text

3940 ARCTIC BLVD. SUITE 300

AutoCAD SHX Text

#AECL882-AK

Dan

RECORD DRAWINGS

Snapshot

Dan

Snapshot

Dan Snapshot

Dan Snapshot

Dan Snapshot

Dan Cloud

Dan Cloud

Dan Arrow

Dan Arrow

Dan Snapshot

Dan Cloud

Dan

A,S,E as-built
VAAK AS-BUILT full set A,S

File details come from the government source that posted it. Updated .