463-15-111_1.6_01 00 00 - Project As-Built Drawings_Part1 of 5.pdf
PDF 8 MB Posted
- Solicitation number
- 36C26021Q0492
About this file
This solicitation notice provides details for a firm fixed-price contract to be awarded for steam humidification system repair services at the Alaska VA Healthcare System located in Anchorage, Alaska. The solicitation number is 36C26021Q0492 and will result from Request for Quote J045. Interested vendors should ensure registration in the System for Award Management is current, including applicable NAICS code 238220. The period of performance will be from date of award through September 3, 2021. The tentative solicitation issue date is April 20, 2021 and quotes are due by April 29, 2021. A site visit schedule will be provided. Offers from VIP-verified SDVOSB sources will be considered. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20 will award the contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dan Text Box
RECORD DRAWINGS SET
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Project Director
1 DECEMBER 2017Revisions: Date:
MECHANICAL GENERAL NOTES, ,
SYMBOLS, ABBREVIATIONS & DRAWING
LIST
M-1
Steam Humidification System
ANCHORAGE, ALASKA
Building 100
JNM JNM
FINAL CONSTRUCTION
DOCUMENTS
463-15-111
DRAWING LIST
DWG.NO. DESCRIPTION
GENERAL NOTES
ABBREVIATIONS
ABBR. DESCRIPTION ABBR. DESCRIPTION
D
E
1000 E. Walnut Street, Suite 227, Pasadena, CA 91106 t: 888.900.3823 f: 626.463.2739 www.schwabeng.com
O
E
T
A
T
S
TH
A
A
K
S
A
L
F
R E G I S T E R ED P RO F E S S I ONA L ENG I N
E E
R
Tracy L. McKeon
ME-11388
AutoCAD SHX Text
1. DURING THE EXECUTION OF THIS CONTRACT, THE SITE AND BUILDING's WILL BE OCCUPIED AND DURING THE EXECUTION OF THIS CONTRACT, THE SITE AND BUILDING's WILL BE OCCUPIED AND IN USE. WORK DONE UNDER THIS CONTRACT SHALL BE PERFORMED WITHOUT INCONVENIENCE TO THE OWNER. ALL EXISTING MACHINES, MATERIALS AND FURNISHINGS, OF WHATEVER NATURE, SHALL BE PROTECTED AT ALL TIMES. DAMAGE INCURRED TO THE OWNER'S PROPERTY SHALL BE REPLACED OR REPAIRED BY AND AT THE EXPENSE OF THE CONTRACTOR TO THE SATISFACTION OF THE OWNER. ALL WORK SHALL BE COORDINATED WITH THE CONTRACTING OFFICER AND IS SUBJECT TO HIS CONTINUOUS APPROVAL. 2. THE CONTRACTOR SHALL DEVELOP A SCHEDULE OF DEMOLITION, NEW INSTALLATION AND THE CONTRACTOR SHALL DEVELOP A SCHEDULE OF DEMOLITION, NEW INSTALLATION AND CHANGEOVER OF THE MECHANICAL, PLUMBING, AND UTILITY SYSTEMS WITHOUT DOWNTIME. THE CONTRACTOR SHALL DEVELOP AND PRESENT A CONSTRUCTION PLAN WITH ALL PHASING, STAGING AND SEQUENCING OF WORK FOR APPROVAL PRIOR TO THE COMMENCEMENT AND BEGINNING IMPLEMENTATION OF HIS WORK. THE CONTRACTOR SHALL DETERMINE PRIOR TO SUBMITTING HIS BID, THE SPECIFIC TIME AVAILABILITY OF ALL AREAS AND SPACES AND DETERMINE WHAT WORK MUST ME DONE ON PREMIUM TIME AND INCLUDE ALL RELATED COSTS IN THE BID PRICE. 3. THE CONTRACTOR IS COMPLETELY RESPONSIBLE FOR ALL CHARACTERISTICS OF THE EQUIPMENT THE CONTRACTOR IS COMPLETELY RESPONSIBLE FOR ALL CHARACTERISTICS OF THE EQUIPMENT THAT HE INTENDS TO INSTALL. THE CONTRACTOR SHALL MAKE ALL CHANGES AND ADJUSTMENTS TO ACCOMMODATE THE PROPOSED EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER. THIS APPLIES TO ALL SUPPORT SERVICES AND FACILITIES NECESSARY TO PROPERLY INSTALL THE EQUIPMENT TO FUNCTION ADEQUATELY AS PART OF THE SYSTEMS FOR WHICH THEY WERE DESIGNED AND SELECTED. THESE CHARACTERISTICS INCLUDE SUCH THINGS AS WEIGHT, DIMENSIONS, ELECTRICAL, MECHANICAL, PLUMBING, AND UTILITY SERVICES, ETC. ACCOMMODATING SERVICES INCLUDE SUCH THINGS AS DIMENSIONS, LOCATIONS AND SIZES OF SUPPORTING MEMBERS, CONNECTION SIZES, ELECTRICAL SERVICE SIZE AND PROTECTION, ELECTRICAL CONNECTION LOCATION, UTILITY AND PLUMBING CONNECTION SIZES AND LOCATIONS, ETC. ALL DRAWINGS AND SHALL BE DESIGNED AND STAMPED BY REGISTERED ENGINEERS IN THE APPROPRIATE DISCIPLINE EMPLOYED BY THE CONTRACTOR AND SHALL BE INCLUDED AS PART OF THE EQUIPMENT SUBMITTALS. ALL CHANGES SHALL BE SUBJECT TO THE APPROVAL OF THE RFP A/E AND THE CONTRACTING OFFICER. 4. COMPLETE, DETAILED AND COMPLETELY MARKED SUBMITTALS ARE REQUIRED. MULTIPLE COMPLETE, DETAILED AND COMPLETELY MARKED SUBMITTALS ARE REQUIRED. MULTIPLE SUBMITTALS ARE ACCEPTABLE. EACH CUT SHEET MUST BE MARKED TO COMPLETELY IDENTIFY THE ITEM PROPOSED. WHEN MULTIPLE ITEMS ARE REQUIRED, CORRELATE EACH ITEM WITH THE PLANS AND SPECS. EVERYTHING THAT IS PRESENTED IN EACH SUBMITTAL MUST BE COMPLETE AND ADEQUATELY MARKED OR THE ENTIRE SUBMITTAL WILL BE REJECTED WITHOUT REVIEW. COMPLETE MEANS: A) ALL ITEMS MUST BE CLEARLY MARKED FOR TAG NUMBER, MODEL NUMBER, SIZE, PART NUMBER, ACCESSORIES, OPTIONS, MATERIALS, CLASS, RATINGS, DESIGN DATA, PERFORMANCE, AND ANY OTHER INSTALLATION DETAILS AS NECESSARY TO EVALUATE THE SUITABILITY OF THE ITEM TO MEET THE INTENT OF THE DESIGN; B) MULTIPLE ITEMS REQUIRE INDIVIDUAL TAG NUMBERS, MULTIPLE, KEYED MARKS OR MULTIPLE SHEETS AND SEPARATE DESIGNATIONS WHERE EACH ITEM OR GROUP OF ITEMS WILL BE INSTALLED; C) THE QUANTITY AND LOCATION OF EACH ITEM MUST BE DESIGNATED; D) INCLUDE PERFORMANCE CAPABILITIES CERTIFIED BY THE MANUFACTURER; E) EACH ITEM MUST BE REFERENCED TO THE SPECIFICATION PARAGRAPH USING THE COMPLETE PARAGRAPH NUMBER. ANY SUBMITTAL ITEM JUDGED AS NOT COMPLETE MAY CAUSE THE ENTIRE SUBMITTAL TO BE IMMEDIATELY REJECTED WITHOUT REVIEW. ONLY ONE RE-SUBMITTAL IS ALLOWED. SUBMITTAL DATA WHICH ARE MARKED “NO EXCEPTIONS TAKEN” DO NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY NO EXCEPTIONS TAKEN” DO NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY DO NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY TO COMPLY WITH THE PLANS AND SPECIFICATIONS. 5. THE CONTRACTOR SHALL SUBMIT FOR APPROVAL DETAILED LAYOUT DRAWINGS OF ALL WORK THE CONTRACTOR SHALL SUBMIT FOR APPROVAL DETAILED LAYOUT DRAWINGS OF ALL WORK INCLUDING PIPING, FLUES, DUCTWORK, ELECTRICAL, STRUCTURAL, ETC. PER THE SPECIFICATIONS, PRIOR TO ANY INSTALLATION WORK. A REGISTERED STRUCTURAL ENGINEER EMPLOYED BY THE CONTRACTOR SHALL PROVIDE THE DESIGN OF THE ANCHORAGE, CURB ANCHORAGE, FLUE, DUCTWORK, AND EQUIPMENT SUPPORTS AND SEISMIC BRACING AND ANCHORAGE BASED ON THE CONTRACTOR'S LAYOUT DRAWING AND THE APPROVED EQUIPMENT. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL NEW STRUCTURAL STEEL MEMBERS AS REQUIRED TO SUPPORT THE AIR HANDLERS, DUCTWORK, CONDUITS, EQUIPMENT, ETC. CALCULATIONS FOR THE SUPPORT AND SEISMIC BRACING AND ANCHORAGE OF ALL CHILLERS PUMPS, DUCTWORK, EQUIPMENT, ETC. PREPARED BY THE CONTRACTOR'S REGISTERED STRUCTURAL ENGINEER, SHALL BE SUBMITTED WITH THE LAYOUT DRAWINGS. SEE THE SPECIFICATIONS. SMACNA GUIDELINES MAY BE USED FOR THE DUCTWORK. THE EQUIPMENT SHALL NOT BE INSTALLED BY THE CONTRACTOR UNTIL THE SHOP DRAWINGS AND STAMPED CALCULATIONS HAVE BEEN APPROVED BY THE RFP A/E. NOTE: THIS APPLIES TO ALL AIR HANDLERS WHICH ARE HEAVIER THAN THE SPECIFIED. 6. DO NOT BEGIN FABRICATION, CUT ANY MEMBERS OR BEGIN INSTALLATION UNTIL THE DO NOT BEGIN FABRICATION, CUT ANY MEMBERS OR BEGIN INSTALLATION UNTIL THE SUBMITTALS AND SHOP DRAWINGS HAVE BEEN APPROVED. ANY WORK CONSTRUCTED OR INSTALLED PRIOR TO THE APPROVAL OF SUBMITTALS AND SHOP DRAWINGS SHALL BE AT THE CONTRACTOR'S RISK AND SHALL BE REMOVED AND REINSTALLED OR RECONSTRUCTED AT THE CONTRACTOR'S EXPENSE AT THE REQUEST OF THE CONTRACTING OFFICER TO THE COMPLETE SATISFACTION OF THE CONTRACTING OFFICER. 7. THE CONTRACTOR SHALL PROVIDE OR ENLARGE EXISTING ROOF OPENINGS, INCLUDING FRAMING, THE CONTRACTOR SHALL PROVIDE OR ENLARGE EXISTING ROOF OPENINGS, INCLUDING FRAMING, FLASHING, COUNTER FLASHING AND WATERPROOFING. 8. ALL WORK SHALL BE DONE WITH COMPLETE COMPLIANCE WITH THE PUBLISHED EDITIONS OF ALL WORK SHALL BE DONE WITH COMPLETE COMPLIANCE WITH THE PUBLISHED EDITIONS OF APPLICABLE CODES AND STANDARDS WHETHER STATUTORY OR NOT. ALL WORK SHALL BE INSTALLED TO COMPLY WITH THE UNIFORM BUILDING, MECHANICAL, PLUMBING, ELECTRICAL AND FIRE CODES, NATIONAL ELECTRICAL CODE, UNDERWRITER'S LABORATORY, INC., AMERICAN NATIONAL STANDARD INSTITUTE, INC., NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION, BASIC ELECTRICAL REGULATIONS AND CODES AND STANDARDS OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA). IF ANY PART OF THE INSTALLATION DOES NOT MEET CODE, NOTIFY THE CONTRACTING OFFICER PRIOR TO BEGINNING THE INSTALLATION. IF ANY PART OF THE PROJECT CANNOT BE INSTALLED TO CONFORM WITH THE RFP PLANS AND/OR SPECIFICATIONS, NOTIFY THE CONTRACTING OFFICER PRIOR TO BIDDING. 9. ALL EXISTING DUCTWORK, PIPING CONDUIT AND MECHANICAL, PLUMBING AND ELECTRICAL ALL EXISTING DUCTWORK, PIPING CONDUIT AND MECHANICAL, PLUMBING AND ELECTRICAL EQUIPMENT NOT TO BE REUSED OR REMAIN IN SERVICE SHALL BE REMOVED FROM THE MEDICAL CENTER. THE CONTRACTING OFFICER HAS THE OPTION TO RECLAIM ANY DEMOLISHED MATERIALS OR EQUIPMENT FOR THE GOVERNMENT IN WHICH CASE IT SHALL BE DELIVERED TO THE LOCATION DESIGNATED BY THE CONTRACTING OFFICER. 10. THE CONTRACTOR SHALL PAY FOR ALL DAMAGE INCLUDING WATER DAMAGE TO PROPERTY AND THE CONTRACTOR SHALL PAY FOR ALL DAMAGE INCLUDING WATER DAMAGE TO PROPERTY AND EQUIPMENT CAUSED BY HIS WORK THROUGHOUT THE CONSTRUCTION AND WARRANTEE PERIOD. 11. REPAIR ALL DAMAGE TO THE SATISFACTION OF THE CONTRACTING OFFICER. REPAIR ALL DAMAGE TO THE SATISFACTION OF THE CONTRACTING OFFICER. 12. PROVIDE ALL LABOR AND MATERIALS TO INSTALL THE EQUIPMENT ACCORDING TO THE PROVIDE ALL LABOR AND MATERIALS TO INSTALL THE EQUIPMENT ACCORDING TO THE MANUFACTURERS INSTRUCTIONS AND TO INSURE THE EQUIPMENT WILL OPERATE AS DESIGNED. 13. THE CONTROLS CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR MAKING THE CONTROL SYSTEM THE CONTROLS CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR MAKING THE CONTROL SYSTEM COMPLETE AND FULLY OPERABLE. THE CONNECTION TO THE EXISTING CAMPUS CONTROL SYSTEM SHALL BE COMPLETE SUCH THAT ALL NEW MONITORING AND CONTROL POINTS ARE RECOGNIZED BY THE EXISTING CAMPUS CONTROL SYSTEM AND THAT ALL NEW POINTS CAN BE READ, ACTUATED AND RESET FROM THE EXISTING CAMPUS CONTROL SYSTEM. THE CONTRACTOR SHALL BE PREPARED TO DEMONSTRATE ALL ITEMS IN THE SEQUENCE OF OPERATION. INTERIM CONTROLS DEMONSTRATIONS AND VERIFICATIONS WILL BE REQUIRED AT THE COMPLETION OF EACH OF TWO ZONES. THE COR SHALL BE NOTIFIED WHEN EACH PHASE THE SYSTEM HAS BEEN COMPLETELY CHECKED OUT, ADJUSTED, CALIBRATED AND PUT IN FINAL WORKING CONDITION WITH ALL THE TROUBLESHOOTING COMPLETED; THIS SHALL BE DONE AT THE COMPLETION OF EACH OF ZONE. WHEN ALL WORK IS COMPLETE A SUBSEQUENT JOBSITE MEETING WILL BE SCHEDULED WITH TWO WEEKS NOTICE AT WHICH TIME THE CONTROLS CONTRACTOR WILL DEMONSTRATE THE OPERATION OF THE CONTROL SYSTEMS TO ALL CONCERNED. IF ANY ITEMS OF THE CONTROL SEQUENCE CANNOT BE SUCCESSFULLY DEMONSTRATED OR REQUIRE FURTHER TROUBLESHOOTING, A SUBSEQUENT CONTROLS INSPECTION WILL BE REQUIRED AND WILL BE AT THE CONTRACTOR'S EXPENSE. THIS PROVISION SHALL BE A CONDITION OF FINAL ACCEPTANCE. THE CONTROLS CONTRACTOR SHALL BE CERTIFIED IN INSTALLATION, PROGRAMMING AND OPERATION OF THE EXISTING CONTROL SYSTEM. PROVIDE PROPER REFERENCES AND AT LEAST 5 YEARS OF EXPERIENCE IN SIMILAR INSTALLATIONS AND WORK. 14. THE CONTRACTOR SHALL GUARANTEE TO REPAIR OR REPLACE AT HIS OWN EXPENSE ANY PART THE CONTRACTOR SHALL GUARANTEE TO REPAIR OR REPLACE AT HIS OWN EXPENSE ANY PART OR PORTION OF THE INSTALLED OR MODIFIED SYSTEM THAT DEVELOPS ANY DEFECTS OR MALFUNCTIONS DUE TO FAULTY MATERIALS OR WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE (NOT THE DATE OF BENEFICIAL USE) AND AS REQUIRED BY THE SPECIFICATIONS. 15. ALL HOT WORK SHALL BE COORDINATED WITH THE VA SAFETY MANAGER AND SHALL REQUIRE ALL HOT WORK SHALL BE COORDINATED WITH THE VA SAFETY MANAGER AND SHALL REQUIRE A HOT WORK PERMIT.
AutoCAD SHX Text
1. DURING THE EXECUTION OF THIS CONTRACT, THE SITE AND BUILDING's WILL BE OCCUPIED AND DURING THE EXECUTION OF THIS CONTRACT, THE SITE AND BUILDING's WILL BE OCCUPIED AND IN USE. WORK DONE UNDER THIS CONTRACT SHALL BE PERFORMED WITHOUT INCONVENIENCE TO THE OWNER. ALL EXISTING MACHINES, MATERIALS AND FURNISHINGS, OF WHATEVER NATURE, SHALL BE PROTECTED AT ALL TIMES. DAMAGE INCURRED TO THE OWNER'S PROPERTY SHALL BE REPLACED OR REPAIRED BY AND AT THE EXPENSE OF THE CONTRACTOR TO THE SATISFACTION OF THE OWNER. ALL WORK SHALL BE COORDINATED WITH THE CONTRACTING OFFICER AND IS SUBJECT TO HIS CONTINUOUS APPROVAL. 2. THE CONTRACTOR SHALL DEVELOP A SCHEDULE OF DEMOLITION, NEW INSTALLATION AND THE CONTRACTOR SHALL DEVELOP A SCHEDULE OF DEMOLITION, NEW INSTALLATION AND CHANGEOVER OF THE MECHANICAL, PLUMBING, AND UTILITY SYSTEMS WITHOUT DOWNTIME. THE CONTRACTOR SHALL DEVELOP AND PRESENT A CONSTRUCTION PLAN WITH ALL PHASING, STAGING AND SEQUENCING OF WORK FOR APPROVAL PRIOR TO THE COMMENCEMENT AND BEGINNING IMPLEMENTATION OF HIS WORK. THE CONTRACTOR SHALL DETERMINE PRIOR TO SUBMITTING HIS BID, THE SPECIFIC TIME AVAILABILITY OF ALL AREAS AND SPACES AND DETERMINE WHAT WORK MUST ME DONE ON PREMIUM TIME AND INCLUDE ALL RELATED COSTS IN THE BID PRICE. 3. THE CONTRACTOR IS COMPLETELY RESPONSIBLE FOR ALL CHARACTERISTICS OF THE EQUIPMENT THE CONTRACTOR IS COMPLETELY RESPONSIBLE FOR ALL CHARACTERISTICS OF THE EQUIPMENT THAT HE INTENDS TO INSTALL. THE CONTRACTOR SHALL MAKE ALL CHANGES AND ADJUSTMENTS TO ACCOMMODATE THE PROPOSED EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER. THIS APPLIES TO ALL SUPPORT SERVICES AND FACILITIES NECESSARY TO PROPERLY INSTALL THE EQUIPMENT TO FUNCTION ADEQUATELY AS PART OF THE SYSTEMS FOR WHICH THEY WERE DESIGNED AND SELECTED. THESE CHARACTERISTICS INCLUDE SUCH THINGS AS WEIGHT, DIMENSIONS, ELECTRICAL, MECHANICAL, PLUMBING, AND UTILITY SERVICES, ETC. ACCOMMODATING SERVICES INCLUDE SUCH THINGS AS DIMENSIONS, LOCATIONS AND SIZES OF SUPPORTING MEMBERS, CONNECTION SIZES, ELECTRICAL SERVICE SIZE AND PROTECTION, ELECTRICAL CONNECTION LOCATION, UTILITY AND PLUMBING CONNECTION SIZES AND LOCATIONS, ETC. ALL DRAWINGS AND SHALL BE DESIGNED AND STAMPED BY REGISTERED ENGINEERS IN THE APPROPRIATE DISCIPLINE EMPLOYED BY THE CONTRACTOR AND SHALL BE INCLUDED AS PART OF THE EQUIPMENT SUBMITTALS. ALL CHANGES SHALL BE SUBJECT TO THE APPROVAL OF THE RFP A/E AND THE CONTRACTING OFFICER. 4. COMPLETE, DETAILED AND COMPLETELY MARKED SUBMITTALS ARE REQUIRED. MULTIPLE COMPLETE, DETAILED AND COMPLETELY MARKED SUBMITTALS ARE REQUIRED. MULTIPLE SUBMITTALS ARE ACCEPTABLE. EACH CUT SHEET MUST BE MARKED TO COMPLETELY IDENTIFY THE ITEM PROPOSED. WHEN MULTIPLE ITEMS ARE REQUIRED, CORRELATE EACH ITEM WITH THE PLANS AND SPECS. EVERYTHING THAT IS PRESENTED IN EACH SUBMITTAL MUST BE COMPLETE AND ADEQUATELY MARKED OR THE ENTIRE SUBMITTAL WILL BE REJECTED WITHOUT REVIEW. COMPLETE MEANS: A) ALL ITEMS MUST BE CLEARLY MARKED FOR TAG NUMBER, MODEL NUMBER, SIZE, PART NUMBER, ACCESSORIES, OPTIONS, MATERIALS, CLASS, RATINGS, DESIGN DATA, PERFORMANCE, AND ANY OTHER INSTALLATION DETAILS AS NECESSARY TO EVALUATE THE SUITABILITY OF THE ITEM TO MEET THE INTENT OF THE DESIGN; B) MULTIPLE ITEMS REQUIRE INDIVIDUAL TAG NUMBERS, MULTIPLE, KEYED MARKS OR MULTIPLE SHEETS AND SEPARATE DESIGNATIONS WHERE EACH ITEM OR GROUP OF ITEMS WILL BE INSTALLED; C) THE QUANTITY AND LOCATION OF EACH ITEM MUST BE DESIGNATED; D) INCLUDE PERFORMANCE CAPABILITIES CERTIFIED BY THE MANUFACTURER; E) EACH ITEM MUST BE REFERENCED TO THE SPECIFICATION PARAGRAPH USING THE COMPLETE PARAGRAPH NUMBER. ANY SUBMITTAL ITEM JUDGED AS NOT COMPLETE MAY CAUSE THE ENTIRE SUBMITTAL TO BE IMMEDIATELY REJECTED WITHOUT REVIEW. ONLY ONE RE-SUBMITTAL IS ALLOWED. SUBMITTAL DATA WHICH ARE MARKED “NO EXCEPTIONS TAKEN” DO NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY NO EXCEPTIONS TAKEN” DO NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY DO NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY TO COMPLY WITH THE PLANS AND SPECIFICATIONS. 5. THE CONTRACTOR SHALL SUBMIT FOR APPROVAL DETAILED LAYOUT DRAWINGS OF ALL WORK THE CONTRACTOR SHALL SUBMIT FOR APPROVAL DETAILED LAYOUT DRAWINGS OF ALL WORK INCLUDING PIPING, FLUES, DUCTWORK, ELECTRICAL, STRUCTURAL, ETC. PER THE SPECIFICATIONS, PRIOR TO ANY INSTALLATION WORK. A REGISTERED STRUCTURAL ENGINEER EMPLOYED BY THE CONTRACTOR SHALL PROVIDE THE DESIGN OF THE ANCHORAGE, CURB ANCHORAGE, FLUE, DUCTWORK, AND EQUIPMENT SUPPORTS AND SEISMIC BRACING AND ANCHORAGE BASED ON THE CONTRACTOR'S LAYOUT DRAWING AND THE APPROVED EQUIPMENT. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL NEW STRUCTURAL STEEL MEMBERS AS REQUIRED TO SUPPORT THE AIR HANDLERS, DUCTWORK, CONDUITS, EQUIPMENT, ETC. CALCULATIONS FOR THE SUPPORT AND SEISMIC BRACING AND ANCHORAGE OF ALL CHILLERS PUMPS, DUCTWORK, EQUIPMENT, ETC. PREPARED BY THE CONTRACTOR'S REGISTERED STRUCTURAL ENGINEER, SHALL BE SUBMITTED WITH THE LAYOUT DRAWINGS. SEE THE SPECIFICATIONS. SMACNA GUIDELINES MAY BE USED FOR THE DUCTWORK. THE EQUIPMENT SHALL NOT BE INSTALLED BY THE CONTRACTOR UNTIL THE SHOP DRAWINGS AND STAMPED CALCULATIONS HAVE BEEN APPROVED BY THE RFP A/E. NOTE: THIS APPLIES TO ALL AIR HANDLERS WHICH ARE HEAVIER THAN THE SPECIFIED. 6. DO NOT BEGIN FABRICATION, CUT ANY MEMBERS OR BEGIN INSTALLATION UNTIL THE DO NOT BEGIN FABRICATION, CUT ANY MEMBERS OR BEGIN INSTALLATION UNTIL THE SUBMITTALS AND SHOP DRAWINGS HAVE BEEN APPROVED. ANY WORK CONSTRUCTED OR INSTALLED PRIOR TO THE APPROVAL OF SUBMITTALS AND SHOP DRAWINGS SHALL BE AT THE CONTRACTOR'S RISK AND SHALL BE REMOVED AND REINSTALLED OR RECONSTRUCTED AT THE CONTRACTOR'S EXPENSE AT THE REQUEST OF THE CONTRACTING OFFICER TO THE COMPLETE SATISFACTION OF THE CONTRACTING OFFICER. 7. THE CONTRACTOR SHALL PROVIDE OR ENLARGE EXISTING ROOF OPENINGS, INCLUDING FRAMING, THE CONTRACTOR SHALL PROVIDE OR ENLARGE EXISTING ROOF OPENINGS, INCLUDING FRAMING, FLASHING, COUNTER FLASHING AND WATERPROOFING. 8. ALL WORK SHALL BE DONE WITH COMPLETE COMPLIANCE WITH THE PUBLISHED EDITIONS OF ALL WORK SHALL BE DONE WITH COMPLETE COMPLIANCE WITH THE PUBLISHED EDITIONS OF APPLICABLE CODES AND STANDARDS WHETHER STATUTORY OR NOT. ALL WORK SHALL BE INSTALLED TO COMPLY WITH THE UNIFORM BUILDING, MECHANICAL, PLUMBING, ELECTRICAL AND FIRE CODES, NATIONAL ELECTRICAL CODE, UNDERWRITER'S LABORATORY, INC., AMERICAN NATIONAL STANDARD INSTITUTE, INC., NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION, BASIC ELECTRICAL REGULATIONS AND CODES AND STANDARDS OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA). IF ANY PART OF THE INSTALLATION DOES NOT MEET CODE, NOTIFY THE CONTRACTING OFFICER PRIOR TO BEGINNING THE INSTALLATION. IF ANY PART OF THE PROJECT CANNOT BE INSTALLED TO CONFORM WITH THE RFP PLANS AND/OR SPECIFICATIONS, NOTIFY THE CONTRACTING OFFICER PRIOR TO BIDDING. 9. ALL EXISTING DUCTWORK, PIPING CONDUIT AND MECHANICAL, PLUMBING AND ELECTRICAL ALL EXISTING DUCTWORK, PIPING CONDUIT AND MECHANICAL, PLUMBING AND ELECTRICAL EQUIPMENT NOT TO BE REUSED OR REMAIN IN SERVICE SHALL BE REMOVED FROM THE MEDICAL CENTER. THE CONTRACTING OFFICER HAS THE OPTION TO RECLAIM ANY DEMOLISHED MATERIALS OR EQUIPMENT FOR THE GOVERNMENT IN WHICH CASE IT SHALL BE DELIVERED TO THE LOCATION DESIGNATED BY THE CONTRACTING OFFICER. 10. THE CONTRACTOR SHALL PAY FOR ALL DAMAGE INCLUDING WATER DAMAGE TO PROPERTY AND THE CONTRACTOR SHALL PAY FOR ALL DAMAGE INCLUDING WATER DAMAGE TO PROPERTY AND EQUIPMENT CAUSED BY HIS WORK THROUGHOUT THE CONSTRUCTION AND WARRANTEE PERIOD. 11. REPAIR ALL DAMAGE TO THE SATISFACTION OF THE CONTRACTING OFFICER. REPAIR ALL DAMAGE TO THE SATISFACTION OF THE CONTRACTING OFFICER. 12. PROVIDE ALL LABOR AND MATERIALS TO INSTALL THE EQUIPMENT ACCORDING TO THE PROVIDE ALL LABOR AND MATERIALS TO INSTALL THE EQUIPMENT ACCORDING TO THE MANUFACTURERS INSTRUCTIONS AND TO INSURE THE EQUIPMENT WILL OPERATE AS DESIGNED. 13. THE CONTROLS CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR MAKING THE CONTROL SYSTEM THE CONTROLS CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR MAKING THE CONTROL SYSTEM COMPLETE AND FULLY OPERABLE. THE CONNECTION TO THE EXISTING CAMPUS CONTROL SYSTEM SHALL BE COMPLETE SUCH THAT ALL NEW MONITORING AND CONTROL POINTS ARE RECOGNIZED BY THE EXISTING CAMPUS CONTROL SYSTEM AND THAT ALL NEW POINTS CAN BE READ, ACTUATED AND RESET FROM THE EXISTING CAMPUS CONTROL SYSTEM. THE CONTRACTOR SHALL BE PREPARED TO DEMONSTRATE ALL ITEMS IN THE SEQUENCE OF OPERATION. INTERIM CONTROLS DEMONSTRATIONS AND VERIFICATIONS WILL BE REQUIRED AT THE COMPLETION OF EACH OF TWO ZONES. THE COR SHALL BE NOTIFIED WHEN EACH PHASE THE SYSTEM HAS BEEN COMPLETELY CHECKED OUT, ADJUSTED, CALIBRATED AND PUT IN FINAL WORKING CONDITION WITH ALL THE TROUBLESHOOTING COMPLETED; THIS SHALL BE DONE AT THE COMPLETION OF EACH OF ZONE. WHEN ALL WORK IS COMPLETE A SUBSEQUENT JOBSITE MEETING WILL BE SCHEDULED WITH TWO WEEKS NOTICE AT WHICH TIME THE CONTROLS CONTRACTOR WILL DEMONSTRATE THE OPERATION OF THE CONTROL SYSTEMS TO ALL CONCERNED. IF ANY ITEMS OF THE CONTROL SEQUENCE CANNOT BE SUCCESSFULLY DEMONSTRATED OR REQUIRE FURTHER TROUBLESHOOTING, A SUBSEQUENT CONTROLS INSPECTION WILL BE REQUIRED AND WILL BE AT THE CONTRACTOR'S EXPENSE. THIS PROVISION SHALL BE A CONDITION OF FINAL ACCEPTANCE. THE CONTROLS CONTRACTOR SHALL BE CERTIFIED IN INSTALLATION, PROGRAMMING AND OPERATION OF THE EXISTING CONTROL SYSTEM. PROVIDE PROPER REFERENCES AND AT LEAST 5 YEARS OF EXPERIENCE IN SIMILAR INSTALLATIONS AND WORK. 14. THE CONTRACTOR SHALL GUARANTEE TO REPAIR OR REPLACE AT HIS OWN EXPENSE ANY PART THE CONTRACTOR SHALL GUARANTEE TO REPAIR OR REPLACE AT HIS OWN EXPENSE ANY PART OR PORTION OF THE INSTALLED OR MODIFIED SYSTEM THAT DEVELOPS ANY DEFECTS OR MALFUNCTIONS DUE TO FAULTY MATERIALS OR WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE (NOT THE DATE OF BENEFICIAL USE) AND AS REQUIRED BY THE SPECIFICATIONS. 15. ALL HOT WORK SHALL BE COORDINATED WITH THE VA SAFETY MANAGER AND SHALL REQUIRE ALL HOT WORK SHALL BE COORDINATED WITH THE VA SAFETY MANAGER AND SHALL REQUIRE A HOT WORK PERMIT.
AutoCAD SHX Text
EXISTING WORK
AutoCAD SHX Text
NEW WORK
AutoCAD SHX Text
NUMBERED NOTE
AutoCAD SHX Text
TEMPERATURE SENSOR
AutoCAD SHX Text
PRESSURE SENSOR
AutoCAD SHX Text
HUMIDITY SENSOR
AutoCAD SHX Text
POC
AutoCAD SHX Text
EQUIPMENT TAG
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text P
AutoCAD SHX Text H
AutoCAD SHX Text
XXX
AutoCAD SHX Text
XX
AutoCAD SHX Text M-1
AutoCAD SHX Text
MECHANICAL GENERAL NOTES, SYMBOLS, ABBREVIATIONS & DRAWING LIST
AutoCAD SHX Text M-3
AutoCAD SHX Text
3A SOUTH PENTHOUSE-DEMO OF EXISTING HUMIDIFIER
AutoCAD SHX Text M-5
AutoCAD SHX Text
3B PENTHOUSE-DEMO OF EXISTING HUMIDIFIERS
AutoCAD SHX Text M-6
AutoCAD SHX Text
3D WEST & EAST PENTHOUSE-DEMO OF EXISTING HUMIDIFIERS
AutoCAD SHX Text
POD
AutoCAD SHX Text M-2
AutoCAD SHX Text
SCHEDULES
AutoCAD SHX Text M-7
AutoCAD SHX Text
3C PENTHOUSE-DEMO OF EXISTING HUMIDIDIFIERS
AutoCAD SHX Text M-8
AutoCAD SHX Text
3D EAST FIRST FLOOR PLAN-DEMO OF EXISTING HUMIDIFIERS
AutoCAD SHX Text M-4
AutoCAD SHX Text
3A NORTH PENTHOUSE-DEMO OF EXISTING HUMIDIFIERS
AutoCAD SHX Text M-9
AutoCAD SHX Text
3A SOUTH PENTHOUSE
AutoCAD SHX Text M-10
AutoCAD SHX Text
3A NORTH PENTHOUSE
AutoCAD SHX Text M-11
AutoCAD SHX Text
3B PENTHOUSE
AutoCAD SHX Text M-12
AutoCAD SHX Text
3D WEST & EAST PENTHOUSE
AutoCAD SHX Text M-13
AutoCAD SHX Text
3C PENTHOUSE
AutoCAD SHX Text
SCOPE OF WORK:
AutoCAD SHX Text 1.
AutoCAD SHX Text REPLACEMENT OF ATOMIZING HUMIDIFICATION SYSTEMS IN NINE (9) AIR HANDLING UNITS IN THE PENTHOUSES AND REPLACEMENT OF TWO DUCT HUMIDIFIERS SERVING OR ROOM 1D22 AND PROCEDURE 1D218 DUE TO BUILD UP OF MINERAL DEPOSITS CAUSED BY HARD WATER. THE REPLACEMENT SYSTEM SHALL CONSIST OF AN ELECTRIC STEAM HUMIDIFIER SYSTEM THAT SHALL BE PLACED IN THE EXISTING AIR HANDLING UNITS AND TWO DUCT MOUNTED ELECTRIC STEAM HUMIDIFIERS.
AutoCAD SHX Text
AI
AutoCAD SHX Text
AFF
AutoCAD SHX Text
AO
AutoCAD SHX Text
BOT
AutoCAD SHX Text
CFM
AutoCAD SHX Text
HP
AutoCAD SHX Text
NC
AutoCAD SHX Text P
AutoCAD SHX Text
POC
AutoCAD SHX Text
SD
AutoCAD SHX Text (R)
AutoCAD SHX Text T
AutoCAD SHX Text
TOM
AutoCAD SHX Text
TYP
AutoCAD SHX Text
UTR
AutoCAD SHX Text V
AutoCAD SHX Text
EX
AutoCAD SHX Text
ANALOG INPUT
AutoCAD SHX Text
ABOVE FINISHED FLOOR
AutoCAD SHX Text
ANALOG OUTPUT
AutoCAD SHX Text
BOTTOM
AutoCAD SHX Text
CUBIC FEET PER MINUTE
AutoCAD SHX Text
HORSEPOWER
AutoCAD SHX Text
NOISE CRITERION
AutoCAD SHX Text
PRESSURE
AutoCAD SHX Text
POINT OF CONNECTION
AutoCAD SHX Text
SUPPLY DIFFUSER
AutoCAD SHX Text
REPLACE
AutoCAD SHX Text
TEMPERATURE
AutoCAD SHX Text
TOP OF MACHINERY
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
UP THROUGH ROOF
AutoCAD SHX Text
VIRTUAL (SOFTWARE)
AutoCAD SHX Text
EXPANSION TANK
AutoCAD SHX Text
POD
AutoCAD SHX Text
POINT OF DISCONNECTION
AutoCAD SHX Text
NAC
AutoCAD SHX Text
NETWORK AREA CONTROLLER
AutoCAD SHX Text
UCU
AutoCAD SHX Text
UNITARY CONTROL UNIT
AutoCAD SHX Text
TT
AutoCAD SHX Text
TEMPERATURE TRANSMITTER
AutoCAD SHX Text
CP
AutoCAD SHX Text
CONTROL PANEL
AutoCAD SHX Text
CHP
AutoCAD SHX Text
CHILLED WATER PUMP
AutoCAD SHX Text
AH
AutoCAD SHX Text
AIR HANDLER
AutoCAD SHX Text
CH
AutoCAD SHX Text
CHILLER
AutoCAD SHX Text
BT
AutoCAD SHX Text
BUFFER TANK
AutoCAD SHX Text
AS
AutoCAD SHX Text
AIR SEPARATOR
AutoCAD SHX Text
WG
AutoCAD SHX Text
WATER GAUGE
AutoCAD SHX Text
CPT
AutoCAD SHX Text
CHEMICAL TREATMENT TANK
AutoCAD SHX Text
RG
AutoCAD SHX Text
RETURN GRILLE
AutoCAD SHX Text (D)
AutoCAD SHX Text
DDC
AutoCAD SHX Text
DI
AutoCAD SHX Text
DO
AutoCAD SHX Text
DTR
AutoCAD SHX Text (E)
AutoCAD SHX Text
EG
AutoCAD SHX Text
ESP
AutoCAD SHX Text
ETR
AutoCAD SHX Text
EWC
AutoCAD SHX Text
DEMOLISH
AutoCAD SHX Text
DIRECT DIGITAL CONTROL
AutoCAD SHX Text
DIGITAL INPUT
AutoCAD SHX Text
DIGITAL OUTPUT
AutoCAD SHX Text
DUCT THROUGH ROOF
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EXHAUST GRILLE
AutoCAD SHX Text
EXTERNAL STATIC PRESSURE
AutoCAD SHX Text
EXISTING TO REMAIN
AutoCAD SHX Text
EVAPORATIVE WATER COOLER
AutoCAD SHX Text
ECC
AutoCAD SHX Text
ENGINEER CONTROL CENTER
AutoCAD SHX Text
DP
AutoCAD SHX Text
DIFFERENTIAL PRESSURE
AutoCAD SHX Text
FS
AutoCAD SHX Text
FLOW STATUS
AutoCAD SHX Text
CT
AutoCAD SHX Text
CURRENT TRANSMITTER
AutoCAD SHX Text M-14
AutoCAD SHX Text
3D EAST FIRST FLOOR PLAN
AutoCAD SHX Text M-15
AutoCAD SHX Text
MECHANICAL DETAILS
AutoCAD SHX Text S
AutoCAD SHX Text
STEAM PIPING
AutoCAD SHX Text
CR
AutoCAD SHX Text
CONDENSATE RETURN PIPING
AutoCAD SHX Text M-16
AutoCAD SHX Text
MECHANICAL DETAILS
AutoCAD SHX Text M-17
AutoCAD SHX Text
MECHANICAL DETAILS
AutoCAD SHX Text
STEAM
AutoCAD SHX Text
CONDENSATE RETURN
AutoCAD SHX Text
COLD WATER
AutoCAD SHX Text H
AutoCAD SHX Text
STEAM HUMIDIFIER
AutoCAD SHX Text B
AutoCAD SHX Text
ELECTRIC STEAM BOILER
AutoCAD SHX Text
SF
AutoCAD SHX Text
WATER SOFTENER
AutoCAD SHX Text T
AutoCAD SHX Text
PRE-CHARGED WATER STORAGE TANK
AutoCAD SHX Text
HC
AutoCAD SHX Text
ELECTRIC STEAM GENERATOR
AutoCAD SHX Text
WS
AutoCAD SHX Text
REVERSE OSMOSIS SYSTEM
AutoCAD SHX Text P
AutoCAD SHX Text
DELIVERY PUMP
AutoCAD SHX Text
BD
AutoCAD SHX Text
CENTRIFUGAL BOILER BLOW OFF
AutoCAD SHX Text
F & T TRAP
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
UNION
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
PRESSURE GAUGE
AutoCAD SHX Text
HL
AutoCAD SHX Text
LL
AutoCAD SHX Text T
AutoCAD SHX Text
TEMPERATURE SENSOR
AutoCAD SHX Text
HIGH LIMIT HUMIDISTAT
AutoCAD SHX Text
LOW LIMIT HUMIDISTAT
AutoCAD SHX Text
FLOW MEASURING STATION
AutoCAD SHX Text
CONTROL VALVE
AutoCAD SHX Text
PT
AutoCAD SHX Text
SP
AutoCAD SHX Text
DIFFERENTIAL PRESSURE SENSOR
AutoCAD SHX Text M
AutoCAD SHX Text
FT
AutoCAD SHX Text
PRESSURE TEMP
AutoCAD SHX Text
RELIEF VALVE
AutoCAD SHX Text
PHONE: (907) 562-3252
AutoCAD SHX Text
ANCHORAGE, ALASKA 99503
AutoCAD SHX Text
3940 ARCTIC BLVD. SUITE 300
AutoCAD SHX Text
#AECL882-AK
Dan
RECORD DRAWINGS
Snapshot
Dan
Snapshot
Dan Snapshot
Dan Snapshot
Dan Snapshot
Dan Cloud
Dan Cloud
Dan Arrow
Dan Arrow
Dan Snapshot
Dan Cloud
Dan
| A,S,E as-built |
| VAAK AS-BUILT full set A,S |
File details come from the government source that posted it. Updated .