Attachment 2 Revised Price Schedule.docx
DOCX document 24 KB Posted
- Solicitation number
- 36C26020Q0177
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 RFI List 20200826.docx | DOCX document | |
| 36C26020Q0177 0004.docx | DOCX document | |
| 36C26020Q0177 0003.docx | DOCX document | |
| Attachment 1 RFI List as of 20200820.docx | DOCX document | |
| Attachment 2 EMR Change.docx | DOCX document | |
| Attachment 1 RFI List-2.docx | DOCX document | |
| Attachment 2 Yurt Grade.png | PNG image | |
| Attachment 3 Sign-in sheet 8-8-2020.pdf | ||
| 36C26020Q0177 0002.docx | DOCX document | |
| 36C26020Q0177 0001.docx | DOCX document | |
| Attachment 1 RFI List.docx | DOCX document | |
| Attachment 4 Drawings As-Builts.pdf | ||
| Attachment 3 Drawings Updated.pdf | ||
| Attachment 2 Specs.pdf | ||
| 36C26020Q0177_3.docx | DOCX document | |
| Attachment 5 Wage Determination.pdf | ||
| Attachment 1 SOW Updated.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C26020Q0177 Reuse CT Trailer Enhance Native American Yurt Area Yurt Area White City, OR Project No. 692-20-115
PRICE/COST SCHEDULE
The contractor shall provide all necessary equipment, labor, materials and supervision to complete all work required as described in the SOW for the VA White City Oregon SORCC. Pricing shall reflect appropriate scope of work for the project as described in the specifications.
| Line Item |
| DESCRIPTION |
| QTY |
| UNIT |
PRICE
| 0001 |
| Base Bid: Enhance Native American Yurt Area |
See Attached SOW Work will be completed in 56 calendar days from Notice To Proceed.
| 1 |
| JB |
| 0002 |
| Option 1: Enhance Native American Yurt Area Excavate and Install New Sewer |
See Attached SOW Work will be completed in 21 calendar days from Notice To Proceed.
| 1 |
| JB |
| 0003 |
| Option 2: Enhance Native American Yurt Area Excavate and Install New Water |
See Attached SOW Work will be completed in 21 calendar days from Notice To Proceed.
| 1 |
| JB |
| 0004 |
| Allowance: For hiring a structural engineer to design and fabricate the lugs in case the manufacturer no longer has the details. Any part of the allowance not used shall be returned to the VA as a credit. |
| 1 |
| JB |
$4,000
| Total |
| $ |