This is an Amendment to Solicitation (Standard Form 30) for a professional abatement services contract issued by the Department of Veterans Affairs Network Contracting Office NCO 19 in Greenwood Village, Colorado. The amendment extends the quotation due date to March 11, 2026, at 10:00 AM Mountain Daylight Time and provides responses to 53 submitted questions, plan view drawings of buildings, a contractor parking area map, and adds Building 9 as line item 0012 to the price schedule. The solicitation number is 36C25926Q0246, with a Product Service Code of F108 and NAICS Code 562910, and is not set aside for SBA.
The contract requires professional abatement services to remove bat guano and pigeon feces from attic spaces across 12 buildings (Buildings 1, 3, 4, 5, 6, 7, 8, 9, 11, 64, 71, and 86) at a VA facility. Each line item is priced as a job (JB) with a base period of performance from March 15, 2026, through March 14, 2027. Scope includes removal of contaminated materials, complete wiping and disinfection of ductwork and all attic surfaces, insulation removal and replacement, application of parasite-killing products (subject to government approval), negative pressure air management, double-bagging and proper disposal of waste with complete documentation, and post-completion closeout inspections. Work is limited to 0800–1500 Monday through Friday with one-hour administrative access windows at each end. The contractor must secure tools in locked boxes when off-site, store equipment in a designated contractor parking area, provide all necessary equipment including generators if electricity is unavailable, coordinate water access with the Contracting Officer's Representative, and submit a detailed work plan before commencing operations. Progress payments are permitted after performance acceptance and invoice approval; advance payments are not permitted. The point of contact is Charles Gritzmacher at charles.gritzmacher@va.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 002 - Contractor Parking Area.pdf | ||
| Attachment 001 - Building Drawings.pdf | ||
| 36C25926Q0246 0001_1.docx | DOCX document | |
| Attachment 1 - Wage Determination - 2015-5411 WY Sheridan Rv 27 12.3.2025.pdf | ||
| 36C25926Q0246_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBJECT*
Bat Guano and Pigeon Feces Clean Up
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 80111 |
| SOLICITATION NUMBER* |
| 36C25926Q0246 |
| RESPONSE DATE/TIME/ZONE |
| 03-11-2026 10:00 AM MOUNTAIN TIME, DENVER, USA |
| ARCHIVE |
| 30 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
| SET-ASIDE |
| SBA |
| PRODUCT SERVICE CODE* |
| F108 |
| NAICS CODE* |
| 562910 |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111
POINT OF CONTACT*
Charles Gritzmacher charles.gritzmacher@va.gov
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 03-05-2026 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders
36C25926Q0246
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 03-11-2026 10:00 AM MDT See CONTINUATION Page X The purpose of this amendment is to:
A. Provide responses to submitted questions.
B. Provide plan view drawings of buildings, see attachment 001.
C. Provide contractor parking area, see attachment 002.
D. Add line item 0012 for building 9, see revised Price Schedule.
E. Extend the quote due date to 3-11-2026. All quotes must be submitted via email by 10:00 am MST on 3-11-2026.
Page 1 of
CONTINUATION PAGE
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 86 - Professional abatement services to remove bat guano and pigeon feces from attic space in accordance with the Statement of Work (SOW).
Contract Period: Base POP Begin: 03-15-2026 POP End: 03-14-2027
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 71 - Professional abatement services to remove bat guano and pigeon feces from attic space in accordance with the Statement of Work (SOW).
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 64 - Professional abatement services to remove bat guano and pigeon feces from attic space in accordance with the Statement of Work (SOW).
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 6 - Professional abatement services to remove bat guano and pigeon feces from attic space in accordance with the Statement of Work (SOW).
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 5 - Professional abatement services to remove bat guano and pigeon feces from attic space in accordance with the Statement of Work (SOW).
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 7 - Professional abatement services to remove bat guano and pigeon feces from attic space in accordance with the Statement of Work (SOW).
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 8 - Professional abatement services to remove bat guano and pigeon feces from attic space in accordance with the Statement of Work (SOW).
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 11 - Professional abatement services to remove bat guano and pigeon feces from attic space in accordance with the Statement of Work (SOW).
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 1 - Professional abatement services to remove bat guano and pigeon feces from attic space in accordance with the Statement of Work (SOW).
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 3 - Professional abatement services to remove bat guano and pigeon feces from attic space in accordance with the Statement of Work (SOW).
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 4 - Professional abatement services to remove bat guano and pigeon feces from attic space in accordance with the Statement of Work (SOW).
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 9 - Professional abatement services to remove bat guano and pigeon feces from attic space in accordance with the Statement of Work (SOW).
| GRAND TOTAL |
| __________________ |
Bat Guano and Pigeon Feces Clean UP Questions and Answers
1. Q: Will there be a hygienist doing air quality tests?
A: No
2. Q: Section 4.4 Cleaning & Sanitizing states: "Wipe and disinfect ductwork within attic areas."
Does this mean every pipe and piece of ductwork needs to be whipped down? Some are triple stacked and go up 8ft-12ft or more. Do they need to be whipped down if only bat droppings are seen? Or spot cleaned? Or, everything gets whipped down, period.
A: Everything gets wiped down
3. Q: Can clearly infested materials be thrown away? Such as misc. pieces of insulation damaged or torn down by Squirrels. Or another way to word it, is what if the only way to remove the bat/pigeon guano on areas that are seen, is to remove the materials.
A: Yes
4. Q: Do all the walls, beams, and trusses also need to be scrubbed of visible bat guano and pigeon feces staining?
A: As much as possible
5. Q: Do we need to supply our own electricity for generators to run equipment outside as well as inside? For instance, the HEPA filters are running 24/7 outside.
A: Most areas have electricity
6. Q: Does equipment need to be moved on and off site everyday?
Three examples being...
-Tools and equipment inside the attic.
-Trailers and equipment outside -Containments for going in and out of attic spaces.
A: Tools can remain in the attic – Attics have limited staff that can access the area, so the VA prefers contractors secure their tools in locked boxes when not on the job site. Trailers and equipment can be stored onsite, locked in contractor parking area. – see attached map, Containments will vary by location. Coordinate with the COR.
7. Q: Is there site access for water?
A: Not in the attic, but there is plenty of water access on the floors below. Coordinate with the COR.
8. Q: Reference: Attachment 1 (SOW), Section 1 states Remediation, but does not mention if Wildlife (Bats/Birds/etc.) have current access into the spaces.
Question: It is presumed that it has been 3-5+ years since any Inspections, evictions, or confirmation of the previous Exclusion (Sealing up of the structure) is still holding up well, with no new fecal or Zoonotic pathogen/viral spore contamination. It is very common for Eviction (Removal via 1-way Doors) or Exclusion (Sealing up of the 12 buildings) projects to not be long-term, depending on the experience, tenure, training, and attention to detail of the performing contractor. In the event of the structures having continued or active access, what will the process be for the awarded contractor to cease/halt any remediation efforts until the structures are property excluding Wildlife?
A: Note all visible access points and give to COR
9. Q: Reference: Attachment 1 (SOW), Section 2 States access to review contamination levels.
Question: The site contact, Thomas Hatch, on Friday, 2/27 Stated he was not prepared for today's Site Visit to allow physical access into the Attic Spaces. Do any parties have photographs to provide for bidding parties, or is there another way between the bid being due (March 9, 2026) for this to take place?
A: Per amendment 0001, a formal site visit was held on March 2nd at 1 pm MST.
10. Q: Reference: Attachment 1 (SOW), Section 4; 4.2 States ‘ Contractor to Maintain continuous negative pressure during removal.”
Question: Does the Project have specific metrics, equipment, or units of measurement to ensure or validate ‘continuous negative pressure monitoring?
A: No, just the requirement of negative pressure machine
11. Q: Are there any project priorities, sequencing, or required completion timelines? We don’t see any specific schedule or duration requirements called out in the report.
A: No priorities
12. Q: We also don’t see any mention of clearance testing (post-remediation air sampling or third-party verification)?
A: COR will visibly inspect areas for cleanliness
13. Q: Is insulation removal/replacement being recommended? The report provided does not appear to call this out, so we need clarification before finalizing the scope and pricing.
A: Yes
14. Q: Can I request % down on the job for logistics and materials cost to start?
A: Invoices shall be submitted after performance is completed and accepted. Advanced payment is not permitted.
15. Q: Will I get paid building by building as work is completed?
A: Progress payments can be made after performance/acceptance and proper invoice submission, review, and approval.
16. Q: Have all the exclusion work (active bat and pigeons) been completed on the structures for the pigeons and bats?
A: 2022
17. Q: Regarding the sqft amounts, should I assume the total attic space is affected, or only concentrated areas?
A: Concentrated area with guano or feces. However, we would like the whole area cleaned and disinfected.
18. Q: During the site walk, several buildings appeared to contain insulation contaminated with droppings. Will the selected contractor be responsible for removing and replacing this insulation?
A: Yes
19. Q: Do all attic spaces have accessible water hookups that contractors will be permitted to use?
A: No
20. Q: During the site walk, certain attic areas were identified as inaccessible but appeared to contain bat guano or other droppings (e.g., behind drywall or internal structures). Should the contractor plan to remove these structures to clean areas that are otherwise inaccessible?
A: No, only what is visible
21. Q: Is the contractor required to conduct any testing to verify that surfaces have been fully sanitized, beyond a standard visual inspection?
A: If possible
22. Q: Multiple buildings appeared to have unsealed entry points that could allow pests to re-enter during or after abatement. Will closeout site walks be scheduled as each building is completed to ensure the final walkthrough accurately reflects the work performed?
A: Yes, upon completion
23. Q: Does the client have any requirements for what chemicals are utilized to perform the cleaning and sanitization?
A: No
24. Q: Scope references wiping ducts located in attic spaces. Please confirm this is an EXTERIOR wipe-down of exposed duct surfaces only and does not include interior duct cleaning or internal HVAC component cleaning.
A: Yes, exterior of duct/insulation only
25. Q: The project has ductwork that does not have covering over insulation. Does the government have a process requirement to address this type of issue for cleaning of unprotected ductwork?
A: Replace this insulation, as disinfecting porous material is not usually successful
26. Q: Please confirm that no interior HVAC/ductwork cleaning is required unless the Government issues a written scope modification.
A: See 24
27. During negative air/abatement activities, is HVAC required to be shut down for each affected building while attic work is performed?
A: No, we will not be shutting down. Your negative air activities will have to be around the hac vents and equipment.
28. The scope requires spraying with a “product to kill parasites.” Does the government have a specified/approved product, or may the contractor select an appropriate product and provide SDS + application method + dwell time?
A: Contractor to submit product for approval
29. Q: If a product is specified, please provide required dwell time, application method, and any occupied-building restrictions (ventilation/clearance/odor sensitivity) A: None specified
30. Q: Building 9 was added during the walkthrough. Please confirm Building 9 is officially included in the scope and advise how it will be handled for pricing (added line item/CLIN vs. included under an existing line item).
A: Yes, it needs to be added since the attic at 71 is open to the attic of 9. Line item 0012 has been added to include building 9.
31. Q: Buildings 3, 11, and 64 are part of the scope; however, we were unable to inspect them during the walkthrough due to workhour/access restrictions. Will a follow-up access window be provided prior to bid closing?
A: No access will not be given again. Assume conditions are the same as building B1’s attic, which was covered in the walkthrough.
32. Q: If follow-up access cannot be provided prior to bid closing, please confirm bidders should price using reasonable assumptions and advise whether post-award reconciliation will be handled by contract modification if actual conditions differ materially.
A: See Question 30
33. Q: Please confirm Building 71 and Building 71N are separate job sites and should be treated as separate priced items.
A: Yes, separate
34. Q: Are as-built drawings/record drawings (or equivalent plans showing attic extents) available for the buildings in scope to support accurate square-footage verification and work planning?
A: A PDF of the general layout and sqft is attached.
35. Q: If as-builts/record drawings cannot be provided, please confirm the Government will allow a contract modification (change order) if actual verified quantities (square footage/extent of attic areas) differ materially from the solicitation’s approximate figures.
A: see question 33
36. Q: At Building 9, we observed visible lead-based paint, potential ACM, and indications of possible microbial growth. Please confirm whether these hazards are included within this contract’s scope (testing and abatement/remediation), or whether they will be handled separately by the Government/another contract.
A: Not in the scope of this project. Use basic OSHA safety measures for your staff, and coordinate with the COR.
37. Q:If lead-based paint and/or ACM are present within work areas, please confirm the Government’s expectations for contractor response (e.g., stop work/notify), and whether survey results/clearance documentation will be provided prior to start.
A: See question 35, you need to do basic OSHA-required safety measures for the safety of your staff doing the work. This will not extend to LBP or ACM abatement beyond what is attached to bat guano.
38. Q: Multiple openings/holes were observed that connect into adjacent attic sections/voids. Please confirm whether all connected attic areas are included in the scope for cleaning/sanitization.
A: Yes, all areas need to be cleaned, and actions coordinated with the COR
39. Q: If connected areas are not included, please clarify whether openings/holes must be sealed/closed under this contract, or whether the contractor should clean to the opening and document it for the Government.
A: Holes less than 1ft by 1ft will be sealed to help prevent the migration of bats to other areas. We will not be marking up dwgs.
40. Q: If building power in/near attic spaces is insufficient to operate NAMs and related equipment, will the Government provide adequate temporary power, or should the contractor include temporary power (generator/distribution) in pricing?
A: Contractors shall include all needed equipment to complete work- reminder gas and propane generators are not to be set up inside buildings, but power supply to work area can run through buildings.
41. Q: Will an on-site staging/storage area be provided for equipment/materials? If yes, please describe location, access rules/hours, and security requirements.
A: Down at the contractors, see attached map and rules on the side.
42. Q: Is the contractor permitted to bring storage trailers and a mobile office for the duration of the project? If yes, please confirm placement restrictions, escort requirements, and removal expectations.
A: See attached map and rules for contractors’ area
43. Q: Will any office space be provided on-site by the Government, or should the contractor plan on a mobile office/off-site administration?
A: None provided from the government, see attached map
44. Q: Operating times are listed as 0800–1500, Monday–Friday. Is the contractor permitted site access up to one hour before and one hour after that window for administrative/logistical preparation only (staging/organizing equipment, loading/unloading, securing materials, paperwork), with no work performed inside the building and no abatement/remediation activities outside stated hours?
A: Yes, the extra hour at each end is allowed for work described above
45. Q: Scope requires waste to be double-bagged and disposed of off station. Are there any specific disposal facility requirements and/or required documentation (waste profile, manifests, disposal tickets) that must be submitted at close out or with invoicing?
A: All cradle to grave documentation must be provided throughout the whole process, which waste facility used is the means and method of the contractor, not decided by the VA. All documentation must meet all regulations by the entities mentioned in the SOW. If crossing state boundaries, all the same regulations for hazardous materials crossing state lines must be followed. Bidders are to be fully qualified for this job, so further details of compliance with this question will not be provided.
46. Q: Please confirm the Government’s acceptance criteria: is acceptance based on visual cleanliness (“clean and free of guano/feces”), or are additional verification items required (specific photo sets, checklists submitted, third-party sampling/testing, etc.)?
A: Area will be clean and free of dust and guano, and will be inspected by the COR.
47. Q: Please confirm whether the Government will set minimum respiratory protection requirements per building/work area, or if respiratory/PPE selection is contractor-determined based on conditions encountered.
A: You are the certified abatement professional in the removal; we expect you to submit your plan before work begins. The government will not dictate your means and methods.
48. Q: Scope references securing tools/equipment daily and removing them daily. If a secured staging area/trailer is approved on site, does that satisfy the daily removal requirement, or must all equipment be physically removed off-site each day?
A: Yes, and certain locked toolboxes in the attic will work.
49. Q: Will the Government provide escorts/keys and ensure attic access points are available during the work window, or should the contractor include access equipment and potential escort delays in pricing?
A: Yes, keys and escorts will be provided.
50. Q: Solicitation process lists sweeping. We will not be sweeping all loose debris collected as to not spread spores. Is using a HEPA vacuum approved for use with collection and spore reduction?
A: The HEPA vacuum sounds closer to a certified removal process than sweeping. Please be clear in your submittals on how you will do this step.
51. Does Sanitize accessible attic spaces mean and include all walls, ceilings and all other items in attic?
A: Yes
52. Q: Will Government provide a form 1449?
A: The solicitation with form 1149 is posted on the GPE at SAM.gov
53. Q: How should acknowledgement of amendment be addressed?
A: All amendments should be signed and submitted.
See attached document: Attachment 001 - Building Drawings.
See attached document: Attachment 002 - Contractor Parking Area.
End of Document Page 1 of Page 1 of
File details come from the government source that posted it. Updated .