This document is an Amendment to a Request for Quote (RFQ) for electrical work at a Veterans Affairs medical facility. The solicitation (36C25925Q0638) involves refeededing electrical from the Generator Room to Automatic Transfer Switch (ATS) #3 at the VA facility, with specific requirements for working in active emergency room and MRI areas. Key details include:

The amendment includes vendor Q&As addressing critical operational constraints, such as limited 4-hour downtime for ATS-3, requirements for coordinating work in emergency rooms, and specific electrical specifications (4) 4/0s and (1) #4 ground in a 2 1/2" or 3" conduit. The project requires careful scheduling, with work to be performed during normal business hours (7:00am to 3:30pm), and mandates that the new electrical feeder must be in place before demolishing the existing feeder. The amendment also updates wage determinations for Oklahoma County and provides an Infection Control Risk Assessment (ICRA) form for the construction project.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DZ--Refeed Electrical from Generator Room to ATS# 3, newest first.
File Type Posted
VHA ICRA-1.3 Electrical.pdf PDF
36C25925Q0638 0001.docx DOCX document
S04 - Site Visit Meeting Doc.docx DOCX document
Pre-Bid Site Visit Sign-In.pdf PDF
S02 Self-Performed and Subcontracted Worksheet.docx DOCX document
Project Photos.pdf PDF
S22 - 852.219-75 LOS Certification.docx DOCX document
36C25925Q0638.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) None 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village

CO

80111 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village

CO

80111 To all Offerors/Bidders

36C25925Q0638 07-17-2025

X X X See CONTINUATION Page X This amendment officially and effectively makes the following changes updates listed below:

1. Post Vendor Questions and Answers

2. Post updated wage determinations dated 07/25/2025 for Oklahoma County in Oklahoma City, OK

3. Provide Infection Control Risk Assessment for Construction, Renovation and Maintenance Form

All other terms and conditions remain unchanged.

Frankie Basham Contracting Officer

CONTINUATION PAGE

RFQ 36C25925Q0638

Refeed Electrical from Generator Room to ATS #3 Vendor Questions and VA answers in red

CONTRACTOR Q&As #1

Question No. 1: How many days' notice do we need to provide to access the two ER rooms and pipe out of both?

Answer No. 1: Please provide an overall schedule to include the days that you will need access to the rooms as a submittal prior to start of work

Question No. 2: How long can each ER be shut down? And can both be shut down simultaneously, or will they need to be phased down?

Answer No. 2: Please provide an overall schedule to include the days that you will need access to the rooms as a submittal prior to start of work

Question No. 3: Is there a way to coordinate access to the 2 ER Rooms in the same day, shut down the ATS 3, which powers all or most of the hospitals MRI machines, and Panel EGR to tie it all in, in the same week and shut down ATS#3 and the panel feeding it, all in the same week?

Answer No. 3: Part 1: both ER rooms would be able to be closed at the same time, in doing so a barrier would have to be placed at the entrances, as only one tile can be out at a time otherwise.

Part 2: ATS-3 is critical and down time is limited to four hours in total, it can not be down for a week.

Question No. 4: What are the hours we can work, without noise affecting patients with drilling through concrete walls?

Answer No. 4: There is no best time to work. Patient occupancy fluctuates. COR work hours are 7:00am to 1530pm.

Question No. 5: What are the busiest days for MRIS?

Answer No. 5: It varies, as it supports our emergency patients as well as regularly scheduled patients, two weeks’ notice and coordination will ensure goal is met for outage.

Question No. 6: How long can we shut MRIS down?

Answer No. 6: No more than 4 hours. Provide schedule of work

Question No. 7: Do we need to shut down the Panel EGP, which supplies ATS #3 and features a 225 amp breaker, in order to work on it, or can we work on it while it's live?

Answer No. 7: Panel EGP is only energized when the generator is running, there will be no problem in shutting the main breaker off, located left of the panel in generator control gear, as long as electrical staff is made aware at the time, no notice would be required for this portion of the project.

Question No. 8. Please confirm award contractor will have access to the emergency room during construction.

Answer No. 8: Yes, the contractor will have access to the emergency room, however, the COR will have to badge the contractors in

Question No. 9: Since construction will be performed in an active emergency room, will an ICRA plan be provided to all bidders?

Answer No. 9: Yes an ICRA will be provided to all bidders

Question No. 10: Can the VA specify conduit and wire size/type that needs to be installed?

Answer No. 10: 4) 4/0s 1) #4 ground, in a 2 1/2'” or 3” conduit, contractor’s choice.

Question No 11: Can an alternate route be considered? Outside above the canopy walkway possibly? This would keep us from having to go through ER areas.

Answer No. 11: Conduit needs to be ran with existing conduits, everything currently ran on the outside is for temporary equipment only, permanent utilities need to be physically secured and away from damage.

Question No. 12: Does the new feeder need to be in place and ready to terminate before we can demo the old feeder? Or can we demo old feeder as we install new feeder?

Answer No. 12: Yes, new feeder needs to be in place prior to demo of existing feeder, providing continuity of backup generator feed serving critical loads and patients.

Question No. 13: Please confirm if we can do all of the install during normal working hours.

Answer No. 13: Normal business hours would be best as this is an emergency room, which never shuts down.

A.1 Wage Rates

"General Decision Number: OK20250049 07/25/2025

Superseded General Decision Number: OK20240049

State: Oklahoma

Construction Type: Building Building Construction -does not include residential construction consisting of single family homes and apartments up to and including 4 stories. (Including building projects on industrial sites and treatment plants)

County: Oklahoma County in Oklahoma.

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658. Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.l(a)(l).

If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022:
· Executive Order 14026 generally applies to the contract.

· The contractor must pay all covered workers at least $17.75 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025.

If the contract was awarded on or between January 1, 2015 and January 29, 2022, and the contract is not renewed or extended on or after January 30, 2022:
· Executive Order 13658 generally applies to the contract.

· The contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2025.

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number
Publication Date
0
01/03/2025
1
03/14/2025
2
07/18/2025
3
07/25/2025

BROK0005-004 06/01/2023

Rates Fringes

BRICKLAYER . $ 26.92 13.09

CARP0216-002 01/01/2022
RatesFringes

MILLWRIGHT. $ 29.15 11.81

CARP0329-003 01/01/2024

Rates Fringes

CARPENTER (Form Work Only). $ 27.79 10.05

* ELEC1141-010 05/27/2024

Rates Fringes

ELECTRICIAN (Excludes Low Voltage Wiring and Installation of Alarms). $ 39.20 17.25%+6.00

* ELEC1141-030 05/27/2024

Rates Fringes

ELECTRICIAN (Low Voltage Wiring Only) $ 23.22 15.5%+6.00

ELEV0063-004 01/01/2024

Rates Fringes

ELEVATOR MECHANIC $ 51.11 38.435+a+b

PAID HOLIDAYS:

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.

b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years' service.

* ENGI0627-023 06/01/2024

Rates Fringes

POWER EQUIPMENT OPERATOR

Group 1$ 36.8418.05
Group 2$ 34.8618.05
Group 3$ 34.1518.05
Group 4$ 32.8218.05
Group10$ 26.0018.05

POWER EQUIPMENT OPERATOR

* Effective first full pay period after June 1, 2021

GROUP 1: All Crane Type Equipment 200 ton and larger and including 400 ton capacity cranes. Includung all Overhead crane types.

#Crances over 400 tons up to and including 500 tons add additional $.75 per hour.

##Cranes over 500 tons and up to and including 700 tons ass an additional $1.50 per hour.

###Cranes over 700 tons shall add additional $3.00 per hour. All Tower Cranes GROUP 2: All Crane Type Equipment 100 ton capacity and larger cranes, and less than 200 ton capacity, including all Overhead cranes types.

GROUP 3: All Crane Type Equipment 50 ton capacity and larger cranes, and less than 100 ton capacity, including all Overhead cranes types.

Cranes Equipment (as rated by mfg.) 3 cu.yd. and over Guy derrick, Whirley, Power Driven Hole Digger (with 30' and longer mast) Excavator, Backhoe, Motor Patrol (Blade).

GROUP 4: Cranes with less than 50 ton capacity and Cranes (as rated by mfg.) less than 3cu. yd., including all Overhead Crans types, Goldhofer/Modular Powered Trailer, Mobile Gantry System, Heavy Duty Mechanic, Welder Overhead Monorail Types Crane, Panel Board Batch, Plant Operator, Piledriver Engineer, Dragline, Clamshell Sideboom or similar type equipment, Gradall, Cherry Picker, Hosit (while operating 2 or more dums); All Hoist (while doing stack and chimney work) Power Driven Hole digger with less than 30' mast. VacuumTruck, Dozer, Loader or High Lift (Track Loader-not Skidsteer type) and Bulldozer.

GROUP 10: Trcuk Crane Oiler and Driver, Crane Oiler, Permanent Building Type Elevator Operator, Oiler/ Assistnat Engineers no Certification or less certification than any above group.

IRON0048-014 06/01/2025

Rates Fringes

IRONWORKER (Ornamental and Structural). $ 32.10 17.38

PLUM0344-006 07/01/2025

Rates Fringes

PLUMBER (Excludes HVAC Pipe Installation). $ 41.00 16.03

PLUM0344-019 07/01/2023

Rates Fringes

HVAC MECHANIC (Installation of HVAC Unit Only, Excludes Installation of HVAC Pipe and Duct). $ 38.25 15.54

PLUM0344-024 07/01/2025

Rates Fringes

PIPEFITTER (Including HVAC Pipe Installation). $ 41.00 16.03

ROOF0143-001 07/01/2024

Rates Fringes

ROOFER. $ 26.30 10.34

SFOK0669-002 01/01/2024

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers). $ 36.54 25.72

SHEE0124-010 07/01/2021

Rates Fringes

SHEET METAL WORKER (HVAC Duct Installation Only) $ 33.38 16.36

SUOK2012-029 07/30/2012

Rates Fringes

CARPENTER (Acoustical Ceiling Installation Only) $ 14.98 ** 0.00

CARPENTER, Excludes Acoustical Ceiling Installation, Drywall Hanging, Form Work, and Metal Stud Installation $ 16.61 ** 3.00

CEMENT MASON/CONCRETE FINISHER $ 16.75 ** 0.00

DRYWALL FINISHER/TAPER $ 13.74 ** 0.00

DRWALL HANGER, Includes Metal Stud Installation $ 14.38 ** 0.00

ELECTRICIAN (Alarm Installation) $ 20.97 5.22

FENCE ERECTOR $ 14.00 ** 0.00

GLAZIER $ 12.02 ** 2.42

IRONWORKER, REINFORCING $ 17.11 ** 0.00

LABORER: Common or General $ 11.70 ** 0.00

LABORER: Landscape $ 13.75 ** 0.00

LABORER: Mason Tender – Brick $ 12.00 ** 0.00

LABORER: Mason Tender – Cement/Concrete $ 13.00 ** 1.91

LABORER: Pipelayer $ 12.39 ** 0.00

LABORER: Plater Tender $ 11.00 ** 0.00

OPERATOR: Backhoe/Excavator/Trackhoe $ 21.25 4.35

OPERATOR: Bulldozer $ 20.64 2.35

OPERATOR: Forklift $ 20.55 0.00

OPERATOR: Grader/Blade $ 14.28 ** 1.70

OPERATOR: Loader (Front End) $ 16.18 ** 0.00

OPERATOR: Paver (Asphalt, Aggregate, and Concrete) $ 13.38 ** 1.54

PAINTER: Brush, Roller and Spray, Excludes Drywall Finishing/Taping $ 12.42 ** 0.00

PLATERER $ 16.10 ** 0.00

SHEET METAL WORKER, Excludes HVAC Duct Installation $ 17.57 4.64

TRUCK DRIVER: Dump and Flatbed Truck $ 11.60 ** 0.00

WELDERS – Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.75) or 13658 ($13.30). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE: UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio. The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations. Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

END OF GENERAL DECISION”

A.2 List of Attachments

See attached document: VHA ICRA-1.3 Electrical.