36C25925Q0223.docx
DOCX document 255 KB Posted
- Attached to
- H342--Life Safety Device Inspection, Testing and Maintenance Base Year Plus Four Option Years
- Solicitation number
- 36C25925Q0223
About this file
This document is a Request for Quote (RFQ) for Life Safety Device Inspection, Testing, and Maintenance (ITM) Services for the George E. Wahlen VA Medical Center in Salt Lake City, Utah. The solicitation (36C25925Q0223) is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with a size standard of 541990 and a contract value not to exceed $19.5 million. The base period is one year with four option years, covering ITM services for fire extinguishers, automated external defibrillators (AEDs), emergency eyewashes, and emergency showers across multiple buildings at the VA Salt Lake City Health Care System.
Key solicitation details include a questions submission deadline of May 4, 2025, at 12:00 PM CST, with an amendment posting answers by May 7, 2025. Offers are due by May 9, 2025, at 12:00 PM CST and must be submitted via email to thomas.parsons2@va.gov. The contractor must perform inspections and maintenance in accordance with NFPA 10, NFPA 101, ANSI Z358.1, and The Joint Commission standards. An optional site visit is scheduled for May 2, 2025, at 1:00 PM MDT, with interested vendors to contact Emmanuel Ramirez for details. Pricing will be evaluated on a lowest-price basis, with special standards of responsibility requiring demonstration of specialized experience and technical capability.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25925Q0223 0003_1.docx | DOCX document | |
| 36C25925Q0223 0003.docx | DOCX document | |
| Questions asked in reference to Solicitation 36C25925Q0223.docx | DOCX document | |
| 36C25925Q0223 0002_1.docx | DOCX document | |
| 36C25925Q0223 0002.docx | DOCX document | |
| AED Locations 2025_0103.docx | DOCX document | |
| 36C25925Q0223 0001_1.docx | DOCX document | |
| January 2025.xlsx | XLSX spreadsheet | |
| 36C25925Q0223 0001.docx | DOCX document | |
| Eyewash and Shower July 2024.pdf | ||
| 36C25925Q0223_1.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25925Q0223
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
UEI:
EFT:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
36C259-25-AP-1047
660-25-1-5030-0001
04-25-2025 Thomas Parsons thomas.parsons2@va.gov
05-09-2025 12:00pm
CST
36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111
X
541990 $19.5 Million Net 30
N/A
36C660 Department of Veterans Affairs Salt Lake City VA Health Care System George E. Wahlen VA Medical Center 500 Foothill Drive Salt Lake City UT 84148 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111
36C660
Department of Veterans Affairs Financial Service Center PO Box 149971 Austin TX 78714-9971
See CONTINUATION Page Vendor to provide Life Safety Device Inspection, Testing and Maintenance (ITM) Services for the George E. Wahlen VA Medical Center in accordance with the SOW. See page 45 for optional site visit information.
Review the Special Standards of Responsibilities (SSR) in Section 52.212-2 on page 53 of this document.
Solicitation questions shall be sent via email to:
thomas.parsons2@va.gov no later than 12:00pm CST, on 5/4/2025.
An amendment with responses to all questions asked timely, will be posted no later than 12:00pm CST, on 5/7/2025.
All offers must be sent via email to: thomas.parsons2@va.gov no later than 12:00pm CST, on 5/9/2025.
Notice of total SDVSOB set-aside and Limitations on Subcontracting applies to this solicitation.
See CONTINUATION Page
Heather Clemons Contracting Officer
Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 3 |
| B.1 CONTRACT ADMINISTRATION DATA | 3 |
| B.2 STATEMENT OF WORK | 5 |
| B.3 PRICE/COST SCHEDULE | 13 |
| ITEM INFORMATION | 13 |
| SECTION C - CONTRACT CLAUSES | 22 |
| C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2023) | 22 |
| C.2 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025) | 28 |
| C.3 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) | 36 |
| C.4 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 36 |
| C.5 SUPPLEMENTAL INSURANCE REQUIREMENTS | 36 |
| C.6 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION) | 37 |
| C.7 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) | 40 |
| C.8 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 42 |
| C.9 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 43 |
| C.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 43 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 44 |
| SECTION E - SOLICITATION PROVISIONS | 45 |
| E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS (OCT 2018) | 45 |
| E.2 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014) | 48 |
| E.3 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 50 |
| E.4 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023) | 53 |
| E.5 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2024) | 54 |
| E.6 52.233-2 SERVICE OF PROTEST (SEP 2006) | 72 |
| E.7 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 72 |
| E.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 73 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
(continuation from Standard Form 1449, block 18A.)
(a). CONTRACT ADMINISTRATION: All contract administration matters will be handled by the following individuals:
| (1). CONTRACTOR: | ________________________ | ||
| ________________________ | |||
| ________________________ | |||
| ________________________ |
SAM UEI: ________________________
| Contact person name: | ________________________ | |
| Contact person email: | ________________________ | |
| Contact person telephone: | ________________________ |
| (2). GOVERNMENT: | DEPT. OF VETERANS AFFAIRS |
| Veterans’ Health Administration | |
| Network Contracting Office (NCO) 19 | |
| 6162 South Willow Drive, Suite 300 | |
| Greenwood Village, CO 80111 |
Contracting Officer: Heather Clemons heather.clemons@va.gov
| Contract Specialist: Thomas Parsons |
| thomas.parsons2@va.gov |
(b). CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
(c). INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] Monthly, in arrears for services furnished during the previous month. |
(d). GOVERNMENT INVOICE ADDRESS:
(1). All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
Department of Veterans Affairs Financial Services Center http://www.fsc.va.gov/einvoice.asp Austin TX
(2). The contractor shall submit original invoices in proper electronic format to the Financial Services Center (FSC) through the Tungsten System. Facsimile, e-mail, and scanned documents are not acceptable forms of submission for payment requests. Proper electronic format means an automated system transmitting information electronically according to the accepted electronic data transmission methods below:
(A). VA’s Electronic Invoice Presentment and Payment System – The FSC uses a third-party contractor, Tungsten, to transition vendors from paper to electronic invoice submission. Please go to this website: http://www.tungsten-network.com/US/en/veterans-affairs/ to begin submitting electronic invoices, free of charge.
(B). Vendor e-Invoice Set-Up Information: Please contact Tungsten at the phone number or email address listed below to begin submitting your electronic invoices to the VA Financial Services Center for payment processing, free of charge. If you have question about the e-invoicing program or Tungsten, please contact the FSC at the phone number or email address listed below:
(i). Tungsten e-Invoice Setup Information: 1-877-489-6135 (ii). Tungsten e-Invoice email: VA.Registration@Tungsten-Network.com (iii). FSC e-Invoice Contact Information: 1-877-353-9791 (iv). FSC e-invoice email: vafsccshd@va.gov
(e). REFERENCE NUMBERS: Please reference both the Task Order number (to be assigned) and the Obligation Number (to be assigned) on all correspondence and invoices. If contract option years are exercised, new obligation numbers will be issued and identified on the contract modification document.
(f). AUTHORIZATIONS:
(1). The Contracting Officer (CO) named in Section (a) above is responsible for the overall administration of this contract. Only the CO has the authority to make changes which affect:
(A). Contract prices, (B). Quality, (C). Quantities, or (D). Delivery terms and conditions.
(2). Contracting Officer Representatives (COR) and Alternate Contracting Officer’s Representatives (Alt-COR) may be assigned to this contract. The COR and Alt-COR shall be provided specific written delegated authority by the CO, a copy of which will be provided to the Contractor.
B.2 STATEMENT OF WORK
Salt Lake City VA Medical Center Salt Lake City, UT 84148
GENERAL SPECIFICATIONS:
General: This is a non-personal services contract to provide LIFE SAFETY DEVICES INSPECTION, TESTING, AND MAINTENANCE (ITM) SERVICES. The Government shall not exercise any supervision or control over the service providers providing the services described herein.
Description of Services/Introduction: The Contractor shall provide all personnel, transportation, materials, equipment, supplies, facilities, supervision, other essential items, and non-personal services necessary to perform ITM services for fire extinguishers, automated external defibrillators (AEDs), emergency eyewashes, and emergency showers as defined in this Statement of Work. The Contractor must assume total liability for all contract employees. The Contractor shall perform to the standards of the contract.
Period of Performance: Base Period of Performance plus 4 option years.
1. Background The VA Salt Lake City Health Care System (VASLCHCS) is comprised of 3 patient care buildings and 26 support buildings that require ITM services for life safety devices (fire extinguishers, AEDs, emergency eyewashes, and emergency showers). Geographically the facility is located in Salt Lake City, Utah.
2. Project Scope:
VASLCHCS requires a single Contractor with the ability to perform life safety devices inspection, testing, maintenance (preventative and corrective) (ITM) of all devices across the buildings. The Contractor must be qualified and experienced in accordance with National Fire Protection Association (NFPA) 10 and NFPA 101 requirements, American National Standards Institute (ANSI) Z358.1 standards and the Joint Commission (TJC) standards. The Life Safety devices ITM may be supported by sub-contractors at the cost of the prime Contractor. The requirement for proof of certifications shall apply to all sub-contractors.
The Contractor shall coordinate database updates of all ITM as defined in the most current editions of the TJC standards, NFPA codes, ANSI, and applicable VHA directives. The VA shall maintain the database. The C&A requirements do not apply, and a Security Accreditation Package is not required.
3. Specifications:
3.1.1. Life Safety Devices Inspection, Testing, and Maintenance (ITM)
3.1.1.1. Contractor must be able to inspect, test, and maintain 100% of the life safety devices listed in accordance with the most recent addition of NFPA 10, NFPA 101, TJC, and ANSI Z358.1 standards and provide these services for the following location:
| George E Wahlen Medical Center |
| 500 Foothill Drive, |
| Salt Lake City, UT 84148 |
[The SLC campus is composed of several buildings encompassing multiple life safety devices. Buildings 1, 3, 14 (multi-storied Hospital buildings); 2, 45, 7, 26, (Research buildings); 4, 6, 8, 9, 18, 38, 47, 49 (support buildings); 5 (kitchen); 16 (multi-story office building); 27, 39, 40, 41, 42, 44 (engineering buildings); 32 (Fisher House); 13 (childcare); building 1 pump house; 48 (parking garage); and 34 (propane storage) contain fire alarm components and are included in this contract.]
| Line |
| Qty not to exceed |
| Inspection/Action |
| 1 |
| 555 |
| Monthly Fire Extinguisher inspections |
| 2 |
| 555 |
| Annual Fire Extinguisher inspections |
| 3 |
| 555 |
| Annual Fire Extinguisher maintenance |
| 4 |
| 75 |
| Monthly AED inspections |
| 5 |
| 75 |
| Monthly Emergency Eyewash/Shower inspections |
| 6 |
| 25 |
| Semiannual Emergency Eyewash Portable REFILLs |
| 7 |
| 555 |
| 6 and 12-year maintenance Fire Extinguisher services |
| 8 |
| 50 |
| Fire Extinguisher Refill/Recharge |
| 9 |
| 75 |
| AED maintenance |
3.1.2. Inspection and Testing Schedules
3.1.2.1. Contractor must be able to meet the following schedule:
| JAN |
| FEB |
| MAR |
| APR |
| MAY |
| JUN |
| JUL |
| AUG |
| SEP |
| OCT |
| NOV |
| DEC |
| A/S/M |
| M |
| M |
| M |
| M |
| M |
| A/S/M |
| M |
| M |
| M |
| M |
| M |
A/S/M = All devices tested Annually, Semi-annually, and Monthly as defined in the most current edition of NFPA 10, NFPA 101, TJC, and ANSI Z358.1 standards.
M = All devices tested Monthly as defined in the most current edition of NFPA 10, NFPA 101, TJC, and ANSI Z358.1 standards.
3.1.2.2. Contractor shall reconcile list of devices inspected and tested with a master inventory list of at the conclusion of inspection and testing cycle.
3.1.2.3. During all onsite work, the Contractor shall provide a daily in-brief prior to Any work completed and out-brief prior to departure to the COR (or representative). A daily log of all activities shall be provided to the COR detailing work performed, condition found, corrective actions.
3.1.3. Fire Extinguishers
3.1.3.1. Contractor shall provide 100% ITM service for all fire extinguishers.
3.1.3.1.1. All fire extinguishers shall be checked monthly according to NFPA 10 standards. This shall be documented to TJC standards.
3.1.3.1.2. All fire extinguishers shall be inspected and maintenance performed annually according to NFPA 10 standards. This shall be documented to TJC standards. Half of the annual requirements shall be performed in January, the remaining half in July.
3.1.3.1.3. All fire extinguishers shall have 6 or 12-year maintenance performed if the extinguisher is due. This shall be determined by historical maintenance information provided by the VA.
3.1.3.1.4. All inspections and maintenance performed shall be Documented utilizing a database maintained by the VA and by detailed invoice.
3.1.3.1.5. The Contractor shall provide all necessary test equipment and Labor to perform required inspection, testing, and maintenance.
3.1.3.1.6. All fire extinguishers shall have a Unique Identifier (UID) number. VA shall provide a UID for every device and location.
3.1.3.1.7. All inventories and inspection reports shall be organized by the UID. UID numbers shall never change over the lifetime of the device (cradle to grave data maintenance).
3.1.3.1.8. UID numbers must never be re-used or re-issued to new devices from a previously retired device.
3.1.4. AED Devices
3.1.4.1. Contractor shall provide 100% inspection service for the public access AED devices in accordance with the medical center policy.
3.1.4.1.1. At a minimum the following items shall be checked:
3.1.4.1.1.1. Visual check of device – check for any obvious damage missing parts
3.1.4.1.1.2. Battery check – different models have different methods of warning about low battery.
3.1.4.1.1.3. Check defibrillator pads are sealed and in-date.
3.1.4.1.1.4. Check spare defibrillator pads are sealed and in-date
3.1.4.1.1.5. Check accessory equipment is present: towel, razor, CPR face shield, scissors, gloves, paperwork.
3.1.4.1.1.6. Check integrity and security of defibrillator cabinet.
3.1.4.1.1.7. Contractor shall place tamper evident seal on each AED cabinet and record the new seal number on daily job sheet.
3.1.4.1.1.8. All inspections and maintenance performed shall be Documented utilizing a database maintained by the VA and by detailed invoice.
3.1.4.1.1.9. The Contractor shall provide all necessary test equipment and labor to perform required inspection, testing, and maintenance.
3.1.4.1.1.10. During all onsite work, the Contractor shall provide a daily in-brief prior to any work completed and out-brief prior to departure to the COR (or representative). A daily log of all activities shall be provided to the COR detailing work performed, condition found, corrective actions, and the as left condition by the Contractor-on-Contractor letterhead.
3.1.4.1.1.11. All AED devices shall have a Unique Identifier (UID) number.
3.1.4.1.1.11.1. VA shall provide a UID for every device.
3.1.4.1.1.11.2. All inventories and inspection reports shall be organized by the UID.
3.1.4.1.1.11.3. UID numbers shall never change over the lifetime of the device (cradle to grave data maintenance).
3.1.4.1.1.11.4. UID numbers must never be re-used or re-issued to new devices from a previously retired device.
3.1.5. Emergency Eyewashes/Showers and Portable Stations
3.1.5.1. Contractor shall provide 100% inspection and testing service for all emergency eyewashes and emergency showers. The VA will perform all related maintenance and repair work for emergency eyewashes and emergency showers.
3.1.5.2. All emergency eyewashes and emergency showers shall be inspected and tested monthly according to ANSI Z358.1 standards. This shall be documented to TJC standards.
3.1.5.3. Any portable emergency eyewashes shall be flushed and refilled semi-annually according to ANSI Z358.1 standards. This shall be documented to TJC standards.
3.1.5.4. All inspections and maintenance performed shall be documented utilizing a database maintained by the VA and by detailed invoice.
3.1.5.5. The Contractor shall provide all necessary test equipment and labor to perform required inspection, testing, and maintenance.
3.1.5.5.1. The testing equipment shall comply with ANSI testing standards such as model 9011 ANSI Shower and Eyewash Testing Kit
3.1.5.6. During all onsite work, the Contractor shall provide a daily in-brief prior to any work completed and out-brief prior to departure to the COR (or
| representative). A daily log of all activities shall be provided to the COR |
| detailing work performed, condition found, corrective actions, and the as |
left condition by the Contractor-on-Contractor letterhead.
3.1.5.7. All emergency eyewashes and emergency showers shall have a Unique Identifier (UID) number.
3.1.5.7.1. VA shall provide a UID for every device.
3.1.5.7.2. All inventories and inspection reports shall be organized by the UID.
3.1.5.7.3. UID numbers shall never change over the lifetime of the device (cradle to grave data maintenance).
3.1.5.7.4. UID numbers must never be re-used or re-issued to new devices from a previously retired device.
3.1.6. Documentation
3.1.6.1. All documentation shall be kept current and up-to date. Documented results are due to the COR within five (5) business days after each ITM cycle. No hand- written reports shall be accepted.
3.1.6.2. Contractor shall provide results of all work in the following format:
3.1.6.2.1. Name of the activity
3.1.6.2.2. Date of the activity
3.1.6.2.3. Required frequency of the activity
3.1.6.2.4. Name and contact information, including affiliation, of individual who performed the activity.
3.1.6.2.5. Result of the activity
3.1.6.3. Contractor shall provide 1 hard copy and 1 electronic (CD/DVD)
| copies on a quarterly basis for all inspection, testing and |
| maintenance services for each individual device covered under |
this contract.
3.1.6.4. Deficiency Notices
3.1.6.4.1. The Contractor shall initiate a Deficiency Notice (DN) using electronic correspondence to the VA COR identifying device (description/UID), location, date, and discovered condition of any failed device. The same DN shall remain open/un-resolved until conclusion of repairs. The comments on a DN shall identify all repair activities, UID’s of any equipment removed and new UID’s of any new equipment added to the system. Ultimately the DN shall contain the test results after each repair is completed and shall be documented on the following report.
3.1.7. Government Requirements
3.1.7.1. All Contractor employees dispatched to or working at any of the VA sites identified herein shall obtain and wear a VA issued badge while performing services. VA badges are to be obtained through coordination with the COR.
3.1.7.2. Information Security
3.1.7.2.1. The Contractor shall not have access to the VA information system or access to government computers to access online resources while in the performance of services of the contract.
3.1.7.2.2. The Contractor shall not have access to Patient Health Information (PHI) while in the performance of services of the contract. In the event any confidential data is encountered, the Contractor shall act accordingly with the conditions set forth in the Privacy Act.
3.1.7.2.3. The C&A requirements do not apply, and a Security
Accreditation Package is not required.
3.1.8. Special Contract Requirements
3.1.8.1. Per VHA Directive 1085, SMOKE-FREE POLICY FOR PATIENTS, VISITORS, CONTRACTORS, VOLUNTEERS, AND VENDORS AT VA HEALTH CARE FACILITIES. Salt Lake City VA campus remains a smoke/vape free campus. All contract employees and subcontract employees are expected to abide by this VHA Directive.
3.1.8.2. Any incidents shall first be reported by telephone to the COR. Contractor notification must be followed up in writing to the VHASLC Safety Manager and the COR (or Alternate COR), not later than five (5) days after the initial telephone report.
3.1.8.3. No work shall be completed under this contract unless specifically allowed for in the scope of work. All direction to work under this contract shall be in writing. No work shall occur based on verbal agreements. Any work completed outside the terms of the contract shall be at the contractor’s expense and risk.
4. SAFETY REQUIREMENTS
4.1. The Contractor shall take such safety precautions as the Contracting Officer, or his designee may determine to be reasonably necessary to protect the lives and health of patients, VA employees, the public, the environment, and the lives and health of the contractor’s personnel from any hazards associated with the performance of this contract.
4.2. The Contractor shall assure that the furnishing of personal protective equipment (PPE) is provided to their staff or that any subcontractors are furnished with approved personal protective equipment (PPE) per NIOSH, ANSI standards. To include, the contractor shall comply with all OSHA, NFPA and VHA safety standard to guarantee the safety of their staff required to complete all tasks within this contract safely.
4.3. The Contract Officer or designee shall notify the contractor of any noncompliance with the foregoing provision and action to be taken. The Contractor shall after receipt of such notice immediately correct the conditions to which attention has been directed. Such notice, when served on the Contractor or representative at the site of the work, shall be deemed sufficient for the purpose of aforesaid. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or any part of the work and hold the Contractor in default.
5. Period of Performance The period of performance shall be from the date of award for a base year and 4 option years. The contractor shall coordinate with the COR to schedule the services outlined in Section 3. Normal hours of operation are Monday through Friday, 8:00am-5:00pm, except Federal holidays. Work is to be conducted in a manner which would present the least amount of disruption to the healthcare facility.
There are eleven (11) Federal holidays set by law (U.S.C. Title 5 Section 6103). Additional days which are deemed holidays by the federal government during this contract period shall also be observed.
Under current definitions, five are set by date:
| New Year’s Day | January 1 | |
| Juneteenth | June 19 | |
| Independence Day | July 4 | |
| Veteran’s Day | November 11 | |
| Christmas Day | December 25 |
If any of the above falls on a Saturday, then Friday shall be observed as a holiday. Similarly, if one falls on a Sunday, then Monday shall be observed as a holiday.
The other six are set by a day of the week and month:
| Martin Luther King Day | Third Monday in January | |
| Washington’s Birthday | Third Monday in February | |
| Memorial Day | Last Monday in May | |
| Labor Day | First Monday in September | |
| Columbus Day | Second Monday in October | |
| Thanksgiving | Fourth Thursday in November |
The Periods of Performance are:
| Base Year: | June 1, 2025 to May 31, 2026 |
| Option Year 1: | June 1, 2026 to May 31, 2027 |
| Option Year 2: | June 1, 2027 to May 31, 2028 |
| Option Year 3: | June 1, 2028 to May 31, 2029 |
| Option Year 4: | June 1, 2029 to May 31, 2030 |
6. Delivery/Work Location:
6.1. Salt Lake City VAMC
500 foothill Blvd Salt Lake City, UT 84148
B.3 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12.00 |
| MO |
| __________________ |
| __________________ |
Monthly Fire Extinguisher Inspections Contract Period: Base POP Begin: 06-01-2025 POP End: 05-31-2026 PRINCIPAL NAICS CODE: 541990 - All Other Professional, Scientific, and Technical Services PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
Annual Fire Extinguisher Inspections
POP Begin: 06-01-2025 POP End: 05-31-2026
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
Annual Fire Extinguisher Maintenance
POP Begin: 06-01-2025 POP End: 05-31-2026
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 12.00 |
| MO |
| __________________ |
| __________________ |
Monthly AED Inspections
POP Begin: 06-01-2025 POP End: 05-31-2026
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 12.00 |
| MO |
| __________________ |
| __________________ |
Monthly Emergency Eyewash Inspections
POP Begin: 06-01-2025 POP End: 05-31-2026
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 2.00 |
| JB |
| __________________ |
| __________________ |
Semiannual Emergency Eyewash Portable Refills
POP Begin: 06-01-2025 POP End: 05-31-2026
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
6 and 12-year maintenance Fire Extinguisher Services
POP Begin: 06-01-2025 POP End: 05-31-2026
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
Fire Extinguisher Refill/Recharge
POP Begin: 06-01-2025 POP End: 05-31-2026
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
AED Maintenance
POP Begin: 06-01-2025 POP End: 05-31-2026
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 12.00 |
| MO |
| __________________ |
| __________________ |
Monthly Fire Extinguisher Inspections Contract Period: Option 1 POP Begin: 06-01-2026 POP End: 05-31-2027
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
Annual Fire Extinguisher Inspections
POP Begin: 06-01-2026 POP End: 05-31-2027
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
Annual Fire Extinguisher Maintenance
POP Begin: 06-01-2026 POP End: 05-31-2027
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 12.00 |
| MO |
| __________________ |
| __________________ |
Monthly AED Inspections
POP Begin: 06-01-2026 POP End: 05-31-2027
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 12.00 |
| MO |
| __________________ |
| __________________ |
Monthly Emergency Eyewash Inspections
POP Begin: 06-01-2026 POP End: 05-31-2027
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 2.00 |
| JB |
| __________________ |
| __________________ |
Semiannual Emergency Eyewash Portable Refills
POP Begin: 06-01-2026 POP End: 05-31-2027
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
6 and 12-year maintenance Fire Extinguisher Services
POP Begin: 06-01-2026 POP End: 05-31-2027
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
Fire Extinguisher Refill/Recharge
POP Begin: 06-01-2026 POP End: 05-31-2027
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
AED Maintenance
POP Begin: 06-01-2026 POP End: 05-31-2027
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 12.00 |
| MO |
| __________________ |
| __________________ |
Monthly Fire Extinguisher Inspections Contract Period: Option 2 POP Begin: 06-01-2027 POP End: 05-31-2028
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
Annual Fire Extinguisher Inspections
POP Begin: 06-01-2027 POP End: 05-31-2028
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
Annual Fire Extinguisher Maintenance
POP Begin: 06-01-2027 POP End: 05-31-2028
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 12.00 |
| MO |
| __________________ |
| __________________ |
Monthly AED Inspections
POP Begin: 06-01-2027 POP End: 05-31-2028
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 12.00 |
| MO |
| __________________ |
| __________________ |
Monthly Emergency Eyewash Inspections
POP Begin: 06-01-2027 POP End: 05-31-2028
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 2.00 |
| JB |
| __________________ |
| __________________ |
Semiannual Emergency Eyewash Portable Refills
POP Begin: 06-01-2027 POP End: 05-31-2028
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
6 and 12-year maintenance Fire Extinguisher Services
POP Begin: 06-01-2027 POP End: 05-31-2028
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
Fire Extinguisher Refill/Recharge
POP Begin: 06-01-2027 POP End: 05-31-2028
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
AED Maintenance
POP Begin: 06-01-2027 POP End: 05-31-2028
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 12.00 |
| MO |
| __________________ |
| __________________ |
Monthly Fire Extinguisher Inspections Contract Period: Option 3 POP Begin: 06-01-2028 POP End: 05-31-2029
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
Annual Fire Extinguisher Inspections
POP Begin: 06-01-2028 POP End: 05-31-2029
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
Annual Fire Extinguisher Maintenance
POP Begin: 06-01-2028 POP End: 05-31-2029
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 12.00 |
| MO |
| __________________ |
| __________________ |
Monthly AED Inspections
POP Begin: 06-01-2028 POP End: 05-31-2029
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 12.00 |
| MO |
| __________________ |
| __________________ |
Monthly Emergency Eyewash Inspections
POP Begin: 06-01-2028 POP End: 05-31-2029
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 2.00 |
| JB |
| __________________ |
| __________________ |
Semiannual Emergency Eyewash Portable Refills
POP Begin: 06-01-2028 POP End: 05-31-2029
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
6 and 12-year maintenance Fire Extinguisher Services
POP Begin: 06-01-2028 POP End: 05-31-2029
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
Fire Extinguisher Refill/Recharge
POP Begin: 06-01-2028 POP End: 05-31-2029
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
AED Maintenance
POP Begin: 06-01-2028 POP End: 05-31-2029
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 12.00 |
| MO |
| __________________ |
| __________________ |
Monthly Fire Extinguisher Inspections Contract Period: Option 4 POP Begin: 06-01-2029 POP End: 05-31-2030
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
Annual Fire Extinguisher Inspections
POP Begin: 06-01-2029 POP End: 05-31-2030
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
Annual Fire Extinguisher Maintenance
POP Begin: 06-01-2029 POP End: 05-31-2030
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 12.00 |
| MO |
| __________________ |
| __________________ |
Monthly AED Inspections
POP Begin: 06-01-2029 POP End: 05-31-2030
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 12.00 |
| MO |
| __________________ |
| __________________ |
Monthly Emergency Eyewash Inspections
POP Begin: 06-01-2029 POP End: 05-31-2030
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 2.00 |
| JB |
| __________________ |
| __________________ |
Semiannual Emergency Eyewash Portable Refills
POP Begin: 06-01-2029 POP End: 05-31-2030
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
6 and 12-year maintenance Fire Extinguisher Services
POP Begin: 06-01-2029 POP End: 05-31-2030
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
Fire Extinguisher Refill/Recharge
POP Begin: 06-01-2029 POP End: 05-31-2030
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| 1.00 |
| YR |
| __________________ |
| __________________ |
AED Maintenance
POP Begin: 06-01-2029 POP End: 05-31-2030
PRODUCT/SERVICE CODE: H342 - Inspection - Fire Fighting, Rescue, and Safety Equipment; Environmental Protection Equipment and Materials
| GRAND TOTAL |
| __________________ |
Page 1 of Page 1 of
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.—
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in FAR 32.608-2 in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;
(3) The clause at 52.212-5.
(4)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .