About this file

This is a quarterly Joint Commission Report documenting fire safety equipment testing at the Main Building of the Main Campus at 1700 Wheeling St, Aurora CO 80045. The inspection was conducted between May 29-June 3, 2022 under Hospital Accreditation standard EC.02.03.05 which requires maintaining fire safety equipment and building features.

The report details the testing of 22 supervisory signal devices, with 20 devices (90.9%) functionally tested and no failures reported. The tested equipment included fire pump devices (auto position, phase reversal, power, and running devices) and high/low pressure switches. All tested devices passed inspection, with specific locations documented including fire pump room LB-102 components and fire riser CS-223 dry systems. The report includes detailed device identification numbers and testing dates, primarily conducted on June 3, 2022. This appears to be part of regular quarterly testing requirements for hospital fire safety systems under Joint Commission standards.

View the file

Other files

File Type Posted
36C25925Q0075 0004.docx DOCX document
UPDATED STATEMENT OF WORK.docx DOCX document
Site Visit Q A.docx DOCX document
Semi Annual Inspection Report.pdf PDF
36C25925Q0075 0003.docx DOCX document
Hood Fire Suppression System Inspection Report.pdf PDF
Building Zones.pdf PDF
S06 Site Visit POC Information.docx DOCX document
36C25925Q0075 0002.docx DOCX document
36C25925Q0075 0001.docx DOCX document
Backflow Preventer List.pdf PDF
STATEMENT OF WORK.docx DOCX document
VAAR 852.219-75.docx DOCX document
36C25925Q0075.docx DOCX document
Wage Determination 2015-5419.txt TXT text file
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .