36C25924R0019 0001.docx
DOCX document 20 KB Posted
- Solicitation number
- 36C25924R0019
About this file
This document contains an amendment to a solicitation for design-build renovation services at the Cheyenne VA Medical Center. The key details are as follows:
The solicitation is to renovate approximately 30,000 square feet of space on the third floor for new Cowboy and Community Living Center areas. The estimated value of design and construction services is between $5-10 million. The period of performance includes 160 calendar days for design, 90 days for long lead procurement, and 420 days for construction. The amendment extends the Phase I proposal due date to January 10, 2024 and provides answers to offeror questions on relevant experience requirements, project scope and schedule, and historical review considerations. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration VISN 19 for the Cheyenne VAMC.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DB Construction Experience Sheet corrected.docx | DOCX document | |
| S02 Past Performance Questionnaire.docx | DOCX document | |
| 36C25924R0019.docx | DOCX document | |
| S22 LOS 852.219-75.docx | DOCX document | |
| Existing Med Gas Schedule 3rd Floor Cowboy 092523.pdf | ||
| DB Construction Experience Sheet.docx | DOCX document | |
| HRB10 Series Handrail Crashrail Bumper.pdf | ||
| Wage Determination WY20230023 4 7 2023.pdf | ||
| Corr finish ref pic.jpg | JPG image | |
| Endo Concept 090823.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 442-24-014 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village
CO
80111 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village
CO
80111 To all Offerors/Bidders
36C25924R0019 12-05-2023
X X X
1/10/2024 1 PM MT
See page 2.
CONTINUATION PAGE
This amendment is created to provide answers to questions submitted during Phase I of the solicitation and to also extend the Phase I proposal due date to January 10, 2024. Proposals are due no later than 1:00 PM MT by email to ilze.karklins-powers@va.gov
RFI #1
1. To clarify, “5 recent and relevant construction projects”, Relevant – includes performance of efforts involving design and renovation of an active hospital area… Are construction projects required to be Design Build or will Design Bid Build projects be accepted as relevant?
0. Design Bid Build projects are accepted as relevant for construction.
1. “The offeror may utilize experience of a design subcontractor to demonstrate design experience…” please define design subcontractor. Would a design subcontractor be defined as a A/E firm?
1. A design subcontractor for this solicitation is defined as an A/E firm.
1. Will a second RFI period be implemented for all phase 2 teams?
2. Yes.
1. I.1B – Magnitude of Construction: Between $500,000 and $1,000,000. – Please confirm the correct magnitude of construction for this project.
3. Thank you for catching this error – Magnitude of the Project (not just construction) is between $5,000,000 and $10,000,000.
1. The offeror may utilize experience of a design subcontractor to demonstrate design experience under this evaluation factor. Please confirm would the design experience from the design subcontractor apply to both the 5 A/E projects and/or the 5 construction projects?
4. The design experience only applies to the A/E projects.
1. On the DB Construction Experience Sheet, it references solicitation number VA259-16-R-0048, Water Softener. This is not the same project number or project as the solicitation. Please clarify.
5. See updated DB Construction Experience Sheet.
1. On the DB Construction Experience Sheet, in the first block there are boxes to be checked for the Construction Experience, i.e., CON #1, CON #2, etc. But there is no box to check for the design firm experience. Does the VA have a Design Experience sheet they would like us to use for our proposal or would the VA like us to just modify this block to read DEN #1, DEN #2, etc. for the submission?
6. You may modify the block to differentiate the construction projects from the A/E projects.
1. In Block 11 of the SF1442 it states that the project (design and Construction) shall be completed in 670 calendar days, which is roughly 22 months. In schedule D of the RFP, we are directed to have design completed in 160 days, 90 days for long lead items and 420 days for construction. Given the nature of the project and the amount of phasing that will be required to complete the construction work, we believe that 420 Calendar days is extremely aggressive. We also feel that 90 days for long lead items is extremely aggressive as well. Would the VA consider extending the period of performance?
7. We will work with the DB team’s proposed schedule beyond the period of performance advertised and anticipated lead times with proper justification once award has been made.
1. In Factor 2 or the RFP document under subparagraph (a) the VA determined Recency as “a recent project is defined as being completed within seven years of the due date of this solicitation. With this being a sizable design build submission that is being procured via Service-Disabled Veteran Owned Small Business, would the VA please consider changing the Recency from 7 years to 8 or 10 years?
8. Recency will be accepted up to 10 years from the date of this solicitation.
1. In Factor 2 of the RFP the VA limits us to 1 page narrative to describe the offeror’s method to manage the project to achieve design and construction objectives as described in the RFP. Give the size and nature of this project it is nearly impossible to provide a description in 1 page. Normally on design build proposals we see a minimum 10 pages allotted for this. Would the VA at a minimum allow us 5 pages for our technical approach in Factor 2?
9. The page limit is increased to 5 pages for this section.
1. With the Cheyenne VAMC being listed as a historical site, I did not see any requirements for review by the State Historical Preservation (SHPO). Will the awardee be required to submit our design for approval to SHPO? And will we be compensated if they had any requirements that would differ from the RFP?
10. The exterior façade is not altered as part of this project; therefore, we have not identified the need for SHPO review. The interior has been modernized over the years and does not contain aesthetic historical elements requiring SHPO review.
See attached document: DB Construction Experience Sheet corrected.