36C25924Q0728_1.docx
DOCX document 254 KB Posted
- Solicitation number
- 36C25924Q0728
About this file
This document is a solicitation (Solicitation Number 36C25924Q0728) for medical gas and vacuum maintenance and repair services at the George E. Wahlen Department of Veterans Affairs Medical Center in Salt Lake City, Utah.
The solicitation is seeking a contractor to provide inspection, testing, maintenance, preventative maintenance, and repair services for the medical gas and vacuum systems in Buildings 1, 14, and 3 on the medical center campus. This is a fixed-firm priced contract for a one-year base period with four one-year option periods. The contractor must have subject matter expertise, be located within a 50-mile radius, and be able to respond to emergencies within one hour. Offers are due by 5:00 PM MDT on September 20, 2024, and the government intends to award to a small business concern. The incumbent contractor is Medical Air Testing & Service, Inc. under Contract 36C25920P0531.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25924Q0728 0003_1.docx | DOCX document | |
| 36C25924Q0728 0003.docx | DOCX document | |
| 36C25924Q0728 0002_1.docx | DOCX document | |
| 36C25924Q0728 0002.docx | DOCX document | |
| 36C25924Q0728 0001_1.docx | DOCX document | |
| Med Gas outlet inventory.pdf | ||
| 36C25924Q0728 0001.docx | DOCX document | |
| 36C25924Q0728.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25924Q0728
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
UEI:
EFT:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
36C259-24-AP-4897
660-25-1-5056-0002
09-04-2024 Heather Clemons heather.clemons@va.gov
09-20-2024
5:00 PM
MDT
36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111
X
811310 $12.5 Million
N/A
36C660
Department of Veterans Affairs George E. Wahlen VA Medical Center 500 Foothill Blvd Salt Lake City UT 84148 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
Department of Veterans Affairs Financial Service Center PO Box 149971 Austin TX 78714-9971 (877)353-9791 (512)460-5221
See CONTINUATION Page Medical Gas & Vacuum Maintenance & Repair Services
All questions must be submitted to heather.clemons@va.gov and received no later than 12:00pm MDT on 9/12/2024.
An amendment will be posted no later than 3:00pm MDT on 9/16/2024 with answer to the submitted questions.
All offers must be submitted to heather.clemons@va.gov and received no later than 5:00pm MDT on 9/20/2024.
Estimated Period of Performance:
Base Year 10/1/2024 - 9/30/2025 Option Year 1 10/1/2025 - 9/30/2026 Option Year 2 10/1/2026 - 9/30/2027 Option Year 3 10/1/2027 - 9/30/2028 Option Year 4 10/1/2028 - 9/30/2029
U.S. Wage Determination 2015-5489, Revision 24 applies to this acquisition.
See CONTINUATION Page
LOA# 660-3650162A1-5056-854100-2543 010050100
Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 3 |
| B.1 CONTRACT ADMINISTRATION DATA | 3 |
| B.2 STATEMENT OF WORK | 4 |
| B.3 PRICE/COST SCHEDULE | 13 |
| SECTION C - CONTRACT CLAUSES | 17 |
| C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2023) | 17 |
| C.2 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2024) | 23 |
| C.3 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) | 31 |
| C.4 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 31 |
| C.5 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020) ALTERNATE I (MAR 2020) | 31 |
| C.6 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022) | 32 |
| C.7 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 34 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 35 |
| SECTION E - SOLICITATION PROVISIONS | 36 |
| E.1 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 36 |
| E.2 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS (OCT 2018) | 38 |
| E.3 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014) | 42 |
| E.4 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2024) | 44 |
| E.5 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023) | 62 |
| E.6 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 63 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
Name/Title:
Email:
Address:
Phone:
SAM UEI Number:
Cage Code:
TAX ID:
b. GOVERNMENT:
Contracting Officer Heather Clemons, heather.clemons@va.gov Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111
Contract Specialist Heather Clemons, heather.clemons@va.gov Department of Veterans Affairs Network Contracting Office
NCO 19
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [X] CLIN 0002 (and subsequent years) |
| c. Other | [X] CLIN 0001 (and subsequent years) annually, CLINs 0003 and 0004 (and subsequent years) upon completion |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
Department of Veterans Affairs Financial Service Center PO Box 149971 Austin TX 78714-9971
FSC e-Invoice Contact Information: (877) 353-9791 FSC e-Invoice email: vafsccshd@va.gov All Invoices from the contractor shall be submitted electronically IAW VAAR Clause 852.232-72 Electronic Submission of Payment Requests. For any questions about the e-invoicing program, please contact the following:
Tungsten Network Client Services Phone: 1-877-489-6135 Link: https://www.tungsten-network.com/customer-campaigns/veteransaffairs/ VA Financial Service Center (FSC) Phone: 1-877-353-9791 For Invoice status tracking, the contractor should use the FSC Customer Engagement Portal, link: https://www.cep.fsc.va.gov/
B.2 STATEMENT OF WORK
36C25924Q0728
Page 1 of Page 1 of
PROJECT TITLE:
Medical gas and vacuum (MGV) systems inspection, testing, maintenance, preventative maintenance end repair services for building 1,2,3 and 14 of the medical center at George E. Wahlen Department of Veterans Affairs Medical Center, Salt Lake City, UT
BRIEF DESCRIPTION OF SUPPLIES OR SERVICES
1. This Fixed Firm priced contract is intended to create a multi-year contracting mechanism to provide the following services on medical gas and medical vacuum piping systems and source equipment. Maintenance services to include, but not limited to inspection, testing, maintenance, repair, replacement and/or modification, preventative maintenance and verification of medical gas and vacuum (MG&V) source system components. This task will be performed in Buildings 1, 14, & 3 on the George E. Wahlen Department of Veterans Affairs Medical Center campus in Salt Lake City, Utah. Medical Gas & Surgical Vacuum systems include all Medical Gas and Medical Vacuum Source Systems, Lab Air & Lab Vacuum Source Systems and source system components in Building 1, 14, & 3. Medical gas shall apply to all piped gas systems with a source equipment located in the respective buildings for oxygen, nitrous oxide, medical air, carbon dioxide, nitrogen, and instrument air. Vacuum systems shall apply to all piped systems for medical vacuum, laboratory vacuum, and waste anesthetic gas disposal (WAGD). All building medical gas & vacuum source equipment inventory listed on Attachment 1.
2. This contract shall comply with current industry standards (latest edition of NFPA 99, FGI ) and applicable building/facility safety codes for inspection, testing, maintenance and repair of all medical gas and vacuum (MG&V) systems to ensure uninterrupted supply of medical gas and vacuum (MG&V) to support medical gas and equipment for patient care use. The contract is intended to establish a cost-effective MG&V management program to ensure timely, optimum operation, and uninterrupted operational services, lengthen the life expectancy of equipment, and support the George E. Wahlen Department of Veterans Affairs Medical Center Patient Safety mission. The selected contractor(s) shall have subject matter expertise and provide all resources necessary to perform the specific requirements as defined in the Task Orders.
3. Selected contractor shall adhere to practices which will ensure the highest industry standards of performance, safety, and most energy efficient operation of the equipment and systems, and as necessary to prevent equipment/system failure and extend useful life.
4. The contractor shall furnish all personnel, facilities, equipment, materials, supplies, and services and otherwise do all things necessary for, or incident to, performance of these requirements in accordance with the statement of work (SOW).
GENERAL REQUIRMENTS
1. The selected contractor(s) shall have subject matter expertise for the MG&V Systems (e.g. mfg. Specifications/mfg. PM recommendations) which support the George E. Wahlen Department of Veterans Affairs Medical Center Complex (Bldgs. 1, 14, 3 & 2) on campus, current training/certification, and capable of obtaining all resources necessary to perform the specific requirements as defined in the Task Orders.
2. The contractor shall ensure that all personnel are qualified, trained, and experienced in the types of medical gas and vacuum system requirements, and processes as described herein. Examples include:
3. Medical gas technicians who repair, maintain, replace or upgrade the integrity of the medical gas system shall be a certified to the most current edition of the NFPA99 & ASSE 6040, Professional Qualification Standard for medical Gas Maintenance Personnel and technically competent on the specific equipment as installed at George E. Wahlen Department of Veterans Affairs Medical Center Salt Lake City.
4. Technicians/personnel who perform welding/brazing work shall have Welding and Brazing Qualifications of the ASME Boiler and Pressure Vessel Code or AWS B2.2, Standard for Brazing Procedure and Performance Qualification, as well as obtain the required ASSE 6010 Medical Gas Installer Qualification, both as modified by NFPA 99 code requirements.
5. Following any breach of the medical gas system and its repair, the responsible Contractor shall perform all required medical gas inspections and verifications on new construction work with a current ASSE 6030, Professional Qualifications Standard for Medical Gas Systems Verifiers to verify & test the system, accordingly to NFPA 99. This includes rough inspections “prior to concealment” as required per NFPA99 section 5.1.12.3.1.1 (2021 edition).
6. Contracting company performing scheduled &/or emergency service on the Medical Gas & Vacuum Systems at the George E. Wahlen Department of Veterans Affairs Medical Center Salt Lake City shall be located within a 50-mile radius and have an emergency response time of one (1) hour in the event of an emergency support is needed.
7. Contracting company shall provide documented medical gas equipment training applicable to the MG&V equipment onsite at the George E. Wahlen Department of Veterans Affairs Medical Center SLC. This training shall consist of 7 scheduled training courses accompanied by a pass or fail testing program and shall be completed by a qualified medical gas professional competent in the medical gas field. One of the specified seven training programs shall meet the requirements of NFPA 99 section 5.1.14.1.3.2 (1) Facility Authority educational program, to facilitate training of the VA facility authority and make them familiar with the medical gas systems in all buildings (Buildings 1, 14, & 3) that contain medical gas systems at the George E. Wahlen Department of Veterans Affairs Medical Center campus. The remaining 6 training programs will be for staff members that will routinely be working on facility medical gas equipment located at George E. Wahlen Department of Veterans Affairs Medical Center SLC during this contract and shall meet the requirements of NFPA 99 section 5.1.14.4.2.5 – Maintenance of medical gas & vacuum systems.
8. Any request for substitution or replacement of key personnel or changes in duties from those cited in the contractor’s original proposal shall be submitted in writing to the Project Officer for approval.
9. Contractor shall furnish an adequate number of properly trained personnel as well as competent supervision as necessary to provide the proper service level at all times. All services rendered by contractor, its employees and agents pursuant to this Agreement shall be undertaken and completed in an expeditious, good, and workmanlike manner.
PROJECT MANAGMENT
1. Contractor shall assign a project manager, capable of representing the contractor in all matters related to successful completion of all task orders satisfactory to the P.O.
2. The Account Representative:
3. Shall be the single point of contact.
4. Subject to approval of George E. Wahlen Department of Veterans Affairs Medical Center Salt Lake City project officer
5. Must have a minimum of five years proven experience in inspection/testing, maintenance and repair of medical gas and vacuum (MG&V) systems in hospitals and medical facilities similar in size and scope.
6. Shall be permanently assigned to this work, for the duration of the contract & reside within one (1) hour of George E. Wahlen Department of Veterans Affairs Medical Center in Salt Lake City, UT.
7. Shall represent the contractor, and all directions given to the project manager shall be as if given to the contractor.
8. Shall meet the qualifications of & obtain a current ASSE 6030 medical gas verifier certification & be readily available to provide information and assistance as the need may arise.
9. The contractor may not replace the project manager without prior written notification to the COR and CO.
CONTRACT SPECIFICS
This is a Fixed Firm Priced contract for service and maintenance for the medical gas systems included in Attachment 1, for one-year base period and four one-year option periods.
PROJECT SCOPE
1. Initial Conditions Assessment.
2. The Contractor shall conduct an initial assessment/evaluation of all Medical Gas and Vacuum Source Systems (i.e. Gas Manifolds, Medical Air Compressor Systems, Medical Surgical & Laboratory Vacuum Systems) for existing conditions and to develop a preventive maintenance plan.
3. Provide written assessment of conditions with recommendations for improvement or system replacement.. The contractor shall provide preventive and corrective maintenance services for medical gas and vacuum (MG&V) source systems for specified systems in identified locations listed in buildings 1, 14, 3 & 2 of the George E. Wahlen Department of Veterans Affairs Medical Center Salt Lake City campus including, but not limited to:
· Develop a comprehensive Preventive Maintenance Program (PMP) for specified medical gas and vacuum systems based on the maintenance recommendations found in the NFPA 99 Annex or ASSE Series 6000 Annex D.
· Preventive maintenance program shall minimize equipment repairs and maintenance costs as well as ensure uninterrupted facility operations through improved preventive maintenance (PM) and predictive maintenance (Pd.M.) measures.
· Program (PMP and Pd.M.) technical approach details shall be submitted in response to this base contract agreement and will be reviewed and approved at the start of the contract.
· The contractor shall inform the COR of any unforeseen items that may need to be addressed under the contract and shall supply quotes to have added to the contract and inventory list after cast changes are completed.
· The contractor will maintain a log of all medical gas equipment inventoried and maintained for the government and shall be left at the SLCVA medical center in hard copy and digital to be left with the intent of government ownership.
· Inspect, test and maintain/service all MG&V source systems identified in Medical Gas and Vacuum Source Equipment list (Attachment 1) IAW the manufacturer’s recommendations, prevailing industry standards, VAMC-SLC requirements, and local, state, national, and international (where applicable) codes.
· Inspection, testing, and all maintenance procedures will be clearly defined by the Contractor and approved at the start of the contract.
· Conduct and document annual inspection of systems/equipment to ensure compliance with industry standard requirements (e.g. ASSE). The contractor shall deliver all reports and required documents to the Facility Authority (as per NFPA 99 section 5.1.14) at the VA medical center. All documentation shall contain and reflect the associated “permit to work” information as per NFPA 99 section 5.1.14.2 for document compliance.
· Inspect and service the source equipment distributing gas to the medical gas pipeline for the following gases: medical surgical vacuum, medical air, waste anesthetic gas disposal (WAGD), laboratory vacuum, laboratory air, nitrous oxide, carbon dioxide, instrument air and nitrogen as per equipment manufacturers recommendations and as per ASSE Series 6000.
· Description of equipment under service contract will be from the inlet piping of the compressors, to the source valve of the distribution piping. From the exhaust piping connection on all vacuum systems to the source valve of the distribution piping. From the connection of the bottles on all manifolds to the source valve of the distribution piping.
· Conduct an independent Medical Gas Source System overall performance evaluation every 12 months.
SYSTEM OVERSITE AND RESPONSE.
1. Provide afterhours immediate contact/notification support to assess any medical gas emergencies within one (1) hours and be able to respond / troubleshoot and address or attempt to repair any failed items/systems within 48 hours.
2. For estimating purposes provide costs to respond after-hours and assess current condition of medical gas system condition 12 times per calendar year (up to 2 hours of afterhours immediate support per call).
3. Repair and Replacement Services. The contractor shall provide repair services for medical gas and vacuum (MG&V) source systems for specified systems in identified locations within the George E. Wahlen Department of Veterans Affairs Medical Center Salt Lake City Campus including, but not limited to
· Equipment preventive maintenance repairs.
· Complete repairs on source equipment identified through predictive maintenance evaluations (e.g. replacing or upgrading a system component prior to failure).
· Complete/conduct comprehensive system repairs, while minimizing down time to system or facility.
· Work close with Facility Authority (as per NFPA99) to schedule any maintenance/ repairs that may require temporary system redundancy interruption.
· Emergency Maintenance/Repair. Be able to provide support within one (1) hour of notification to assess an emergency and be able to respond/troubleshoot and address or attempt to repair any failed items/systems on-site within 4 hours.
· System(s) Replacement and Installation.
· In the event of system(s) failure and need for system(s) or MG&V related parts/piping replacement, contractor shall have access to industry experts and designers to not only be able to plan the replacement, but also provide a temporary system or alternative measures to ensure minimal- interruption of service.
· If replacement is determined to be the best approach, quote replacement.
· Follow on task will be issued to contractor detailing the project requirements of system replacement. However, contractor must be capable of providing the following services as part of system replacement/installation.
· Contractor must submit a detailed plan demonstrating the execution of this work as part of their technical proposal.
· All new equipment/systems must be prepared and installed in accordance with NFPA, ASSE, & CGMA industry codes & standards for MG&V systems. All system verification testing, commissioning, and documentation to be performed as required per current code, federal authority having jurisdiction, & The Joint Commission requirements.
· Medical Gas and Vacuum System outages must be minimized to the maximum extent possible to support buildings 1, & 14 - Critical Patient Care Areas which provide 24 hours a day, 7 days a week patient care.
· The government’s preference is to have all work in place so that ONE extended outage (less than 24-hours) can occur to connect new or temporary systems.
· Contractor must demonstrate they can assist in connecting all systems within the same outage period.
· Installation of all new medical gas equipment & piping must be performed by ASSE Certified 6010 medical gas installer and verified by an ASSE certified 6030 Verifier as per NFPA 99 code requirements. Current certification credentials required to be listed on all documentation.
· As-Built Drawings. The contractor shall provide changes to as-built drawings to the P.O. for any work performed by contractor or subcontractor personnel which causes changes including, but not be limited to, plant layout, piping or equipment design or detection of an error within 15 days of the change. Changes shall consist of marked-up (red-lined) copies of affected drawings.
· Perform/complete corrective maintenance associated with repairing MG&V system(s) per manufacture recommendations and industry standards; or as directed in a specific task.
TASK MANAGEMENT / DOCUMINTATION / REPORTING.
1. Contractor shall track and document all inspection, testing, maintenance, repairs/tasks/activities and visits under this contract so staff can upload all documentation to the Computerized Maintenance Management System (CMMS) as well as the permit to work system.
2. All tasks or periodic monitoring points will be entered into the system as maintenance is assigned to systems/equipment, building/location.
3. All preventive inspection, testing, and maintenance inspections and routines are conducted & documented electronically through a computer.
4. Contractor shall indicate & record any discrepancies found upon performing all inspections, testing, & maintenance checklists. All failed inspection points and out of range parameters, to include recommended repair actions.
5. Contractor shall provide all annual/routine inspection reports to the Facility Authority staff member so they can enter everything into the CMMS system within five (5) business days of completing the inspection.
6. Sample deliverables: As part of the bid package, upon request from the Facility Authority, contractor shall provide samples of inspection and testing checklist/ documents for the Medical gas and vacuum systems listed in attachment 1.
7. It is the expectation that the contractor will provide documentation that as a minimum meets industry standard (e.g. NFPA 99 and ASSE).
8. It is the contractor’s responsibility to upload these reports as documents associated with the respective pieces of equipment or in the electronic ‘Binder’ within the CMMS system if requested by the Facility Authority.
MEDICAL GAS SYSTEM SHUTDOWN.
1. In the event of a planned medical gas system shutdown, the contractor shall ensure to perform the following:
2. Prepare and submit a written shutdown plan which includes, but not limited to the following: (a) identifying the gas systems to be shutdown, (b) describing/specifying the installation and verification testing procedures and techniques to be performed (c) identifying prefabrication opportunities (d) identifying valve(s) (in collaboration with the facility authority) that will need to be shutdown (e) identifying and verifying the areas to be affected by the shutdown (f) define the duration of the shutdown (e.g. allow for piping work, installer testing, gas activation, and notification to all departments that system is acceptable for patient use)
3. Acquire/schedule all necessary materials, equipment, labor and outside services required for the shutdown. As well as provide documentation/memorandum that the equipment and material used are per current NFPA 99 code requirements.
4. Coordinate and schedule all work with Facility Authority/PO/CO/FM. Contractor must meet and coordinate with Facility Authority prior to any work scheduled for review.
5. Notify the PO and Facility Authority when ready to commence work and when work is completed.
6. Conduct and provide verification test result report per NFPA 99 code and ASSE requirements to PO and Facility Authority.
7. The government’s preference is to have all work in place so that ONE extended outage (less than 24-hours) can occur to connect the systems.
GENERAL REQUIREMENTS
1. The contractor shall follow all facility requirements, e.g. facility entry standard operating procedures. Work may be after-hours.
2. The services described or specified shall not be deemed to be all encompassing having the effect of excluding services not specifically mentioned but necessary to execute the contract.
3. Problem Solving - Inherent with the performance of the Contractor services is the cooperation, advice and actions necessary to identify, resolve, and implement expeditious solutions to problems arising during the execution of the project.
4. Contractor shall complete all required facility specific training required by the End User in advance of performing any work.
5. Contractor shall provide proof of qualifications of technician/verifier to conduct testing, inspection, and installation/replacement or perform any other related work on Medical Gas and Vacuum systems for systems specified.
6. All required shutdowns and lock out, tag outs shall be coordinated with Facility Manager or Facility Authority. Work shall be coordinated and scheduled with CO/PO/FM. Contractor must meet and coordinate with FM prior to any work scheduled for review.
7. Contractor shall perform all work in a safe manner, using proper PPE and following proper procedures related to SDS as appropriate.
8. Contractor shall be responsible for housekeeping during the performance of all work and from services they perform, which includes, but is not limited to removal of all debris, proper disposal of debris, and cleaning of the area/equipment/systems, as appropriate.
9. All materials and equipment incorporated into the work shall be new and for the purpose intended, unless otherwise specified, and all workmanship shall be of good quality and performed in a skilled manner as determined by the Facility Authority/CO.
10. Unless specified otherwise in the Task Order, all documents prepared under this contract shall comply with the latest edition of the applicable design policies, guidelines, codes and standards as well as National & International codes, standards & regulations.
11. All services rendered by contractor, its employees and agents pursuant to this Agreement shall be undertaken and completed in an expeditious, good, and workmanlike manner.
12. Piping replacement materials must be in accordance with NFPA99 & meet all system manufacturers requirements. Contractor shall provide all necessary supplies and equipment to complete any repairs.
13. All shutdowns require a minimum of 15 days for approval. Work shall be coordinated and scheduled with the Project Officer (P.O.), Facility Manager, Facility Authority and coordinate with VA Medical Center -SLC Leadership and end users. Contractor must meet and coordinate with Facility Authority prior to any work scheduled for review.
14. All materials and equipment incorporated into the work shall be new and for the purpose intended, unless otherwise specified, and all workmanship shall be of good quality and performed in a skillful manner as determined by the Contracting Officer.
15. When system replacement is recommended, the contractor is responsible for hiring and managing a 3rd party verifier agent to confirm proper installation of the system. This cost shall be included in proposals submitted in response to specific tasks. Contractor shall complete all commissioning requirements for all equipment in accordance with manufacturer/industry standards and comply with current NFPA 99 code requirements.
16. Badging - ID Badge, is an identification credential issued to identify individuals who are in a short-term or intermittent position that requires physical access to the VAMC SLC campus and/or facilities. The contractor and subcontractor(s) shall always wear their VAMC SLC issued ID badge prominently while on campus.
17. Properly marked company vehicles and equipment required in the performance of the work shall be permitted to park within the project approved staging area(s). Personal vehicles are prohibited from parking within the staging areas.
18. Invoicing Instructions – Per procedures on Standard Form 1442 provided by the contracting officer.
SAFETY
1. VA SLC is committed to providing a safe environment for its employees, guests, and patients. Safety, as demonstrated during previous contracts, may be used in the performance evaluation of a Contractor’s ability to build, design, construct, develop, field or operate a system, building or facility. This effort has two aspects, design/ construction of buildings & facilities and design, development, production and fielding of systems.
2. Interim Life Safety Measures/Construction Risk Assessment / Infections Control Risk Assessment. Contractors performing work in the buildings 1, 2, 3, or 14 of the VA SLC Complex must comply with all requirements of the current VA SLC Facilities Development Manual (FDM), with special emphasis on Section 3-10 Interim Life Safety Measures (ILSM) Infections Control Risk Assessment (ICRA) and Construction Risk Assessment (CRA), and Section 3-16 CCC Construction and Above Ceiling Permit. This procedure applies to all construction and maintenance support projects located in the VA SLC Complex.
3. Contractors and all subcontractors that will be conducting work at VA SLC that receive a Task Order with the Office of Research Facilities as a result of this solicitation are required to enroll in the Contractor Safety Assessment Program (CSAP) within 10 calendar days from the receipt of award.
4. The Contractor shall provide an accident prevention plan for each work activity to be performed at the VA SLC.
Period of Performance The work shall proceed promptly upon execution of this contract and only after the issuance of the Notice to Proceed (NTP) by the Government for the activities indicated. The Period of Performance shall be for 12 months with option to renew at the Government's sole discretion.
Statement of Work (SOW) -ATTACHMENT 1- George E. Wahlen Department of Veterans Affairs Medical Center campus Salt Lake City campus SOURCE EQUIPMENT INVENTORY LIST Building 14
Medical Air:
Patton's Medical Scroll Medical Air Compressors w/ Duplex Desiccant Dryer
Serial #62-75557
Lab Air:
Atlas Copco SF-15 scroll compressor system with Duplex Refrigerated Dryers
Serial #000612918
Medical Surgical Vacuum:
Becker Tri-plex Oil Lubricated Rotary Vane Vacuum System
Serial #F2402118
Lab Vacuum:
Becker Tri-plex Oil Lubricated Rotary Vane Vacuum System
Serial #E1910854
Nitrous Oxide:
Amico High Pressure Manifold 3X3
Serial #20120414-B-A
Nitrogen:
Amico High Pressure Manifold 5X5
Serial #20120412-D-A
Instrument Air:
Amico High Pressure Manifold 2X2
Serial #20120415-B-B
Carbon Dioxide:
Amico High Pressure Manifold 2X2
Serial #20120417-B-C
Building 1
Medical Air:
Atlas Copco SF-15 scroll compressor system
Serial #000685696
| Duplex Desiccant Dryer System: |
| Serial #64-62511 |
Medical Surgical Vacuum:
Becker Tri-plex Oil Lubricated Rotary Vane Vacuum System
Serial #F2402244
Lab Vacuum:
Becker Tri-plex Oil Lubricated Rotary Vane Vacuum System
Serial #E1910869
Nitrogen:
Amico High Pressure Manifold 2X2
Serial #20040723-D-A
Building 2
Lab Air:
Atlas Copco SF-15 scroll compressor system with Duplex Refrigerated Dryers
Serial #000612918
Lab Vacuum:
Becker duplex Oil Lubricated Rotary Vane Vacuum System
Serial #F2403697
All services will accompany documentation that is in compliance with TJC, NFPA99, ASSE, & customers Facility Authority
B.3 PRICE/COST SCHEDULE
POP: Base Year October 1, 2024 – September 30, 2025
| CLIN |
| DESCRIPTION OF SERVICES |
| QTY |
| U/I |
| UNIT PRICE |
| TOTAL AMOUNT |
| 0001 |
| Annual Medical Gas and Vacuum System Inspection in accordance with the Statement of Work. |
Contract Period: Base POP Begin: 10-01-2024 POP End: 09-30-2025
| 1 |
| YR |
| $_________ |
| $_____________ |
| 0002 |
| Semi-Annual inspection and preventative maintenance in accordance with the Statement of Work. |
Contract Period: Base POP Begin: 10-01-2024 POP End: 09-30-2025
| 2 |
| EA |
| $_________ |
| $_____________ |
| 0003 |
| Repair Services and parts for issues discovered during preventative maintenance and annual inspection in accordance with the Statement of Work. Pricing to be adjusted via modification as needed. |
Contract Period: Base POP Begin: 10-01-2024 POP End: 09-30-2025
| 1 |
| YR |
| $10,000.00 |
| $10,000.00 |
| 0004 |
| Emergency diagnosis and repairs in accordance with the Statement of Work. Maximum of 240 annual hours. |
Contract Period: Base POP Begin: 10-01-2024 POP End: 09-30-2025
| 240 |
| HR |
| $_________ |
| $_____________ |
POP: Option Year 1 October 1, 2025 – September 30, 2026
| CLIN |
| DESCRIPTION OF SERVICES |
| QTY |
| U/I |
| UNIT PRICE |
| TOTAL AMOUNT |
| 1001 |
| Annual Medical Gas and Vacuum System Inspection in accordance with the Statement of Work. |
Contract Period: Option Year 1 POP Begin: 10-01-2025 POP End: 09-30-2026
| 1 |
| YR |
| $_________ |
| $_____________ |
| 1002 |
| Semi-Annual inspection and preventative maintenance in accordance with the Statement of Work. |
Contract Period: Option Year 1 POP Begin: 10-01-2025 POP End: 09-30-2026
| 2 |
| EA |
| $_________ |
| $_____________ |
| 1003 |
| Repair Services and parts for issues discovered during preventative maintenance and annual inspection in accordance with the Statement of Work. Pricing to be adjusted via modification as needed. |
Contract Period: Option Year 1 POP Begin: 10-01-2025 POP End: 09-30-2026
| 1 |
| YR |
| $10,500.00 |
| $10,500.00 |
| 1004 |
| Emergency diagnosis and repairs in accordance with the Statement of Work. Maximum of 240 annual hours. |
Contract Period: Option Year 1 POP Begin: 10-01-2025 POP End: 09-30-2026
| 240 |
| HR |
| $_________ |
| $_____________ |
POP: Option Year 2 October 1, 2026 – September 30, 2027
| CLIN |
| DESCRIPTION OF SERVICES |
| QTY |
| U/I |
| UNIT PRICE |
| TOTAL AMOUNT |
| 2001 |
| Annual Medical Gas and Vacuum System Inspection in accordance with the Statement of Work. |
Contract Period: Option Year 2 POP Begin: 10-01-2026 POP End: 09-30-2027
| 1 |
| YR |
| $_________ |
| $_____________ |
| 2002 |
| Semi-Annual inspection and preventative maintenance in accordance with the Statement of Work. |
Contract Period: Option Year 2 POP Begin: 10-01-2026 POP End: 09-30-2027
| 2 |
| EA |
| $_________ |
| $_____________ |
| 2003 |
| Repair Services and parts for issues discovered during preventative maintenance and annual inspection in accordance with the Statement of Work. Pricing to be adjusted via modification as needed. |
Contract Period: Option Year 2 POP Begin: 10-01-2026 POP End: 09-30-2027
| 1 |
| YR |
| $11,025.00 |
| $11,025.00 |
| 2004 |
| Emergency diagnosis and repairs in accordance with the Statement of Work. Maximum of 240 annual hours. |
Contract Period: Option Year 2 POP Begin: 10-01-2026 POP End: 09-30-2027
| 240 |
| HR |
| $_________ |
| $_____________ |
POP: Option Year 3 October 1, 2027 – September 30, 2028
| CLIN |
| DESCRIPTION OF SERVICES |
| QTY |
| U/I |
| UNIT PRICE |
| TOTAL AMOUNT |
| 3001 |
| Annual Medical Gas and Vacuum System Inspection in accordance with the Statement of Work. |
Contract Period: Option Year 3 POP Begin: 10-01-2027 POP End: 09-30-2028
| 1 |
| YR |
| $_________ |
| $_____________ |
| 3002 |
| Semi-Annual inspection and preventative maintenance in accordance with the Statement of Work. |
Contract Period: Option Year 3 POP Begin: 10-01-2027 POP End: 09-30-2028
| 2 |
| YR |
| $_________ |
| $_____________ |
| 3003 |
| Repair Services and parts for issues discovered during preventative maintenance and annual inspection in accordance with the Statement of Work. Pricing to be adjusted via modification as needed. |
Contract Period: Option Year 3 POP Begin: 10-01-2027 POP End: 09-30-2028
| 1 |
| YR |
| $11,576.25 |
| $11,576.25 |
| 3004 |
| Emergency diagnosis and repairs in accordance with the Statement of Work. Maximum of 240 annual hours. |
Contract Period: Option Year 3 POP Begin: 10-01-2027 POP End: 09-30-2028
| 240 |
| HR |
| $_________ |
| $_____________ |
POP: Option Year 4 October 1, 2028 – September 30, 2029
| CLIN |
| DESCRIPTION OF SERVICES |
| QTY |
| U/I |
| UNIT PRICE |
| TOTAL AMOUNT |
| 4001 |
| Annual Medical Gas and Vacuum System Inspection in accordance with the Statement of Work. |
Contract Period: Option Year 4 POP Begin: 10-01-2028 POP End: 09-30-2029
| 1 |
| YR |
| $_________ |
| $_____________ |
| 4002 |
| Semi-Annual inspection and preventative maintenance in accordance with the Statement of Work. |
Contract Period: Option Year 4 POP Begin: 10-01-2028 POP End: 09-30-2029
| 2 |
| YR |
| $_________ |
| $_____________ |
| 4003 |
| Repair Services and parts for issues discovered during preventative maintenance and annual inspection in accordance with the Statement of Work. Pricing to be adjusted via modification as needed. |
Contract Period: Option Year 4 POP Begin: 10-01-2028 POP End: 09-30-2029
| 1 |
| YR |
| $12,155.06 |
| $12,155.06 |
| 4004 |
| Emergency diagnosis and repairs in accordance with the Statement of Work. Maximum of 240 annual hours. |
Contract Period: Option Year 4 POP Begin: 10-01-2028 POP End: 09-30-2029
| 240 |
| HR |
| $_________ |
| $_____________ |
| BASE YEAR TOTAL |
| $ |
| OPTION YEAR 1 TOTAL |
| $ |
| OPTION YEAR 2 TOTAL |
| $ |
| OPTION YEAR 3 TOTAL |
| $ |
| OPTION YEAR 4 TOTAL |
| $ |
| GRAND TOTAL BASE PLUS 4 |
| $ |
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.—
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in FAR 32.608-2 in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical…