S05 - RFIs and Responses 2023.pdf
PDF 172 KB Posted
- Attached to
- Z2DA--VETERANS HEALTH-PRIVACY AND DECENCY
- Solicitation number
- 36C25923R0084
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S05 - RFIs and Responses FINAL.pdf | ||
| 36C25923R0084 0005.docx | DOCX document | |
| 36C25923R0084 0004.docx | DOCX document | |
| S06 - ICRA Template.pdf | ||
| 36C25923R0084 0003.docx | DOCX document | |
| Veterans Health Sheridan VAMC Takeoff 06142023.pdf | ||
| S05 - RFI for Curtain Fabrics_Color.pdf | ||
| 36C25923R0084 0002.docx | DOCX document | |
| S04 - Site Visit Sign-In Roster 06142023.pdf | ||
| S04 - Site Visit Meeting Doc_Vet Health.pdf | ||
| 36C25923R0084 0001.docx | DOCX document | |
| S02 - Design Alert.pdf | ||
| S02 - Specifications.pdf | ||
| S02 - Drawings.pdf | ||
| 36C25923R0084_1.docx | DOCX document | |
| S22 - Blank LOS Cert.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project: 666-19-104 Veteran’s Health-Privacy and Decency Sheridan VAMC RFI’s
Solicitation: 36C25923R0084
1. The spec gives no information regarding fabric or mesh colors on the curtains, can the VA provide? We need this information to provide accurate pricing:
A: Match existing fabrics in adjacent rooms if possible. If not possible, the VA interior designer shall provide an alternative.
2. Can the VA provide specifications sections for the sink going in room 131 in building 71N?
A: See specification section 09 06 00 Schedule of finishes. Color to be white.
3. Does the VA want any light in the closet in room 131 in building 71N?
A: Drawing do not show a light. No light is required.
4. Will there need to be fire suppression in the closet 131 A?
A: Yes
5. Can the VA provide more detail on the bi-fold closet door they would like to have on closet 131A?
A: The door shall be a solid unit, cannot be louvered. Contractor shall follow ICRA guidelines and submit proposed door for approval.
6. Can the VA confirm that the only work that needs to be done for door B6-111 is to remove and install door hardware?
A: Yes
7. Can all the work be done during normal business hours?
A: Normally Yes. There may be some renovation work that will require multiple days labor, but no overtime hours are expected.
8. Will we be able to shut down restrooms and rooms during normal business hours to perform the work?
A: Yes Coordinate with COR
9. With adding a wall in unisex bathroom 106C building 86, will we have to move the toilet to meet ADA standards? Toilet will not need to be moved as part of this project.
A: Toilet will not need to be moved as part of this project. ADA is not applicable in this case.
10. Where the curtain track systems in the rooms run into each other are we to make it 90 degrees or would the VA like to see some curves to allow for less curtains in the room?
A: 90 degrees, curves, or multiple curtains may need to be used to achieve the privacy called out in the Design Alert requirements.
11. When relocating items on tile walls and new items don’t cover up old holes will the contractor need to replace the tile on the wall?
A: Yes, per general notes on sheet G-001
12. Can the VA provide an infectious control assessment for installing curtain tracks?
A: ICRA under review. Will be provided to successful offeror
13. Can the VA provide an infectious control assessment for installing specialty items?
A: ICRA under review. Will be provided to successful offeror
14. Will we be able to work in more than one area at a time?
A: Yes. Coordinate with the COR
15. Are we to include all the changes shown in the Illustrations in the design alert?
A: All pertinent design alert guidance has been incorporated into the plans and specifications. Follow plans and specifications.
16. What are the heights of the curtains that will be installed?
A: curtains heights will be determined by ceiling height. The ceilings vary from building to building. Most buildings have suspended ceilings, but the contractor could encounter hard ceilings in some areas. Most ceiling heights range from 10 to 12 feet, but contractor shall field verify all areas prior to starting construction in the area.
17. What kind of fabric do you want for these curtains?
designer shall provide an alternative.
18. What color should be used for the mesh?
designer shall provide an alternative
19. What is the ceiling height
A: The ceilings vary from building to building. Most buildings have suspended ceilings, but the contractor could encounter hard ceilings in some areas. Most ceiling heights range from 10 to 12 feet, but contractor shall field verify all areas prior to starting construction in the area.