McCurtain CBOC Follow - up QA.pdf

PDF 75 KB Posted

Attached to
Q201--McCurtain CBOC Federal contract opportunity
Solicitation number
36C25923R0040
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

This document contains questions and responses related to a Request for Proposal (RFP) for the McCurtain Community-Based Outpatient Clinic (CBOC). Key details include:

The RFP requires the contractor to provide medical care services to local veterans and specifies technical requirements such as the number of telehealth rooms, data ports, and cabling standards (CAT6A). The government has updated the performance period to 180 days from contract award for commencement of services, and the base period is 12 months with 9 optional 12-month periods. The solicitation is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside, with a current enrollment of 950 billable patients. Contractors must meet the government's space requirements per the Performance Work Statement. The proposal submission requires redaction of business names after the first page.

View the file

Other files for this federal contract opportunity

Other files attached to Q201--McCurtain CBOC, newest first.
File Type Posted
D.22 Quality Assurance Surveillance Plan - McCurtain CBOC.pdf PDF
36C25923R0040 0007.docx DOCX document
36C25923R0040 0006.docx DOCX document
D.26 Medications Vaccines Listing.pdf PDF
D.27 McCurtain CBOC Schedule.xlsx XLSX spreadsheet
36C25923R0040 v2 05162024.pdf PDF
McCurtain CBOC QA 05162024.pdf PDF
36C25923R0040 0005.docx DOCX document
36C25923R0040 0004.docx DOCX document
36C25923R0040 0003.docx DOCX document
36C25923R0040 0002.docx DOCX document
36C25923R0040 0001.docx DOCX document
D.25 Documentation Checklist.pdf PDF
D.23 eQM measurements for 2023.pdf PDF
D.19 Document Scanning Policy 02.pdf PDF
D.18 Outpatient Scheduling Processes and Procedures 02.pdf PDF
D.16 Immigration Certification 02.pdf PDF
D.12 SCA 15 -5333 Wage Determination 01252024.pdf PDF
D.22 Quality Assurance Surveillance Plan - McCurtain.pdf PDF
D.17 42 CFR Part 493-Laboratory Requirements 02.pdf PDF
D.14 Org Conflict of Interest 02.pdf PDF
D.10 Communication Test Results to Providers 02.pdf PDF
D.5 Specimen Handling and Transporting From CBOCs 02.pdf PDF
D.1 Anticoagulation Program .pdf PDF
D.24 No Show-Minimum Scheduling Effort SOP 02.pdf PDF
D.20 Past Performance References 02.pdf PDF
D.11 Suicide Prevention.pdf PDF
D.9 Information Security 02.pdf PDF
D.7 Pretreatment and Transportation of Soiled Critical 1 02.pdf PDF
D.3 Patient Rights and Responsibilities 02.pdf PDF
D.2 11-108 Medication Reconciliation Process.pdf PDF
D.21 Past Performance Questionnaire 02.pdf PDF
D.15 Contractor Rules of Behavior 02.pdf PDF
D.13 DBA OK20240071 Wage Determination.pdf PDF
D.8 Pretreatment and Transportation Soiled Critical 2 02.pdf PDF
D.6 EOC 2022 02.pdf PDF
D.4 Women's Health Mammography and Cervical Screening Care Coordination 02.pdf PDF
36C25923R0040.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. QUESTION 28: Reference section 4.9.1 page 82. Will the government please confirm if 8 data ports are required per room?

Government Response: The PWS does not identify number of data points required per room. As guidance, IT requires a minimum of three data ports. Some spaces may need more, depending on their purpose/how many pieces of equipment need connected to the network.

Follow-up Question: Is the VA requiring 3 data points per plate?

Government Response: VA requires that ALL data drops be terminated to the VA OIT closet patch panel. These are for phone and data.

Follow-up Question: Is the VA requesting any phone pre-wiring? If so, would the pre-wiring be provided in the VA IT closet or another location?

Government Response: Per the government’s previous response, a minimum of three data ports are needed. Some spaces may need more, depending on their purpose/how many pieces of equipment need connected to the network.

2. QUESTION 29: Reference section 4.9.1 page 83. Tele-health will require four (4) rooms. One (1) teleretinal imaging patient care room; one (1) telehealth patient care room; and two (2) counseling patient care rooms. Consult Rooms will be three spaces. Two (2) consult patient care rooms; and one interview patient care room.

Are the 3 spaces for consult rooms separate from the 4 tele-health rooms which includes two counseling patient care rooms?

Government Response: Yes, they are separate.

Follow-up Question: Does a primary care consultation room count as one of the three required telehealth consult rooms?

Government Response: A primary care consultation room can serve a dual purpose as a telehealth consultation room.

3. QUESTION 34: Reference section 4.11.2.6.7 page 93. Racks: infrastructure installer should install

Leviton CAT6 patch panels and connectors in the rack.

Could the government please confirm if a comparable brand to Leviton is suffice.

Government Response: Reference PWS para 4.1.2.6.7 updated to read “Infrastructure installer should install CAT6A patch panels and connectors in the rack”

Follow-up Question: Could the Government confirm if a comparable brand to Leviton is sufficient to fulfill the requirement?

Government Response: A comparable brand to Leviton is sufficient.

4. QUESTION 35: Reference section 6.1.2 page 106. The Contractor shall have 120 days from contract award to commencement of the provision of medical care to local Veterans.

Would the VA consider 180 days from contract award to commencement of the provision of medical care to local Veterans due to the national shortage of building supplies?

Government Response: PWS para 6.1.2. updated to reflect: The Contractor shall have 180 calendar days from contract award to commencement of the provision of medical care to local Veterans.

However, the Contractor must have all start-up requirements in place and ready to commence operation NLT 173 calendar days from contract award.

Follow-up Question: We respectfully note that both the scheduled provided in the amended Solicitation and the schedule provided in the excel with the questions and answers lists the period of performance starting on October 1, 2024. The timeframe as of today and October 1, 2024, is less than the number of days given for Contract start-up.

Will the Government provide an updated period of performance for the required services?

Government Response: The contract will have a twelve (12) month base period with Nine (9) twelve

(12) month option periods. The Schedule will be updated at award.

5. QUESTION 56: Please provide a Microsoft Word version of the solicitation document.

Government Response: An excel version of the schedule will be posted.

Follow-up Question: Is this excel required to be submitted with the proposal?

Government Response: The excel spreadsheet is not required to be submitted with proposal.

6. QUESTION 73: Please advise how many telehealth rooms (by type) the VA requires in this facility and if the VA would like exam tables in the rooms.

Government Response: Reference paragraph 4.9 Space Requirements: One tele retinal room; one patient care room; and two counseling patient care rooms. PWS section 4.9 updated to read (1) telehealth patient care room requires an exam table. “

Follow-up Question: Can you clarify whether the tele retinal room and counseling patient care rooms also require an exam table?

Government Response: Tele retinal and counseling patient care rooms do not require an exam table.

7. QUESTION 90: Does the government require CAT6 or CAT6A cabling?

Government Response: Reference PWS para 4.11.2.6.7 updated to read “Infrastructure installer should install CAT6A patch panels and connectors in the rack”.

Follow-up Question: Can you clarify whether the VA requires CAT6 or CAT6A cabling throughout the McCurtain CBOC, or just as the patch panels?

Government Response: CAT6A should be used throughout the CBOC.

Follow-up Question: If the VA requires a separate phone wiring does the VA require the phone wiring to be CAT6 or CAT6A cabling?

Government Response: CAT6A

8. QUESTION: On what dates was the market research performed?

Government Response: The market research report is an internal document to the Government and is used to determine the acquisition strategy used for these services. The market research findings are exhibited in the Government’s determination to publish this solicitation as an SDVOSB set-side.

9. QUESTION: Would the government consider increasing the price maximum for this solicitation?

Government Response: The price maximum will be reviewed at contract award.

10. QUESTION: Does the current CBOC meet the government’s space requirements?

Government Response: All offers must meet the Government’s space requirements per the

Performance Work Statement in the RFP.

11. QUESTION: Please provide the number of billable enrollees on the most current invoice.

Government Response: 950

12. QUESTION: Being that all contracted staff must go through VA’s onboarding and credentialing, what is the attrition rate for this current contract for both providers and support staff?

Government Response: Please see the PWS for the credentialing process and qualifications for successful onboarding.

13. QUESTION: Would the government extend the due date for this solicitation by 30 days?

Government Response: Review amendment blocks 11 and 14 for offer Due Date and Time

14. QUESTION: We respectfully note that page 173 of the Amended Solicitation reads as follows:

“Please indicate the name of the business on the first page only in the redacted proposal. DO NOT place business name on every page of the proposal, use “our company” in place of business name after the first page.”

We assume that the redacted nature of the proposal is not applicable to the Section B component of the submission. Can you clarify whether this assumption is correct?

Government Response: One copy of the Technical Proposal, Past Performance Proposal and Price Proposal will be redacted.

15. QUESTION: We respectfully note that page 173 of the Amended Solicitation reads as follows:

“Please indicate the name of the business on the first page only in the redacted proposal. DO NOT place business name on every page of the proposal, use “our company” in place of business name after the first page.”

We assume that the redacted nature of the proposal is not applicable to past performance questionnaires and any letters, metrics, customer surveys, independent surveys, provided with the submission. Can you clarify whether this assumption is correct?

Government Response: Past Performance Questionnaires do not need redaction as they are sent directly to the contracting office. Any letters, metrics, customer surveys, independent surveys, provided with the submission will be redacted.

16. QUESTION: We respectfully note that the Acceptable Quality Level for the influenza immunization composite score is 29%, as shown in Section 4.13.12 of the PWS.

We respectfully note that the Acceptable Quality Level provided in the Quality Assurance Surveillance Plan for the influenza immunization composite score is 2%.

We assume that the correct Acceptable Quality Level is 29%, and the 2% Acceptable Quality Level in the Quality Assurance Surveillance Plan is a typo. Can you clarify whether this assumption is correct?

Government Response: The composite score on both the PWS and the QASP is 29%. The QASP will be updated to reflect 29%

17. QUESTION: We respectfully note that the Acceptable Quality Level for clinical reminders is 90%, as shown in Section 4.13.15 of the PWS.

We respectfully note that the Acceptable Quality Level provided in the Quality Assurance Surveillance Plan for clinical reminders is 95%.

Which is the correct clinical reminder Acceptable Quality Level for the McCurtain CBOC?

Government Response: The Acceptable Quality Level for clinical reminders is 90%. The QASP will be updated to reflect 90%.

18. QUESTION: According to the most recent version of VHA Directive 1406, panel capability can be adjusted by the number of exam rooms per PCP FTE.

We assume that the total number of examination rooms counted to make this adjustment includes Women’s Health Examination Rooms. Can you clarify whether this assumption is correct?

Government Response: Women's Health Examination rooms are included in the total number of examination rooms counted to make the adjustment.

File details come from the government source that posted it. Updated .