This document is a phasing plan for a road and parking lot resurfacing project at the Sheridan VA Medical Center in Sheridan, Wyoming. The project will be completed in three phases, with each phase including base bid work as well as optional deducts. Phase 1 involves improvements to roads, parking lots, lighting, and landscaping near residential quarters and along Freedom Lane. Phase 2 focuses on additional road, parking lot, and sidewalk work along Coast Guard Lane, Air Force Lane, and Navy Lane. Phase 3 covers repairs to Coast Guard Lane, the maintenance area, and Fort Road. The document provides detailed notes on sequencing, access requirements, and tie-in responsibilities for each phase and deduct. Bidders should submit pricing for the base scope of each phase as well as itemized costs for the individual deducts listed. Coordination with the contracting officer's representative is emphasized throughout construction.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FORT RD (T-337)
FREEDOM LANE
FREEDOM LANE
FREEDOM LANE
COAST GUARD LN.
ARMY LN.
AI
R
FO
RC
E
LN
IN
DE
PE
ND
EN
CE
L N.
MA
RI
NE
C
OR
PS
LN
NAVY LN.
71N
3 64
QUARTERS RD.
FORT RD (T-337)
QUARTERS RD.
NA
VY
LN
AIR FORCE LN.
AR
MY
LN
COAST GUARD LANE
PARKING LOT 10
PA
RK
IN
G
LO
T
PARKING LOT 7
PARKING LOT 6
PARKING LOT 15
PARKING LOT 1
PARKING LOT 22
PA
RK
IN
G
LO
T
PARKING
LOT 16
PARKING LOT 12
PARKING
LOT 13
PARKING
LOT 20
M
M
W
V
U
TS
RQP
ONM
LKJ
HGF
DCB
I
E
A
X
O N
E
I N
C H
T
I R
Y
F
E E
T
O N
E
I N
O
N E
H
U N
D R
D
E
T
O N
E
I N
W O
H
U N
D R
E
T
CALL 811 OR 1-800-849-2476
SITE SERIAL: 2019290075
17277
Date
P r o f e s s i o nal n g i n e e r
W
Y
O M
I N
G
C
H R
I
S
T
O
P
H
E R
G
A
R Y
O N
E
I N
O
H
U N
D R
I F
E
T architects + engineers acela architects + engineers, pc
2633 Moravian Ave.
Allentown, PA 18103 office: 610.365.4023 website: www.acela-ae.com email: info@acela-ae.com
O N
E
I N
I R
E
T
O N
E
I N
O
N E
H
U N
D R
E
T
O N
E
I N
O
H
U N
D R
E
T
CALL 811 OR 1-800-849-2476
SITE SERIAL: 2019290075
17277
Date
P r o f e s s i o nal n g i n e e r
W
Y
O M
I N
G
C
H R
I
S
T
O
P
H
E R
G
A
R Y
O N
E
I N
O
H
U N
D R
I F
E
T architects + engineers acela architects + engineers, pc
2633 Moravian Ave.
Allentown, PA 18103 office: 610.365.4023 website: www.acela-ae.com email: info@acela-ae.com
SCALE: 1"=250'
500'250'0'
SITE SYMBOLS - PHASING
PHASE 1
PHASE 2
PHASE 3
GENERAL PHASING NOTES
1. THE CONTRACTOR SHALL BE AWARE THAT THE CAMPUS IS A
FUNCTIONING HOSPITAL AND SHALL WORK WITH THE VA AND COR
THROUGHOUT CONSTRUCTION TO ENSURE THAT THE CAMPUS IS
ABLE TO FUNCTION AS INTENDED. THE CONTRACTOR MUST
NOTIFY THE COR BEFORE CLOSURE OF ANY PARKING LOTS,
ROADS, DRIVEWAYS AND SIDEWALKS. FULL CLOSURES OF
ROADWAYS WILL NOT BE PERMITTED, UNLESS OTHERWISE
APPROVED BY THE COR. CONSTRUCTION SEQUENCING SHALL BE
COORDINATED AND APPROVED BY THE COR.
2. CONTRACTOR STAGING FOR ALL PHASES SHALL BE LOCATED
EAST OF BUILDING 31. THE LOCATION IS SHOWN ON EROSION
AND SEDIMENTATION CONTROL PLANS,HOWEVER THE EXACT
LOCATION AND EXTENT SHALL BE COORDINATED WITH THE COR
PRIOR TO CONSTRUCTION.
3. DAILY ACCESS TO THE WATER TOWER (107) IS REQUIRED. AT A
MINIMUM, GRAVEL ACCESS SHALL BE MAINTAINED THROUGHOUT
THE DURATION OF CONSTRUCTION FOR ALL PHASES.
4. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL TRAFFIC
CONTROL STRUCTURES AND PERSONNEL REQUIRED FOR LANE
OR SIDEWALK CLOSURES. LOCATION OF SUCH TRAFFIC CONTROL
DEVICES SHALL BE COORDINATED WITH THE COR BEFORE
CLOSURE. OVERNIGHT CLOSURES REQUIRE SIGNS WITH
FLASHING LIGHTS. ALL TRAFFIC CONTROL SHALL BE PROVIDED
PER WYOMING DOT REQUIREMENTS AND APPROVED PER VA.
5. CONTRACTOR SHALL COORDINATE TRASH PICKUP AND LAUNDRY
ROUTES WITH THE COR PRIOR TO THE START OF EACH PHASE.
6. SUB PHASES WITHIN EACH PHASE SHALL BE APPROVED BY THE
COR PRIOR TO CONSTRUCTION.
7. COAST GUARD LANE AND ALL CORE BUILDINGS (SUCH AS
BUILDINGS 3,4,5,6,7,8,9,61,71,71N,86,87) SHALL HAVE FIRE AND
AMBULANCE ACCESS AT ALL TIMES DURING CONSTRUCTION.
COORDINATE WITH COR FOR ACCEPTABLE ROUTES.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TYING THE ENDS
OF EACH PHASE AND/OR DEDUCT BACK TO EXISTING CONDITIONS
HORIZONTALLY & VERTICALLY TO ENSURE A SAFE TRANSITION
BETWEEN PHASES. BEFORE COMPLETION OF EACH PHASE THE
CONTRACTOR SHALL OBTAIN APPROVAL FROM THE COR AND
COMPLETE ANY REQUIRED TRANSITION WORK.
9. THE CONTRACTOR SHALL PROVIDE THE COR WITH A SITE SAFETY
PLAN PRIOR TO CONSTRUCTION.
PHASE 1 NOTES
1. THE CONTRACTOR SHALL ENSURE ACCESS TO THE QUARTERS IS
PROVIDED FOR RESIDENTS AT ALL TIMES. ANY PARTIAL CLOSURE
SHALL BE COORDINATED WITH THE COR. TEMPORARY PARKING
MAY NEED TO BE PROVIDED.
2. THE CONTRACTOR SHALL ENSURE ACCESS TO THE WATER
TOWER (107) IS PROVIDED.
3. SEQUENCING AND CONSTRUCTION OF PARKING LOT 16 AND
INDEPENDENCE LANE SHALL BE COORDINATED WITH THE COR.
PHASE 2 NOTES
1. DURING CONSTRUCTION OF PARKING LOT 12, AT LEAST 5
TEMPORARY ADA SPACES SHALL BE PROVIDED FOR PATIENTS AS
WELL AS ACCESS TO THE EMERGENCY ENTRANCE LOCATED
EAST OF BUILDING 71N. THE RELOCATION OF ADA SPACES SHALL
BE COORDINATED WITH THE COR PRIOR TO CONSTRUCTION OF
THE LOT.
2. HOSPITAL ACCESS TO BUILDING 71N IS REQUIRED AT ALL TIMES.
CONTRACTOR SHALL COORDINATE WORK WITH COR.
3. COORDINATE WITH COR AND ENGINEER DUE TO POSSIBLE
CHANGES BETWEEN DESIGN AND CONSTRUCTION TIME FOR THE
NAVY LANE EMERGENCY ACCESS ROAD AND LOOP.
PHASE 3 NOTES
1. THE CONTRACTOR SHALL ENSURE AT LEAST ONE LANE IS OPEN
AT ALL TIMES DURING CONSTRUCTION ALONG FORT ROAD. ALL
TRAFFIC CONTROL SHALL BE PROVIDED PER WYDOT
REQUIREMENTS.
GENERAL BID DEDUCT NOTES
1. THE CONTRACTOR SHALL BID THE PROJECT ACCORDING TO PHASE. THE BASE BID SHALL INCLUDE ALL
IMPROVEMENTS WITHIN THE PHASE. EACH LISTED BID DEDUCT SHALL BE ITEMIZED INDIVIDUALLY, IN
ADDITION TO THE BASE BID.
2. ALL CONSTRUCTION DOCUMENTS, INCLUDING PLANS AND SPECIFICATIONS, WERE COMPLETED
ASSUMING ALL IMPROVEMENTS ARE TO BE CONSTRUCTED. IF DEDUCTS OCCUR, THE CONTRACTOR IS
RESPONSIBLE FOR COORDINATING WITH THE COR THE TIE IN LOCATIONS, HORIZONTALLY & VERTICALLY, OF THE DEDUCTS WITH THE PROPOSED IMPROVEMENTS AND EXISTING FEATURES.
3. THE VA RESERVES THE RIGHT TO ADJUST BEGINNING AND END LOCATIONS OF DEDUCTS AS NECESSARY
TO ENSURE PROPER TIE IN AND ADJUSTMENTS TO PROPOSED IMPROVEMENTS ASSOCIATED WITH THIS
PROJECT, AS IMPROVEMENTS FROM A DIFFERENT PROJECT THAT MAY BE OCCURRING AT THE TIME OF
CONSTRUCTION. COORDINATION WITH THE COR IS REQUIRED.
PHASE 1 DEDUCT NOTES
1. DEDUCT 1.1 REMOVES WORK ASSOCIATED WITH THE ROADWAY AND PARKING IMPROVEMENTS BEHIND
BUILDING 1, INCLUDING ALL IMPROVEMENTS EAST OF THE DEDUCT LINE SHOWN ON THE PLANS. THE
DEDUCT INCLUDES ALL DEMOLITION, PAVEMENT, DUMPSTER PADS, CURBING, UTILITY, LANDSCAPING
AND LIGHTING IMPROVEMENTS. THE CONTRACTOR SHALL COORDINATE WITH THE COR TO DETERMINE
TIE IN LOCATIONS OF PROPOSED IMPROVEMENTS ALONG FREEDOM LANE AND NEAR PARKING LOT 1.
2. DEDUCT 1.2 REMOVES WORK ASSOCIATED WITH THE LIGHTING IMPROVEMENTS ALONG QUARTERS ROAD
AT STATION 199+39. THE DEDUCT INCLUDES THE LIGHT POLE (1), FOUNDATION AND ALL ASSOCIATED
ELECTRICAL IMPROVEMENTS INCLUDING THE APPROX 100 LF OF ELECTRICAL WIRE.
3. DEDUCT 1.3 REMOVES WORK ASSOCIATED WITH THE LANDSCAPE IMPROVEMENTS ALONG AREAS OF
FREEDOM LANE AND INDEPENDENCE LANE. THE DEDUCT DOES NOT INCLUDE THE REMOVAL OF THE
EXISTING TREES, WHICH SHALL REMAIN INCLUDED IN THE BASE BID AND COMPLETED REGARDLESS OF
THE REMOVAL OF DEDUCT 1.3. THE DEDUCT INCLUDES THE INSTALLATION OF SEVEN (7) TREES ALONG
THE EAST SIDE OF INDEPENDENCE LANE, IN FRONT OF BUILDINGS 9 AND 71, AS WELL AS THREE (3)
TREES ALONG THE WEST SIDE OF FREEDOM LANE, IN FRONT OF BUILDINGS 71 AND 71N.
4. DEDUCT 1.4 REMOVES WORK ASSOCIATED WITH THE IMPROVEMENTS TO PARKING LOT 16. THE DEDUCT
INCLUDES THE MILL AND OVERLAY OF THE LOT, CONCRETE REPAIR WORK AND CONCRETE CURB AND
GUTTER REPLACEMENT ALONG THE NORTHWEST SIDE OF THE PARKING LOT. THE CONTRACTOR SHALL
NOT INCLUDE THE PAINT STRIPING WITHIN THE DEDUCT. IF DEDUCT 1.4 IS REMOVED FROM PROJECT
SCOPE THE CONTRACTOR SHALL RESTRIPE EXISTING SPACES, AS CURRENTLY STRIPED. THE
CONTRACTOR SHALL COORDINATE WITH THE COR TO DETERMINE TIE IN LOCATIONS OF PROPOSED
IMPROVEMENTS ALONG INDEPENDENCE LANE.
5. DEDUCT 1.5 REMOVES WORK ASSOCIATED WITH THE RECONSTRUCTION OF PARKING LOT 9, ALONG
FREEDOM LANE. THE DEDUCT INCLUDES ALL DEMOLITION, PAVEMENT, CURBING, SIGNAGE, SIDEWALK, AND RAMP CONSTRUCTION. THE CONCRETE VALLEY GUTTER LOCATED BETWEEN THE LOT AND
FREEDOM LANE SHALL BE INSTALLED AND TIED TO THE EXISTING PAVEMENT IN LOT 9 IF SELECTED AS A
DEDUCT. EXISTING PAVEMENT AND CONCRETE SIDEWALK MAY HAVE TO BE ADJUSTED TO ENSURE
POSITIVE DRAINAGE & PROPER TIE-IN TO EXISTING FEATURES.
6. DEDUCT 1.6 REMOVES WORK ASSOCIATED WITH THE RECONSTRUCTION OF PARKING LOT 14, ALONG
FREEDOM LANE. THE DEDUCT INCLUDES ALL DEMOLITION, PAVEMENT, CURBING, AND RAMP
CONSTRUCTION IMPROVEMENTS ALONG WITH ANY UTILITY ADJUSTMENTS. THE CONTRACTOR SHALL
NOT INCLUDE THE PAINT STRIPING WITHIN THE DEDUCT. IF DEDUCT 1.6 IS REMOVED FROM PROJECT
SCOPE THE CONTRACTOR SHALL RESTRIPE EXISTING SPACES, AS CURRENTLY STRIPED. THE
CONTRACTOR SHALL COORDINATE WITH THE COR TO DETERMINE TIE IN LOCATIONS OF PROPOSED
IMPROVEMENTS ALONG FREEDOM LANE.
PHASE 2 DEDUCT NOTES
1. DEDUCT 2.1 INCLUDES INSTALLING GRAVEL SURFACE IN REPLACEMENT OF ASPHALT SURFACE BETWEEN
BUILDINGS 41& 42, AS SHOWN ON THE PLAN. PROPOSED GRAVEL SHALL BEGIN AT THE EXISTING EDGE OF
PAVEMENT NOT AT THE DEDUCT LINE SHOWN ON THE PLAN. IF THIS DEDUCT IS SELECTED THE
PROPOSED PAVEMENT ASSOCIATED WITH COAST GUARD LANE WILL STOP AT THE BID DEDUCT LINE.
REFER TO BID DEDUCT PLAN FOR ADDITIONAL DETAIL.
2. DEDUCT 2.2 REMOVES THE TWO NORTHERNMOST LIGHT FIXTURES, BASES, AND ASSOCIATED
ELECTRICAL BETWEEN BUILDINGS 41 & 42. THIS DEDUCT DOES NOT INCLUDE THE LIGHT FIXTURE AND
ASSOCIATED ELECTRICAL FOR THE LIGHT NORTH OF BUILDING 42. SEE BID DEDUCT PLAN FOR MORE
DETAIL.
3. DEDUCT 2.3 REMOVES THE INSTALLATION OF THE SIDEWALK RUNNING EAST/WEST ALONG AIR FORCE
LANE TO ARMY LANE, BEGINNING AT THE SOUTHEAST END OF PARKING LOT 4 (STA 70+89 TO 81+88). THE
DEDUCT DOES NOT INCLUDE THE CONCRETE PAVEMENT IMPROVEMENTS TO PARKING LOT 17. IF DEDUCT
2.3 IS REMOVED FROM SCOPE THEN CONCRETE SIDEWALK NEAR BUILDING 113 SHALL BE ADJUSTED AS
NECESSARY TO MATCH THE PROPOSED CURB. IF DEDUCT 2.3 IS REMOVED, THE CROSSWALK SHOW AT
THE SOUTH END OF PARKING LOT 4 (STA 0+65 ) SHALL NOT BE INSTALLED.
4. DEDUCT 2.4 REMOVES WORK ASSOCIATED WITH THE IMPROVEMENTS TO PARKING LOT 10. THE DEDUCT
INCLUDES THE MILL AND OVERLAY OF THE LOT, IMPROVEMENTS TO CURBING, AND THE REPLACEMENT
OF INLET 50B GRATE. THE CONTRACTOR SHALL NOT INCLUDE THE PAINT STRIPING WITHIN THE DEDUCT.
IF DEDUCT 2.4 IS REMOVED FROM PROJECT SCOPE THE CONTRACTOR SHALL RE-STRIPE EXISTING
SPACES, AS CURRENTLY STRIPED.
5. DEDUCT 2.5 REMOVES WORK ASSOCIATED WITH THE EMERGENCY ACCESS PORTION OF NAVY LANE, LOCATED OFF FREEDOM LANE, EXTENDING BEHIND BUILDING 64, INCLUDING THE TURNAROUND LOOP.
THE DEDUCT INCLUDES ALL DEMOLITION, PAVEMENT, CURBING, SIDEWALKS, SIGNAGE AND STORM AND
UTILITY IMPROVEMENTS, INCLUDING LIGHTING AND ALL ASSOCIATED ELECTRICAL. THE NORTHERN END
OF THE DEDUCT SHALL TIE TO THE EXISTING GUTTER (APPROX STA 2+25) AND THE SOUTH RADIUS OF
THE NAVY LANE PARKING LOT SHALL TIE TO EXISTING CURB AFTER THE PC (APPROX STA 95+40). THE
SOUTHERN END OF THE DEDUCT SHALL BEGIN AFTER THE INTERSECTION WITH THE PARKING LOT
BEHIND BUILDING 27(APPROX STA 90+75). THE COR SHALL HAVE FINAL DETERMINATION ON THE EXTENT
OF THE DEDUCT BEGINNING AND END TO ENSURE PROPER TIE IN TO THE NAVY LANE IMPROVEMENTS AS
WELL AS THE DRIVEWAY IMPROVEMENTS TO THE PARKING LOT LOCATED BEHIND BUILDING 27.
6. DEDUCT 2.6 REMOVES WORK ASSOCIATED WITH PARKING LOT 17, LOCATED ALONG AIR FORCE LANE
NEAR STATION 72+00. THE DEDUCT INCLUDES DEMOLITION, PAVEMENT, AND SIGNAGE.
7. DEDUCT 2.7 REMOVES WORK ASSOCIATED WITH PARKING LOT 13. THE DEDUCT INCLUDES DEMOLITION, CURBING AND STRIPING WEST OF THE VALLEY GUTTER BETWEEN THE LOT AND AIR FORCE LANE. IF
SELECTED AS A DEDUCT THE VALLEY GUTTER BETWEEN AIR FORCE LANE AND THE LOT SHALL BE TIED
TO EXISTING PAVEMENT. ENSURE POSITIVE DRAINAGE IF SELECTED AND TIED TO EXISTING FEATURES.
8. DEDUCT 2.8 REMOVES WORK ASSOCIATED WITH PARKING LOT 21 LOCATED SOUTH OF COAST GUARD
LANE NEAR STATION 20+00. THE DEDUCT INCLUDES DEMOLITION, PAVEMENT, AND CURBING. IF
SELECTED, THE CONCRETE VALLEY GUTTER BETWEEN THE LOT AND COAST GUARD LANE SHALL BE TIED
TO EXISTING PAVEMENT ENSURING POSITIVE DRAINAGE.
PHASE 3 DEDUCT NOTES
1. DEDUCT 3.1 REMOVES WORK ASSOCIATED WITH THE MAINTENENCE AREA EAST OF BUILDING 31. THE
DEDUCT INCLUDES DEMOLITION AND PAVEMENT. IF SELECTED, THE TWO PROPOSED LIGHTS EAST OF
THE PROPOSED PAVEMENT SHALL BE SHIFTED WEST TO BE LOCATED 3' EAST OF THE PROPOSED EDGE
OF PAVEMENT. REFER TO BID DEDUCT PLANS FOR MORE DETAIL.
2. DEDUCT 3.2 REMOVES WORK ASSOCIATED WITH THE IMPROVEMENTS OF COAST GUARD LANE, EAST OF
ARMY LANE (APPROX. STA 7+13 TO 9+45). THIS INCLUDES ALL DEMOLITION, PAVEMENT AND CURBING
IMPROVEMENTS. IF SELECTED, THE NORTHERN CURBLINE SHALL BE TIED BACK TO EXISTING PAVEMENT
WITH A TAPER. SEE BID DEDUCT PLANS FOR MORE DETAIL.
3. DEDUCT 3.3 REMOVES WORK ASSOCIATED WITH IMPROVEMENTS TO THE EAST OF BUILDINGS 35 AND 37
WITHIN THE MAINTENANCE AREA. THIS INCLUDES ALL DEMOLITION, PAVEMENT, LIGHTING, ELECTRICAL
AND UTILITY ADJUSTMENTS FROM THE SOUTHERN EDGE OF BUILDING 35 EXTENDING NORTH BEYOND
BUILDING 37 AND ENDING AT THE DRIVEWAY TO ARMY LANE. THE CONTRACTOR SHALL COORDINATE
WITH THE COR TIE IN LOCATIONS FOR PROPOSED WORK ALONG ARMY LANE AND ALONG THE DRIVEWAY
BETWEEN BUILDINGS 35 AND 31.
4. DEDUCT 3.4 REMOVES WORK ASSOCIATED WITH THE IMPROVEMENTS ALONG FORT ROAD. THIS DEDUCT
REDUCES THE REPAIR OF CONCRETE SLABS AND ADJACENT CONCRETE CURB AND GUTTER BY 50%. THE
ENTIRE REPAIR SHALL BE INCLUDED IN THE BASE BID AND REDUCED BY 50% FOR THE DEDUCT. THE
MOST DAMAGED SLABS SHALL REMAIN WITH THE BASE BID AS WELL AS THE VALLEY GUTTER REPAIR AND
LESSER DAMAGED SLABS SHALL BE INCLUDED IN THE DEDUCT. THE COR SHALL HAVE FINAL
DETERMINATION ON SLAB REPLACEMENT AND EXTENT OF DEDUCT.
5. DEDUCT 3.5 REMOVES WORK ASSOCIATED WITH THE PROPOSED SIDEWALK RUNNING NORTH/SOUTH ON
THE WEST SIDE OF ARMY LANE (APPROX STA 57+53 TO 66+95). THIS INCLUDES THE REMOVAL OF THE
CROSSWALK ACROSS THE PARKING LOT 10 DRIVEWAY OFF ARMY LANE.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text Christopher W. Geary
AutoCAD SHX Text
PE# 17277
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHERIDAN VAHCS PLANNING AND ENGINEERING
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text 6/14/2020
AutoCAD SHX Text Geary
AutoCAD SHX Text Peters
AutoCAD SHX Text Sheridan VA Medical Center
AutoCAD SHX Text Sheridan, WY
AutoCAD SHX Text
AutoCAD SHX Text 666-17-104
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Phasing Plan
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Resurface Roads And Parking Lots
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CS101
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text Christopher W. Geary
AutoCAD SHX Text
PE# 17277
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHERIDAN VAHCS PLANNING AND ENGINEERING
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text 6/14/2020
AutoCAD SHX Text Geary
AutoCAD SHX Text Peters
AutoCAD SHX Text Sheridan VA Medical Center
AutoCAD SHX Text Sheridan, WY
AutoCAD SHX Text
AutoCAD SHX Text 666-17-104
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONSULTANTS: