Questions Set 2.docx

DOCX document 18 KB Posted

Attached to
Z2DA--* T4 554-23-108 Install Ladders and Platforms in Mechanical Areas (VA-23-00006335)
Solicitation number
36C25923Q0086
Issued by

View the file

Other files

File Type Posted
36C25923Q0086 0005.docx DOCX document
Pictures Question 11.docx DOCX document
Ladder.pdf PDF
PSN.docx DOCX document
36C25923Q0086 0004.docx DOCX document
36C25923Q0086 0003.docx DOCX document
S04-Site Visit Attendance.pdf PDF
Questions.docx DOCX document
36C25923Q0086 0002.docx DOCX document
Site Visit Meeting Doc.docx DOCX document
36C25923Q0086 0001.docx DOCX document
11-AS-107 PVS Roof Ladder.pdf PDF
Fisher House Mech Room Ladder.pdf PDF
XX.AS.411 Bldg D F Roof Access Detail.pdf PDF
03-PP-100-B DS-102 Vault Ladder.pdf PDF
Bldg D Upper Roof Access 2.jpg JPG image
13-PP-102-A Vault Lid Replacement.pdf PDF
Combined Spec.pdf PDF
PVS Elevator Machine Room on Roof.jpg JPG image
36C25923Q0086.docx DOCX document
Bldg F Upper Roof Access.jpg JPG image
Bldg D Upper Roof Access.jpg JPG image
03-AS-104-B Bldg D Upper Roof Access.pdf PDF
03-AS-104-A Bldg F Upper Roof Access.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions for Solicitation 36C25923Q0086

1-Is there any bond requirements for this project?

Since this project is under the Simple acquisition threshold that is $250K, the Government does not require Bonds but is required a Certificate of Insurance.

2-For the sump ladder/rungs. Please see the attached file named “Ladder” and confirm if this will be approved. This route will save on the cost of installation verse having three guys for two days installing individual rungs.

VA recommends against a prefabricated ladder, as space in the vault is very limited and a ladder would severely impair worker movement in the vault.

3-The second question concerns the ladder in Parking Staff North (PSN picture) parking garage (see attached picture). We need a detailed drawing showing how the VA wants us to mount this ladder and attach it to the penthouse siding?

VA recommends mounting to the roof deck at the bottom and top. Avoid mounting to the siding of the building.

4-Can the roof access steps and platforms be more of a ships ladder style to eliminate the clearance and access issues?

Yes. Contractor shall abide by OSHA regulations for platforms/steps.

0. Does the VA want to add a handrail on the roofs leading edge for building F & D to protect from falls?

Yes.

5-How much weight does the ladder need to hold in the fisher house?

350 pounds.

6-Can the fisher house ladder be prefabricated?

Yes.

7-What is the access opening dimensions at the fisher house?

3’ x 4’.

8-Please confirm that the VA suggests we use a center rail for tying off per the site walk.

Center rail recommended.

9-Are we to just replace the covers on the manholes or do we need to replace the entire assembly?

Replace the assembly, new covers and hinges – existing covers are severely rusted and unusable.

10-Can the VA provide additional information on the manhole cover make and model?

No make and model known at this time. RK Specialties was responsible for metal fabrication for the site.

11-Can the VA provide pictures and dimension for DS-102 as we did not go down there on the site walk.

To come in separate response.

12-Will we need to provide any lighting protection for the items on the roof or make any modifications for the new metal roof platforms and ladders?

No.

13-Confirm that the parking lot roof ladder needs to be bolted to the roof decks and not the side of the building per the site walk?

Recommend mounting to roof deck.

14-Can all this work be done during normal business hours.

All work to be done during normal business hours (7:30 AM to 4:00 PM.)

15-Can the roof steps and platforms be bolted together for easier delivery to location, or does it need to be one complete assembly?

Contractor’s discretion.

16-Please confirm that ASIC fabricators and installers are not required for this project.

Not required.

17-Will we need to flash the roofing to the new ladders and platforms?

Yes.

18-Where can we set the crane for the building F, Building D, and parking garage north roof?

Crane can be set in the courtyards between buildings. Coordinate with COR.

19-Can the manhole steps in service level be the steel-reinforced plastic manhole steps or does it have to be prefabricated metal steps?

Prefab metal.