This document contains a schedule of finishes and a federal contract opportunity notice. The schedule of finishes provides product and color specifications for flooring, wall, base, and ceiling materials to be used in restoration of flood damage at the Salt Lake City VA Medical Center. The related federal contract opportunity is a pre-solicitation notice for restoration services with a magnitude between $500,000 and $1,000,000. The opportunity is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The restoration work includes repairing sheetrock ceilings and will be awarded after a request for proposal is issued on or around November 3, 2021.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF FINISHES

RESTORATION FLOOD DAMAGE - 660-21-802

WALLS

BLDG ROOM ROOM NAME FLOOR BASE NORTH EAST SOUTH WEST CEILING NOTES

3 GA00-3 CORRIDOR TT RB-2 P-2 P-1 P-1 P-1 EXIST.

3 GA05-3 GROUP ROOM (Clothing Rm) CPT-1 RB-1 P-2 P-1 P-1 P-1 EXIST.

3 GA05A-3 STORAGE CPT-1 RB-1 P-1 P-1 P-1 P-1 EXIST.

3 GA05B-3 STORAGE CPT-1 RB-1 P-1 P-1 P-1 P-1 EXIST.

3 GA05C-3 STORAGE CPT-1 RB-1 P-1 P-1 P-1 P-1 EXIST.

3 GA05D-3 STORAGE CPT-1 RB-1 P-1 P-1 P-1 P-1 EXIST.

3 GA05E-3 STORAGE CPT-1 RB-1 P-1 P-1 P-1 P-1 EXIST.

3 GA07-3 OFFICE CPT-1 RB-1 P-1 P-3 P-1 P-1 EXIST.

3 GA09-3 OFFICE CPT-1 RB-1 P-1 P-1 P-1 P-2 EXIST.

3 GA11-3 OFFICE CPT-1 RB-1 P-1 P-3 P-1 P-1 EXIST.

3 GA13-3 OFFICE - PANTRY LVT-1 RB-1 P-1 P-1 P-1 P-3 EXIST.

3 GA17-3 VENDING TT RB-2 P-1 P-2 P-1 P-1 EXIST.

3 GA19-3 OFFICE CPT-1 RB-1 P-1 P-1 P-1 P-3 EXIST.

3 GA21-3 OFFICE CPT-1 RB-1 P-1 P-1 P-1 P-2 EXIST.

3 GA23-3 OFFICE CPT-1 RB-1 P-1 P-1 P-1 P-3 EXIST.

3 GA25-3 OFFICE CPT-1 RB-1 P-1 P-1 P-1 P-2 EXIST.

3 GA29-3 OFFICE CPT-1 RB-1 P-1 P-1 P-1 P-3 EXIST.

3 GA31-3 OFFICE CPT-1 RB-1 P-1 P-2 P-1 P-1 EXIST.

3 GA33-3 OFFICE CPT-1 RB-1 P-1 P-1 P-1 P-3 EXIST.

3 GB00-3 CORRIDOR TT RB-2 P-2 P-1 P-1 P-1 EXIST.

3 GB00A-3 CORRIDOR TT RB-2 P-1 P-1 P-1 P-1 EXIST.

3 GB01-3 ENTRY UTILITIES EXIST. EXIST. P-1 P-1 P-1 P-1 EXIST.

3 GB01A-3 TEL/DATA EXIST. EXIST. P-1 P-1 P-1 P-1 EXIST.

3 GB01B-3 AUX SYSTEM EXIST. EXIST. P-1 P-1 P-1 P-1 EXIST.

3 GB01C-3 ELECTRICAL EXIST. EXIST. P-1 P-1 P-1 P-1 EXIST.

3 GB04-3 STORAGE EXIST. RB-1 P-1 P-1 P-1 P-1 EXIST.

3 GB06-3 OFFICE CPT-1 RB-1 P-1 P-2 P-1 P-1 EXIST.

3 GB08-3 OFFICE CPT-1 RB-1 P-1 P-1 P-1 P-3 EXIST.

3 GB09-3 CLOTHING ROOM (Storage) LVT-1 RB-1 P-1 P-1 P-1 P-3 EXIST.

3 GC00-3 CORRIDOR TT RB-2 P-2 P-1 P-1 P-1 EXIST.

3 GC00A-3 CORRIDOR TT RB-2 P-1 P-2 P-1 P-1 EXIST.

3 GC01-3 STORAGE EXIST. RB-1 P-1 P-1 P-1 P-1 EXIST.

3 GC02-3 ART THERAPY CPT-1 RB-1 P-2 P-1 P-1 P-1 EXIST.

3 GC03-3 OFFICE CPT-1 RB-1 P-1 P-1 P-1 P-2 EXIST.

3 GC03A-3 STORAGE CPT-1 RB-1 P-1 P-1 P-1 P-1 EXIST.

3 GC05-3 OFFICE CPT-1 RB-1 P-1 P-1 P-1 P-3 EXIST.

WALLS

BLDG ROOM ROOM NAME FLOOR BASE NORTH EAST SOUTH WEST CEILING NOTES

4 BB05B-4 STORAGE SVT RB-1 P-1 P-1 P-1 P-1 EXIST.

4 BB05-4 TRAINING ROOM CPT-1 RB-1 P-1 P-3 P-1 P-1 EXIST.

4 BB05A-4 STORAGE CPT-1 RB-1 P-1 P-1 P-1 P-1 EXIST.

4 BB07-4 MECHANICAL ROOM EXIST N/A P-1 P-1 P-1 P-1 EXIST.

4 BB09-4 ENTRY SVT RB-1 P-1 P-1 P-1 P-1 EXIST.

4 BB00B-4 CORRIDOR TT RB-2 P-1 P-1 P-1 P-1 EXIST.

4 BB03-4 HALLWAY EXIST EXIST P-1 P-1 P-1 P-1 EXIST.

4 BB03A-4 IT CLOSET EXIST N/A P-1 P-1 P-1 P-1 EXIST.

4 BB03B-4 ELECTRICAL EXIST N/A P-1 P-1 P-1 P-1 EXIST.

4 BB00C-4 CORRIDOR TT RB-2 P-1 P-1 P-1 P-1 EXIST.

WALLS

BLDG ROOM ROOM NAME FLOOR BASE NORTH EAST SOUTH WEST CEILING NOTES

7 1A00-7 CORRIDOR (EAST SECTION) WSF WSF P-1 P-1 P-1 P-1 EXIST.

7 1A15A-7 LAB WSF WSF P-1 P-1 P-1 P-1 EXIST.

7 1A15AA-7 OFFICE WSF WSF P-1 P-1 P-1 P-1 EXIST.

7 1A15AB-7 LAB WSF WSF P-1 P-1 P-1 P-1 EXIST.

7 1A15AC-7 LAB WSF WSF P-1 P-1 P-1 P-1 EXIST.

7 1A15B-7 LAB WSF WSF P-1 P-1 P-1 P-1 EXIST.

WALLS

BLDG ROOM ROOM NAME FLOOR BASE NORTH EAST SOUTH WEST CEILING NOTES

8 1A01-8 RETAIL STORE LVT-2 RB-1 EXIST. EXIST. EXIST. EXIST. EXIST.

8 1A01A-8 STORAGE LVT-2 RB-1 P-1 P-1 P-1 P-1 EXIST.

8 1A03-8 STORAGE SVT RB-1 P-1 P-1 P-1 P-1 EXIST.

8 1A05-8 WAITING/SHUTTLE EXIST. RB-2 P-1 P-1 P-1 P-1 EXIST.

8 1A00A-8 VESTIBULE/VENDING EXIST. RB-2 P-1 P-1 P-1 P-1 EXIST.

8 1A07-8 STORAGE SVT RB-1 P-1 P-1 P-1 P-1 EXIST.

8 1B01-8 WAITING AREA EXIST. RB-3 DM-1/P-9 & P-10 DM-1/P-7 CW/P-7 CW/CMU EXIST.

8 1B00-8 HALLWAY EXIST. RB-3 CW DM-1/P-7 CW/P-7 DM-1/P-7/CMU EXIST.

8 1B03-8 EXAM EXIST. RB-3 P-9 P-8 P-9 P-9 EXIST.

8 1B00C-8 DIRTY LINENS EXIST. EXIST. P-7 P-7 P-7 P-7 EXIST.

8 1B13-8 MECHANICAL ROOM EXIST. EXIST. P-7 P-7 P-7 P-7 EXIST.

8 1B09-8 IT CLOSET EXIST. EXIST. P-7 P-7 P-7 P-7 EXIST.

8 1B11-8 ELECTRICAL EXIST. EXIST. P-7 P-7 P-7 P-7 EXIST.

8 1B00B-8 HALLWAY EXIST. RB-3 CMU P-7 P-7 EXIST.

8 1B10-8 OFFICE CPT-2 RB-3 P-9 P-9 P-9 P-9 EXIST.

8 1B08-8 CONFERENCE CPT-2 RB-3 P-9 P-9 P-9 P-9 EXIST.

8 1B06-8 OPEN OFFICE CPT-2 RB-3 P-9 P-9 P-9 P-9 EXIST.

8 1B04-8 OFFICE CPT-2 RB-3 P-9 P-9 P-9 P-9 EXIST.

8 1B02-8 OFFICE CPT-2 RB-3 P-9 P-9 P-9 P-9 EXIST.

8 1A02-8 DINING CANTEEN LVT-2 RB-1 P-1 P-1 P-1 P-1 EXIST.

8 1A02B-8 STAFF DINING LVT-2 RB-1 P-1 P-1 P-1 P-1 EXIST.

8 1A02A-8 OFFICE LVT-2 RB-1 P-1 P-1 P-1 P-1 EXIST.

8 1A02AB-8 OFFICE (CHIEF) LVT-2 RB-1 P-1 P-1 P-1 P-1 EXIST.

8 1A02AA-8 OFFICE/VAULT ROOM LVT-2 RB-1 P-1 P-1 P-1 P-1 EXIST.

8 1A16-8 CLOAK ROOM SVT RB-1 P-1 P-1 P-1 P-1 EXIST.

8 1A18-8 STORAGE MPC SVT RB-1 P-1 P-1 P-1 P-1 EXIST.

8 1A09-8 OFFICE (WELLNESS) CPT-2 RB-1 P-1 P-1 P-1 P-1 EXIST.

8 1A11A-8 STORAGE (WELLNESS) SVT RB-1 P-1 P-1 P-1 P-1 EXIST.

8 1A00-8 CORRIDOR EXIST. RB-2 P-1 P-1 P-1 P-1 EXIST. Column Bases P-6

8 1A00B-8 CORRIDOR EXIST. RB-2 P-1 P-1 P-1 P-1 EXIST.

8 1A00C-8 CORRIDOR EXIST. RB-2 P-1 P-1 P-1 P-1 EXIST.

8 1A00D-8 CORRIDOR EXIST. RB-2 P-1 P-1 P-1 P-1 EXIST.

8 1A30-8 OFFICE CPT-2 RB-1 P-1 P-1 P-1 P-1 EXIST.

8 1A28-8 OFFICE CPT-2 RB-1 P-1 P-1 P-1 P-1 EXIST.

8 1A26-8 ELECTRICAL EXIST. EXIST. P-1 P-1 P-1 P-1 EXIST.

8 1A22-8 GYMNASIUM (E&W) as noted on the next 2 rooms EXIST.

8 1A22A-8 GYM WEST COURT RAF-1 RB-2 EXIST. EXIST. EXIST. EXIST. EXIST.

8 1A22B-8 GYM EAST COURT RAF-2 RB-2 EXIST. EXIST. EXIST. EXIST. EXIST.

8 GA02-8 OFFICE (Suite) CPT-2 RB-1 P.1 P.1 P.1 P.4 EXIST. accent wall in open area. All offices just P.1 8 GA02A-8 OFFICE (Suite) CPT-2 RB-1 P.1 P.1 P.1 P.1 EXIST. added for clarification of GA02-8 Suite 8 GA02B-8 OFFICE (Suite) CPT-2 RB-1 P.1 P.1 P.1 P.1 EXIST. added for clarification of GA02-8 Suite 8 GA02C-8 OFFICE (Suite) CPT-2 RB-1 P.1 P.1 P.1 P.1 EXIST. added for clarification of GA02-8 Suite 8 GA02D-8 OFFICE (Suite) CPT-2 RB-1 P.1 P.1 P.1 P.1 EXIST. added for clarification of GA02-8 Suite

8 GA07-8 ENTRY UTILITIES EXIST. EXIST. P-1 P-1 P-1 P-1 EXIST.

8 GA07A-8 TEL/DATA EXIST. EXIST. P-1 P-1 P-1 P-1 EXIST.

8 GA05-8 SHOP EXIST. EXIST. P-1 P-1 P-1 P-1 EXIST.

8 GA03-8 TRAINING (ERGONOMICS) CPT-2 RB-1 P-1 P-1 P-1 P-1 EXIST.

8 GA01AA-8 TOILET/SHOWERS (W) EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. P-5 Ceiling Sheetrock repairs 8 GA01CB-8 TOILET/SHOWERS (M) EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. P-5 Ceiling Sheetrock repairs

8 GA00-8 CORRIDOR SVT RB-1 P-1 P-1 P-1 P-1 EXIST.

FLOOD RESTORATION FINISH LEGEND

All finishes require a submittal from the contractor Code Desciption Manufacturer Style Model # Color Remarks

CPT-1 Carpet Tile Tandus Maelstrom 04849 Greenway 33202 24" X 24" Install--Vertical Ashlar. ER3-RS backing CPT-2 Carpet Tile Tandus Persona Accents 11116 Greige Coat Accent 15705 !8" X 36" Install--Vertical Ashlar. ER3-RS backing

LVT-1 Luxury Vinyl Tile Tarkett Event Classic Plank ECK ASH 3308 6" X 36" 30 mil Wear Layer Thickness LVT-2 Luxury Vinyl Tile Tarkett Event Classic Plank ECK European Cherry 3307 6" X 36" 30 mil Wear Layer Thickness TT Terrazzo Tile Floorazzo Marble American Pie 24" X 24" Fusion Install SVT Solid Vinyl Tile Johnsonite Cortina Grande CG503 Ginger Ale 16" X 16" X 1/8" WSF Welded Seam Sheet Flooring Johnsonite iQ Optima 3242246 Eqyptian Scrolls Homogeneous Viyl Sheet- Heat Welded RAF-1 Resilient Athletic Flooring Tarkett Sports Indoors Omnisports Active 8.1MMGolden Maple underlayment Tarkett Sports Indoors: Tarkolay RAF-2 Resilient Athletic Flooring Tarkett Sports Indoors Dropzone Elite 22.5 MMDZ43A - Desert underlayment Tarkett Sports Indoors: Tarkolay

RB-1 Rubber Base Johnsonite Rubber 1/8" X 6" TS Toast 283 6" Thermoset Rubber w/ Toe RB-2 Rubber Base Johnsonite Reveal 6" Millwork Toast 283 final color selection after samples received RB-3 Rubber Base Roppe Pinnacle Rubber 1/8" X 6" w/toe 191 Camel 6" Vulcanized w/Toe

P.1 Latex Paint Sherwin Williams Emerald SW 7011 Natural Choice Satin P.2 Latex Paint Sherwin Williams Emerald SW 6163 Grassland Satin P.3 Latex Paint Sherwin Williams Emerald SW7569 Stucco Satin P.4 Latex Paint Sherwin Williams SW6513 Take Five Satin P.5 EPOXY Sherwin Williams RAF SW 7009 Pearly White Flat--ceiling P.6 Emerald-Urethane Trim Enamel Sherwin Williams Emerald-Urethane Trim Enamel SW 7513 Sanderling DOOR FRAMES Semi Gloss P.7 Latex Paint Sherwin Williams Emerald SW7035 Aesthetic White Satin P.8 Latex Paint Sherwin Williams Emerald SW6225 Sleepy Blue Satin P.9 Latex Paint Sherwin Williams Emerald SW7517 China Doll Satin P.10 Latex Paint Sherwin Williams Emerald SW6162 Ancient Marble Satin