This solicitation is for restoration flood damage services at the Salt Lake City VA Medical Center located in Salt Lake City, Utah. The contractor will provide all labor, materials, equipment, supervision and project management to complete restoration and repair work in Buildings 3, 4, 7 and 8 resulting from flood damage. Scope of work includes installation of cove molding, flooring, drywall and painting across approximately 50,000 square feet of affected space. The contractor must comply with all VA safety, infection control and COVID-19 protocols for the duration of the project. The period of performance is 90 calendar days with normal work hours of 7:00am to 4:30pm Monday through Friday. This requirement is reserved as a 100% set aside for Service-Disabled Veteran-Owned Small Businesses and the award amount is estimated between $500,000 to $1 million.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 660-21-802 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders

36C25922R0010 11-08-2021

X X X

X The purpose of this amendment is as follows:

A) Implement the VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contracto

rs. This includes updating the SOW and adding FAR 52.223-99 to the solicitation.

B) All proposals are to be sent via email to Christina.Beeler-Blackburn@va.gov.

All other items and conditions remain the same.

A.1 Statement of Work

RESTORATION FLOOD DAMAGE

VA Salt Lake City Health Care System Restoration Flood Damage Project No. 660-21-802

Location: Buildings 3, 4, 7, 8, Salt Lake City, UT, VA Salt Lake City Health Care System (VASLCHCS)

I. SCOPE OF WORK:

A. Contractor shall provide all necessary professional services, equipment, labor, materials, supervision, and tools to perform and complete a construction / repair project for the NRM Project #000-00-000, entitled “Restoration Flood Damage”, located at 500 Foothill Drive, Salt Lake City, UT 84148. The work includes, but is not limited to, site investigation, updating and revising drawings, and complete construction of project. The contractor, to include subcontractors performing professional services under this contract, shall perform its services consistent with the standards and best practices within each field. All work will be performed as specified herein to be in accordance with all applicable codes indicated in the Department of Veterans Affairs (VA) Design Manuals, and VA Publications (Master Construction Specifications, Construction Standards, etc.) and any other applicable codes (safety, fire, and infection control).

The VA will provide current construction drawings (in AutoCAD and PDF), when requested. The contractor shall review all drawings with the assigned VA COR (Contracting Officer’s Representative) to verify the project area/s and what the project entails.

B. The indicated areas include operational clinic/public areas, thus proper planning is of utmost importance. The contractor is to provide all materials and labor for demolition and construction according to this Scope of Work, drawings, and specifications, unless otherwise noted. All paint to be used will be of low VOC. The contractor shall be required to move and replace all furniture in effected areas to allow for construction/repair work. The contractor shall provide and replace all corner and wall guards, flooring, cove molding, wall treatments, drywall, and doors with specified material. The contractor shall provide and replace all outlet covers.

The scope of work includes, but is not limited to construction, repair, patching, painting, ceiling repair and installation, drywall, flooring installation, electrical, plumbing, excavation, and fire-stopping within Buildings 3, 4, 7, and 8 with the following approximate quantities.

Building 3:

2,133 linear feet of cove molding; 17,694 square feet of painted wall area; 7,991 square feet of floor covering; and 4,265 square feet of drywall. Extend (2 each 3’ 9” X 3’ 9”) exterior concrete ventilation chase to an above grade height of 24” and relocate protective grate to top of chase.

Building 4:

483 linear feet of cove molding; 6,994 square feet of painted wall area; 1,832 square feet of floor covering; and 966 square feet of drywall. Double door replacement for Room BB03A-4.

Building 7:

443 linear feet of cove molding; 4,032 square feet of painted wall area; 1,797 square feet of floor covering; and 885 square feet of drywall.

Building 8:

2,646 linear feet of cove molding; 25,827 square feet of painted wall area; 13,892 square feet of floor covering; 5,292 square feet of drywall; 75 feet of stainless steel wall protection sheeting; and 28 feet of stainless steel corner guard.

Deduct Bid Item: The contractor shall label all outlet covers, in the affected areas, with their associated circuit breaker designation. The deduct bid to include all labor, profit, and overhead for the electrical circuits.

Scope of work to include, but is not limited to site investigation, and complete restoration and repair of flood damaged areas. The contractor shall coordinate project reviews and any questions and/or concerns/issues between the VA and all subcontractors. The Contractor shall ensure all proper approvals and modifications are complete before proceeding. The work shall be completed to most recent released building and NFPA codes. The contractor shall conduct site surveys to review site to ensure no unforeseen conditions will arise. The contractor shall be required to attend phased meetings to discuss progress and problems with the VA staff. The contractor shall be required to take meeting minutes and distribute to the VA for approval and as documentation of what was covered within the meeting.

C. Fire, Safety, and Infection Control Requirements shall be enforced for the duration of the project, regardless of any disruptions, to protect patients, visitors, VA staff, and contractors/subcontractors. The contractor shall be responsible for the site during construction and shall ensure all contractor employees and subcontractors adhere to all fire, safety, and infection control requirements at all times. The VA will inspect all containments before work commences and periodically during construction. Contractor/ subcontractors shall conduct themselves in a professional manor at all times as this is an active hospital, keeping in mind noise levels affects patients, and shall adhere to all industry standard practices. Contractor shall repair all penetrations created during construction to meet the requirements for fire-rated walls. It will be the responsibility of the contractor to make changes to sprinkler system to provide proper coverage in each room.

D. The Prime Contractor shall designate a minimum of one Site Safety and Health Officer (SSHO) to administer the contractor’s safety program and government-accepted Accident Prevention Plan. Each subcontractor shall designate a minimum of one Competent Person (CP) in compliance with 29 CFR 1926.20 (b)(2) that will be identified as a CP to administer their individual safety programs. Also, The SSHO or an equally qualified designated representative/alternative will maintain a presence on the site during construction operations in accordance with FAR Clause 52.236-6: Superintendence by the Contractor. CPs will maintain presence during their construction activities in accordance with above mentioned clause. A listing of the designated SSHO and all known CPs shall be submitted prior to the start of work as part of the APP with the training documentation and/or AHA.

In order to comply with above, please do NOT bid for same SSHO that would or would potentially cover multiple projects on the campus.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain temporary VA badges. This will require fingerprinting and background checks of each individual. The employees of the general contractor will obtain permission of the VA Human Resources, be identified by project and employer, and restricted from unauthorized access.

F. All contractor employees and subcontractor employees requiring access to VA information and VA information systems shall complete VA Privacy and Information Security Awareness and Rules of Behavior Training.

G. Period of Performance: 90 calendar days after Notice to Proceed.

H. Normal Working Hours: Monday through Friday, 0700 – 1630, except on Federal holidays. Plan for after-hours work for water shutdowns. Any request to work outside of previous mentioned hours, shall be requested to VA COR a minimum of 72-hour notice.

I. All VA campuses are Tobacco Free, this includes but not limited to vaping and smokeless tobacco products.

J. All CDC and VHA COVID protocols and regulations are to be followed for the duration of the solicitation and project.

K. “VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors

1. Contractor employees who work in or travel to VHA locations must comply with the following:

a. Documentation requirements:

1. If fully vaccinated, shall show proof of vaccination

1. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination

2. If unvaccinated and granted a medical or religious exception, shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test.

3. Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.

4. Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the following website: COVID-19 Screening Tool. Regularly check the website for updates.

a. Contractor employees who work away from VA locations, but who will have direct patient contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

3. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.”

***************End of Restoration Flood Damage SOW**************** A.2 52.223-99 Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors.

ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021) (DEVIATION)

(a) Definition. As used in this clause - United States or its outlying areas means—

(1) The fifty States;

(2) The District of Columbia;

(3) The commonwealths of Puerto Rico and the Northern Mariana Islands;

(4) The territories of American Samoa, Guam, and the United States Virgin Islands; and

(5) The minor outlying islands of Baker Island, Howland Island, Jarvis Island, Johnston Atoll, Kingman Reef, Midway Islands, Navassa Island, Palmyra Atoll, and Wake Atoll.

(b) Authority. This clause implements Executive Order 14042, Ensuring Adequate COVID Safety Protocols for Federal Contractors, dated September 9, 2021 (published in the Federal Register on September 14, 2021, 86 FR 50985).

(c) Compliance. The Contractor shall comply with all guidance, including guidance conveyed through Frequently Asked Questions, as amended during the performance of this contract, for contractor workplace locations published by the Safer Federal Workforce Task Force (Task Force Guidance) at https:/www.saferfederalworkforce.gov/contractors/.

(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in subcontracts at any tier that exceed the simplified acquisition threshold, as defined in Federal Acquisition Regulation 2.101 on the date of subcontract award, and are for services, including construction, performed in whole or in part within the United States or its outlying areas.

(End of clause)