SECTION 02 41 00 DEMOLITION.pdf

PDF 80 KB Posted

Attached to
Z2DA--666-18-103 (CON) B64 Follow on Renovation (VA-20-00091866)
Solicitation number
36C25922R0006
Issued by

About this file

This document provides details for a federal contract opportunity to complete renovations at the Sheridan, Wyoming VA Medical Center mental health residential facility. The solicitation seeks offers from service-disabled veteran-owned small businesses to renovate the existing facility for between $5 million and $10 million. The North American Industry Classification System code for this procurement is 236220 for general contractors specializing in commercial and institutional building construction. The solicitation is set aside 100% for service-disabled veteran-owned small businesses, who must be verified and listed in the Vendor Information Pages database at the time of proposal submission to be considered eligible for award. The point of contact for questions is Christina Beeler-Blackburn, who may be reached by phone or email. The solicitation number is 36C25922R0006.

View the file

Other files

File Type Posted
S06- 36C25922R0006 Amend 0019.docx DOCX document
S06- 36C25922R0006 Amend 0018.docx DOCX document
B64 Follow-on questions_update B.docx DOCX document
Statement of Work_Bldg. 64 Follow-On Renvovation_UPDATED.docx DOCX document
S06- B64 All 2nd Questions - Answers_Updated.docx DOCX document
B64 Follow-on questions_updated.docx DOCX document
Bid Schedule_updated.docx DOCX document
S06- 36C25922R0006 Amend 0017.docx DOCX document
02821319 Asbestos Floor Tile and Mastic Abatement.pdf PDF
Asbestos Survey.pdf PDF
S06- B64 All 2nd Questions - Answers.docx DOCX document
09 65 19 RESILIENT TILE FLOORING.pdf PDF
S06- 36C25922R0006 Amend 0016.docx DOCX document
2nd Site Visit Attendance.pdf PDF
2226.17_Sheridan Bldg 64_Combined Submittal Set_updated_20220608_Part2.pdf PDF
2226.17_Sheridan Bldg 64_Combined Submittal Set_updated_20220608_Part3.pdf PDF
S06-36C25922R0006 Amend 0015.docx DOCX document
2226.17_Sheridan Bldg 64_Combined Submittal Set_updated_20220608_Part4.pdf PDF
2226.17_Sheridan Bldg 64_Combined Submittal Set_updated_20220608_Part1.pdf PDF
2226.17_Sheridan Bldg 64_Combined Submittal Set_updated_20220608_Part5.pdf PDF
SPEC COMBINED_FINAL_02JUN2022.pdf PDF
2nd Questions - Answers.docx DOCX document
S06-36C25922R0006 Amend 0014.docx DOCX document
Questions and Answers_updated.docx DOCX document
S06- 36C25922R0006 Amend 0013.docx DOCX document
S06- 36C25922R0006 Amend 0012.docx DOCX document
S06- 36C25922R0006 Amend 0011.docx DOCX document
S06- 36C25922R0006 Amend 0010.docx DOCX document
S06- 36C25922R0006 Amend 0009.docx DOCX document
S06- 36C25922R0006 Amend 0008.docx DOCX document
S06- 36C25922R0006 Amend 0007.docx DOCX document
S06- 2nd Site Visit Meeting Doc.docx DOCX document
S06- B64 Follow-On - Soliciation Site Visit 2 Attendance_11-22-2021.pdf PDF
S06- 36C25922R0006 Amend 0006.docx DOCX document
36C25922R0006 Amend 0005.docx DOCX document
09 06 00 SCHEDULE OF FINISHES 180105.pdf PDF
Questions and Responses.docx DOCX document
SPECIFICATIONS_SECTION 01 00 00 GENERAL REQUIREMENTS.pdf PDF
36C25922R0006 Amend 0004.docx DOCX document
36C25922R0006 Amend 0003.docx DOCX document
S04- Site Visit Meeting Doc.docx DOCX document
SECTION 01 00 00 GENERAL REQUIREMENTS.pdf PDF
36C25922R0006 0002.docx DOCX document
S04- B64 Follow-On - Soliciation Site Visit Attendance.pdf PDF
S06- 36C25922R0006_Amend 0001.docx DOCX document
36C25922R0006.zip ZIP file
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

08-01-17

02 41 00 - 1

SECTION 02 41 00

DEMOLITION

PART 1 - GENERAL

1.1 DESCRIPTION:

This section specifies demolition and removal of buildings, portions of buildings, utilities, other structures and debris from trash dumps shown.

1.2 PROTECTION:

A. Perform demolition in such manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of structures.

Comply with requirements of GENERAL CONDITIONS Article, ACCIDENT

PREVENTION.

B. Provide safeguards, including warning signs, barricades, temporary fences, warning lights, and other similar items that are required for protection of all personnel during demolition and removal operations.

Comply with requirements of Section 01 00 00, GENERAL REQUIREMENTS, Article PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES AND IMPROVEMENTS.

C. Maintain fences, barricades, lights, and other similar items around exposed excavations until such excavations have been completely filled.

D. Provide enclosed dust chutes with control gates from each floor to carry debris to truck beds and govern flow of material into truck.

Provide overhead bridges of tight board or prefabricated metal construction at dust chutes to protect persons and property from falling debris.

E. Prevent spread of flying particles and dust. Sprinkle rubbish and debris with water to keep dust to a minimum. Do not use water if it results in hazardous or objectionable condition such as, but not limited to; ice, flooding, or pollution. Vacuum and dust the work area daily.

F. In addition to previously listed fire and safety rules to be observed in performance of work, include following:

1. No wall or part of wall shall be permitted to fall outwardly from structures.

02 41 00 - 2

2. Maintain at least one stairway in each structure in usable condition to highest remaining floor. Keep stairway free of obstructions and debris until that level of structure has been removed.

3. Wherever a cutting torch or other equipment that might cause a fire is used, provide and maintain fire extinguishers nearby ready for immediate use. Instruct all possible users in use of fire extinguishers.

4. Keep hydrants clear and accessible at all times. Prohibit debris from accumulating within a radius of 4500 mm (15 feet) of fire hydrants.

G. Before beginning any demolition work, the Contractor shall survey the site and examine the drawings and specifications to determine the extent of the work. The contractor shall take necessary precautions to avoid damages to existing items to remain in place, to be reused, or to remain the property of the Medical Center; any damaged items shall be repaired or replaced as approved by the Resident Engineer. The

Contractor shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing, and supports as required. The Contractor shall ensure that structural elements are not overloaded and shall be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. Do not overload structural elements. Provide new supports and reinforcement for existing construction weakened by demolition or removal works.

Repairs, reinforcement, or structural replacement must have Resident

Engineer’s approval.

H. The work shall comply with the requirements of Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS.

I. The work shall comply with the requirements of Section 01 00 00, GENERAL REQUIREMENTS and Section 01 35 26, SAFETY REQUIREMENTS.

1.3 UTILITY SERVICES:

A. Demolish and remove outside utility service lines shown to be removed.

B. Remove abandoned outside utility lines that would interfere with installation of new utility lines and new construction.

02 41 00 - 3

PART 2 - PRODUCTS (NOT USED)

PART 3 – EXECUTION

3.1 DEMOLITION:

A. Completely demolish and remove buildings and structures, including all appurtenances related or connected thereto, as noted below:

1. As required for installation of new utility service lines.

2. To full depth within an area defined by hypothetical lines located

1500 mm (5 feet) outside building lines of new structures.

B. Debris, including brick, concrete, stone, metals and similar materials shall become property of Contractor and shall be disposed of by him daily, off the Medical Center to avoid accumulation at the demolition site. Materials that cannot be removed daily shall be stored in areas specified by the Resident Engineer. Break up concrete slabs below grade that do not require removal from present location into pieces not exceeding 600 mm (24 inches) square to permit drainage. Contractor shall dispose debris in compliance with applicable federal, state or local permits, rules and/or regulations.

C. In removing buildings and structures of more than two stories, demolish work story by story starting at highest level and progressing down to third floor level. Demolition of first and second stories may proceed simultaneously.

D. Remove and legally dispose of all materials, other than earth to remain as part of project work, from any trash dumps shown. Materials removed shall become property of contractor and shall be disposed of in compliance with applicable federal, state or local permits, rules and/or regulations. All materials in the indicated trash dump areas, including above surrounding grade and extending to a depth of 1500mm

(5feet) below surrounding grade, shall be included as part of the lump sum compensation for the work of this section. Materials that are located beneath the surface of the surrounding ground more than 1500 mm

(5 feet), or materials that are discovered to be hazardous, shall be handled as unforeseen. The removal of hazardous material shall be referred to Hazardous Materials specifications.

E. Remove existing utilities as indicated or uncovered by work and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Resident Engineer.

When Utility lines are encountered that are not indicated on the

02 41 00 - 4 drawings, the Resident Engineer shall be notified prior to further work in that area.

3.2 CLEAN-UP:

On completion of work of this section and after removal of all debris, leave site in clean condition satisfactory to Resident Engineer.

Clean-up shall include off the Medical Center disposal of all items and materials not required to remain property of the Government as well as all debris and rubbish resulting from demolition operations.

- - - E N D - - -