Bid Schedule_updated.docx

DOCX document 20 KB Posted

Attached to
Z2DA--666-18-103 (CON) B64 Follow on Renovation (VA-20-00091866)
Solicitation number
36C25922R0006
Issued by

About this file

This document contains a bid schedule and scope of work for the renovation of Building 64 at the Sheridan VA Medical Center campus in Sheridan, Wyoming. The contractor will provide pricing for the base project and one additive alternate to complete all renovations specified in the attached statement of work, including exterior landscaping. Pricing will be on a firm fixed price basis. The base project performance period is 410 days from notice to proceed. A single award will be made to the responsible offeror submitting the most advantageous proposal based on pricing for the base work and any additives, if funds allow. The solicitation specifies this opportunity is a total small business set-aside for Service-Disabled Veteran-Owned Small Businesses. Eligible vendors must be verified and listed in the Vendor Information Pages database.

View the file

Other files

File Type Posted
S06- 36C25922R0006 Amend 0019.docx DOCX document
S06- 36C25922R0006 Amend 0018.docx DOCX document
B64 Follow-on questions_update B.docx DOCX document
Statement of Work_Bldg. 64 Follow-On Renvovation_UPDATED.docx DOCX document
S06- B64 All 2nd Questions - Answers_Updated.docx DOCX document
B64 Follow-on questions_updated.docx DOCX document
SECTION 02 41 00 DEMOLITION.pdf PDF
S06- 36C25922R0006 Amend 0017.docx DOCX document
02821319 Asbestos Floor Tile and Mastic Abatement.pdf PDF
Asbestos Survey.pdf PDF
S06- B64 All 2nd Questions - Answers.docx DOCX document
09 65 19 RESILIENT TILE FLOORING.pdf PDF
S06- 36C25922R0006 Amend 0016.docx DOCX document
2nd Site Visit Attendance.pdf PDF
2226.17_Sheridan Bldg 64_Combined Submittal Set_updated_20220608_Part2.pdf PDF
2226.17_Sheridan Bldg 64_Combined Submittal Set_updated_20220608_Part3.pdf PDF
S06-36C25922R0006 Amend 0015.docx DOCX document
2226.17_Sheridan Bldg 64_Combined Submittal Set_updated_20220608_Part4.pdf PDF
2226.17_Sheridan Bldg 64_Combined Submittal Set_updated_20220608_Part1.pdf PDF
2226.17_Sheridan Bldg 64_Combined Submittal Set_updated_20220608_Part5.pdf PDF
SPEC COMBINED_FINAL_02JUN2022.pdf PDF
2nd Questions - Answers.docx DOCX document
S06-36C25922R0006 Amend 0014.docx DOCX document
Questions and Answers_updated.docx DOCX document
S06- 36C25922R0006 Amend 0013.docx DOCX document
S06- 36C25922R0006 Amend 0012.docx DOCX document
S06- 36C25922R0006 Amend 0011.docx DOCX document
S06- 36C25922R0006 Amend 0010.docx DOCX document
S06- 36C25922R0006 Amend 0009.docx DOCX document
S06- 36C25922R0006 Amend 0008.docx DOCX document
S06- 36C25922R0006 Amend 0007.docx DOCX document
S06- 2nd Site Visit Meeting Doc.docx DOCX document
S06- B64 Follow-On - Soliciation Site Visit 2 Attendance_11-22-2021.pdf PDF
S06- 36C25922R0006 Amend 0006.docx DOCX document
36C25922R0006 Amend 0005.docx DOCX document
09 06 00 SCHEDULE OF FINISHES 180105.pdf PDF
Questions and Responses.docx DOCX document
SPECIFICATIONS_SECTION 01 00 00 GENERAL REQUIREMENTS.pdf PDF
36C25922R0006 Amend 0004.docx DOCX document
36C25922R0006 Amend 0003.docx DOCX document
S04- Site Visit Meeting Doc.docx DOCX document
SECTION 01 00 00 GENERAL REQUIREMENTS.pdf PDF
36C25922R0006 0002.docx DOCX document
S04- B64 Follow-On - Soliciation Site Visit Attendance.pdf PDF
S06- 36C25922R0006_Amend 0001.docx DOCX document
36C25922R0006.zip ZIP file
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule The contractor shall furnish all labor, equipment, materials, and supervision to complete renovation of Building 64 at the Sheridan VA campus, 1898 Fort Rd., Sheridan, WY, 82801.

The contractor shall provide three (3) prices; Line Item 0001, Line Item 0002 and Line Item 0003, (additive pricing). The contractor shall include prices for all items listed in the pricing schedule and include all costs associated for work in the SOW, if specifically listed in the pricing schedule. Work will be accomplished at the Sheridan VA Medical Center campus.

Contractor Name:Duns:
CLIN
Description
Qty
Unit of issue

Firm Fixed Price Lump Sum amount

0001 Base Pricing 1 Job $___________

(SEE SOW FOR DETAILS)

Provide all work as described by attached Plans, Specifications, and Wage Determinations For Veterans Administration project: VA Project 666-18-103:

Building 64 Follow-on Renovation at the Sheridan VAMC as described in the attached scope of work. Price includes all costs for construction. Cost shall include but not be limited to direct and indirect costs including profit, overhead, general and administration, insurance, labor, bonds, taxes, necessary for 100% completion of the project as indicated in the attached SOW.

The construction performance period is 410 days from receipt of notice to proceed.

0002 Alternate 1 Additive Pricing 1 Job $_____________

(SEE SOW FOR DETAILS)

All work including labor, profit, and overhead related to the exterior landscaping.

Grand Total $_________________

Note: A single award will be made on the Base Bid to the responsible offeror whose proposal conforming to the solicitation will be most advantageous to the Government. Award will be made on Base bid , then Alternate No. 1, etc., in that order, if sufficient funds are available for award. All offerors will be evaluated on the same Base Bid or additive line items.

Offerors shall provide prices on the Base Bid and the additive bid alternates. The Base Bid shall be priced exclusive of the additive alternates. Each additive alternate shall have its own price exclusive of the Base Bid price.