02 FCA Deficiencies.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
C1DB--FY21 - Design 575-21-121 Renovate Lab (VA-21-00000872)
Solicitation number
36C25921R0007
Issued by

About this file

This document includes a pre-solicitation notice for architectural and engineering services and a federal contract opportunity related to renovating a pathology laboratory at the Grand Junction Veterans Affairs Medical Center in Colorado. Key details include:

The pre-solicitation notice seeks statements of qualifications from firms interested in providing design services to renovate approximately 9,000 square feet of space currently occupied by the pathology laboratory and cardiopulmonary departments. Required services include assessing laboratory needs, planning temporary accommodations during construction, and designing mechanical and electrical systems to support laboratory equipment. Interested firms must submit SF-330 forms by November 25, 2020. The project is set aside for service-disabled veteran-owned small businesses and has an estimated value between $5-10 million. Selection will be based on firm qualifications, experience with laboratory design and central utilities, past performance, location, and proposed use of veteran-owned small businesses. Interviews will be conducted with the most highly qualified firms.

The related federal contract opportunity provides additional scope details, including temporary laboratory requirements and evaluating capacity of existing utilities. The design must address deficiencies such as insufficient storage, mechanical space, and ductwork capacity. Construction is planned to start in fiscal year 2021 with the medical center to remain operational.

View the file

Other files

File Type Posted
04 Lab Equipment List_20200522_v2.pdf PDF
03 GJVAMC Lab Remodel Request_20200511_Signed.pdf PDF
36C25921R0007 0006.docx DOCX document
36C25921R0007 0005.docx DOCX document
S02 - 2015-06-05 Past Performance Questionnaire.docx DOCX document
36C25921R0007 0004.docx DOCX document
36C25921R0007 0003.docx DOCX document
36C25921R0007 0002.docx DOCX document
36C25921R0007 0001.docx DOCX document
36C25921R0007.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Needs Correction

Rec #VISNStation_NumberBldg #SystemSystemIdSubSystemSubSystemIdSeq #ConditionUseful LifeRemain LifeCorrection $DescriptionPending_FlagProjectIndUseful LifeReplacement_CostCurrentAgeSourcePending_ConditionPending_Remaining_LifePending_Correction_CostPending_DescriptionPending_StatusPending_SourceField_Accept_IndField_NotesPending_SystemIDPending_SubsystemIdField_Engineer_Approved_FlagNew_FCA_Record_FlagFCA_Risk_Level
382519195751Architectural2Fixed Equipment389Dexceeds$ 67,3002nd floor lab casework is past its useful life and requires replacement.FALSETRUE15FCAFALSEFALSE31.00$ 67,300.00
382522195751Architectural2Interior Finish/Door5434Dexceeds$ 4,000*Floor 2 replace expansion joint cover and repair floor, approx 10 feet wide.FALSETRUE10FCAFALSEFALSE31.00$ 4,000.00
310526195751Electrical3Fire Alarm352D*$ 17,500Approximately 90 percent of the mechanical rooms do not have a notification device. Approximately 50 percent of electrical closets are missing smoke detectors. Install devices.FALSETRUE*FCAFALSEFALSEFALSE50.08$ 1,458.33
41635195751Electrical3Lighting & Power591Dexceeds$ 657,000Approximately 50% of lighting fixtures are T8 and CF lamps, with electronic ballasts. Replace flourescent lighting with LED fixtures.FALSETRUE25022-MayFCATRUEFALSEFALSE30.01$ 6,570.00
310534195751Electrical3Secondary Dist.803C27$ - 0"2nd Floor: *Two (2) 250A Siemens panelboards installed in 1999 in fair condition. Have 2015 arc-flash label. *Two (2) 400A Siemens panelboards installed in 1999 in fair condition. Have 2015 arc-flash label. *One (1) 600A Siemens panelboards installed in 1999 in fair condition. Have 2015 arc-flash label 4th Floor: *One (1) 250A Siemens panelboard installed in 1998 in fair condition. Has 2015 arc-flash label. Penthouse: *Two (2) 400A Square D panelboards installed in 1990's in fair condition. Have 2015 arc-flash labels."FALSE30FCAFALSEFALSEFALSE$ - 0
313061195751Information Technology15Telecommunications Rooms1248D8$ 6,072Telecommunincations Rooms 2231, 2414 and 5409 1) have no grounding from IT equipment to building ground, install bonding straps on IT racks, telephone cabling housings and cable trays such that they are grounded to building ground. 2) have abandoned cabling; remove abandoned cabling to comply with code. 3) have bare concrete floors, paint floors or apply appropriate flooring to reduce dust & staticFALSETRUEFCAFALSEFALSE0.25$ 1,517.99
313060195751Information Technology15Telecommunications Rooms1247D8$ 5,060Telecommunincations Rooms 2637, 2665 and 4411 1) have no grounding from IT equipment to building ground, install bonding straps on IT racks, telephone cabling housings and cable trays such that they are grounded to building ground. 2) have abandoned cabling; remove abandoned cabling to comply with code.FALSETRUEFCAFALSEFALSE0.33$ 1,686.66
313062195751Information Technology15Telecommunications Rooms1249F8$ 221,951All 12 Telecommunications rooms in building 1 are too small, expand rooms or relocate to locations that conform to requirements outlined in VA Space Planning Criteria Chapter 232 and OIT Design Guide Section 4 - 84.FALSETRUEFCAFALSEFALSE0.08$ 18,495.90
311236195751Mechanical7Air Handling Equip25Dexceeds$ 387,400"AHU-12; 18,000 cfm located indoor that serves 2nd fl. Labs. and offices is in poor condition. Has glycol heat recovery, 10 hp RF, 25 hp SF, clean steam humidifier "FALSE20FCAFALSEFALSEFALSE5$ - 0
381219195751Mechanical7Ducts & Water Dist256Dexceeds$ 121,100"[ Auto Generated Project Pending on 09/20/2018 for Project Number 575-18-ALV created by VHATUCAlvarD1.] Rework main steam piping in Mech Rm B100-1 to provide access to isolation valves, and replace isolation valves. Assume 150 feet of 6-inch diameter steam pipe and 8 isolation valves After deficiency is corrected, please delete original record #311243.FALSETRUE30FCAFALSEFALSE3$ - 0
311244195751Mechanical7Ducts & Water Dist254Dexceeds$ 209,800"Ductwork associated with AHU-12 needs replaced (13,000 CFM system)FALSETRUE30FCAFALSEFALSEFALSE3$ - 0
41642195751Mechanical7Ducts & Water Dist251Dexceeds$ 1,963,092[ Field Engineer Review Completed on 10/07/2019 by VHAGRJMeyerE1.] [ Auto Generated Project Pending on 09/20/2018 for Project Number 575-18-ALV created by VHATUCAlvarD1.] Replace ducts and piping accommodate new load requirements when Air Handling Units are replaced. Also provide new duct and piping that is deteriorating and internal insulation is separating, when installing Ward 5 new Air Handling Unit.FALSETRUE300variesProj0FALSEFALSE50.17$ 327,181.97
381242195751Mechanical7Heating & Ventil.474C10$ - 0(2) HX and (2) 3 hp pumps by AHU-12 in fair condition. Serve Lab and cardiopulminary reheat and AHU-12 hot water coil.FALSE25FCAFALSEFALSE$ - 0
$ 428,210.86