36C25918R0207-00003003.pdf
PDF 366 KB Posted
- Solicitation number
- 36C25918R0207
About this file
36C25918R0207 00003 554-17-112 Drawings-CD 101_rev01.pdf
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 38 CLC
BUILDING C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
CD101_rev01
DEMOLITION PLAN
A
F i l e
P a t h
DESIGN DEVELOPMENT
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1055 Clermont St., Denver, CO, 80220
554-17-112
C Project Director
Issue date Chkd By Drwn ByRevisions: Date:
GENERAL NOTES
KEY NOTES
GRAPHIC KEY
Demolish Building C & Replace with Parking
DEMO PLAN
01 - ADDED DWG SCALE 03/19/2018
AutoCAD SHX Text GRAPHIC KEY: ELECTRIC - LOW VOLTAGE ELECTRIC - POWER FIRE ALARM NATURAL GAS TELEPHONE LINES US WEST & NORAD PHONE LINES SANITARY SEWER STORM SEWER STEAM LINES DOMESTIC WATER LINES FIRE WATER LINES
AutoCAD SHX Text GRAPHIC KEY: ELECTRIC - LOW VOLTAGE ELECTRIC - POWER FIRE ALARM NATURAL GAS TELEPHONE LINES US WEST & NORAD PHONE LINES SANITARY SEWER STORM SEWER STEAM LINES DOMESTIC WATER LINES FIRE WATER LINES
AutoCAD SHX Text N0. 7
AutoCAD SHX Text
ELECT M.H.
AutoCAD SHX Text
TR8
AutoCAD SHX Text
150KW DG
AutoCAD SHX Text
STANDBY
AutoCAD SHX Text N0. 15
AutoCAD SHX Text
ELECT M.H.
AutoCAD SHX Text
FDR 3
AutoCAD SHX Text
FDR 3,4
AutoCAD SHX Text C
AutoCAD SHX Text x x x
AutoCAD SHX Text x x x
AutoCAD SHX Text
AutoCAD SHX Text x x x
AutoCAD SHX Text
FUEL TANK
AutoCAD SHX Text
FUEL TANK
AutoCAD SHX Text 16"
AutoCAD SHX Text 16"
AutoCAD SHX Text 16"
AutoCAD SHX Text
DW
AutoCAD SHX Text
FW
AutoCAD SHX Text
FW
AutoCAD SHX Text
DW
AutoCAD SHX Text 16"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 4100U
AutoCAD SHX Text
NODE #4
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text S,3V,M
AutoCAD SHX Text J
AutoCAD SHX Text
LEFT END
AutoCAD SHX Text
1N,1SD
AutoCAD SHX Text
1N,1SD
AutoCAD SHX Text
LIMIT OF GPR SURVEY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
0 FEET
AutoCAD SHX Text
1. TERMINATE TELE-COMM CABLE AT MANHOLE. LEAVE CONDUIT IN PLACE. TERMINATE TELE-COMM CABLE AT MANHOLE. LEAVE CONDUIT IN PLACE. 2. COORDINATE GAS SERVICE REMOVAL WITH UTILITY. COORDINATE GAS SERVICE REMOVAL WITH UTILITY. 3. CUT AND CAP WATER AT LOCATION SHOWN. REMOVE ABANDONED PIPE. CUT AND CAP WATER AT LOCATION SHOWN. REMOVE ABANDONED PIPE. 4. REMOVE TELE-COMM CABLE LEADING TO BLDG 4. REMOVE ABANDONED CONDUIT. REMOVE TELE-COMM CABLE LEADING TO BLDG 4. REMOVE ABANDONED CONDUIT. 5. CUT AND CAP SANITARY SEWER AT MANHOLE. CUT AND CAP SANITARY SEWER AT MANHOLE. 6. REMOVE LOW VOLTAGE POWER CABLE BACK TO TRANSFORMER, TR8. REMOVE LOW VOLTAGE POWER CABLE BACK TO TRANSFORMER, TR8. 7. REMOVE EXISTING CHILLER, CONCRETE PAD, FENCE, PAD TRANSFORMER, UNDERGROUND REMOVE EXISTING CHILLER, CONCRETE PAD, FENCE, PAD TRANSFORMER, UNDERGROUND ELECTRICAL, AND UNDERGROUND PIPING. 8. REMOVE CURB SECTION FOR NEW ROAD. REMOVE CURB SECTION FOR NEW ROAD. 9. REMOVE HANDICAP RAMP. REMOVE HANDICAP RAMP. 10. TERMINATE FIRE ALARM WIRING AT JUNCTION BOX IN BUILDING 4. REMOVE ABANDONED TERMINATE FIRE ALARM WIRING AT JUNCTION BOX IN BUILDING 4. REMOVE ABANDONED CONDUIT AND WIRE.
AutoCAD SHX Text
DEMOLITION AREA
AutoCAD SHX Text
AutoCAD SHX Text
1. Contractor shall conduct GPR survey to verify all existing conditions and layouts prior to demolition. Notify COR of Contractor shall conduct GPR survey to verify all existing conditions and layouts prior to demolition. Notify COR of deviations. 2. Contractor shall use necessary means to protect all items not designated for removal and shall provide appropriate dust Contractor shall use necessary means to protect all items not designated for removal and shall provide appropriate dust control. Coordinate location of dust containment with COR prior to initiating demolition work. 3. Contractor shall recycle materials per attached specification 01 74 19, Construction Waste Management. Contractor shall Contractor shall recycle materials per attached specification 01 74 19, Construction Waste Management. Contractor shall inform VA of all quantities of materials recycled in this manner per this specification. 4. Contractor shall submit demolition plan and site staging plan for VA approval prior to beginning work. Demolition may be Contractor shall submit demolition plan and site staging plan for VA approval prior to beginning work. Demolition may be performed by method of contractor's choice. Hospital is operational 24/7 and contractor shall be mindful of noise and dust control measures and their impact on the hospital in their planning and during demolition. 5. Area of demolition is a very active area of the campus and includes a loading dock & oxygen storage tanks whose Area of demolition is a very active area of the campus and includes a loading dock & oxygen storage tanks whose free-flow of traffic must be maintained and operations cannot be hindered at any time. Contractor’s staging plan shall be s staging plan shall be mindful of these areas and of all hospital functions. Contractor to install temporary fencing to protect the outside flow of traffic and keep debris within the limits of disturbance for this work. 6. Contractor shall cut, cap, and remove abandoned site utilities, including water, sewer, natural gas, and electric back to the Contractor shall cut, cap, and remove abandoned site utilities, including water, sewer, natural gas, and electric back to the main line of their respective utility, without disrupting any utility services to adjacent buildings. 7. Contractor to maintain integrity / mitigate potential risk of collapse of low-voltage utility bank between Buildings 6 & 23 Contractor to maintain integrity / mitigate potential risk of collapse of low-voltage utility bank between Buildings 6 & 23 throughout the duration of this project - reference existing site utility plans for location of concern. 8. All utility shutdowns shall be coordinated with COR at least 2 weeks prior. Contractor to coordinate shut-down and All utility shutdowns shall be coordinated with COR at least 2 weeks prior. Contractor to coordinate shut-down and deprogramming of the Fire Alarm System with Simplex Grinnell and Biomed during demolition and at the time of hand-off.
AutoCAD SHX Text
FIRE ALARM SYSTEM
| Sheets and Views |
| CD 101 |
File details come from the government source that posted it.