36C25918R0207-00001001.pdf

PDF 300 KB Posted

Attached to
554-18-2-541-0038 Demolish Building C and Replace with Parking (VA-18-00021352)
Solicitation number
36C25918R0207
Issued by

About this file

36C25918R0207 00001 554-17-112 Drawings-GI 001 Scale.pdf

View the file

Other files

File Type Posted
36C25918R0207-00003001.pdf PDF
36C25918R0207-00003002.pdf PDF
36C25918R0207-00003004.pdf PDF
36C25918R0207-00003003.pdf PDF
36C25918R0207-00003000.docx DOCX document
36C25918R0207-00002008.pdf PDF
36C25918R0207-00002006.pdf PDF
36C25918R0207-00002000.docx DOCX document
36C25918R0207-00002003.jpg JPG image
36C25918R0207-00002009.pdf PDF
36C25918R0207-00002007.pdf PDF
36C25918R0207-00002004.jpg JPG image
36C25918R0207-00002010.pdf PDF
36C25918R0207-00002001.pdf PDF
36C25918R0207-00002002.jpg JPG image
36C25918R0207-00002005.jpg JPG image
36C25918R0207-00001002.pdf PDF
36C25918R0207-00001000.docx DOCX document
36C25918R0207-00001004.dwg DWG drawing
36C25918R0207-00001003.pdf PDF
36C25918R0207-008.pdf PDF
36C25918R0207-009.pdf PDF
36C25918R0207-006.doc DOC document
36C25918R0207-005.doc DOC document
36C25918R0207-004.zip ZIP file
36C25918R0207-003.pdf PDF
36C25918R0207-002.doc DOC document
36C25918R0207-001.docx DOCX document
36C25918R0207-011.docx DOCX document
36C25918R0207-007.pdf PDF
36C25918R0207-010.pdf PDF
36C25918R0207-000.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

GI001

GENERAL INDEX

A

DESIGN DEVELOPMENT

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Building C Demolish & Replace with Parking

1055 Clermont St., Denver, CO, 80220

554-17-112

C Project Director

DaveyRevisions: Date:

VA PROJECT TEAM

OWNER

OWNER'S CONTRACTING OFFICER

DESIGN INTENT

PHASING

ALL WORK WILL BE PHASED AND APPROVED BY COR AND VA PERSONNEL.

WORK TO TAKE PLACE DURING BUSINESS HOURS. IF WORK CAN NOT BE

COMPLETED DURING BUSINESS HOURS WORK WILL BE SCHEDULED AT NIGHT

OR ON WEEKENDS. CONTRACTOR TO COORDINATE EACH TASK AND PHASE

WITH COR AND STAFF TWO (2) WEEKS IN ADVANCE.

INDEX OF DRAWINGS

DRAWING TITLEDWG NO.

SHEET OF #

GI001

SITE PLAN LOCATION DETAIL

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

CD001

CP001

INTERIM LIFE SAFETY MEASURES (ILSM)

File details come from the government source that posted it.