S05. Attachment 1 - RFQ 36C25821B0015 Responses to RFI 001 - 077.docx
DOCX document 304 KB Posted
- Solicitation number
- 36C25821B0015
About this file
This document contains responses to requests for information (RFI) related to a solicitation for upgrades to parking lot lighting and conduit at the Loma Linda VA Medical Center.
The solicitation seeks a contractor to provide construction services including all labor, materials, equipment, and supervision necessary to upgrade parking lot lighting and install new conduit. Key details include that the project is a total set-aside for Service-Disabled Veteran-Owned Small Businesses, has a performance period of 270 days, and a magnitude between $1,000,000 to $2,000,000. The responses clarify project scope items such as LEED certification not being required, the limited need for hazardous material evaluation, and acceptable alternatives for some materials. Temporary lighting, trench plating and phasing of work areas are also addressed.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ Solicitation # 36C25821B0015 36C262-20-AP-5243 Project #605-19-410
Request for Information (RFI) Log Incident Command Center Upgrades Construction Project: 605-19-410 28 July 2021 Loma Linda VA Medical Center (605)
| RFI Number |
| Question |
| Answer |
| 001 |
| Scope of Work, Part D states that this project must be registered with USGBC for a minimum LEED Silver Certification. Will the VA clarify whether SOW Part D applies to this project? |
Project is not required to be registered with USGBC. However, project is to follow LEED standards.
| 002 |
| Scope of Work, Part F states that the Contractor must employ a CIH to evaluate the building areas for asbestos and lead. Will the VA clarify whether this applies to this project? |
Scope of Work, Part F sections F.3 and F.4 do not apply to this project.
| 003 |
| SF1442, Block 10 states that the Site Visit will be held via a virtual video conference but is limited to two persons per GC. Since this will be a Virtual Site Visit, may the GC be allowed more than two persons to sign up for the teleconference? |
Addressed in amendment #1
| 004 |
| Will the Site Supt., if duly qualified, be allowed to also serve in the roles of SSHO & CQC or will a separate person be required for either of those two roles? |
Yes, as long as Superintendent is qualified.
| 005 |
| Is there a list of participating GC’s that I can contact to coordinate with for this project? (Numerous questions were received about this, they all fall under this 1) |
See Attached Site Walk attendance
| 006 |
| Are substitutes allowed for the light fixtures? |
If so, what is the substitute submittal process, can it be evaluated before the bid due date?
Substitutes will be allowed but the contractor will need to provide a revised photometric plan showing the same calculation areas, summaries, and fixture schedule as is shown on the current plans so proper comparisons can be made by the VA and or EOR. Any substituted lighting controls from those shown on the plans will need to be coordinated with the proposed fixtures to ensure compatibility. The substituted lighting control will also need to provide the same capabilities as the currently specified lighting control system. The submittal will be evaluated after the award of bid and cost difference credited back to the VA.
| 007 |
| The removal of existing light poles will result in appx. 150 old poles. Will the VA want to salvage these poles, or will the Contractor be responsible to dispose of these poles? |
Poles that require replacement or are new are noted on the plans. There are 13 new poles as noted with fixture name callouts “A (N)”, ”B(N)”, “D (N)”, and “C2 (N)” as noted on the plans. There is on only 1 pole noted as “A (R)” that is being replaced. All others are existing poles with new lighting heads as noted on the plans.
| 008 |
| Will the VA provide an adequate on-site contractor staging area for new poles and equipment as well as old poles and equipment, or will all staging be required to be off site? |
Poles that require replacement or are new are noted on the plans. There are 13 various new poles as noted with fixture name callouts “A (N)”, “B (N)”, “D (N)”, and “C2 (N)” as noted on the plans. There is only one pole noted as (A (R) that is being replaced. All others are existing poles with new lighting heads as noted on the plans.
VA will assist with providing a staging area for the equipment. If space becomes an issue, off-site staging will then be required.
| 009 |
| Has the VA performed any Hazardous Material Testing for any PCB’s or lead paint for this project? Will the Contractor be expected to encounter and HAZMAT for this project? |
Contractor is not expected to encounter HAZMAT for this project.
| 010 |
| For potholing purposes. Can we get a drawing that shows existing known utilities? The provided project drawings do not show any water, storm drain, electrical, and communication utility structures or underground piping paths. |
Refer to the PDF of existing utility information as originally provided by VA Loma Linda.
| 011 |
| We are looking at some of the new electrical conduit to be installed by means of directional boring. Is this an acceptable option? |
Boring is not excluded by the plans or specifications.
| 012 |
| Many of the existing light poles are in essentially the same locations as the new poles being installed. Will the VA provide their guidance on how the work will be phased and if any temporary lighting will be required for vehicular and pedestrian safety? |
Poles that require replacement or are new are noted on the plans. There are 13 new poles as noted with fixture name callouts “A (N)”, “B (N)”, “D (N)”, and “C2 (N)” as noted on the plans. There is on only 1 pole noted as (A (R) that is being replaced. All others are existing poles with new lighting heads as noted on the plans.
| 013 |
| Drawing Sheets E-2.01 -> E-2.04 has a block in the Keynotes that states “Existing conduit is to have the wire removed and the conduit abandoned”. Past experiences with long conductor runs have shown that long wire runs can sometimes be impossible to remove from the conduit. If this occurs on this project will the VA permit on a case by case basis that the wire can be abandoned in place? |
This is understandable. The E.C. shall coordinate issues with the removal of existing wire on a case-by-case basis with the VA construction project manager during demolition.
| 014 |
| Drawing Sheets E-3.01 -> E-3.04 have a Keynote #24 that describes a junction pull box to be installed within 3’ of each pole. Drawing Sheet E-7.02, Details #3 & #4 depict a detail for a junction pull box with gravel and bricks. It appears that the junction boxes are not depicted on the drawings. Will the Contractor follow the Drawings with no junction boxes depicted or follow Keynote #24 and install an in-ground junction box within 3’ of each pole? |
Light poles are to have boxes within three feet as noted in keynote 24 and per detail 3 on sheet E-7.02 which is the VA standard for pull boxes. Pull boxes were omitted from the site plans for drawing clarity at such a small scale except for stand-alone pull boxes which are shown.
| 015 |
| Can we provide a bid to the VA directly as a prime bidder or must we be a SBA? |
This requirement is set-aside for SDVOSB’s only.
| 016 |
| Will the VA please provide the footing details for the parking lot solar shades? |
Yes, VA will provide these details upon request.
| 017 |
| Will the VA accept all asphalt and concrete, be cut all at once and leave in place until excavation? |
VA will not accept this method.
| 018 |
| Will the VA accept backfilling of the trenches in the asphalt and concrete areas up to the top with dirt until a specific amount is excavated, to eliminate multiple mobilizations of the asphalt and concrete repair contractors? |
In order to comply with patient safety, a phasing plan is to be followed. Therefore, this method is not acceptable.
| 019 |
| This project will generate a large amount of removed Soil, Concrete, and Asphalt. Will the VA allocate an area large enough to stockpile the Soil, Concrete, and Asphalt to save on the overall expense of hauling short loads to the designated disposal site? |
VA will not allocate an area for stockpiling.
| 020 |
| For Bidding purposes and accuracy, please provide clarification what Note #9 implies in drawing E-2.03. Note #9 is being identified at fixtures C1 and D on drawing. |
The note 9 keynote should read the same as note 9 on sheet E-2.02. “NO EXISTING ELECTRICAL INFORMATION REGARDING LIGHT FIXTURE. CONTRACTOR TO VERIFY SOURCE ELECTRICAL PANEL AND VOLTAGE. CONTRACTOR TO CONTACT ENGINEER IF DIFFERENT THAN WHAT IS SHOWN ON NEW WORK SHEETS (E-3.01 THROUGH E-3.04.)”, Refer to updated sheet E-2.03.
| 021 |
| Per note #1 on drawing E-5.00, we are to provide a 3 pole 100A Circuit Breaker at "MSB" to feed the new transformer "T-1". Per drawings E-0.03, we are to use an existing 225A CB at Distribution Board "MDBA” to feed new transformer "T-DB". Drawing E-0.03. Please clarify if we are to use the existing 225A CB or if we are to provide a New 100A, pole Circuit Breaker. |
Existing 225A C.B. is to remain. Existing switchboard is “MDBA”. New transformer is “T-DB”. New distribution board is “DB”. See new addendum “A” dated 7/26/2 21 on sheets E-5.00 and E-5.01.
| 022 |
| Please clarify if we are to assume all CAT5e cable will be installed in conduit per Drawing E-6.02. Note# 4 verbiage instructs us to install CAT5e for lighting controls on wall or in the existing cable tray system. For bidding purposes, are we to assume 50% of the installation in 1" EMT conduit and 50% of the CAT5e will be installed exposed in the existing cable tray system or do we assume 100% of the CAT5e in 1" EMT conduit? |
CAT5e is to be in conduit when on or in wall, exposed, and not in cable tray. CAT5e is to be placed in data cable tray where possible. No new cable tray is being added.
| 023 |
| Per Note #1 on Drawing E-0.01 it states to replace all existing damaged light poles. For Bidding purposes are we to assume all existing pole light to be in good and fair conditions and no replacing is required? |
| Poles that require replacement or are new are noted on the plans. There are 13 new poles as noted with fixture name callouts “A (N)”, “B (N)”, “D (N)”, and “C2 (N)” as noted on the plans. There is on only 1 pole noted as (A (R) that is being replaced. All others are existing poles with new lighting heads as noted on the plans. |
| 024 |
| Per note #5 on Drawing E-6.01 we are to provide a dedicated 20A, 120v Emergency Circuit from the nearest Emergency Panel to the power pack in Room 1D-04. For bidding purposes and accuracy, please provide further information of the distance of the closest Emergency 120/208V panel from Room 1D-04. Please note there's a cost impact depending on the distance of the source |
The VA will need to help identify the nearest 120V emergency panel that can supply the power pack in room 1D-04.
| 025 |
| Does the VA have a specific phasing plan? |
There is no specific phasing plan. This is to be planned out with contractor prior to beginning construction.
| 026 |
| Please clarify if existing lighting system needs to be maintained while new system is being installed and are all cutovers to be kept at a minimum if possible. |
| The existing lighting is to remain in place until new conduit and wire are in place. The lighting heads can be replaced after conduit connections are established. Based on as-built drawings, the existing lighting on the existing 35’ poles and the new replacement lighting heads are 480V. The remainder of the SOW lighting is 277V. |
| 027 |
| Please provide clarity how many poles being removed and replace will have equipment mounted on them and who will be responsible to relocate the equipment. For example, CCTV surveillance system and flags. |
| Most poles are remaining. New poles being added at new locations have no related existing equipment. There is only one existing 35’ pole type “A (R)” being replaced that has one parking lot designation flag. E.C. is remove the existing pipe strapped flag and protect for reinstallation onto the replacement pole. The location of this light is shown on sheet E-8.01 and updated sheets E-300 and E-3.01. |
| 028 |
| Please clarify if the existing lighting panels "BUH", "BDH", "BXH", and "BAH" are located in the Basement Service Bay and not in the Service Bays located on the 1st Floor Level. |
The lighting panels are in the basement level service bays.
| 029 |
| Please provide additional information of a routing plan for new 2" lighting conduits from the exterior area to each Service Bay Panel. Drawing are ambiguous and for bidding purposes, the method of conduit installation from the exterior to the interior is important if coring and waterproofing will be required. |
The E.C. is to reuse the existing wall penetration that is near each panel. E.C. is to patch and repair water proofing of the existing penetration after new conduits have been installed.
| 030 |
| Per note #7 in drawing E-3.01 and E-3.04 we are to provide 2" Stainless Steel Conduit underneath the existing bridge. Will Ocal PVC coated Rigid Conduit and fitting be acceptable in lieu of Stainless Steel? |
Ocal PVC may be used under the existing bridges.
| 031 |
| Specification Section 26 08 00 requires formal Electrical Commissioning for this project. Section 26 08 00 refers the reader to Specification Section 01 91 00 – General Commissioning which was not included in the Specifications. Will the VA confirm formal Commissioning will be required for this project and if so, provide the missing Section 01 91 00? If formal Commissioning is required, will the VA engage the CxA by separate contract or will the CxA be hired by the Contractor |
Commissioning is not required for this project.
| 032 |
| Specification Section 01 00 00 still contains the “Spec Writers Notes”. Should the Contractor assume this is the complete and final Specification Section for this project since it apparently has not been edited? |
Specification Section 01 00 00 is final.
| 033 |
| Will the VA clarify if the work for this project, with the exception of any power shutdowns, be performed M-F during normal business hours? |
All work is expected during normal business hours (M-F). With the exception of power shutdowns.
| 034 |
| Will the VA require entire parking lots to be fenced off during this project or only selective areas directly adjacent to the work? |
VA will not require entire parking lot to be fenced off during construction. However, construction phasing portion will be required to be fence off.
| 035 |
| Specification Section 01 00 00, Part 1.11-C states that a Soils Report has been completed and will be made available to the bidders. Will the VA issue the Geotechnical Report in an Amendment? |
VA will not provide Geotechnical report.
| 036 |
| Specification Section 01 00 00, Part 1.12 – Professional Surveying Services requires the Contractor to hire a Professional Land Surveyor and states that the surveying requirements shall be specified herein and in other Specification Sections. Will the VA issue the Specification Section for Surveying? |
VA will not issue a specific section for surveying.
| 037 |
| Specification Section 01 00 00, Part 1.17-A, B, & C require the Contractor to install electric meters and pay for power at the prevailing rate. Will the VA require the Contractor to pay for electricity and meters and if so, will the VA provide the “prevailing rate”? |
Disregard section 1.17 A, B and C.
| 038 |
| Specification Section 01 00 00, Parts 1.23 & 1.24 require the Contractor to construct and erect lumber framed painted project and safety signs. Will the VA confirm whether this will be a requirement for this project? |
Parts mentioned in Specification 01 00 00 parts 1.23 & 1.24 are required.
| 039 |
| Specification Section 01 35 26 still contains the “Spec Writers Notes”. Should the Contractor assume this is the complete and final Specification Section for this project since it apparently has not been edited? |
Specification Section 01 35 26 is final.
| 040 |
| Please provide the work hours for this project. |
Monday – Friday (07:00AM – 3:30PM).
| 041 |
| Will any areas need to be done at night or weekends? If so, please indicate which areas. |
Areas which require an electrical shutdown.
| 042 |
| Is contractor responsible for landscape repairs? |
| Yes, as it pertains to the construction/installation of conduits and lighting poles/footings phase of this project |
| 043 |
| Please provide location and size of laydown area. |
| This will be provided prior to construction. |
| 044 |
| Please provide location for job trailer or indicate if VA will provide an office inside one of the buildings. |
VA will not provide office inside one of their buildings.
| 045 |
| The Statement of Work calls for contractor to provide a CIH to evaluate impacted areas for asbestos. Please provide a HazMat Report. |
Reference response to RFI 009.
| 046 |
| Page 1 Keynote 1 states damaged light poles need to be replaced. The site visit did not allow for testing and inspection of all light poles. For bidding purposes can VA provide a number of light poles to replace to be used for all bidders. |
At the time of design there was one fixture “A(R)” that has an existing damaged pole which is to be replaced and a new fixture head added.
| 047 |
| Page 1 Keynote 1 states damaged light poles need to be replaced. Should bid include replacing the bases as well? |
At the time of design there was one fixture “A(R)” that has an existing damaged pole which is to be replaced and a new fixture head added. If the base appears to be damaged or if the existing mounting bolts will not work with the new base, then a new base will need to be installed according to detail 10 on sheet E-7.02.
| 048 |
| Please provide the most current as-builts for the CNG & fuel lines that are in close proximity to work. We understand utility locating is required but the additional information will be helpful. |
This information is not on hand.
| 049 |
| Page E-3.00, Keynote 9 states soil requirements to be verified with VA and VA city requirements. Please provide requirements. |
Project is to follow standard construction soil requirements.
| 050 |
| Page E-5.00, Construction Note 13 states the installation of 2” data conduit. Please verify this is conduit only with pull tape. No wiring. |
Please see revised note 13 on sheet E-5.00.
| 051 |
| Conflict between Demo drawings E-2.01 – E-2.04 “Existing Conduit Note: All existing conduit shown is to have wire removed and conduit abandoned” and Electrical Site Plans E-3.01 – E-3.04 Keynote 3 to Reuse existing ¾” conduit. Please clarify. |
| Conduit mounted to the parking canopy structures are to remain. |
| 052 |
| Spec. section 010000-6 calls for a fence around the construction area. Will this apply to our project since the construction area is the entire property? To further expand a little, some portions of work will only be required to be cordoned off for around 15-20 minutes so erecting a fence will most likely take longer than the actual work – can we cordon off the area with caution tape for these smaller, quicker areas of work instead. |
VA will not require entire parking lot to be fenced off during construction. However, construction phasing portion will be required to be fence off.
| 053 |
| Spec. section 010000-3 calls for unarmed guards 24/7. Will the VA require for this project or is this for building construction projects? |
This is not a requirement for this project.
| 054 |
| Spec. section 010000-13 states that a soil report is available. Would it be possible for you to get a copy of this? |
This report is not available.
| 055 |
| Are there any known hazardous materials within the scoped work? |
There are no known hazardous materials within the scope of work.
| 056 |
| See E-0.03/5 (Note 6) “See electrical plans … E-5.01 for conduit and wire sizes.” On page E5.01 the wire size between (N)XFMR “T-DB” to “DB” is not called out. |
Please provide wire size for this run.
Wire size was called out. Please see updated plans.
| 057 |
| See E-3.00 Lighting Fixture Schedule. Please review and clarify all poles that need to be replaced. Please clarify fixtures A(R), C2, C2(N), and C4. |
• C2(N) description says new pole but no pole number is placed in manufacturer column.
• Please confirm that “symbols” are flipped on C2 and C4.
• Does C2 need new pole?
• Does C2(N) need new pole and new arm?
• A(R) on fixture schedule but none on plans. Please clarify if none are A(R).
• C4 and D4 called out on drawings. Are these the same fixture?
• No D4 on Fixture Schedule.
This photo description is called out as C2 on Fixture Schedule. Assuming it is a C4. Please clarify
There are 13 new poles as noted with fixture name callouts “A (N)”, “B (N)”, “D (N)”, and “C2 (N)” as noted on the plans. There is on only 1 pole noted as “A(R)” that is being replaced. All others are existing poles with new lighting heads as noted on the plans.
· A(N) is a new pole/arm with new fixture at new location.
· A(R) is an existing pole/arm being replaced with new pole/arm and light fixture at existing location. Please see E-3.00 and E-3.01 for location.
· C2(N) is a new pole/arm with new fixture at new location. Pole designation has been added to the fixture schedule. Refer to revised sheet E-3.00 for updated fixture schedule.
· The symbols for fixtures C2 and C4 were swapped on the fixture schedules and have been corrected. Refer to revised sheet E-3.00 for updated fixture schedule.
· Two (2) 4 headed fixtures/poles shown on plans should have been 3 headed type D3. Fixture schedule is correct. Please refer to updated sheets E-3.00 and E-3.01
| 058 |
| See E-3.04. Lights in this area not called out. |
Does the VA want us to do anything with Flagpole lights? They are out of shape. Near “Colors Donated By American Legion Auxiliary District 25”
Replacing the flag pole lights are not part of this contract. The As-built drawings indicate that the power and control of the existing flagpole lights is from a different source than those notes on the plans.
| 059 |
| Will the VA accept alternate lighting and controls packages? |
| Alternate/equal lighting manufactured products can be submitted for review. Photometrics will be required and will be the responsibility of the contractor to provide. |
| 060 |
| Verify location of new heads on existing pole when no pole is present? |
| The orientation of the new lighting heads should be as shown on the new work site plans. |
| 061 |
| Any security clearances required? Average processing time for this? |
A screening process is required for personnel working on this project.
| 062 |
| When canopy stub is not on North Side Column depicted in plans, does VA want a new feed up the support column or to go to South Side Column and tie into existing J box. |
Tie into existing J-box when possible.
| 063 |
| See E-3.02. Note 25 called out near D4 but no note 25 exist on this page. |
Note should have been note 20. Refer to updated sheet E-3.02. Note 25 refers to new conduit section on lower left of sheet E-3.04. Refer to updated sheet E-3.02.
| 064 |
| There is plenty of concrete pavers and obstacles for new underground conduit runs. The site walk confirmed that alternate routes whether on the roof, going through asphalt or boring underneath pavers may be more appropriate than suggest routes on plans. Some of the paths of conduit called out go directly over concrete walkways or pavers completely avoiding the open asphalt. Is it the VA intent to avoid trenching the asphalt? Can we trench into asphalt? Will alternate routes be accepted later in planning? |
Alternate routes may be accepted later in planning.
| 065 |
| Will the work be completed in phases per Area? |
Work will be completed in phases for this project.
| 066 |
| Each area must be shutdown end to end to begin demo and construction of new lights. That is ¼ of parking lighting to be temporarily down; that being said, is there an expectation of temporary lighting of parking areas when said area is shut down for construction? |
Yes, temporary lighting is expected.
| 067 |
| Is there an expectation of grates to cover open trenches for vehicular pass during construction? |
Yes. If left unattended during construction and after construction hours, all trenches must be covered to make safe and for vehicular traffic.
| 068 |
| Will construction contract duration be extended beyond 270 calendar days due to the nature of physical obstacles and heavy pedestrian activity? |
Duration of contract may be extended at no additional cost due to understandable reasons at the discretion of the contracting officer.
| 069 |
| Will a bid due date extension be provided following RFI responses? |
Addressed in Amendment #2
| 070 |
| Will any temporary lighting be required? |
Contractor shall allow for temporary lighting in the event a lighting circuit/area cannot be re-energized and cannot be made safe at sundown.
| 071 |
| Will directional boring/horizontal drilling be permitted wherever possible? (this will minimize impact to vehicle/pedestrian traffic and existing conditions) |
Yes. However, the contractor will be liable for any underground utilities that may be damaged during and after boring operation (damage to water lines may not be apparent right away, i.e., irrigation lines).
| 072 |
| The existing pole lights contain in-line fuses. Can these be removed and discarded, or will all the pole lights require in-line fuses? |
THE VA design guidelines to not require inline fuses for the exterior lighting. Proceed with no inline fuses.
| 073 |
| Does the existing wiring inside each light pole have to be replaced, or can it be reused? |
Replace all wiring including within pole and up to lighting fixture head.
| 074 |
| Is concrete encasement required for any of the new site lighting conduits? |
No concrete encasement is required.
| 075 |
| How many areas can we work in at the same time while working in the parking lot? These areas will need to be closed for traffic while working in the trenches. |
One area at a time due to the high parking demand.
| 076 |
| While cutting the asphalt trenches, we will cut over asphalt string stalls. Will the VA require the whole striping to be re-done or only the trenches sections? |
VA will require all stripping to be re-done for uniformity.
| 077 |
| I am hoping to get some clarification on the Solid State Breaker Panel and/or Breakers that are called out on E-3.01 Keynote #1. I am in direct contact with Atom Power Inc. and they advised me that they do not make a solid state breaker panel. When I asked them about the breakers Ryan B. Rizor of ATOM POWER said, "We do not have available at this time the products that were specified for this project." |
I am looking to get some insight for the use of the solid state breakers/panel. Any information would be greatly appreciated.
There have been revisions made to the drawings in response to this RFI. See attached.
image3.emf image4.emf image1.jpeg image2.emf