This document contains a pre-solicitation notice and sheet change summary for an upcoming invitation for bid to upgrade parking lot lighting and conduit at the Loma Linda VA Healthcare System in California. The Department of Veterans Affairs Network Contracting Office NCO 22 will issue an IFB on or around May 14, 2021 to remain open for approximately 30 days. The project includes general construction services to provide all labor, materials, equipment, and supervision necessary to execute the construction plans upgrading the parking lot lighting and conduit. The sheet change summary outlines revisions made to construction drawings and specifications in response to pre-bid requests for information. The pre-solicitation notice specifies the solicitation number, project name and description, total estimated value between $1,000,000 and $2,000,000, NAICS code 236220 for commercial and institutional building construction, small business size standard of $39.5M, a firm-fixed price construction contract type, a 270 day period of performance after notice to proceed, and bid submission requirements. The acquisition is a total set-aside for Service-Disabled Veteran-Owned Small Businesses.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 Peters Canyon Rd., Ste.130, Irvine, CA 92606 | tel. 949.387.8500| fax. 949.387.0800 | www.idsgi.com
Delta “A” revision changes dated 7/26/2021 in response to Pre-Bid RFI’s.
Sheet E-0.01
• Revised Basis of Design, item 4 to remove solid state panel reference.
• Revised Basis of Design, item 5 for clarity of new trailer panel scope.
Sheet E-0.03
• Revised keynote 5 to remove solid state panel reference.
Sheet E-0.04
• Revised Panel “BAH” name to remove solid state panel reference.
Sheet E-0.05
• Revised Panel “BAH” name to remove solid state panel reference.
Sheet E-2.00
• Revised keynote 1 to remove solid state panel reference.
Sheet E-2.01
• Revised keynote 1 to remove solid state panel reference.
Sheet E-2.03
• Revised keynote 9.
Sheet E-3.00
• Revised keynote 1 to remove solid state panel reference.
• Revised fixture schedule: added pole information to fixture C2(N), corrected symbols for fixtures C2 and C4.
• Revised two D4 fixtures with 4 heads to be two type D3 fixtures with 3 heads (located above the emergency department expansion). There are no D4 type fixtures.
• Revised two other fixture callouts on the overall site plan; A(R), and C2(N).
Sheet E-3.01
• Revised keynote 1 to remove solid state panel reference.
• Revised keynote 9
• Added call-out for fixture A(R)
• Revised two D4 fixtures with 4 heads to be two type D3 fixtures with 3 heads (located above the emergency department expansion). There are no D4 type fixtures.
Sheet E-3.02
• Revised keynote 1 to remove solid state panel reference.
• Panel BDH Homerun keynote 25 changed to keynote 20.
• Circuit 2,4,6,8 keynote 20 changed to keynote 18.
Sheet E-3.03
• Revised keynote 1 to remove solid state panel reference.
• Panel BXH Homerun with keynote 20 added.
Sheet E-3.04
• Revised keynote 1 to remove solid state panel reference.
• Panel BUH Homerun with keynote 20 added.
• Conduit leading to fixture D(N) at stairs that exit Barton Road: keynote 15 changed to keynote 25.
Sheet E-4.01
• Revised keynote 5 for clarity.
Sheet E-4.02
• Revised keynote 6 to remove solid state panel reference.
Delta “A” revision changes dated 7/26/2021
PAGE
Sheet E-5.00
• Keynotes 1, 12, and 13 revised.
• Callout for existing switchboard changed to “MDBA”.
Sheet E-5.01
• Revised keynotes 7, 9, 12, and 13.
• Added callout 13 to conduit between transformer T-DB and panel DB.
• Added keynote 12 to panel “DB” callout.
• Corrected improperly printed detail callout at transformer T-DB.
S:\PROJECTS\2017\Shared\17X001.06 VA Loma Linda - Parking Lot Lighting\11 CA\05 RFI\2021-0709 Prebid RFI\Sent\Sheet Change Summary.docx