36C25819B0033 0002 Attach E - Comprehensive Hazardous Materials Survey.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25819C0138-000.docx | DOCX document | |
| 36C25819B0033-0002004.pdf | ||
| 36C25819B0033-0002005.pdf | ||
| 36C25819B0033-0002003.pdf | ||
| 36C25819B0033-0002002.pdf | ||
| 36C25819B0033-0002000.docx | DOCX document | |
| 36C25819B0033-0001000.docx | DOCX document | |
| 36C25819B0033-005.pdf | ||
| 36C25819B0033-004.pdf | ||
| 36C25819B0033-012.pdf | ||
| 36C25819B0033-015.pdf | ||
| 36C25819B0033-010.pdf | ||
| 36C25819B0033-003.pdf | ||
| 36C25819B0033-009.pdf | ||
| 36C25819B0033-002.pdf | ||
| 36C25819B0033-018.pdf | ||
| 36C25819B0033-001.docx | DOCX document | |
| 36C25819B0033-016.pdf | ||
| 36C25819B0033-006.pdf | ||
| 36C25819B0033-013.pdf | ||
| 36C25819B0033-007.pdf | ||
| 36C25819B0033-014.pdf | ||
| 36C25819B0033-011.pdf | ||
| 36C25819B0033-017.pdf | ||
| 36C25819B0033-019.docx | DOCX document | |
| 36C25819B0033-008.pdf | ||
| 36C25819B0033-000.docx | DOCX document |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment E
Comprehensive Hazardous Materials Survey
ASBESTOS AND LEAD INSPECTION REPORT
VA Hospital – San Diego Page 44 of 149 Asbestos AHERA Inspection and Lead-Based Paint Inspection Report ENCORP Project Number P14320.V11
Building 1: 5th Floor Interstitial:
SUMMARY OF SUSPECT MATERIALS TESTED
Building Material Component Location Of Material Estimated Quantity
Material Category Sample Number % and type of
Asbestos Friability Condition Hazard Ranking Recommendations
Fireproofing Overspray 5th Floor Interstitial 55,000 sq ft Surf 407626- 16 407627- 17 407628- 18
3% Chrysotile Friable G 6
Continue O& M procedures
Follow guidelines under Note 2 below
Fireproofing Beam 5th Floor Interstitial 90,00 sq ft Surf 407629- 19 407630- 20 407631- 21
3% Chrysotile Friable G 6
Continue O& M procedures
Follow guidelines under Note 2 below
Fireproofing Column 5th Floor Interstitial 30,000 sq ft Surf 407611- 1 407612- 2 407613- 3
8% Chrysotile Friable G 6
Continue O& M procedures
Follow guidelines under Note 2 below
Thermal System Insulation Elbows 5th Floor Interstitial 1,000 sq ft TSI
407614- 4 407615- 5 407616- 6
3% Chrysotile Friable G 9 Continue O& M procedures
Fiberglass Pipe Wrap 5th Floor Interstitial - TSI 407617- 7 407618- 8 407619- 9
ND Friable G N/A Samples indicate materials is non-asbestos
Brown Duct Seam Caulking 5th Floor Interstitial 2,500 ln ft Misc 407620- 10 407621- 11 407622- 12
5% Chrysotile Non G 11 Continue O& M procedures
Plaster 5th Floor Interstitial - Surf 407623- 13 407624- 14 407625- 15
ND Non G N/A Samples indicate materials is non-asbestos
Cloth Pipe Wrap 5th Floor Interstitial 2,500 ln ft TSI 407632- 22 407633- 23 407634- 24
80% Chrysotile Friable G 9 Continue O& M procedures
Green Duct Seam Caulking 5th Floor Interstitial - Misc 407635- 25 407636- 26 407637- 27
ND Non G N/A Samples indicate materials is non-asbestos Note: Conditions of materials are identified as follows: Good (G), Damaged (D), or Significantly Damaged (SD). The quantities listed are for budgetary purposes only.
Contractors completing proposals for the removal of asbestos containing materials are responsible for verifying the location, quantity, degree of difficulty and necessity for removing the identified materials.
Note 2: All activities involving work above T-Bar ceilings, air plenums etc., including removal and or changing of panels and ceiling, where ACM fireproofing is found should be performed by (at a minimum) 16-hour AHERA Operations and Maintenance Trained individuals (or Licensed Abatement Contractor) under proper PPE and containment. Until exposure assessments are determined, all asbestos disturbance work should be assumed to be above the OSHA Permissible Exposure Limits.
| Attach E - Comprehensive Hazardous Materials Survey |
| Attach F |
| Attach F - Comprehensive Hazardous Materials Survey |
Building 1 5th Floor Interstitial Asbestos